Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
CTNY License LLC |
2750 Luberon Lane Cumming, GA 30041 United States |
+1 (678) 777-8659 | bfielder@youralaskalink.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Samuel Hariton Widelity |
Samuel Hariton 4031 University Dr Suite 100 Fairfax, VA 22030 United States |
+1 (339) 222-8107 | sam.hariton@widelity.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | WJKP-LD is purchasing a new transmitter, a new antenna, new transmission line, and move to a new tower. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | LX | |
Year | 2005 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 2 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TMU9evo-2 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 750 W | |
Justification for New Transmitter | WJKP-LD cannot retune the transmitter, as the old transmitter cannot be retuned to the new repack frequency. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 30.0 feet | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Primary Transmitter - RF System Mask Filter |
Primary Transmitter - RF System Mask Filter |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 314.0 W | |
Manufacturer | ||
Model | DL8 | |
Year | 2005 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 314.0 W | |
Manufacturer | ||
Model | SWEDL8OI/14 | |
Year | 2019 | |
Justification for New Antenna | The antenna can't be retuned to the new frequency. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 421 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Number of parallel runs | 1 | |
Length | 440 feet per run | |
Justification for New Transmission Line | The tower owner is making us move to his new tower It one has been structurally upgraded to rev G specs and the old tower has not. Switching towers will save money.New line is required to avoid serious down time." | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 42° 08' 31.2" N- |
Longitude (NAD83) | 077° 04' 38.8" W- | |
Overall Structure Height | 800.52 feet | |
Support Structure Height | 800.52 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 1679.77 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | GRI Telecom | |
Date Constructed | 10/15/2005 |
Facility ID | Call Sign | Service |
---|---|---|
125480 | WECY-LD | LPD |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Tower mapping and report for structural engineer |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 254 | |
Explanation | Widelity Project Management Services | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
RF Eng - Land Mobile Research |
RF Eng - Land Mobile Research |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | Yes | |
Type | Unlicensed |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $47,369.00 | $32,604.00 | N/A | $31,824.00 | N/A |
Total for all systems | $474,002.62 | $503,044.61 | N/A | $389,694.33 | N/A |
Primary Transmitter TMU9evo-2 | $47,369.00 | $32,604.00 | $31,824.00 | ||
UHF - Air Cooled Solid State Transmitter 750 - 1000 Watts | $29,850.00 | $15,500.00 | Please see Rohde & Schwarz quote 364537.0 | $15,500.00 | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $13,985.00 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $13,985.00 | N/A |
2" Rigid Conduit and Wiring (Cost per foot) | $780.00 | $780.00 | N/A | N/A | N/A |
Primary Transmitter - RF System Mask Filter | $2,339.00 | $2,339.00 | Please see Rohde & Schwarz quote 364537.0 | $2,339.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF - Air Cooled Solid State Transmitter 750 - 1000 Watts | |
Service entrance 3 phase/800 amp/208 volt | |
2" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Primary Transmitter - RF System Mask Filter |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $23,776.62 | $56,111.62 | N/A | $50,381.62 | N/A |
Total for all systems | $474,002.62 | $503,044.61 | N/A | $389,694.33 | N/A |
Primary Antenna SWEDL8OI/14 | $23,776.62 | $56,111.62 | $50,381.62 | ||
Pattern scatter analysis for side mount (if not included in antenna base cost) | $0.00 | $0.00 | N/A | N/A | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $5,730.00 | N/A | N/A | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 314.0watt input, Horizontal | $13,421.62 | $13,421.62 | Please see Estimated Cost Justification WJKP-LD-210-Primary Antenna - UHF Low Power Side Mount, H-POL V0 | $13,421.62 | N/A |
Side Mount antenna brackets | $4,625.00 | $36,960.00 | per Estimated Cost Justification WJKP-LD-210-Primary Antenna - Side Mount Brackets V0 | $36,960.00 | N/A |
Actual Information Description | File Name |
---|---|
Pattern scatter analysis for side mount (if not included in antenna base cost) | Information not provided. |
Sweep test of transmission line and antenna | Information not provided. |
UHF-Low Power, Side Mount, Slotted Coaxial, 314.0watt input, Horizontal | |
Side Mount antenna brackets |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $10,560.00 | $8,203.99 | N/A | $8,203.99 | N/A |
Total for all systems | $474,002.62 | $503,044.61 | N/A | $389,694.33 | N/A |
Primary Transmission Line | $10,560.00 | $8,203.99 | $8,203.99 | ||
Flexible Foam Transmission Line - dielectric, 1 5/8" | $10,560.00 | $8,203.99 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $8,203.99 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Foam Transmission Line - dielectric, 1 5/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $336,750.00 | $339,780.00 | N/A | $255,140.00 | N/A |
Total for all systems | $474,002.62 | $503,044.61 | N/A | $389,694.33 | N/A |
Primary Tower TOWER | $336,750.00 | $339,780.00 | $255,140.00 | ||
Minor tower reinforcement/modifications | $158,000.00 | $158,000.00 | Catalog of Costs | $91,000.00 | N/A |
Tower Rigging Tall Tower (greater than 500') | $157,750.00 | $160,780.00 | Estimated Cost Justification WJKP-LD-410-Existing Primary Tower - Tower Rigging, Tall Tower v0 | $160,780.00 | N/A |
Tower mapping and report for structural engineer | $21,000.00 | $21,000.00 | N/A | $3,360.00 | N/A |
Actual Information Description | File Name |
---|---|
Minor tower reinforcement/modifications | |
Tower Rigging Tall Tower (greater than 500') | |
Tower mapping and report for structural engineer |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $44,797.00 | $55,595.00 | N/A | $41,637.90 | N/A |
Total for all systems | $474,002.62 | $503,044.61 | N/A | $389,694.33 | N/A |
Outside Professional Services | $44,797.00 | $55,595.00 | $41,637.90 | ||
Project management of the transition | $26,797.00 | $41,910.00 | Please see WJKP-LD Widelity strategic support quote. | $38,175.40 | N/A |
RF Eng - Land Mobile Research | $480.00 | $480.00 | Please see WJKP-LD RF Eng Land Mobile Research Budget Revision Justification Letter | $480.00 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $150.00 | Please see WJKP-LD Attorney STA Budget Justification Letter | $150.00 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $725.00 | Please see WJKP-LD Attorney Other Matters Budget Justification Letter | $725.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Prepare Form 601 | $755.00 | $755.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | N/A | N/A |
Perform engineering study for displacement application | $1,800.00 | $2,107.50 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $2,107.50 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,710.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Project management of the transition | |
RF Eng - Land Mobile Research | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare Form 601 | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for displacement application | |
Prepare/ Review 399 reimbursement form | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $10,750.00 | $10,750.00 | N/A | $2,506.82 | N/A |
Total for all systems | $474,002.62 | $503,044.61 | N/A | $389,694.33 | N/A |
Other Expenses | $10,750.00 | $10,750.00 | $2,506.82 | ||
New Point to Point Microwave System: Unlicensed | $2,250.00 | $2,250.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $3,500.00 | $3,500.00 | Estimate per the station engineer | $2,506.82 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $5,000.00 | $5,000.00 | Estimate per the station engineer | N/A | N/A |
Actual Information Description | File Name |
---|---|
New Point to Point Microwave System: Unlicensed | Information not provided. |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $474,002.62 | $503,044.61 | $389,694.33 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | William J Christian CEO 06/10/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | William J Christian CEO 06/10/2022 |