Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
NBC TELEMUNDO LICENSE LLC |
Angela Ball 300 NEW JERSEY AVENUE, NW SUITE 700 WASHINGTON, DC 20001 United States |
+1 (202) 524-6413 | angela.ball@nbcuni.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Angela Ball Assistant Secretary NBCUniversal, LLC |
300 New Jersey Avenue, NW Washington, DC 20001 United States |
+1 (202) 524-6413 | angela.ball@nbcuni.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Install new antenna in place of existing analog antenna and new transmitter for new channel. The old transmitter and antenna will remain in place for interim use until the cut-over. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | TVTX03M56 | |
Year | 2008 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 397 W |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | TMU9-3 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.8 kW | |
Justification for New Transmitter | The old Transmitter, DMT System TVTX03M56, was no longer supported. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | Install 1 40 3-phase dedicated circuit to new transmitter. Circuit will be installed in EMT Conduit with a flex-connection at entry of transmitter. Inspection upon completion of work. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Installation Costs |
Installation of transmitter |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | CS-2030-F-18 | |
Year | 2008 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | TLP-12C/VP | |
Year | 2018 | |
Justification for New Antenna | The old antenna which was single channel would not operate on the new channel. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 1 5/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Installation Costs |
Installation of new antenna and line. Removal of old antenna and line |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Air | |
Diameter | 7/8 inches | |
Number of parallel runs | 1 | |
Length | 538 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Air | |
Diameter | 3 inches | |
Number of parallel runs | 1 | |
Length | 540 feet per run | |
Justification for New Transmission Line | The current transmission line is obsolete and no longer supported by the manufacturer so if it is damaged it cannot be repaired. | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1018227 | |
Coordinates (NAD83) | Latitude (NAD83) | 37° 30' 45.6" N- |
Longitude (NAD83) | 077° 36' 04.8" W- | |
Overall Structure Height | 1228.66 feet | |
Support Structure Height | 907.80 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 357.94 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | SpectraSite Communications, LLC. through American Towers, LLC. | |
Date Constructed | 02/20/2008 |
Facility ID | Call Sign | Service |
---|---|---|
74168 | WBTJ | FM |
74416 | WRIC-TV | DTV |
9987 | WCVE-TV | DTV |
9989 | WCVW | DTV |
412 | WRLH-TV | DTV |
57832 | WTVR-TV | DTV |
65116 | WRID-LD | LPD |
190695 | WWBK-LD | LPD |
10016 | WCVE-FM | FM |
10019 | WNVT | DTV |
182288 | WUDW-LD | LPD |
182308 | WFWG-LD | LPD |
54972 | W203CB | FX |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Tower mapping and report for structural engineer |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Major Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 425 | |
Explanation | Project oversight of transmitter install, electrical connectivity, tower work, and antenna installation. Additional time will be spent tracking financial and legal process and coordinating with other broadcasters. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | No |
Prepare engineering section of Form FCC Construction Permit Application | No | |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | Yes | |
Number of Days | 5 | |
Justification | Site survey required |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Call support |
VOICENATION |
DTV MEDICAL NOTIFICATIONS |
Medical Notification Mailing COMPLETION |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $116,270.00 | $107,942.71 | N/A | $55,427.47 | N/A |
Total for all systems | $705,969.33 | $719,746.26 | N/A | $365,699.75 | N/A |
Primary Transmitter TMU9-3 | $116,270.00 | $107,942.71 | $55,427.47 | ||
Installation Costs | $20,000.00 | $20,000.00 | N/A | $14,406.20 | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $8,800.00 | N/A | $0.00 | N/A |
Other Electrical Service: Install 1 40 3-phase dedicated circuit to new transmitter. Circuit will be installed in EMT Conduit with a flex-connection at entry of transmitter. Inspection upon completion of work. | $2,270.00 | $2,270.00 | N/A | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $76,872.71 | N/A | $41,021.27 | N/A |
Actual Information Description | File Name |
---|---|
Installation Costs | |
Transmitter Building Site Survey/Installation | Information not provided. |
Other Electrical Service: Install 1 40 3-phase dedicated circuit to new transmitter. Circuit will be installed in EMT Conduit with a flex-connection at entry of transmitter. Inspection upon completion of work. | Information not provided. |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $91,288.33 | $80,133.33 | N/A | $26,094.15 | N/A |
Total for all systems | $705,969.33 | $719,746.26 | N/A | $365,699.75 | N/A |
Primary Antenna TLP-12C/VP | $91,288.33 | $80,133.33 | $26,094.15 | ||
Side Mount antenna brackets | $4,625.00 | $2,500.00 | N/A | $2,234.25 | N/A |
Elbow complex, single channel, 1 5/8” input (if needed) | $6,900.00 | $1,050.00 | N/A | $1,049.40 | N/A |
Installation Costs | $53,033.33 | $53,033.33 | For antenna & Transmission Line installation | $0.00 | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical | $21,000.00 | $21,000.00 | N/A | $20,260.50 | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $2,550.00 | N/A | $2,550.00 | N/A |
Actual Information Description | File Name |
---|---|
Side Mount antenna brackets | |
Elbow complex, single channel, 1 5/8” input (if needed) | |
Installation Costs | |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical | |
Sweep test of transmission line and antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $31,860.00 | $20,265.05 | N/A | $20,265.05 | N/A |
Total for all systems | $705,969.33 | $719,746.26 | N/A | $365,699.75 | N/A |
Primary Transmission Line | $31,860.00 | $20,265.05 | $20,265.05 | ||
Flexible Air Transmission Line - dielectric, 3" | $31,860.00 | $20,265.05 | N/A | $20,265.05 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Air Transmission Line - dielectric, 3" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $346,306.00 | $297,522.67 | N/A | $93,500.00 | N/A |
Total for all systems | $705,969.33 | $719,746.26 | N/A | $365,699.75 | N/A |
Primary Tower GTOWER | $346,306.00 | $297,522.67 | $93,500.00 | ||
Major tower reinforcement/modifications | $167,556.00 | $167,556.00 | N/A | $0.00 | N/A |
Tower Rigging Tall Tower (greater than 500') | $157,750.00 | $125,966.67 | N/A | $89,500.00 | N/A |
Tower mapping and report for structural engineer | $21,000.00 | $4,000.00 | N/A | $4,000.00 | N/A |
Actual Information Description | File Name |
---|---|
Major tower reinforcement/modifications | Information not provided. |
Tower Rigging Tall Tower (greater than 500') | |
Tower mapping and report for structural engineer |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $76,250.00 | $169,887.50 | N/A | $142,894.53 | N/A |
Total for all systems | $705,969.33 | $719,746.26 | N/A | $365,699.75 | N/A |
Outside Professional Services | $76,250.00 | $169,887.50 | $142,894.53 | ||
Project management of the transition | $44,837.50 | $140,000.00 | 400 hours @ $158 per hour | $138,759.33 | N/A |
Additional Field Engineering Service, 5 Days | $7,500.00 | $7,500.00 | N/A | $0.00 | N/A |
RF Exposure Measurements | $12,100.00 | $12,100.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | $225.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $1,500.00 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $5,500.00 | $5,500.00 | N/A | $3,410.70 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | $499.50 | N/A |
Actual Information Description | File Name |
---|---|
Project management of the transition | |
Additional Field Engineering Service, 5 Days | Information not provided. |
RF Exposure Measurements | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Form 399 assistance or other Program Management costs | |
Prepare/ Review 399 reimbursement form |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $43,995.00 | $43,995.00 | N/A | $27,518.55 | N/A |
Total for all systems | $705,969.33 | $719,746.26 | N/A | $365,699.75 | N/A |
Other Expenses | $43,995.00 | $43,995.00 | $27,518.55 | ||
Equipment Storage | $21,000.00 | $21,000.00 | N/A | $20,524.60 | N/A |
Equipment Delivery and Handling Charges | $3,700.00 | $3,700.00 | N/A | $3,645.00 | 0 |
DTV MEDICAL NOTIFICATIONS | $2,000.00 | $2,000.00 | N/A | $2,000.00 | N/A |
Call support | $12,000.00 | $12,000.00 | N/A | $1,348.95 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $0.00 | $0.00 | The work hasn't been carried out yet so costs TBD | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,960.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Equipment Storage | |
Equipment Delivery and Handling Charges | |
DTV MEDICAL NOTIFICATIONS | |
Call support | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 Major change CP application | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $705,969.33 | $719,746.26 | $365,699.75 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Angela Ball Assistant Secretary 12/12/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Angela Ball Assistant Secretary 12/12/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Angela Ball Assistant Secretary 12/12/2022 |