Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
EDUARDO S. GALLEGOS Applicant Doing Business As: EDUARDO S. GALLEGOS |
5232 RUSTIC MANOR BROWNSVILLE, TX 78526 United States |
+1 (956) 346-5328 | EDUARDOGALLEGOS@ME.COM | Other |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Tony Zummallen President QCommunications, LLC |
Tony zumMallen 705 SE MELODY LN STE B LEES SUMMIT, MO 64063 United States |
+1 (816) 729-1177 | Tony@qcomm.tv |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Primary RF 44 to Primary RF 34. We are changing transmission line, replacing filter, and replacing antenna. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Retune Existing |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | GatesAir |
Model | USXT | |
Year | 2014 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.5 kW |
Section | Question | Response |
---|---|---|
New Mask Filter | Does the transmitter require a new mask filter? | Yes |
Mask Filter Type | Full Service | |
Power | 1.1-2kW | |
New Exciter | Is a new exciter needed? | No |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Manufacturer Technician |
Expenses for on-site manufacturer technician to assist with proof and retuning of old transmitter |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels | 16 | |
Design power capacity in use | 50.0 % | |
Lower Limit | 650.00 MHz | |
Upper Limit | 656.00 MHz | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ALP16L2-8SER-44 | |
Year | 2014 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | TLP-16M (SP) | |
Year | 2022 | |
Justification for New Antenna | Old antenna cannot be retuned. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 4 1/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Mounting Plates |
Mounting Plates |
300000839 |
Jumper Cable 7/8" Foam Flex 1-5/8 Conn 9 Feet LG |
11000013395 |
Adaptor SMA (F) to Type-N (M) |
Connectors |
Connectors |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Leased | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 4 1/16 inches | |
Segment Length | 20 inches | |
Number of parallel runs | 72 | |
Length | 20 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 4 1/16 inches | |
Segment Length | 19 1/2 inches | |
Number of parallel runs | 72 | |
Length | 19 feet per run | |
Justification for New Transmission Line | Electrical performance of the current line is not compatible with RF 34 | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | Yes |
Name | Description |
---|---|
Removal of Existing Line |
Costs to remove existing transmission line |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1222106 | |
Coordinates (NAD83) | Latitude (NAD83) | 26° 06' 02.3" N- |
Longitude (NAD83) | 097° 50' 21.5" W- | |
Overall Structure Height | 1491.12 feet | |
Support Structure Height | 1402.87 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 56.10 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Pinnacle Towers LLC | |
Date Constructed | 08/20/2001 |
Facility ID | Call Sign | Service |
---|---|---|
40777 | KBFM | FM |
43328 | KRGV-TV | DTV |
64631 | KTEX | FM |
12523 | KVEO-TV | DTV |
Users |
---|
US Gov't Use |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Tower mapping and report for structural engineer |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Major Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Structural Analysis and Site Inspection |
Structural Analysis and Site Inspection |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 80 | |
Explanation | No expertise. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 3 | |
Justification | Change of RF, proof of performance, making certain direction antenna is correct |
Name | Description |
---|---|
Outside Engineering Services |
General engineering services |
General Legal |
General Legal Services |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Advertising Campaign |
Advertising Campaign to inform public of new channel and to encourage rescan of equipment to allow Repack Channel to be Received |
Bank Fees |
Bank fees |
Permit |
county permit |
Signal Survey |
Signal Survey |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $34,597.65 | $40,897.65 | N/A | $40,897.65 | N/A |
Total for all systems | $1,137,170.33 | $1,209,518.59 | N/A | $638,962.68 | N/A |
Primary Transmitter USXT | $34,597.65 | $40,897.65 | $40,897.65 | ||
Manufacturer Technician | $9,547.65 | $9,547.65 | On-site assistance from manufacture to assist with retuning and proof of transmitter | $9,547.65 | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $7,350.00 | This is the amount charged | $7,350.00 | This is the amount charged |
Retune - UHF and VHF - minor re-channel issues | $11,000.00 | $21,300.00 | Per actual costs from invoices | $21,300.00 | N/A |
1.1-2kW w mask filter Full Service | $4,050.00 | $2,700.00 | Per actual costs | $2,700.00 | N/A |
Actual Information Description | File Name |
---|---|
Manufacturer Technician | |
Transmitter Building Site Survey/Installation | |
Retune - UHF and VHF - minor re-channel issues | |
1.1-2kW w mask filter Full Service |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $47,778.00 | $52,807.00 | N/A | $49,307.00 | N/A |
Total for all systems | $1,137,170.33 | $1,209,518.59 | N/A | $638,962.68 | N/A |
Primary Antenna TLP-16M (SP) | $47,778.00 | $52,807.00 | $49,307.00 | ||
Connectors | $276.00 | $276.00 | Per actual costs | $276.00 | N/A |
11000013395 | $935.00 | $935.00 | N/A | $935.00 | N/A |
300000839 | $57.00 | $57.00 | N/A | $57.00 | N/A |
Mounting Plates | $2,325.00 | $2,325.00 | Mounting plates per Dielectric sales order 1936081 and INV 1324037 | $2,325.00 | N/A |
Pattern scatter analysis for side mount (if not included in antenna base cost) | $3,500.00 | $3,500.00 | N/A | N/A | N/A |
Side Mount antenna brackets | $4,625.00 | $12,500.00 | Custom Pole Mounts per Dielectric Quote 1935142 | $12,500.00 | N/A |
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) | $9,570.00 | $6,054.00 | Per Dielectric quote 1935142 | $6,054.00 | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal | $20,760.00 | $20,760.00 | ***System Notice: Estimate adjusted and locked because line has been superseded.***Antenna TLP-16M Ch34 per Dielectric Quote 1935142 | $20,760.00 | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $6,400.00 | Per Dielectric Quote 1935142 | $6,400.00 | N/A |
Actual Information Description | File Name |
---|---|
Connectors | |
11000013395 | |
300000839 | |
Mounting Plates | |
Pattern scatter analysis for side mount (if not included in antenna base cost) | Information not provided. |
Side Mount antenna brackets | |
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) | |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal | |
Sweep test of transmission line and antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $213,264.00 | $246,561.40 | N/A | $200,311.50 | N/A |
Total for all systems | $1,137,170.33 | $1,209,518.59 | N/A | $638,962.68 | N/A |
Primary Transmission Line | $213,264.00 | $246,561.40 | $200,311.50 | ||
Rigid Transmission Line - copper, 4 1/16" | $168,264.00 | $201,561.40 | Per Dielectric quote 1935142. Includes freight charges | $200,311.50 | Per actual costs |
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Removal of Existing Line | $35,000.00 | $35,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 4 1/16" | |
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators | Information not provided. |
Removal of Existing Line | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $150,768.74 | $150,768.74 | N/A | $99,768.74 | N/A |
Total for all systems | $1,137,170.33 | $1,209,518.59 | N/A | $638,962.68 | N/A |
Primary Tower TOWER | $150,768.74 | $150,768.74 | $99,768.74 | ||
Structural Analysis and Site Inspection | $6,500.00 | $6,500.00 | Per actual Crown Castle invoice | $6,500.00 | N/A |
Tower mapping and report for structural engineer | $21,000.00 | $21,000.00 | N/A | N/A | N/A |
Complex Tower (includes, e.g., towers with candelabras and/or stacked antennas) | $30,000.00 | $30,000.00 | N/A | N/A | N/A |
Major tower reinforcement/modifications | $93,268.74 | $93,268.74 | Per Rio Steel proposal dated 10/27/21 plus (2) change order invoices. | $93,268.74 | per actual costs |
Actual Information Description | File Name |
---|---|
Structural Analysis and Site Inspection | |
Tower mapping and report for structural engineer | Information not provided. |
Complex Tower (includes, e.g., towers with candelabras and/or stacked antennas) | Information not provided. |
Major tower reinforcement/modifications |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $130,836.25 | $158,713.11 | N/A | $102,342.05 | N/A |
Total for all systems | $1,137,170.33 | $1,209,518.59 | N/A | $638,962.68 | N/A |
Outside Professional Services | $130,836.25 | $158,713.11 | $102,342.05 | ||
General Legal | $7,305.00 | $7,305.00 | Per actual invoice amounts | $7,305.00 | N/A |
Outside Engineering Services | $7,880.00 | $7,880.00 | Per actual invoices | $7,880.00 | N/A |
Additional Field Engineering Service, 3 Days | $15,000.00 | $15,000.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $26,125.00 | Antenna pattern verification only | $13,062.50 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $4,470.00 | $1,425.00 | This is the amount charged | $1,425.00 | This is the amount charged |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $3,262.50 | N/A | $3,262.50 | This is the amount charged |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $356.25 | N/A | $356.25 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $9,787.50 | this is the amount charged | $9,787.50 | This is the amount charged. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $3,300.00 | This is the amount charged | $3,300.00 | This is the amount charged |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | N/A | N/A |
Project management of the transition | $8,440.00 | $59,858.11 | Per actual costs | $35,258.30 | Estimated same as actual |
Prepare/ Review 399 reimbursement form | $1,710.00 | $950.00 | This is the amount charged | $950.00 | This is the amount charged |
Form 399 assistance or other Program Management costs | $20,611.25 | $20,611.25 | Per actual invoice amounts | $19,755.00 | This is the amount charged |
Actual Information Description | File Name |
---|---|
General Legal | |
Outside Engineering Services | |
Additional Field Engineering Service, 3 Days | Information not provided. |
Comprehensive coverage verification via field study, if needed | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for displacement application | Information not provided. |
Project management of the transition | |
Prepare/ Review 399 reimbursement form | |
Form 399 assistance or other Program Management costs |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $559,925.69 | $559,770.69 | N/A | $146,335.74 | N/A |
Total for all systems | $1,137,170.33 | $1,209,518.59 | N/A | $638,962.68 | N/A |
Other Expenses | $559,925.69 | $559,770.69 | $146,335.74 | ||
Equipment Delivery and Handling Charges | $10,408.32 | $10,408.32 | Per actual costs | $10,408.32 | N/A |
Bank Fees | $14.95 | $14.95 | Bank fees | $0.00 | N/A |
Advertising Campaign | $529,620.00 | $529,620.00 | Costs for re-scan advertising campaign. | $128,290.00 | This is the amount charged |
Equipment Storage | $5,000.00 | $5,000.00 | N/A | $2,020.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $8,000.00 | $8,000.00 | N/A | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $270.00 | N/A | $270.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $215.00 | License to cover - FCC filing fees | $215.00 | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Signal Survey | $4,500.00 | $4,500.00 | This is the amount charged | $4,500.00 | This is the amount charged |
Permit | $632.42 | $632.42 | County Permit costs to replace antenna | $632.42 | N/A |
Actual Information Description | File Name |
---|---|
Equipment Delivery and Handling Charges | |
Bank Fees | |
Advertising Campaign | |
Equipment Storage | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | |
FCC Filing Fees - Form 2100 license to cover application | |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
Signal Survey | |
Permit |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $1,137,170.33 | $1,209,518.59 | $638,962.68 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Eduardo Gallegos Applicant 11/18/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Eduardo Gallegos Applicant 11/18/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Eduardo Gallegos Applicant 11/18/2022 |