Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
NBC TELEMUNDO LICENSE LLC |
Angela Ball 300 NEW JERSEY AVENUE, NW SUITE 700 WASHINGTON, DC 20001 United States |
+1 (202) 524-6413 | angela.ball@nbcuni.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Angela Ball Assistant Secretary NBCUniversal, LLC |
300 New Jersey Avenue, NW Washington, DC 20001 United States |
+1 (202) 524-6413 | angela.ball@nbcuni.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Install new antenna in place of existing analog antenna and new transmitter for new channel. The old transmitter and antenna will remain in place for interim use until the cut-over. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | LU5000AT | |
Year | 2006 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1.5 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | TMU9-3 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.8 kW | |
Justification for New Transmitter | Old transmitter, AXCERA LU5000AT, was no longer supported. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | We installed one 20-amp, one 20 volt circuit to a new quad- receptacle and one new duplex receptacle. We also did one 1-1/4" conduit with 4 THHN conductors. We also installed one 10x10 junction box. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Installation Costs |
Transmitter Installation Costs |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | TLP-12F/VP | |
Year | 2006 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | TLP-12F/VP | |
Year | 2018 | |
Justification for New Antenna | The old antenna which was single channel would not operate on the new channel. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 42° 05' 07.2" N- |
Longitude (NAD83) | 072° 42' 11.4" W- | |
Overall Structure Height | 170.00 feet | |
Support Structure Height | 155.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 759.00 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | NBC | |
Date Constructed | 11/30/1988 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study need for guyed or free-standing tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Installation Costs |
Antenna installation and tower modification |
Fiber Guy Wires |
The furnish and installation of three 40' Long HPTG 270001 Fiber Guy assembly with corona sockets factory install on each end. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 350 | |
Explanation | Project oversight of transmitter install, electrical connectivity, tower work, and antenna installation. Additional time will be spent tracking financial and legal process and coordinating with other broadcasters. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | No |
Prepare engineering section of Form FCC Construction Permit Application | No | |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | Yes | |
Number of Days | 5 | |
Justification | Site survey prior to install |
Name | Description |
---|---|
Medical Notifications |
Notification to medical facilities |
RF Field Strength Signal Survey |
RF Field Strength Signal Survey |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Field Verification |
Verifying existing conditions at antenna, mounts and feedline connector |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $125,530.00 | $121,152.71 | N/A | $2,090.91 | N/A |
Total for all systems | $439,851.43 | $545,929.14 | N/A | $312,333.32 | N/A |
Primary Transmitter TMU9-3 | $125,530.00 | $121,152.71 | $2,090.91 | ||
Installation Costs | $30,000.00 | $30,000.00 | N/A | $2,090.91 | N/A |
Other Electrical Service: We installed one 20-amp, one 20 volt circuit to a new quad- receptacle and one new duplex receptacle. We also did one 1-1/4" conduit with 4 THHN conductors. We also installed one 10x10 junction box. | $1,530.00 | $1,530.00 | N/A | $0.00 | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $12,750.00 | Decommissioning of the existing Axcera transmitter to create space in the room for install added to the cost. | $0.00 | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $76,872.71 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Installation Costs | |
Other Electrical Service: We installed one 20-amp, one 20 volt circuit to a new quad- receptacle and one new duplex receptacle. We also did one 1-1/4" conduit with 4 THHN conductors. We also installed one 10x10 junction box. | Information not provided. |
Transmitter Building Site Survey/Installation | |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $15,730.00 | $30,000.00 | N/A | $16,150.00 | N/A |
Total for all systems | $439,851.43 | $545,929.14 | N/A | $312,333.32 | N/A |
Primary Antenna TLP-12F/VP | $15,730.00 | $30,000.00 | $16,150.00 | ||
Sweep test of transmission line and antenna | $5,730.00 | $20,000.00 | Estimated cost is greater than predetermined cost estimate | $16,150.00 | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical | $10,000.00 | $10,000.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Sweep test of transmission line and antenna | |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $196,080.06 | $138,190.06 | N/A | $106,995.42 | N/A |
Total for all systems | $439,851.43 | $545,929.14 | N/A | $312,333.32 | N/A |
Primary Tower TOWER | $196,080.06 | $138,190.06 | $106,995.42 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $0.00 | Rigging costs are included in the $53,085 price for tower modifications. | N/A | N/A |
Study needed for guyed or free-standing tower | $8,700.00 | $7,000.00 | N/A | $6,400.00 | N/A |
Minor tower reinforcement/modifications | $25,000.00 | $25,000.00 | N/A | $3,360.00 | N/A |
Installation Costs | $100,000.00 | $100,000.00 | N/A | $91,292.42 | N/A |
Fiber Guy Wires | $6,190.06 | $6,190.06 | N/A | $5,943.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') | Information not provided. |
Study needed for guyed or free-standing tower | |
Minor tower reinforcement/modifications | |
Installation Costs | |
Fiber Guy Wires |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $76,957.50 | $231,032.50 | N/A | $166,780.18 | N/A |
Total for all systems | $439,851.43 | $545,929.14 | N/A | $312,333.32 | N/A |
Outside Professional Services | $76,957.50 | $231,032.50 | $166,780.18 | ||
RF Field Strength Signal Survey | $5,800.00 | $5,800.00 | N/A | $5,800.00 | N/A |
Medical Notifications | $2,000.00 | $2,000.00 | N/A | $2,000.00 | N/A |
Additional Field Engineering Service, 5 Days | $7,500.00 | $7,500.00 | N/A | $7,450.00 | N/A |
RF Exposure Measurements | $12,100.00 | $12,100.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | $360.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $6,320.00 | $6,320.00 | N/A | $3,285.00 | N/A |
Project management of the transition | $36,925.00 | $191,000.00 | Project management cost exceed predetermined cost | $147,488.58 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | $396.60 | N/A |
Actual Information Description | File Name |
---|---|
RF Field Strength Signal Survey | |
Medical Notifications | |
Additional Field Engineering Service, 5 Days | |
RF Exposure Measurements | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Form 399 assistance or other Program Management costs | |
Project management of the transition | |
Prepare/ Review 399 reimbursement form |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $25,553.87 | $25,553.87 | N/A | $20,316.81 | N/A |
Total for all systems | $439,851.43 | $545,929.14 | N/A | $312,333.32 | N/A |
Other Expenses | $25,553.87 | $25,553.87 | $20,316.81 | ||
Field Verification | $3,270.00 | $3,270.00 | N/A | $3,270.00 | N/A |
Equipment Storage | $6,865.00 | $6,865.00 | N/A | $3,832.00 | N/A |
Equipment Delivery and Handling Charges | $5,973.87 | $5,973.87 | Kenco Shipping cost | $5,973.87 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $8,000.00 | $8,000.00 | tbd | $7,240.94 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Field Verification | |
Equipment Storage | |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $439,851.43 | $545,929.14 | $312,333.32 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Angela Ball Assistant Secretary 11/02/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Angela Ball Assistant Secretary 11/02/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Angela Ball Assistant Secretary 11/02/2022 |