Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
COCOLA BROADCASTING COMPANIES, LLC Doing Business As: COCOLA BROADCASTING COMPANIES, LLC |
Gary M. Cocola 706 W. HERNDON AVENUE FRESNO, CA 93650 United States |
+1 (559) 269-0425 | garyc@cocolatv.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Station was displaced from RF channel 51 to RF channel 9; will install a new VHF transmitter, antenna and transmission line. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | 834A | |
Year | 1998 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TRN-VIII-640-FA | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 640 W | |
Justification for New Transmitter | Existing ITS transmitter is a UHF transmitter and station is being displaced to VHF channel 9 requiring a new transmitter. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | Yes | |
Size | 1 inches | |
Length | 25.0 feet | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Contract Engineering |
Contract engineering costs to install the new Anywave VHF transmitter. |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels | 6 | |
Design power capacity in use | 70.0 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 862.00 MHz | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | UP-6-NC | |
Year | 1998 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Yagi | |
ERP: | 2.3 kW | |
Manufacturer | ||
Model | 2xHDCA-10/URM/HV | |
Year | 2020 | |
Justification for New Antenna | Existing SBP UP-6-NC is a UHF Broadband Panel antenna and will not support VHF RF 9. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 150 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 150 feet per run | |
Justification for New Transmission Line | The existing SBP (UP-6-NC) antenna will not be removed from tower and the existing transmission line will continue to support this antenna. The new antenna will be mounted on a different leg of the tower and requires new transmission line. | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1065031 | |
Coordinates (NAD83) | Latitude (NAD83) | 36° 17' 14.0" N- |
Longitude (NAD83) | 118° 50' 20.0" W- | |
Overall Structure Height | 128.94 feet | |
Support Structure Height | 75.13 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 5715.81 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Falcon Cable Systems Company II, LP | |
Date Constructed | 10/27/1998 |
Facility ID | Call Sign | Service |
---|---|---|
16950 | KNXT | DTV |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 90 | |
Explanation | Project manage material and contractors for this displacement project. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $35,622.75 | $52,122.75 | N/A | $51,622.75 | N/A |
Total for all systems | $130,370.25 | $92,455.75 | N/A | $75,460.75 | N/A |
Primary Transmitter TRN-VIII-640-FA | $35,622.75 | $52,122.75 | $51,622.75 | ||
High VHF - Air Cooled Solid State Transmitter 400 - 1000 Watts | $30,000.00 | $46,500.00 | New Anywave 640 Watt transmitter for the KVVG displacement channel RF 9. | $46,500.00 | N/A |
1" Rigid Conduit and Wiring | $500.00 | $500.00 | Electrical conduit and wiring costs for new VHF transmitter. | N/A | N/A |
Contract Engineering | $5,122.75 | $5,122.75 | Installation of transmission equipment for interim and the new Anywave VHF transmitter at final site. | $5,122.75 | N/A |
Actual Information Description | File Name |
---|---|
High VHF - Air Cooled Solid State Transmitter 400 - 1000 Watts | |
1" Rigid Conduit and Wiring | Information not provided. |
Contract Engineering |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $6,850.00 | $10,338.00 | N/A | $4,838.00 | N/A |
Total for all systems | $130,370.25 | $92,455.75 | N/A | $75,460.75 | N/A |
Primary Antenna 2xHDCA-10/URM/HV | $6,850.00 | $10,338.00 | $4,838.00 | ||
High-VHF, Low Power, Yagi/Cross-Dipole/Log Periodic Transmit Antenna | $1,120.00 | $4,838.00 | Kathrein quote #1162-1 attached to invoice #PO_1162-1 in the amount of $4,838 plus 5% for shipping. | $4,838.00 | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $5,500.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
High-VHF, Low Power, Yagi/Cross-Dipole/Log Periodic Transmit Antenna | |
Sweep test of transmission line and antenna | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $3,600.00 | $0.00 | N/A | $0.00 | N/A |
Total for all systems | $130,370.25 | $92,455.75 | N/A | $75,460.75 | N/A |
Primary Transmission Line | $3,600.00 | $0.00 | $0.00 | ||
Flexible Foam Transmission Line - dielectric, 1 5/8" | $3,600.00 | $0.00 | Station will not request reimbursement of transmission line for this facility. | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Foam Transmission Line - dielectric, 1 5/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,190.00 | $6,200.00 | N/A | $6,200.00 | N/A |
Total for all systems | $130,370.25 | $92,455.75 | N/A | $75,460.75 | N/A |
Primary Tower TOWER | $56,190.00 | $6,200.00 | $6,200.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $6,200.00 | N/A | $6,200.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $22,662.50 | $18,350.00 | N/A | $12,800.00 | N/A |
Total for all systems | $130,370.25 | $92,455.75 | N/A | $75,460.75 | N/A |
Outside Professional Services | $22,662.50 | $18,350.00 | $12,800.00 | ||
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,500.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,050.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $200.00 | N/A | $200.00 | N/A |
Form 399 assistance or other Program Management costs | $1,900.00 | $1,900.00 | Prepare 399 Eligibility and Broadcaster Relocation documents | $1,900.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $3,575.00 | Time to prepare, review, revise, submit and resubmit 399 invoices for the displaced station to the FCC for reimbursement. | $3,575.00 | N/A |
Project management of the transition | $9,495.00 | $1,875.00 | N/A | $1,875.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $5,250.00 | Displacement resulted in a need to move the facility from its current facility that was unavailable to an interim site due to 30 mile rule before building at final site at Bear Mountain. | $5,250.00 | N/A |
Actual Information Description | File Name |
---|---|
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Form 399 assistance or other Program Management costs | |
Prepare/ Review 399 reimbursement form | |
Project management of the transition | |
Perform engineering study for displacement application |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $5,445.00 | $5,445.00 | N/A | $0.00 | N/A |
Total for all systems | $130,370.25 | $92,455.75 | N/A | $75,460.75 | N/A |
Other Expenses | $5,445.00 | $5,445.00 | $0.00 | ||
Equipment Storage | $1,500.00 | $1,500.00 | Temporary storage of the antenna and tx line until it can be transported to the transmit site; site has difficult access. | N/A | N/A |
Equipment Delivery and Handling Charges | $1,500.00 | $1,500.00 | Access to the transmit site is difficult requiring special handling to transport equipment for this project. | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $1,000.00 | $1,000.00 | Costs for disposal of boxes, crates and packing material. | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $130,370.25 | $92,455.75 | $75,460.75 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Gary M Cocola Managing Member 09/28/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Gary M Cocola Managing Member 09/28/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Gary M. Cocola Managing Member 09/28/2022 |