Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
VENTANA TELEVISION, INC. |
Eric Yonkin 1 HSN Drive St. Petersburg, FL 33729 United States |
+1 (727) 872-7443 | EASnotice@hsn.net | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Warren A. Kessler Hogan Lovells US LLP |
555 Thirteenth Street, NW Washington, DC 20004 United States |
+1 (202) 637-3632 | warren.kessler@hoganlovells.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | The transition plan includes installing a new transmitter, antenna, and transmission line, along with a study needed for the document tower. |
Question | Response |
---|---|
Sharee Station Facility ID | 146421 |
Call Sign | NEW |
Type | |
Licensee Name | EDGEWATER BROADCASTING, INC. |
Status | FACILITY VOID |
DTS | No |
Community of License | |
Pre-auction RF Channel | |
Post-auction RF Channel | |
Neilsen DMA | |
Network Affiliation |
Question | Response |
---|---|
Sharee Station Facility ID | 158581 |
Call Sign | W280FD |
Type | |
Licensee Name | CIRCUITWERKES, INC. |
Status | LICENSED |
DTS | No |
Community of License | LARGO, FL |
Pre-auction RF Channel | 280 |
Post-auction RF Channel | |
Neilsen DMA | |
Network Affiliation |
Question | Response |
---|---|
Sharee Station Facility ID | 158420 |
Call Sign | W252DF |
Type | |
Licensee Name | CIRCUITWERKES |
Status | LICENSED |
DTS | No |
Community of License | LARGO, FL |
Pre-auction RF Channel | 252 |
Post-auction RF Channel | |
Neilsen DMA | |
Network Affiliation |
Question | Response |
---|---|
Sharee Station Facility ID | 156011 |
Call Sign | W248CA |
Type | Commercial |
Licensee Name | NIA BROADCASTING, INC. |
Status | LICENSED |
DTS | No |
Community of License | ST. PETERSBURG, FL |
Pre-auction RF Channel | 248 |
Post-auction RF Channel | |
Neilsen DMA | |
Network Affiliation |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | AUTV-1000 | |
Year | 2009 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 0.3 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | EC702HP-BB | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.7 kW | |
Justification for New Transmitter | New antenna lower gain/less bays due to length for lower channel. Requires higher TPO. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Invoice No. 20200511 - NFB Consulting |
Purchase of Software:Statmon:STC-PLUGIN |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 2.7 kW | |
Manufacturer | ||
Model | PSILP16APR | |
Year | 2010 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | JA-SS-12/32 SCL | |
Year | 2020 | |
Justification for New Antenna | The original antenna was with a single channel coaxial slot for channel 40, which would not work on repack for channel 32. The pattern is also drastically different. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 708 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Air | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 708 feet per run | |
Justification for New Transmission Line | The new antenna power divider system requires pressurization. The existing foam line will not provide the gas pass. | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1037654 | |
Coordinates (NAD83) | Latitude (NAD83) | 27° 50' 52.9" N- |
Longitude (NAD83) | 082° 45' 48.3" W- | |
Overall Structure Height | 639.10 feet | |
Support Structure Height | 639.10 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 9.84 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | Pinnacle Towers LLC | |
Date Constructed | 05/11/2018 |
Facility ID | Call Sign | Service |
---|---|---|
146421 | NEW | FX |
158420 | W252DF | FX |
156011 | W248CA | FX |
158581 | W280FD | FX |
Users |
---|
Cellular |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Tower mapping and report for structural engineer |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Serious Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | No |
Prepare engineering section of Form FCC Construction Permit Application | No | |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Invoice No. 13783 - Hitachi |
Shipping of the replacement transmitter from the factory to the W32FH-D transmitting site. |
Invoice No. 20200511 - NFB Consulting |
Software: Statmon: STC-Plugin |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $84,450.00 | $84,450.00 | N/A | $49,867.88 | N/A |
Total for all systems | $404,026.20 | $354,124.68 | N/A | $125,947.68 | N/A |
Primary Transmitter EC702HP-BB | $84,450.00 | $84,450.00 | $49,867.88 | ||
Invoice No. 20200511 - NFB Consulting | $450.00 | $450.00 | N/A | $0.00 | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $84,000.00 | N/A | $49,867.88 | N/A |
Actual Information Description | File Name |
---|---|
Invoice No. 20200511 - NFB Consulting | |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $42,158.00 | $42,158.00 | N/A | $21,079.00 | N/A |
Total for all systems | $404,026.20 | $354,124.68 | N/A | $125,947.68 | N/A |
Primary Antenna JA-SS-12/32 SCL | $42,158.00 | $42,158.00 | $21,079.00 | ||
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical | $21,079.00 | $21,079.00 | N/A | $21,079.00 | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical | $21,079.00 | $21,079.00 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical | |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $23,364.00 | $19,187.48 | N/A | $19,029.98 | N/A |
Total for all systems | $404,026.20 | $354,124.68 | N/A | $125,947.68 | N/A |
Primary Transmission Line | $23,364.00 | $19,187.48 | $19,029.98 | ||
Flexible Air Transmission Line - dielectric, 1 5/8" | $23,364.00 | $19,187.48 | N/A | $19,029.98 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Air Transmission Line - dielectric, 1 5/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $193,750.00 | $175,500.00 | N/A | $34,575.71 | N/A |
Total for all systems | $404,026.20 | $354,124.68 | N/A | $125,947.68 | N/A |
Primary Tower GTOWER | $193,750.00 | $175,500.00 | $34,575.71 | ||
Tower Rigging Tall Tower (greater than 500') | $157,750.00 | $157,750.00 | N/A | $31,825.71 | N/A |
Tower mapping and report for structural engineer | $21,000.00 | $2,750.00 | N/A | $2,750.00 | N/A |
Serious tower reinforcement/modifications | $15,000.00 | $15,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Tall Tower (greater than 500') | |
Tower mapping and report for structural engineer | |
Serious tower reinforcement/modifications | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,755.11 | $29,280.11 | N/A | $0.00 | N/A |
Total for all systems | $404,026.20 | $354,124.68 | N/A | $125,947.68 | N/A |
Outside Professional Services | $56,755.11 | $29,280.11 | $0.00 | ||
Form 399 assistance or other Program Management costs | $1,500.00 | $1,500.00 | N/A | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $25,125.00 | N/A | N/A | N/A |
Invoice No. 13783 - Hitachi | $945.11 | $945.11 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Form 399 assistance or other Program Management costs | Information not provided. |
Prepare/ Review 399 reimbursement form | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Invoice No. 13783 - Hitachi |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $3,549.09 | $3,549.09 | N/A | $1,395.11 | N/A |
Total for all systems | $404,026.20 | $354,124.68 | N/A | $125,947.68 | N/A |
Other Expenses | $3,549.09 | $3,549.09 | $1,395.11 | ||
Invoice No. 20200511 - NFB Consulting | $450.00 | $450.00 | N/A | $450.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $1,818.98 | $1,818.98 | N/A | $0.00 | N/A |
Invoice No. 13783 - Hitachi | $945.11 | $945.11 | N/A | $945.11 | N/A |
Actual Information Description | File Name |
---|---|
Invoice No. 20200511 - NFB Consulting | |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
Equipment Delivery and Handling Charges | |
Invoice No. 13783 - Hitachi |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $404,026.20 | $354,124.68 | $125,947.68 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Eric Yonkin Associate General Counsel, Legal 01/19/2023 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Eric Yonkin Associate General Counsel, Legal 01/19/2023 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Eric Yonkin Associate General Counsel, Legal 01/19/2023 |