Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
Jennifer Juarez Doing Business As: JENNIFER JUAREZ |
1138 N. TILLERY DALLAS, TX 75211 United States |
+1 (214) 418-1068 | jenniferjuarez0406@gmail.com | Individual |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Moving from channel 46 UHF to channel 22 UHF we need to do the following: purchase a new transmitter purchase a new antenna purchase a new coax cable and move to a new transmitter site |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | No | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DB-150 | |
Year | 2008 | |
Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power Capacity | 0.15 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | BE-TV3k0-FAU | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 3 kW | |
Justification for New Transmitter | I am changing channels from 46 UHF to 22 UHF channel. The old transmitter cannot accommodate the power required under the new permit. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | I need to install 100 amps circuit. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Top Mount | |
Antenna position in stack | Top | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 1.0 kW | |
Manufacturer | ||
Model | PSILP8OI | |
Year | 2008 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Middle | |
Polarization | Circular | |
Type | Other | |
Other Antenna Type | omnidirectional | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | JA-SS-8/15 SCO | |
Year | 2020 | |
Justification for New Antenna | I need to move from CHANNEL 46 UHF to 22 Channel 22 UHF. The antenna cannot be re-tuned. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 7/8 inches | |
Number of parallel runs | 1 | |
Length | 350 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 350 feet per run | |
Justification for New Transmission Line | Cannot use coax cable of 7/8 for this antenna | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1211887 | |
Coordinates (NAD83) | Latitude (NAD83) | 32° 26' 38.5" N- |
Longitude (NAD83) | 099° 44' 05.3" W- | |
Overall Structure Height | 320.86 feet | |
Support Structure Height | 279.85 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 1727.01 feet | |
Structure Type | B - Building | |
Tower Owner | WWC Texas RSA LLC | |
Date Constructed | 02/01/1994 |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 150 | |
Explanation | Jennifer Juarez does not have the expertise to perform work. Therefore, I will need to hire professional services to do the job. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Consulting and Assistance |
Consulting and assistance with channel and also with form 399 |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $136,670.00 | $138,088.86 | N/A | $138,088.86 | N/A |
Total for all systems | $302,785.00 | $272,467.61 | N/A | $249,720.11 | N/A |
Primary Transmitter BE-TV3k0-FAU | $136,670.00 | $138,088.86 | $138,088.86 | ||
5 Ton system | $20,250.00 | $10,013.13 | N/A | $10,013.13 | N/A |
Other Electrical Service: I need to install 100 amps circuit. | $10,120.00 | $10,120.00 | The amount $10,120 also includes travel and labor hours. | $10,120.00 | N/A |
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW | $106,300.00 | $117,955.73 | The estimated cost is greater because this cost includes all the accessories for transmitter, shipping cost and tax. | $117,955.73 | the sub total is greater than the estimated cost because the transmitter includes a directional coupler UHF, patch panel, band pass filter |
Actual Information Description | File Name |
---|---|
5 Ton system | |
Other Electrical Service: I need to install 100 amps circuit. | |
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $16,175.00 | $16,175.00 | N/A | $11,550.00 | N/A |
Total for all systems | $302,785.00 | $272,467.61 | N/A | $249,720.11 | N/A |
Primary Antenna JA-SS-8/15 SCO | $16,175.00 | $16,175.00 | $11,550.00 | ||
UHF-Low Power, Side Mount, Other, 15.0kW input, Circular | $11,550.00 | $11,550.00 | N/A | $11,550.00 | N/A |
Side Mount antenna brackets | $4,625.00 | $4,625.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
UHF-Low Power, Side Mount, Other, 15.0kW input, Circular | |
Side Mount antenna brackets | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $8,400.00 | $8,180.00 | N/A | $8,180.00 | N/A |
Total for all systems | $302,785.00 | $272,467.61 | N/A | $249,720.11 | N/A |
Primary Transmission Line | $8,400.00 | $8,180.00 | $8,180.00 | ||
Flexible Foam Transmission Line - dielectric, 1 5/8" | $8,400.00 | $8,180.00 | N/A | $8,180.00 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Foam Transmission Line - dielectric, 1 5/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,190.00 | $13,480.00 | N/A | $13,480.00 | N/A |
Total for all systems | $302,785.00 | $272,467.61 | N/A | $249,720.11 | N/A |
Primary Tower B | $56,190.00 | $13,480.00 | $13,480.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $13,480.00 | N/A | $13,480.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $83,905.00 | $95,218.75 | N/A | $78,206.25 | N/A |
Total for all systems | $302,785.00 | $272,467.61 | N/A | $249,720.11 | N/A |
Outside Professional Services | $83,905.00 | $95,218.75 | $78,206.25 | ||
Consulting and Assistance | $40,750.00 | $40,750.00 | N/A | $40,750.00 | N/A |
RF Exposure Measurements | $12,100.00 | $12,100.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $4,612.50 | Amount charged | $4,612.50 | Amount charged |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $2,493.75 | This is the amount charged | $2,493.75 | This is the amount charged |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $6,862.50 | Amount charged | $6,862.50 | amount charged |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $2,000.00 | This is the amount charged | $2,000.00 | This is the amount charged |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $3,700.00 | amount charged | $3,700.00 | amount charged |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $17,562.50 | amount charged | $17,087.50 | amount charged |
Project management of the transition | $15,825.00 | $2,637.50 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $700.00 | $700.00 | This is the amount charged | $700.00 | This is the amount charged |
Actual Information Description | File Name |
---|---|
Consulting and Assistance | |
RF Exposure Measurements | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for displacement application | Information not provided. |
Prepare/ Review 399 reimbursement form | |
Project management of the transition | Information not provided. |
Form 399 assistance or other Program Management costs |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,445.00 | $1,325.00 | N/A | $215.00 | N/A |
Total for all systems | $302,785.00 | $272,467.61 | N/A | $249,720.11 | N/A |
Other Expenses | $1,445.00 | $1,325.00 | $215.00 | ||
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $215.00 | N/A | $215.00 | N/A |
Actual Information Description | File Name |
---|---|
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $302,785.00 | $272,467.61 | $249,720.11 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Dan J Alpert Legal Counsel 09/06/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Dan J Alpert Legal Counsel 09/06/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Dan J Alpert Legal Counsel 09/06/2022 |