Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
IMPACTO NETWORK, INC. Doing Business As: IMPACTO NETWORK, INC. |
Ambrosio Cruz P.O. BOX 490 1014 3RD AVENUE NORTH CALDWELL, ID 83606 United States |
+1 (208) 283-6683 | ncruz512@hotmail.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Move from Channel 42 to Channel 36 Acquire new transmitter Acquire new antenna Acquire new coaxial cable Move to a new transmitter location |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | UFHXMITR 2KW-DTV | |
Year | 2012 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 2 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | BE-TV3k0-FAVI | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 3 kW | |
Justification for New Transmitter | Old transmitter brand doesn't exist any more, no parts available for a tune channel. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | New circuit for 100 amps as need. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Middle | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels | 2 | |
Design power capacity in use | 80.0 % | |
Lower Limit | 638.00 MHz | |
Upper Limit | 644.00 MHz | |
ERP: | 12.0 kW | |
Manufacturer | ||
Model | 723147X2 | |
Year | 2013 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Middle | |
Polarization | Circular | |
Type | Other | |
Other Antenna Type | Slot | |
ERP: | 5.0 kW | |
Manufacturer | ||
Model | JA/MS-8/15-SCO | |
Year | 2020 | |
Justification for New Antenna | Change channel from channel 42 UHF to channel 36 UHF. Antenna cannot be retuned. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 120 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 140 feet per run | |
Justification for New Transmission Line | New installation | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1226408 | |
Coordinates (NAD83) | Latitude (NAD83) | 43° 37' 50.6" N- |
Longitude (NAD83) | 116° 32' 58.5" W- | |
Overall Structure Height | 193.90 feet | |
Support Structure Height | 189.96 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 2469.13 feet | |
Structure Type | LTOWER - Lattice Tower | |
Tower Owner | SpectraSite Communications, LLC. through American Towers, LLC. | |
Date Constructed | 03/19/2001 |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 200 | |
Explanation | Our church staff does not have any knowledge for installation or arrangements to build a television station. Outside expertise will be needed. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Consulting and Assistance |
Assistance and consulting for the channel at the beginning through the end |
Credit Memo |
Credit Memo |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $146,670.00 | $175,097.72 | N/A | $157,610.85 | N/A |
Total for all systems | $309,016.25 | $290,983.37 | N/A | $212,199.00 | N/A |
Primary Transmitter BE-TV3k0-FAVI | $146,670.00 | $175,097.72 | $157,610.85 | ||
Transmitter Building Site Survey/Installation | $10,000.00 | $7,250.00 | This is the amount charged | $0.00 | This is the amount charged |
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW | $106,300.00 | $137,477.72 | This invoice includes accessories for transmitter as well | $137,477.72 | This is the amount charged |
Other Electrical Service: New circuit for 100 amps as need. | $10,120.00 | $10,120.00 | N/A | $10,120.00 | N/A |
5 Ton system | $20,250.00 | $20,250.00 | N/A | $10,013.13 | N/A |
Actual Information Description | File Name |
---|---|
Transmitter Building Site Survey/Installation | |
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW | |
Other Electrical Service: New circuit for 100 amps as need. | |
5 Ton system |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $12,115.00 | $9,240.00 | N/A | $9,240.00 | N/A |
Total for all systems | $309,016.25 | $290,983.37 | N/A | $212,199.00 | N/A |
Primary Antenna JA/MS-8/15-SCO | $12,115.00 | $9,240.00 | $9,240.00 | ||
Side Mount antenna brackets | $4,625.00 | $1,750.00 | N/A | $1,750.00 | N/A |
UHF-Low Power, Side Mount, Other, 5.0kW input, Circular | $7,490.00 | $7,490.00 | This is the amount charged | $7,490.00 | This is the amount charged |
Actual Information Description | File Name |
---|---|
Side Mount antenna brackets | |
UHF-Low Power, Side Mount, Other, 5.0kW input, Circular |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $3,360.00 | $2,564.40 | N/A | $2,564.40 | N/A |
Total for all systems | $309,016.25 | $290,983.37 | N/A | $212,199.00 | N/A |
Primary Transmission Line | $3,360.00 | $2,564.40 | $2,564.40 | ||
Flexible Foam Transmission Line - dielectric, 1 5/8" | $3,360.00 | $2,564.40 | N/A | $2,564.40 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Foam Transmission Line - dielectric, 1 5/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,190.00 | $16,400.00 | N/A | $16,400.00 | N/A |
Total for all systems | $309,016.25 | $290,983.37 | N/A | $212,199.00 | N/A |
Primary Tower LTOWER | $56,190.00 | $16,400.00 | $16,400.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $16,400.00 | N/A | $16,400.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $89,236.25 | $86,356.25 | N/A | $26,168.75 | N/A |
Total for all systems | $309,016.25 | $290,983.37 | N/A | $212,199.00 | N/A |
Outside Professional Services | $89,236.25 | $86,356.25 | $26,168.75 | ||
Credit Memo | $0.00 | $0.00 | Credit Memo | ($2,650.00) | N/A |
Consulting and Assistance | $41,000.00 | $41,000.00 | N/A | $0.00 | This is the amount charged |
RF Exposure Measurements | $12,100.00 | $12,100.00 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $506.25 | $506.25 | This is the amount charged | $506.25 | This is the amount charged |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $3,262.50 | This is the amount charged | $3,262.50 | Amount charges |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $2,375.00 | This is the amount charged | $2,375.00 | This is the amount charged |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $4,162.50 | This is the amount charged | $4,162.50 | This is the amount charged |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,500.00 | This is the amount charged | $1,500.00 | This is the amount charged |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,250.00 | This is the amount charged | $2,250.00 | this is the amount charged |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | N/A | N/A |
Project management of the transition | $21,100.00 | $2,637.50 | N/A | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $14,762.50 | This is the amount charged | $14,762.50 | This is the amount charged based on the time spent |
Actual Information Description | File Name |
---|---|
Credit Memo | |
Consulting and Assistance | |
RF Exposure Measurements | Information not provided. |
Form 399 assistance or other Program Management costs | |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for displacement application | Information not provided. |
Project management of the transition | Information not provided. |
Prepare/ Review 399 reimbursement form |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,445.00 | $1,325.00 | N/A | $215.00 | N/A |
Total for all systems | $309,016.25 | $290,983.37 | N/A | $212,199.00 | N/A |
Other Expenses | $1,445.00 | $1,325.00 | $215.00 | ||
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $215.00 | N/A | $215.00 | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
FCC Filing Fees - Form 2100 license to cover application | |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $309,016.25 | $290,983.37 | $212,199.00 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Dan J Alpert Legal Counsel 06/30/2023 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Dan J Alpert Legal Counsel 06/30/2023 |