Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
33955
Service:
LPA
Call Sign:
WFYW-LP
Channel:
35 (UHF)
File Number:
0000088672
FRN:
0026455469
Eligibility Status:
Eligible
Date Submitted:
12/09/2022

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

EDGE SPECTRUM, INC.

Doing Business As: EDGE SPECTRUM, INC.

PO Box 54025

Hurst, TX 76054

United States

+1 (972) 291-3750 randy@crosstalk.org Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

The Preparer is same as the reimbursement contact.

 

 

 

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan WFYW-LP Analog displacement to digital Ch 35 Applicant will build the CP as part of a coordinated system build out plan.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Ownership Owned
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Analog
Year 2001
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 1 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model EC702MP BB3
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity .17 kW
Justification for New Transmitter Analog transmitter cannot be used on digital channel 35

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Other Transmitter Costs
Does the transmitter installation require a Transmitter Building Site Survey/Installation? Yes
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Rigid Conduit and Wiring No
Other Electrical Service Yes
Description To be determined based on site survey.
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 5 tons
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 120.0 square feet

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Encoder

Analog to Digital transition, transmitter will need encoder.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Ownership Owned
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
ERP: 1.0 kW
Manufacturer
Model SL-8
Year 2001

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Change Type Purchase New
Ownership Owned
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Broadband Panel
Number of Stations Supported 1
Number of Panels/Bays 12
Lower Limit 470.00 MHz
Upper Limit 806.00 MHz
Design power capacity in use 100.0 %
ERP: 2.0 kW
Manufacturer
Model TUL-C3 1/3-M-1-K
Year 2020
Justification for New Antenna Analog antenna cut to Channel 41 cannot be used for digital Ch 35.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? No
Power Dividers Does the panel antenna require power dividers? No
Cable Harness Does the panel antenna require cable harness? No

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Ownership Owned
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Flexible Foam
Diameter 1 5/8 inches
Number of parallel runs 1
Length 280 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Flexible Foam
Diameter 1 5/8 inches
Number of parallel runs 1
Length 280 feet per run
Justification for New Transmission Line Line will be swept and determined if it remains usable.
Interior RF Systems Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? No

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Move Equipment
Tower Use Primary (Main)
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
Is tower documented for structural analysis? Unknown
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1030409
Coordinates (NAD83) Latitude (NAD83) 44° 29' 05.9" N-
Longitude (NAD83) 069° 39' 18.7" W-
Overall Structure Height 276.90 feet
Support Structure Height 259.84 feet
Ground Elevation Above Mean Sea Level (AMSL) 425.85 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner American Towers LLC
Date Constructed 06/23/2003


Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Structural Analysis

Structural Analysis

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 80
Explanation No on site engineering staff. Complete turnkey project management.
Outside RF consulting Engineering Services Perform engineering study for displacement application No
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Prepare Form 601 No
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application No
Prepare and file Form FCC License to Cover Application No
Prepare request for Special Temporary Authority No
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Form 399 assistance or other program management costs Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service Yes
Number of Days 5
Justification Turnkey installation and integration of new and existing equipment, includes, EAS, satellite hookup, etc.

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Mobilization Charge and travel expenses for site survey

$1500/day, 1.5 days

Mobilization Charge and travel expenses for installation

$1500/day, 4 days

Site Survey

8 hours @ $100/hour

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Permit and Filing Costs FCC Construction Permit Major Change No
FCC Construction Permit Minor Change No
FCC License to Cover Application Yes
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Point to Point Microwave (STL/ICR) Frequency Coordination for Unidirection System No
Frequency Coordination for Bi-Direction System No
New Point to Point Microwave System No

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $111,996.46 $110,461.59 N/A $32,229.13 N/A
Total for all systems $240,369.96 $223,201.88 N/A $126,832.13 N/A
Primary Transmitter EC702MP BB3 $111,996.46 $110,461.59 $32,229.13
Other -- Building Addition Size: 120.0 $30,000.00 $30,000.00 10 x 12 building 120 sq ft. @ $250 / sq ft See FCC Appendix A LPTV Cost Catalog $0.00 N/A
UHF - Air Cooled Solid State Transmitter 160 - 300 Watts $24,300.00 $21,179.13 See Comark Quote. $33,470 - $11,836 (install cost) = $21,634 transmitter cost $21,179.13 N/A
Transmitter Building Site Survey/Installation $10,000.00 $11,836.00 See attached Comark Quote.pdf Transmitter Installation $11,050.00 N/A
Other Electrical Service: To be determined based on site survey. $2,033.00 $2,033.00 Quote 9/9/19 Mr Sparky Quote.pdf N/A N/A
5 Ton system $20,250.00 $20,000.00 N/A N/A N/A
Encoder $25,413.46 $25,413.46 Comark Encoder Transition from Analog to Digital Transmitter will require new encoder. N/A N/A

Components

Actual Information Description File Name
Other -- Building Addition Size: 120.0 Information not provided.
UHF - Air Cooled Solid State Transmitter 160 - 300 Watts

Component Description:
transmitter
Amount:
$21,179.13

Component Description:
Transmitter
Amount:
$21,179.13
Transmitter Building Site Survey/Installation

Component Description:
Install
Amount:
$11,050.00
Other Electrical Service: To be determined based on site survey. Information not provided.
5 Ton system Information not provided.
Encoder Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $7,281.00 $7,281.00 N/A $7,281.00 N/A
Total for all systems $240,369.96 $223,201.88 N/A $126,832.13 N/A
Primary Antenna TUL-C3 1/3-M-1-K $7,281.00 $7,281.00 $7,281.00
UHF-Low Power, Side Mount, Broadband Panel, 12 bay, 2.0kW input, Elliptical $7,281.00 $7,281.00 N/A $7,281.00 N/A

Components

Actual Information Description File Name
UHF-Low Power, Side Mount, Broadband Panel, 12 bay, 2.0kW input, Elliptical

Component Description:
Antenna
Amount:
$7,281.00

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $6,720.00 $6,789.79 N/A $0.00 N/A
Total for all systems $240,369.96 $223,201.88 N/A $126,832.13 N/A
Primary Transmission Line $6,720.00 $6,789.79 $0.00
Flexible Foam Transmission Line - dielectric, 1 5/8" $6,720.00 $6,789.79 invoice cost $0.00 N/A

Components

Actual Information Description File Name
Flexible Foam Transmission Line - dielectric, 1 5/8"

Component Description:
Cable
Amount:
$6,789.79

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $63,440.00 $42,750.00 N/A $42,750.00 N/A
Total for all systems $240,369.96 $223,201.88 N/A $126,832.13 N/A
Primary Tower TOWER $63,440.00 $42,750.00 $42,750.00
Tower Rigging Short Tower (less than 500') $56,190.00 $35,500.00 N/A $35,500.00 N/A
Structural Analysis $7,250.00 $7,250.00 N/A $7,250.00 N/A

Components

Actual Information Description File Name
Tower Rigging Short Tower (less than 500')

Component Description:
Tower Work
Amount:
$35,500.00
Structural Analysis

Component Description:
Fee
Amount:
$750.00

Component Description:
Structural Analysis
Amount:
$6,500.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $35,597.50 $40,584.50 N/A $34,572.00 N/A
Total for all systems $240,369.96 $223,201.88 N/A $126,832.13 N/A
Outside Professional Services $35,597.50 $40,584.50 $34,572.00
Project management of the transition $8,440.00 $17,125.00 See ARCJ Project Management Quote & SOW.pdf $17,125.00 N/A
Site Survey $800.00 $800.00 Site Survey Charge See ARCJ Site Survey Quote & SOW.pdf $800.00 N/A
Prepare request for Special Temporary Authorization $1,280.00 $390.00 N/A $390.00 N/A
Mobilization Charge and travel expenses for installation $0.00 $0.00 Mobilization Charge and Travel Expenses for Installation of EAS, CAP. Satellite Interconnect, Final Transmitter/Antenna connection, station turn on . Trip $1500/day 4 days. See ARCJ Turnkey Quote & SOW.pdf N/A N/A
Mobilization Charge and travel expenses for site survey $2,250.00 $2,250.00 1 1/2 day @ $1500/day See ARCJ Site Survey Quote & SOW.pdf $2,250.00 N/A
Additional Field Engineering Service, 5 Days $11,000.00 $11,000.00 Turnkey Installation and integration of new and existing equipment. Installation of EAS,CAP, Satellite Interconnect, Final Transmitter/Antenna connection, station turn on. See ARCJ Turnkey Integration Quote & SOW.pdf $8,250.00 N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $3,262.50 $1,057.00 N/A $1,057.00 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,052.50 $1,052.50 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $2,102.50 $1,500.00 N/A N/A N/A
Prepare/ Review 399 reimbursement form $1,710.00 $1,710.00 See BWS 399 Reimbursement Estimate $1,000.00 N/A
Form 399 assistance or other Program Management costs $3,700.00 $3,700.00 See BWS Estimate Eligibility 1876 Filing $3,700.00 N/A

Components

Actual Information Description File Name
Project management of the transition

Component Description:
PM
Amount:
$10,125.00

Component Description:
PM #2
Amount:
$1,500.00

Component Description:
399PM
Amount:
$1,000.00

Component Description:
50% Project Management
Amount:
$3,000.00

Component Description:
FINAL PM
Amount:
$1,500.00
Site Survey

Component Description:
50% Site Survey
Amount:
$400.00

Component Description:
Site Survey
Amount:
$400.00
Prepare request for Special Temporary Authorization

Component Description:
FCC Filing
Amount:
$240.00

Component Description:
CP EXT
Amount:
$150.00
Mobilization Charge and travel expenses for installation Information not provided.
Mobilization Charge and travel expenses for site survey

Component Description:
Site Mobilization
Amount:
$1,125.00

Component Description:
50% Site Mobilization
Amount:
$1,125.00
Additional Field Engineering Service, 5 Days

Component Description:
TURNKEY
Amount:
$8,250.00
Attorney Fees - Negotiation of lease and other matters for shared locations

Component Description:
Legal Work
Amount:
$1,057.00
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare/ Review 399 reimbursement form

Component Description:
399
Amount:
$1,000.00
Form 399 assistance or other Program Management costs

Component Description:
399 COMPLETE
Amount:
$1,000.00

Component Description:
399 WORK
Amount:
$400.00

Component Description:
399 work
Amount:
$500.00

Component Description:
399 WORK
Amount:
$800.00

Component Description:
399 Eligibility Fee
Amount:
$1,000.00

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $15,335.00 $15,335.00 N/A $10,000.00 N/A
Total for all systems $240,369.96 $223,201.88 N/A $126,832.13 N/A
Other Expenses $15,335.00 $15,335.00 $10,000.00
Equipment Storage $5,000.00 $5,000.00 Included Equipment Deliver and Handling Charges. ARCJ Equipment Storage Removal Disposal Quote & SOW. $5,000.00 N/A
Equipment Delivery and Handling Charges $5,000.00 $5,000.00 Equipment Deliver and Handling Charges. ARCJ Equipment Storage Removal Disposal Quote & SOW. N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $5,000.00 $5,000.00 Removal and disposal of equipment from job site, transmitter, coax, antenna and all debris. SEE ARCJ Equipment Storage Removal Disposal Quote & SOW.pdf $5,000.00 N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $335.00 N/A N/A N/A

Components

Actual Information Description File Name
Equipment Storage

Component Description:
STORAGE
Amount:
$5,000.00
Equipment Delivery and Handling Charges Information not provided.
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
EQUIPMENT REMOVAL
Amount:
$5,000.00
FCC Filing Fees - Form 2100 license to cover application Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $240,369.96 $223,201.88 $126,832.13

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

SUSAN HANSEN

CONSULTANT


12/09/2022

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

RANDY WEISS

CEO


12/09/2022

Attachments

Back to Top