Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
WSBS LICENSING, INC. Doing Business As: WSBS LICENSING, INC. |
Spanish Broadcasting System, Inc. 7007 NW 77TH AVE. MIAMI, FL 33166 United States |
+1 (305) 441-6901 | licensemanagement@sbscorporate.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Nancy A. Ory , Esq . Lerman Senter PLLC |
Nancy A. Ory 2001 L St NW Suite 400 Washington, DC 20036 United States |
+1 (202) 416-6791 | SBS-Repack@SummitRidgeGroup.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | WSBS-CD will be re-tuning its main transmitter and replacing the mask filter. An auxiliary transmitter will need to be replaced and a new antenna and line will be required to meet repack assignments and timelines. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Retune Existing |
Use | Primary (Main) | |
Ownership | Owned | |
Owner | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | Harris |
Model | UAX2500AT | |
Year | 2010 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 2.5 kW |
Section | Question | Response |
---|---|---|
New IOT Tubes | Number of Tubes (including accessories) needed | N/A |
New Mask Filter | ||
Power | 3 kW | |
Other Power | N/A | |
New Exciter | Is a new exciter needed? | Yes |
Exciter Type | Dual exciter with changeover |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Installation |
Installation and tuning charges to install new exciters and re-tune transmitter to CH 19 |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Back-Up Transmitter | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | SSTVU-5000 | |
Year | 1996 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 5 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAXTE-4R37 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 2.01 kW | |
Justification for New Transmitter | Current Auxiliary transmitter will not tune to new CH 19 assignment. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ALP16L4-CDP50 | |
Year | 2007 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Class A |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 7.98 kW | |
Manufacturer | ||
Model | TLP-12J | |
Year | 2018 | |
Justification for New Antenna | Current Antenna is not capable of broadcasting on channel 19. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 3 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Jumper HJ7-50A |
20 Ft EIA with 2 1 5/8 Gas Pass Female Connectors |
On site field engineering |
On site field engineering: includes travel, expenses, and report |
UHF Mid Power Side Mount |
Mid Power Side Mount for Antenna |
Reducer |
3-50 x 1-50 EIA CU |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Air | |
Diameter | 4 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 800 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Air | |
Diameter | 4 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1000 feet per run | |
Justification for New Transmission Line | Current line need for continued operation on existing channel. New Line will allow for testing and turn-up of Ch19 according to repack timelines. |
Name | Description |
---|---|
Connector Install Fee |
Install Fee for HJ9-50 & HJ11-50 |
Flexline Conn 3-50 |
Costs for Fem Flexline connector convertad to Gas Pass |
Building Penetration |
Costs for building penetration and re-sealing. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1224225 | |
Coordinates (NAD83) | Latitude (NAD83) | 25° 59' 10.0" N- |
Longitude (NAD83) | 080° 11' 36.3" W- | |
Overall Structure Height | 1019.02 feet | |
Support Structure Height | 942.90 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 11.15 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Towers, LLC. | |
Date Constructed | 10/12/2001 |
Facility ID | Call Sign | Service |
---|---|---|
4366 | WURH-CD | DTV |
51979 | WZTU | FM |
64971 | WSCV | DTV |
51349 | WBEC-TV | DTV |
60536 | WAMI-DT | DTV |
63154 | WTVJ | DTV |
51978 | WMIA-FM | FM |
11965 | WBGG-FM | FM |
29567 | WSFS | FM |
41381 | WHYI-FM | FM |
67193 | WMIB | FM |
48608 | WPXM-TV | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Tower Modification Project Manager |
Tower Modification Project Management. |
Ground and Building Drawing Package |
Generation of permitting drawing package. |
Tower Permit Drawing Package |
Generation of permitting drawing package. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 355 | |
Explanation | Project management fee for pre-construction services (including initial antenna placement and RF compatibility review, zoning and permitting requirements review; leasing application services) to support the transition of (1) broadcasters. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Site Meetings |
Coordination and transition planning with all parties onsite and management of the timelines and schedules occurring during the repack. |
Transition Coordination |
Coordination and transition planning with all parties onsite and management of the timelines and schedules occurring during the repack. |
Notice of Commencement Filing |
Costs related to Filing Notice of Commencement |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | No | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Professional Labor |
Labor to re-plumb existing RF switch and dummy load to accommodate new line and transmitter. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $302,705.00 | $214,945.27 | N/A | $153,357.95 | N/A |
Total for all systems | $1,434,570.53 | $1,158,067.11 | N/A | $455,943.20 | N/A |
Primary Transmitter UAX2500AT | $176,705.00 | $91,360.73 | $35,660.73 | ||
Installation | $20,000.00 | $20,000.00 | Installation, configuration, and re-tuning of existing transmitter. | $19,300.00 | N/A |
Dual exciter system with change over | $47,350.00 | $45,000.00 | N/A | N/A | N/A |
UHF and VHF - minor banding issues | $105,200.00 | $10,000.00 | N/A | N/A | N/A |
3 kW mask filter | $4,155.00 | $16,360.73 | Please see attached quote from GatesAir. Due to physical location within rack additional hardware needed for correct installation. | $16,360.73 | N/A |
Auxiliary Transmitter UAXTE-4R37 | $126,000.00 | $123,584.54 | $117,697.22 | ||
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $126,000.00 | $123,584.54 | See the attached UAXTE-4 Quote and Justification. | $117,697.22 | N/A |
Actual Information Description | File Name |
---|---|
Installation | |
Dual exciter system with change over | Information not provided. |
UHF and VHF - minor banding issues | Information not provided. |
3 kW mask filter | |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $173,904.80 | $173,374.80 | N/A | $27,470.80 | N/A |
Total for all systems | $1,434,570.53 | $1,158,067.11 | N/A | $455,943.20 | N/A |
Primary Antenna TLP-12J | $173,904.80 | $173,374.80 | $27,470.80 | ||
Reducer | $540.00 | $540.00 | N/A | $540.00 | N/A |
UHF Mid Power Side Mount | $19,172.80 | $19,172.80 | N/A | $19,172.80 | N/A |
On site field engineering | $6,400.00 | $6,400.00 | N/A | $6,400.00 | N/A |
UHF - Lower Power, Top Mount, Class A, basic slot antenna, 8 kW input, directional,, elliptically or circularly polarized | $132,104.00 | $132,104.00 | $17,000 additional cost for V-Pol antenna. | $0.00 | N/A |
Jumper HJ7-50A | $1,358.00 | $1,358.00 | N/A | $1,358.00 | N/A |
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed) | $7,600.00 | $7,400.00 | N/A | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Reducer | |
UHF Mid Power Side Mount | |
On site field engineering | |
UHF - Lower Power, Top Mount, Class A, basic slot antenna, 8 kW input, directional,, elliptically or circularly polarized | Information not provided. |
Jumper HJ7-50A | |
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed) | Information not provided. |
Sweep test of existing antenna | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $81,730.64 | $66,573.40 | N/A | $62,573.40 | N/A |
Total for all systems | $1,434,570.53 | $1,158,067.11 | N/A | $455,943.20 | N/A |
Primary Transmission Line | $81,730.64 | $66,573.40 | $62,573.40 | ||
Connector Install Fee | $170.64 | $170.64 | N/A | $170.64 | N/A |
Flexible Air Transmission Line - dielectric, 4" | $74,000.00 | $58,842.76 | N/A | $58,842.76 | N/A |
Building Penetration | $4,000.00 | $4,000.00 | Cost for boring through concrete building, flashing, and sealing. | N/A | N/A |
Flexline Conn 3-50 | $3,560.00 | $3,560.00 | N/A | $3,560.00 | N/A |
Actual Information Description | File Name |
---|---|
Connector Install Fee | |
Flexible Air Transmission Line - dielectric, 4" | |
Building Penetration | Information not provided. |
Flexline Conn 3-50 |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $625,300.00 | $460,000.00 | N/A | $117,867.41 | N/A |
Total for all systems | $1,434,570.53 | $1,158,067.11 | N/A | $455,943.20 | N/A |
Primary Tower GTOWER | $625,300.00 | $460,000.00 | $117,867.41 | ||
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $400,000.00 | N/A | $96,045.00 | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $30,000.00 | N/A | $8,375.92 | N/A |
Tower Permit Drawing Package | $5,000.00 | $5,000.00 | The generation of a permitting drawing package for one (1) broadcasters/customers. | N/A | N/A |
Tower Modification Project Manager | $10,000.00 | $10,000.00 | Project management fee for pre-construction services (including initial antenna placement and RF compatibility review, zoning and permitting requirements review; leasing application services) to support the transition of (1) broadcasters. 100Hrs @ $100HR | N/A | N/A |
Ground and Building Drawing Package | $5,000.00 | $5,000.00 | The generation of a permitting drawing package for one (1) broadcasters/customers. | $4,700.00 | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $10,000.00 | N/A | $8,746.49 | N/A |
Actual Information Description | File Name |
---|---|
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Minor tower reinforcement/modifications | |
Tower Permit Drawing Package | Information not provided. |
Tower Modification Project Manager | Information not provided. |
Ground and Building Drawing Package | |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $197,104.67 | $189,898.22 | N/A | $62,463.22 | N/A |
Total for all systems | $1,434,570.53 | $1,158,067.11 | N/A | $455,943.20 | N/A |
Outside Professional Services | $197,104.67 | $189,898.22 | $62,463.22 | ||
Notice of Commencement Filing | $574.67 | $574.67 | Cost of Filing Notice of Commencement | $574.67 | N/A |
Transition Coordination | $3,000.00 | $3,000.00 | Coordination and transition planning with all parties onsite and management of the timelines and schedules occurring during the repack. | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $2,250.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $4,065.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Project management of the transition | $56,090.00 | $55,573.55 | N/A | $55,573.55 | N/A |
Site Meetings | $3,000.00 | $3,000.00 | Coordination and transition planning with all parties onsite and management of the timelines and schedules occurring during the repack. | N/A | N/A |
RF Exposure Measurements | $21,050.00 | $20,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Notice of Commencement Filing | |
Transition Coordination | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form | Information not provided. |
Project management of the transition | |
Site Meetings | Information not provided. |
RF Exposure Measurements | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $53,825.42 | $53,275.42 | N/A | $32,210.42 | N/A |
Total for all systems | $1,434,570.53 | $1,158,067.11 | N/A | $455,943.20 | N/A |
Other Expenses | $53,825.42 | $53,275.42 | $32,210.42 | ||
Disposal Costs (for equipment and other waste, net of any salvage value) | $5,000.00 | $5,000.00 | Disposal of old ch 50 antenna, line, and transmitter. | N/A | N/A |
Non-zoning permits | $10,134.17 | $10,134.17 | Permits for local municipality for road closures need for tower rigging. Permits for Licenses and Equipment Removal (See Invoice 1000). | $10,134.17 | N/A |
Local Zoning | $3,000.00 | $3,000.00 | Obtain local permits (costs associated with preparation, filing, and fees) | $750.00 | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | $7,185.00 | N/A |
Professional Labor | $10,000.00 | $10,000.00 | Labor to re-plumb existing RF switch and dummy load to accommodate new line and transmitter. Labor to assist in installation and removal of heavy broadcast equipment. | N/A | N/A |
MVPD Notification of Channel Change | $985.00 | $985.00 | See WSBS_DTVNotification_INV-001963_PO720 | $985.00 | N/A |
Equipment Delivery and Handling Charges | $13,156.25 | $13,156.25 | N/A | $13,156.25 | N/A |
Actual Information Description | File Name |
---|---|
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Non-zoning permits | |
Local Zoning | |
DTV Medical Facility Notification | |
Professional Labor | Information not provided. |
MVPD Notification of Channel Change | |
Equipment Delivery and Handling Charges |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $1,434,570.53 | $1,158,067.11 | $455,943.20 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Richard D Lara Secretary 08/30/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Richard D Lara Secretary 08/30/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Richard D Lara Secretary 08/30/2022 |