Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
The University of Texas at Austin |
Frank Serpas III 2500 Whitis Avenue Communications Bldg. C Austin, TX 78712 United States |
+1 (512) 471-7052 | serpas@austin.utexas.edu | Government Entity |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Existing transmitter (400 W) and antenna (directional) will be replaced with equipment needed to fulfill construction permit; existing transmission line (7/8") will be reused. Broadcast location (atop Main Building of University of Texas) is unchanged. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | AT7400 | |
Year | 2010 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 400 W |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | EC701HP-BB2 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1100 W | |
Justification for New Transmitter | Our existing transmitter model has been discontinued and the manufacturer has advised that replacement is warranted. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 3400.0 W | |
Manufacturer | ||
Model | PSILPD8EC-29 | |
Year | 2009 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
ERP: | 7500.0 W | |
Manufacturer | ||
Model | PSILPD8OI-32-EP | |
Year | 2020 | |
Justification for New Antenna | New antenna parameters correspond to changes in ERP, pattern, and broadcast frequency; elliptical polarization is an upgrade. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Name | Description |
---|---|
removal and replacement labor |
Labor to remove existing antenna from and install new antenna upon UT Main Building. |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $84,000.00 | $37,815.00 | N/A | $37,815.00 | N/A |
Total for all systems | $133,110.00 | $86,323.00 | N/A | $86,323.00 | N/A |
Primary Transmitter EC701HP-BB2 | $84,000.00 | $37,815.00 | $37,815.00 | ||
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $37,815.00 | N/A | $37,815.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $36,800.00 | $36,800.00 | N/A | $36,800.00 | N/A |
Total for all systems | $133,110.00 | $86,323.00 | N/A | $86,323.00 | N/A |
Primary Antenna PSILPD8OI-32-EP | $36,800.00 | $36,800.00 | $36,800.00 | ||
removal and replacement labor | $25,250.00 | $25,250.00 | The cost estimate was the actual cost of installing the K29HW-D antenna atop the UT Main Building in 2010. Subsequent changes to the building's infrastructure increased the difficulty (and thus cost) associated with installing the new antenna for K32OJ-D. | $25,250.00 | The cost estimate was the actual cost of installing the K29HW-D antenna atop the UT Main Building in 2010. Subsequent changes to the building's infrastructure increased the difficulty (and thus cost) associated with installing the new antenna for K32OJ-D. |
UHF-Low Power, Side Mount, Slotted Coaxial, 7500.0watt input, Elliptical | $11,550.00 | $11,550.00 | N/A | $11,550.00 | N/A |
Actual Information Description | File Name |
---|---|
removal and replacement labor | |
UHF-Low Power, Side Mount, Slotted Coaxial, 7500.0watt input, Elliptical |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $12,310.00 | $11,708.00 | N/A | $11,708.00 | N/A |
Total for all systems | $133,110.00 | $86,323.00 | N/A | $86,323.00 | N/A |
Outside Professional Services | $12,310.00 | $11,708.00 | $11,708.00 | ||
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $975.00 | N/A | $975.00 | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $406.50 | N/A | $406.50 | N/A |
Perform engineering study for displacement application | $1,800.00 | $2,050.00 | Necessary to conduct full allocation study and interference study for market. | $2,050.00 | Necessary to conduct full allocation study and interference study for market. |
Form 399 assistance or other Program Management costs | $157.50 | $157.50 | N/A | $157.50 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $763.50 | Form 399 preparation expense | $763.50 | Form 399 preparation expense |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $3,708.00 | Additional coordination with new channel 29 broadcaster in Austin, TX. | $3,708.00 | Additional coordination with new channel 29 broadcaster in Austin, TX. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,647.50 | Additional legal work to research other broadcasters in Austin, TX area. | $3,647.50 | Additional legal work to research other broadcasters in Austin, TX area. |
Actual Information Description | File Name |
---|---|
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | |
Perform engineering study for displacement application | |
Form 399 assistance or other Program Management costs | |
Prepare/ Review 399 reimbursement form | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $0.00 | $0.00 | N/A | $0.00 | N/A |
Total for all systems | $133,110.00 | $86,323.00 | N/A | $86,323.00 | N/A |
Other Expenses | $0.00 | $0.00 | $0.00 |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $133,110.00 | $86,323.00 | $86,323.00 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Frank Serpas business/operations manager 09/15/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Frank Serpas business/operations manager 09/15/2022 |