Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
IGLESIA MANMIN TODA LA CREACION USA INC. Doing Business As: IGLESIA MANMIN TODA LA CREACION USA INC. |
Esteban Handal 1640 WEST FLAGLER ST. MIAMI, FL 33130 United States |
+1 (837) 231-7255 | estebanhandal@gmail.com | Not-for-Profit |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Jeffrey C Gehman Engineering Associate Kessler and Gehman Associates, Inc. |
Jeffrey C. Gehman 507-D NW 60th Street Gainesville, FL 32607 United States |
+1 (352) 332-3157 | jeff@kesslerandgehman.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Moving from channel 2 VHF to channel 17 UHF we need to do the following: purchase a new transmitter purchase a new antenna purchase a new coax cable and move to a new transmitter site |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | No | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | E1000 | |
Year | 2015 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | BE-TV1000-FAVI | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.2 kW | |
Justification for New Transmitter | We are changing channels from 2 VHF to 17 UHF channel. The old transmitter cannot be re-tuned. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | 100 amp circuit | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Single Rack Cabinet |
Single Rack Cabinet |
Surge Suppressor |
Surge Suppressor |
Filter Mounting Kit |
Filter Mounting Kit |
Filter |
Filter |
Site survey and training |
Site survey and training |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | No | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Middle | |
Polarization | Horizontal | |
Type | Other | |
Other Antenna Type | Dipole Flat Panel | |
ERP: | 3.0 kW | |
Manufacturer | ||
Model | JHD-LV4 | |
Year | 2010 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Middle | |
Polarization | Horizontal | |
Type | Other | |
Other Antenna Type | non-directional | |
ERP: | 0.25 kW | |
Manufacturer | ||
Model | JUHD-1/4 | |
Year | 2019 | |
Justification for New Antenna | We need to move from 11 VHF Channel to 17 UHF Channel. The antenna cannot be re-tuned. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 50 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Air | |
Diameter | 7/8 inches | |
Number of parallel runs | 1 | |
Length | 250 feet per run | |
Justification for New Transmission Line | New installation on tower | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | Terrain Constrained | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 38° 20' 42.42" N- |
Longitude (NAD83) | 075° 16' 58.7" W- | |
Overall Structure Height | 20.00 feet | |
Support Structure Height | 20.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 19.00 feet | |
Structure Type | other - | |
Tower Owner | Mobil Tower | |
Date Constructed | 09/09/2007 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | No study needed |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Terrain constrained |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 8 | |
Explanation | Iglesia Manmin does not have the expertise to perform work. It therefore will need to hire outside professional services. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
RF Engineer |
RF Engineer |
AV Rack |
AV Rack |
EAS |
EAS |
Encoder MUX |
Encoder MUX |
Generator |
Generator |
HVAC Installation |
HVAC Installation |
TX Site Conditioning |
TX Site Conditioning |
Travel |
Travel |
UPS |
UPS |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $170,650.00 | $140,400.00 | N/A | $0.00 | N/A |
Total for all systems | $429,145.25 | $402,576.00 | N/A | $22,164.50 | N/A |
Primary Transmitter BE-TV1000-FAVI | $170,650.00 | $140,400.00 | $0.00 | ||
Site survey and training | $20,000.00 | $20,000.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
Filter Mounting Kit | $2,700.00 | $2,700.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
Surge Suppressor | $2,800.00 | $2,800.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
Single Rack Cabinet | $1,700.00 | $1,700.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
5 Ton system | $20,250.00 | $4,500.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
Other Electrical Service: 100 amp circuit | $25,000.00 | $25,000.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $69,500.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
Filter | $14,200.00 | $14,200.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Site survey and training | |
Filter Mounting Kit | |
Surge Suppressor | |
Single Rack Cabinet | |
5 Ton system | |
Other Electrical Service: 100 amp circuit | |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
Filter |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $9,900.00 | $9,900.00 | N/A | $0.00 | N/A |
Total for all systems | $429,145.25 | $402,576.00 | N/A | $22,164.50 | N/A |
Primary Antenna JUHD-1/4 | $9,900.00 | $9,900.00 | $0.00 | ||
UHF-Low Power, Side Mount, Other, 0.25kW input, Horizontal | $9,900.00 | $9,900.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF-Low Power, Side Mount, Other, 0.25kW input, Horizontal |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $4,500.00 | $3,750.00 | N/A | $0.00 | N/A |
Total for all systems | $429,145.25 | $402,576.00 | N/A | $22,164.50 | N/A |
Primary Transmission Line | $4,500.00 | $3,750.00 | $0.00 | ||
Flexible Air Transmission Line - dielectric, 7/8" | $4,500.00 | $3,750.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Air Transmission Line - dielectric, 7/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $59,000.00 | $59,000.00 | N/A | $0.00 | N/A |
Total for all systems | $429,145.25 | $402,576.00 | N/A | $22,164.50 | N/A |
Primary Tower other | $59,000.00 | $59,000.00 | $0.00 | ||
Complex Tower (includes, e.g., towers with candelabras and/or stacked antennas) | $59,000.00 | $59,000.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Complex Tower (includes, e.g., towers with candelabras and/or stacked antennas) |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $38,280.25 | $42,711.00 | N/A | $22,164.50 | N/A |
Total for all systems | $429,145.25 | $402,576.00 | N/A | $22,164.50 | N/A |
Outside Professional Services | $38,280.25 | $42,711.00 | $22,164.50 | ||
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $2,375.00 | This is the amount charged | $0.00 | This is the amount charged |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $3,200.00 | This is the amount charged | $3,200.00 | This is the amount charged |
Perform engineering study for displacement application | $1,800.00 | $1,800.00 | N/A | N/A | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $914.50 | N/A | $914.50 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
RF Exposure Measurements | $12,100.00 | $12,100.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $2,375.00 | This is the amount charged | $0.00 | This is the amount charged |
Form 399 assistance or other Program Management costs | $10,806.25 | $10,806.25 | This is the amount charged | $10,806.25 | This is the amount charged |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $7,243.75 | This is the amount charged | $7,243.75 | This is the amount charged |
Project management of the transition | $844.00 | $844.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for displacement application | Information not provided. |
Prepare/ Review 399 reimbursement form | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
RF Exposure Measurements | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Form 399 assistance or other Program Management costs | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Project management of the transition | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $146,815.00 | $146,815.00 | N/A | $0.00 | N/A |
Total for all systems | $429,145.25 | $402,576.00 | N/A | $22,164.50 | N/A |
Other Expenses | $146,815.00 | $146,815.00 | $0.00 | ||
UPS | $24,800.00 | $24,800.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
Travel | $18,000.00 | $18,000.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
TX Site Conditioning | $20,000.00 | $20,000.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
HVAC Installation | $5,500.00 | $5,500.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
Generator | $11,500.00 | $11,500.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
Encoder MUX | $12,500.00 | $12,500.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
EAS | $10,291.00 | $10,291.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
AV Rack | $16,479.00 | $16,479.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
RF Engineer | $25,000.00 | $25,000.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
Equipment Delivery and Handling Charges | $1,300.00 | $1,300.00 | See attached / uploaded PDF file titled "OM Sys 11719 v220815jgv1.pdf" | $0.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
UPS | |
Travel | |
TX Site Conditioning | |
HVAC Installation | |
Generator | |
Encoder MUX | |
EAS | |
AV Rack | |
RF Engineer | |
Equipment Delivery and Handling Charges | |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $429,145.25 | $402,576.00 | $22,164.50 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Esteban Handal President 09/06/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Esteban Handel President 09/06/2022 |