Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
NBC TELEMUNDO LICENSE LLC |
Angela Ball 300 NEW JERSEY AVE, N.W. SUITE 700 WASHINGTON, DC 20001 United States |
+1 (202) 524-6413 | ANGELA.BALL@NBCUNI.COM | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Angela Ball NBCUniversal, LLC |
300 New Jersey Ave. NW Suite 700 Washington, DC 20001 United States |
+1 (202) 524-6413 | angela.ball@nbcuni.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Use existing transmitter and aux antenna as interim facility on old channel.. Remove old antenna. Install new transmitter and replacement top mount antenna for new channel. After transition remove old transmitter and channel 48 aux antenna. |
Question | Response |
---|---|
Sharee Station Facility ID | 12895 |
Call Sign | KETH-TV |
Type | Noncommercial Educational |
Licensee Name | COMMUNITY EDUCATIONAL TELEVISION, INC. |
Status | LICENSED |
DTS | No |
Community of License | HOUSTON, TX |
Pre-auction RF Channel | 24 |
Post-auction RF Channel | 24 |
Neilsen DMA | HOUSTON |
Network Affiliation |
Question | Response |
---|---|
Sharee Station Facility ID | 6690 |
Call Sign | KVVV-LD |
Type | |
Licensee Name | Sovryn Holdings, Inc. |
Status | LICENSED |
DTS | No |
Community of License | HOUSTON, TX |
Pre-auction RF Channel | 15 |
Post-auction RF Channel | |
Neilsen DMA | |
Network Affiliation |
Question | Response |
---|---|
Sharee Station Facility ID | 53847 |
Call Sign | KXLN-DT |
Type | Commercial |
Licensee Name | KXLN LICENSE PARTNERSHIP, L.P. |
Status | LICENSED |
DTS | No |
Community of License | ROSENBERG, TX |
Pre-auction RF Channel | 30 |
Post-auction RF Channel | 30 |
Neilsen DMA | Houston |
Network Affiliation |
Question | Response |
---|---|
Sharee Station Facility ID | 66790 |
Call Sign | KUGB-CD |
Type | |
Licensee Name | HC2 STATION GROUP, INC. |
Status | LICENSED |
DTS | No |
Community of License | HOUSTON, TX |
Pre-auction RF Channel | 28 |
Post-auction RF Channel | 28 |
Neilsen DMA | Houston |
Network Affiliation |
Question | Response |
---|---|
Sharee Station Facility ID | 24436 |
Call Sign | KLTJ |
Type | Noncommercial Educational |
Licensee Name | Community Television Educators of Texas, Inc. |
Status | LICENSED |
DTS | No |
Community of License | GALVESTON, TX |
Pre-auction RF Channel | 23 |
Post-auction RF Channel | 23 |
Neilsen DMA | HOUSTON |
Network Affiliation |
Question | Response |
---|---|
Sharee Station Facility ID | 60537 |
Call Sign | KFTH-DT |
Type | Commercial |
Licensee Name | UNIMAS HOUSTON LLC |
Status | LICENSED |
DTS | No |
Community of License | ALVIN, TX |
Pre-auction RF Channel | 36 |
Post-auction RF Channel | 36 |
Neilsen DMA | Houston |
Network Affiliation |
Question | Response |
---|---|
Sharee Station Facility ID | 69269 |
Call Sign | KUHT |
Type | Noncommercial Educational |
Licensee Name | University of Houston System |
Status | LICENSED |
DTS | No |
Community of License | HOUSTON, TX |
Pre-auction RF Channel | 8 |
Post-auction RF Channel | 8 |
Neilsen DMA | HOUSTON |
Network Affiliation |
Question | Response |
---|---|
Sharee Station Facility ID | 70492 |
Call Sign | KUBE-TV |
Type | Commercial |
Licensee Name | RNN NATIONAL, LLC |
Status | LICENSED |
DTS | No |
Community of License | BAYTOWN, TX |
Pre-auction RF Channel | 31 |
Post-auction RF Channel | 31 |
Neilsen DMA | Houston |
Network Affiliation |
Question | Response |
---|---|
Sharee Station Facility ID | 57187 |
Call Sign | KVQT-LD |
Type | |
Licensee Name | C. Dowen Johnson |
Status | LICENSED |
DTS | No |
Community of License | HOUSTON, TX |
Pre-auction RF Channel | 14 |
Post-auction RF Channel | |
Neilsen DMA | |
Network Affiliation |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DCX-2H | |
Year | 2002 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 40 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | THU9-60 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 88.5 kW | |
Justification for New Transmitter | New Transmitter required as the current transmitter is not longer supported (see attached note) Solid State transmitter chosen as it is less expensive then a new solid state (see attached proposal) and will allow old transmitter to be used as interim |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Electrical Connectivity to new transmitter | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Transmitter Installation |
Installation of Transmitter, Filter, and ground level RF components |
RF Filter installation |
RF Filter for new channel (ch 22) |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Auxiliary (Backup) | |
Description of Use | To maintain coverage when primary antenna is unavailable | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this antenna currently shared with any other stations? | No | |
Is this antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 676.0 kW | |
Manufacturer | ||
Model | TFU-24DSB-C | |
Year | 2004 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Auxiliary (Backup) |
Description of Use | Used to maintain coverage when main antenna is unavailable | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 600.0 kW | |
Manufacturer | ||
Model | TFU-16DSB-D | |
Year | 2019 | |
Justification for New Antenna | New antenna required because existing auxiliary is single channel and will not work on new channel. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Aux Antenna Installation |
New Aux Antenna Installation |
Elbow for Aux |
Elbow Assemby for Aux Antenna 4 1/16 |
Reducer |
4-50 to 3-50 antenna input reducer |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Top | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | ATW26HS6-ETCXL-22H | |
Year | 2002 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Top | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 592.0 kW | |
Manufacturer | ||
Model | ATW19HS6-ETCX-22H | |
Year | 2019 | |
Justification for New Antenna | A new antenna is required as the current antenna is designed for channel 48 will not work on the new channel (Ch 22) |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 8 3/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Antenna Mount |
Tower Stub, 6 ft., 42" face triangular tower, structural mount for antenna |
Additional Installation Weather Days |
Additional Installation Weather Days |
Antenna Installation |
Install Antenna- Structural Installation |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Waveguide | |
Diameter | N/A | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 2045 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 8 3/16 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 2045 feet per run | |
Justification for New Transmission Line | New line is required because the existing GLW1500 waveguide will not work on channel 22. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1064696 | |
Coordinates (NAD83) | Latitude (NAD83) | 29° 34' 16.0" N- |
Longitude (NAD83) | 095° 30' 38.0" W- | |
Overall Structure Height | 1973.07 feet | |
Support Structure Height | 1842.17 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 76.77 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Towers, LLC | |
Date Constructed | 11/19/2001 |
Facility ID | Call Sign | Service |
---|---|---|
35524 | KRBE | FM |
58835 | KPXB-TV | DTV |
53847 | KXLN-DT | DTV |
18516 | KTBZ-FM | FM |
12895 | KETH-TV | DTV |
35073 | KLOL | FM |
25449 | KKHH | FM |
25439 | KILT-FM | FM |
24436 | KLTJ | DTV |
70492 | KUBE-TV | DTV |
35337 | KODA | FM |
66790 | KUGB-CD | DTV |
47749 | KHMX | FM |
60537 | KFTH-DT | DTV |
Users |
---|
KVQT-LD |
KPBX-LD |
KDHU-LD |
KVVV-LD |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for tower with candelabra |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Serious Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | Yes |
Name | Description |
---|---|
Tower Drawling Package |
Tower Permit Drawing Package (Cost per customer of ATC) |
Ground and Building Permit Drawing Package |
Ground & Building A&E Permit Drawing Package (Cost per customer of ATC) |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 1040 | |
Explanation | Project oversight of transmitter install, electrical connectivity, tower work, and antenna installation. Additional time will be spent tracking financial and legal process and coordinating with other broadcasters | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | No |
Prepare engineering section of Form FCC Construction Permit Application | No | |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare engineering section of Form FCC License to Cover Application | No | |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | Yes | |
Environmental Assessment | No | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | Yes | |
Number of Days | 20 | |
Justification | Ground Level RF Engineering |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Public Hearing |
Public Hearing (cost per customer) as per ATC documentation |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,859,527.94 | $1,264,970.94 | N/A | $1,160,758.20 | N/A |
Total for all systems | $5,965,480.94 | $3,297,740.17 | N/A | $2,883,520.04 | N/A |
Primary Transmitter THU9-60 | $2,859,527.94 | $1,264,970.94 | $1,160,758.20 | ||
RF Filter installation | $4,500.00 | $4,500.00 | N/A | $0.00 | N/A |
Transmitter Installation | $189,825.49 | $189,825.49 | N/A | $90,112.75 | N/A |
Other Electrical Service: Electrical Connectivity to new transmitter | $9,652.45 | $9,652.45 | Electrical connection costs are reflected in the installation cost estimate | $9,652.45 | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $11,200.00 | N/A | $11,200.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 86.8 . 106 kW | $2,630,000.00 | $1,049,793.00 | N/A | $1,049,793.00 | N/A |
Actual Information Description | File Name |
---|---|
RF Filter installation | |
Transmitter Installation | |
Other Electrical Service: Electrical Connectivity to new transmitter | |
Transformer 3 phase/480v - 150 KVA | |
UHF - Liquid Cooled Solid State Transmitter 86.8 . 106 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $458,333.00 | $466,663.00 | N/A | $346,850.00 | N/A |
Total for all systems | $5,965,480.94 | $3,297,740.17 | N/A | $2,883,520.04 | N/A |
Primary Antenna ATW19HS6-ETCX-22H | $364,555.00 | $363,475.00 | $258,700.00 | ||
Antenna Installation | $25,000.00 | $25,000.00 | N/A | $13,000.00 | N/A |
Additional Installation Weather Days | $10,075.00 | $10,075.00 | N/A | $8,450.00 | N/A |
Antenna Mount | $18,000.00 | $18,000.00 | N/A | $18,000.00 | N/A |
Elbow complex, single channel, at antenna input, per 8 3/16. feedline (if needed) | $15,250.00 | $14,500.00 | N/A | $0.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $0.00 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $289,500.00 | N/A | $219,250.00 | N/A |
Auxiliary Antenna TFU-16DSB-D | $93,778.00 | $103,188.00 | $88,150.00 | ||
Elbow for Aux | $3,920.00 | $3,920.00 | N/A | $3,920.00 | N/A |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $15,000.00 | Actual exceed predetermined cost | $12,825.00 | N/A |
UHF - High Power, Side Mount, basic slot antenna, 600 kW input, directional,, horizontally polarized | $45,000.00 | $45,000.00 | N/A | $39,032.00 | N/A |
Aux Antenna Installation | $32,000.00 | $32,000.00 | N/A | $31,505.00 | N/A |
Reducer | $868.00 | $868.00 | N/A | $868.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Antenna Installation | |
Additional Installation Weather Days | |
Antenna Mount | |
Elbow complex, single channel, at antenna input, per 8 3/16. feedline (if needed) | Information not provided. |
Sweep test of existing antenna | Information not provided. |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | |
Elbow for Aux | |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | |
UHF - High Power, Side Mount, basic slot antenna, 600 kW input, directional,, horizontally polarized | |
Aux Antenna Installation | |
Reducer | |
Sweep test of existing antenna | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $709,615.00 | $578,704.23 | N/A | $560,186.83 | N/A |
Total for all systems | $5,965,480.94 | $3,297,740.17 | N/A | $2,883,520.04 | N/A |
Primary Transmission Line | $709,615.00 | $578,704.23 | $560,186.83 | ||
Rigid Transmission Line - copper, 8 3/16" | $709,615.00 | $578,704.23 | Line, adapters, and deign services from attached Antenna Proposal | $560,186.83 | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 8 3/16" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,501,700.00 | $516,355.00 | N/A | $454,464.00 | N/A |
Total for all systems | $5,965,480.94 | $3,297,740.17 | N/A | $2,883,520.04 | N/A |
Primary Tower GTOWER | $1,501,700.00 | $516,355.00 | $454,464.00 | ||
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $421,000.00 | See proposal from ERI for antenna installation services | $404,459.50 | N/A |
Serious tower reinforcement/modifications | $1,052,000.00 | $55,000.00 | see attached American Tower cost estimate form | $12,899.50 | N/A |
Structural engineering tower load study for a documented tower with candelabra | $20,000.00 | $31,655.00 | Price for tower mapping and structural engineering, as per ATC documentation | $31,655.00 | N/A |
Ground and Building Permit Drawing Package | $1,000.00 | $1,000.00 | see attached American Tower cost estimate form | $750.00 | N/A |
Tower Helicopter Lift | $3,000.00 | $3,000.00 | As per M. Rhodes: cost reflected in "Complex Tower" line item | $0.00 | N/A |
Tower Drawling Package | $4,700.00 | $4,700.00 | see attached American Tower cost estimate form | $4,700.00 | N/A |
Actual Information Description | File Name |
---|---|
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Serious tower reinforcement/modifications | |
Structural engineering tower load study for a documented tower with candelabra | |
Ground and Building Permit Drawing Package | |
Tower Helicopter Lift | Information not provided. |
Tower Drawling Package |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $312,975.00 | $355,032.00 | N/A | $285,289.25 | N/A |
Total for all systems | $5,965,480.94 | $3,297,740.17 | N/A | $2,883,520.04 | N/A |
Outside Professional Services | $312,975.00 | $355,032.00 | $285,289.25 | ||
Additional Field Engineering Service, 20 Days | $20,000.00 | $20,000.00 | N/A | $10,000.00 | N/A |
RF Exposure Measurements | $21,050.00 | $15,000.00 | N/A | $0.00 | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $47,732.00 | N/A | $47,732.00 | N/A |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $1,400.00 | N/A | $0.00 | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $500.00 | N/A | $0.00 | N/A |
NEPA Section 106 environmental review, if needed | $6,310.00 | $5,400.00 | N/A | $0.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $2,500.00 | N/A | $415.80 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $8,500.00 | Actual cost exceed predetermined cost estimate | $8,471.60 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $816.86 | N/A |
Project management of the transition | $164,320.00 | $250,000.00 | PM cost exceed predetermined cost | $217,761.19 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $1,500.00 | N/A | $91.80 | N/A |
Actual Information Description | File Name |
---|---|
Additional Field Engineering Service, 20 Days | |
RF Exposure Measurements | Information not provided. |
Comprehensive coverage verification via field study, if needed | |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | Information not provided. |
ASR modification (prepare FCC Form 854) | Information not provided. |
NEPA Section 106 environmental review, if needed | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Address transition timing and coordination issues w/ other stations and wireless | |
Prepare and or review reimbursement form | |
Project management of the transition | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $123,330.00 | $116,015.00 | N/A | $75,971.76 | N/A |
Total for all systems | $5,965,480.94 | $3,297,740.17 | N/A | $2,883,520.04 | N/A |
Other Expenses | $123,330.00 | $116,015.00 | $75,971.76 | ||
Public Hearing | $2,000.00 | $2,000.00 | see attached ATC documentation | $0.00 | N/A |
MVPD Notification of Channel Change | $12,000.00 | $12,000.00 | N/A | $0.00 | N/A |
Develop and air announcement of upcoming channel change | $5,000.00 | $5,000.00 | N/A | $0.00 | N/A |
Equipment Storage | $16,000.00 | $16,000.00 | N/A | $15,237.00 | N/A |
Non-zoning permits | $2,500.00 | $2,500.00 | N/A | $0.00 | N/A |
Local Zoning | $750.00 | $750.00 | N/A | $0.00 | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | $0.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | $0.00 | N/A |
DTV Medical Facility Notification | $11,550.00 | $4,250.00 | N/A | $4,250.00 | N/A |
Equipment Delivery and Handling Charges | $58,000.00 | $58,000.00 | N/A | $56,484.76 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $15,000.00 | $15,000.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Public Hearing | Information not provided. |
MVPD Notification of Channel Change | Information not provided. |
Develop and air announcement of upcoming channel change | |
Equipment Storage | |
Non-zoning permits | Information not provided. |
Local Zoning | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
DTV Medical Facility Notification | |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $5,965,480.94 | $3,297,740.17 | $2,883,520.04 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Angela Ball Assistant Secretary 11/02/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Angela Ball Assistant Secretary 11/02/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Angela Ball Assistant Secretary 11/02/2022 |