Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
WORD BROADCASTING NETWORK, INC. Doing Business As: WORD BROADCASTING NETWORK, INC. |
3701 FERN VALLEY ROAD LOUISVILLE, KY 40219 United States |
+1 (502) 964-2121 | TOM@WBNA21.COM | Not-for-Profit |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Licensee is transitioning on 10/11/19 to its new spectrum in accordance with the previously granted construction permit. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | UNKNOWN | |
Year | 1900 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TRN-5X-U-18-C | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.1 kW | |
Justification for New Transmitter | Existing transmitter not compatible with new spectrum allocation as more power is required to transmit signal |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
MASK FILTER |
New 10 kW upgraded mask filter, like-for-like mask filter is 3 kW. |
Primary Transmitter - Installation |
Primary Transmitter - Installation |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Middle | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ALP32L3-8SW | |
Year | 2006 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Middle | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ATC-BCE316C5-V2-25 | |
Year | 2019 | |
Justification for New Antenna | Existing antenna is incompatible with new spectrum allocation. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 3 1/8 inches | |
Segment Length | 20 inches | |
Number of parallel runs | 1 | |
Length | 400 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 400 feet per run | |
Justification for New Transmission Line | Needed for new antenna, existing is in disrepair. | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1028414 | |
Coordinates (NAD83) | Latitude (NAD83) | 38° 21' 55.2" N- |
Longitude (NAD83) | 085° 50' 24.2" W- | |
Overall Structure Height | 464.89 feet | |
Support Structure Height | 459.97 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 962.91 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | SBA GC Towers, LLC | |
Date Constructed | 01/25/1996 |
Facility ID | Call Sign | Service |
---|---|---|
91916 | W205BT | FX |
38621 | WFPK | FM |
38464 | WDYL-LD | LPD |
64024 | WKYI | AM |
4258 | WFPL | FM |
91679 | W270CR | FX |
69113 | WUOL-FM | FM |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 194 | |
Explanation | WBNM-LD requires the aid of outside project management services in order to fulfill the requirements of the repack. WBNM-LD does not have sufficient resource capacity and expertise in-house to handle all the necessary activities. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | Yes | |
Number of Days | 4 | |
Justification | Installation of new transmitter and supervision of installation for transmission line and antenna @ $2,000 per day |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
IP BASED STL |
Replacement of existing STL system with an IP based transport system to connect studios/programming source with transmitter |
Internal Labor |
Internal Labor |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $94,152.20 | $91,072.20 | N/A | $91,072.20 | N/A |
Total for all systems | $368,912.27 | $351,168.67 | N/A | $258,724.06 | N/A |
Primary Transmitter TRN-5X-U-18-C | $94,152.20 | $91,072.20 | $91,072.20 | ||
MASK FILTER | $3,702.20 | $3,702.20 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $3,702.20 | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $84,000.00 | $80,920.00 | Please see Anywave proposal 7359-01-6-14-2019 | $80,920.00 | N/A |
Primary Transmitter - Installation | $6,450.00 | $6,450.00 | Please See: WBNM-LD Primary Transmitter Installation Budget Revision Justification Cover Letter.pdf | $6,450.00 | N/A |
Actual Information Description | File Name |
---|---|
MASK FILTER | |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
Primary Transmitter - Installation |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $37,255.00 | $36,630.00 | N/A | $24,400.00 | N/A |
Total for all systems | $368,912.27 | $351,168.67 | N/A | $258,724.06 | N/A |
Primary Antenna ATC-BCE316C5-V2-25 | $37,255.00 | $36,630.00 | $24,400.00 | ||
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | N/A | $1,500.00 | N/A |
Side Mount antenna brackets | $4,625.00 | $4,000.00 | N/A | $0.00 | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical | $26,900.00 | $26,900.00 | Please see Alive Telecom quote dated 5-9-2019, lines 1 and 1a | $22,900.00 | N/A |
Actual Information Description | File Name |
---|---|
Sweep test of transmission line and antenna | |
Side Mount antenna brackets | Information not provided. |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Elliptical |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $9,600.00 | $6,244.40 | N/A | $0.00 | N/A |
Total for all systems | $368,912.27 | $351,168.67 | N/A | $258,724.06 | N/A |
Primary Transmission Line | $9,600.00 | $6,244.40 | $0.00 | ||
Flexible Foam Transmission Line - dielectric, 1 5/8" | $9,600.00 | $6,244.40 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Foam Transmission Line - dielectric, 1 5/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,190.00 | $22,875.00 | N/A | $22,875.00 | N/A |
Total for all systems | $368,912.27 | $351,168.67 | N/A | $258,724.06 | N/A |
Primary Tower GTOWER | $56,190.00 | $22,875.00 | $22,875.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $22,875.00 | Please see Tower Maintenance Estimate #1053 | $22,875.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $127,697.00 | $150,329.00 | N/A | $80,654.87 | N/A |
Total for all systems | $368,912.27 | $351,168.67 | N/A | $258,724.06 | N/A |
Outside Professional Services | $127,697.00 | $150,329.00 | $80,654.87 | ||
Additional Field Engineering Service, 4 Days | $8,000.00 | $8,000.00 | N/A | $0.00 | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $52,600.00 | N/A | $28,000.00 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $1,292.50 | Please see WBNM-LD Attorney Other Matters Budget Revision Justification Letter. The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $1,292.50 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | $740.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $2,471.25 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $2,471.25 | N/A |
Form 399 assistance or other Program Management costs | $20,000.00 | $20,000.00 | 200 man hours @$100 p/h | $0.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | $628.37 | N/A |
Project management of the transition | $20,467.00 | $44,497.75 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $44,497.75 | N/A |
RF Exposure Measurements | $12,100.00 | $12,000.00 | N/A | $0.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | $220.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | $2,805.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Additional Field Engineering Service, 4 Days | |
Comprehensive coverage verification via field study, if needed | |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for displacement application | |
Form 399 assistance or other Program Management costs | |
Prepare/ Review 399 reimbursement form | |
Project management of the transition | |
RF Exposure Measurements | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $44,018.07 | $44,018.07 | N/A | $39,721.99 | N/A |
Total for all systems | $368,912.27 | $351,168.67 | N/A | $258,724.06 | N/A |
Other Expenses | $44,018.07 | $44,018.07 | $39,721.99 | ||
Internal Labor | $20,165.63 | $20,165.63 | Please see Estimated Cost Justification WBNM-LD-610-Internal Labor v0 | $20,165.63 | N/A |
IP BASED STL | $14,987.20 | $14,987.20 | Please see Estimated Cost Justification WBNM-LD-610-IP Based STL v0 | $14,387.20 | N/A |
Equipment Storage | $4,000.00 | $4,000.00 | N/A | $3,975.00 | N/A |
Equipment Delivery and Handling Charges | $1,420.24 | $1,420.24 | Please see Estimated Cost Justification WBNM-LD-610-Equipment Delivery and Handling v0 | $1,194.16 | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | $0.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | $0.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $2,000.00 | $2,000.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Internal Labor | |
IP BASED STL | |
Equipment Storage | |
Equipment Delivery and Handling Charges | |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $368,912.27 | $351,168.67 | $258,724.06 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Tom Fawbush General Manager 07/22/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Tom Fawbush GM 07/22/2022 |