Facility ID:
136751
Service:
DTV
Call Sign:
WNYA
Channel:
7 (High VHF)
File Number:
0000025402
FRN:
0005828736
Date Submitted:
04/19/2022

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

WNYT-TV, LLC

Doing Business As: WNYT-TV, LLC

Ryan Vandewiele, Vice President

3415 University Ave., West

St. Paul, MN 55114

United States

+1 (651) 642-4334 KShuldes@hbi.com Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Charles Naftalin

Counsel to Licensee

Holland & Knight LLP

Charles Naftalin

Holland & Knight, 800 17th Street, NW

Suite 1100

Washington, DC 20006

United States

+1 (202) 457-7040 charles.naftalin@hklaw.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan See Revised Exhibit 1.

Question Response
Sharee Station Facility ID 73264
Call Sign WCWN
Type Commercial
Licensee Name WCWN LICENSEE, LLC
Status LICENSED
DTS No
Community of License SCHENECTADY, NY
Pre-auction RF Channel 22
Post-auction RF Channel 22
Neilsen DMA Albany-Schenectady-Troy
Network Affiliation
Question Response
Sharee Station Facility ID 74422
Call Sign WTEN
Type Commercial
Licensee Name Nexstar Media Inc.
Status LICENSED
DTS No
Community of License ALBANY, NY
Pre-auction RF Channel 24
Post-auction RF Channel 24
Neilsen DMA Albany-Schenectady-Troy
Network Affiliation
Question Response
Sharee Station Facility ID 73263
Call Sign WMHT
Type Noncommercial Educational
Licensee Name WMHT EDUCATIONAL TELECOMMUNICATIONS
Status LICENSED
DTS No
Community of License SCHENECTADY, NY
Pre-auction RF Channel 25
Post-auction RF Channel 25
Neilsen DMA ALBANY-SCHENECTADY-TROY
Network Affiliation
Question Response
Sharee Station Facility ID 73942
Call Sign WRGB
Type Commercial
Licensee Name WRGB LICENSEE, LLC
Status LICENSED
DTS No
Community of License SCHENECTADY, NY
Pre-auction RF Channel 35
Post-auction RF Channel 6
Neilsen DMA Albany-Schenectady-Troy
Network Affiliation
Question Response
Sharee Station Facility ID 73363
Call Sign WNYT
Type Commercial
Licensee Name WNYT-TV, LLC
Status LICENSED
DTS No
Community of License ALBANY, NY
Pre-auction RF Channel 12
Post-auction RF Channel 12
Neilsen DMA Albany-Schenectady-Troy
Network Affiliation
Question Response
Sharee Station Facility ID 11970
Call Sign WXXA-TV
Type Commercial
Licensee Name MISSION BROADCASTING, INC.
Status LICENSED
DTS No
Community of License ALBANY, NY
Pre-auction RF Channel 8
Post-auction RF Channel 8
Neilsen DMA Albany-Schenectady-Troy
Network Affiliation
Question Response
Sharee Station Facility ID 73266
Call Sign WMHT-FM
Type Noncommercial Educational
Licensee Name WMHT Educational Telecommunications
Status LICENSED
DTS No
Community of License SCHENECTADY, NY
Pre-auction RF Channel 206
Post-auction RF Channel
Neilsen DMA
Network Affiliation

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Innovator HX
Year 2008
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 2.5 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model VAXTE-12R37
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 8.6 kW
Justification for New Transmitter The manufacturer of the existing transmitter is defunct so re-tuning the existing transmitter is not feasible. Power capacity of the replacement transmitter exceeds existing transmitter due to antenna changes. See Revised Exhibit 1.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 150 kVA
Rigid Conduit and Wiring Yes
Size 4 inches
Length 435.0 feet
Other Electrical Service Yes
Description External Surge Suppressor
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Other Transmitter Expenses

Equipment labels

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 12.69 kW
Manufacturer
Model LP4OIM
Year 2008

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? Yes
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Top
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 3
Number of Panels/Bays 2
Lower Limit 174.00 MHz
Upper Limit 216.00 MHz
Design power capacity in use 50.0 %
Other Antenna Type N/A
ERP: 12.45 kW
Manufacturer
Model THA-O4-1H/4UD2SP-1-R
Year 2021
Justification for New Antenna In late 2019, the FCC granted WNYA's application to broadcast from another existing site in the market. See Revised Exhibit 1 for details.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna?
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Reducer

The selected antenna requires a transmission line reducer at the input, per quote/invoice.

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 12.45 kW
Manufacturer
Model TLS-V4-R
Year 2017
Justification for New Antenna See Revised Exhibit 1.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Broadband or Single Channel? N/A
Feed Line Size N/A
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Add Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmission currently shared with any other stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Flexible Foam
Diameter Other
Other Diameter 3 inches
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 300 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Flexible Air
Diameter 4 inches
Other Diameter N/A
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 600 feet per run
Justification for New Transmission Line New line needed because prior antenna only had to support two, rather than three, stations; new antenna required new transmission line. See Revised Exhibit 1.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Interior Transmission Line

Rigid coaxial sections (Various) - see Revised Exhibit 1.

Patch Panel

4-1/16" 7-Port Patch Panel with Interlocks - see Revised Exh. 1

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Rigid
Diameter 4 1/16 inches
Segment Length 20'
Other Segment Length
Number of parallel runs 1
Length 40 feet per run
Justification for New Transmission Line Study found existing out-of-service line on tower at updated site - see Revised Exhibit 1 -- acceptable for interim use; however, line needed to be extended 40 feet for interim antenna use.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Move Equipment
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? Unknown
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1002871
Coordinates (NAD83) Latitude (NAD83) 42° 38' 13.0" N-
Longitude (NAD83) 073° 59' 43.0" W-
Overall Structure Height 314.96 feet
Support Structure Height 259.18 feet
Ground Elevation Above Mean Sea Level (AMSL) 1527.87 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner WRGB Licensee, LLC
Date Constructed 01/01/1954

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
73942 WRGB DTV
15330 WRVE FM

Other Types of Users

Users
Cellphones
Two Way Radios

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Mapping, Tower

Tower mapping necessary due to number of existing users, incl. newly repacked stations, on primary tower.

Support Material

Custom-manufactured support brackets to mount new 4" transmission line to tower.

Interim Tower

Back to Top

Tower Construction Costs

Section Question Response
Construct New Tower Use Interim
Description of Use N/A
Height 738.00 feet
Justification for New Tower Interim Tower is an existing structure owned by the Licensee. (ASR #1004249.) Please refer to Revised Exhibit 1.

Interim Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Interim Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Mapping, Inspection, Interim Tower

Documentation of current tower loading by tower climbing crew.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? No
Number of Hours N/A
Explanation N/A
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application No
For Auxiliary Facility N/A
For Main Facility N/A
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Site Survey, Main

Main site requires professional site survey.

Outside Legal Advice and Analysis

Attorney fees and FCC transition requirement

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? No
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Internal Staff Work

The Station employees have performed or expect to perform considerable work in managing and completing the work necessary to the channel change. See Revised Exhibit 1 and August 2017 Supplement.

Remote Control and Monitoring, New Site

New control system needed for Station's new transmitter site.

Sales Tax

New York State's sales tax and local sales tax (where applicable)

Other Miscellaneous Expenses

Blueprint scanning of interim site tower.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $459,275.00 $458,795.38 N/A $430,394.72 N/A
Total for all systems $1,393,377.80 $1,450,814.33 N/A $1,294,975.98 N/A
Primary Transmitter VAXTE-12R37 $459,275.00 $458,795.38 $430,394.72
Other Electrical Service: External Surge Suppressor $20,000.00 $20,000.00 Because Gates Air does not build in surge suppressor, an external surge suppressor is required. $2,325.00 N/A
Transformer 3 phase/480v - 150 KVA $25,550.00 $5,550.00 Transmitter manufacturer Gates Air specified only a 75kVA transformer, a value not offered as a menu option on this form. See Revised Exhibit 1. $5,549.34 N/A
4" Rigid Conduit and Wiring (Cost per foot) $43,935.00 $29,833.00 See Revised Exhibit 1. $29,833.00 N/A
High VHF - Air Cooled Solid State Transmitter 6.5 . 12.5 kW $331,500.00 $312,659.38 See Revised Exhibit 1 $312,659.38 N/A
Other Transmitter Expenses $90.00 $90.00 N/A $90.00 N/A
Switchgear - industrial 800 amp $38,200.00 $90,663.00 Building distribution required a Square D-brand 800A circuit breaker ("Masterpact NW Series") with metering (current transformers) and specialized installation. Service to room required two panels: one each for 480V and 208V. See Revised Exhibit 1. $79,938.00 N/A

Components

Actual Information Description File Name
Other Electrical Service: External Surge Suppressor

Component Description:
Electrical services for the installation of surge suppressor.
Amount:
$700.00

Component Description:
Modular surge protection
Amount:
$1,625.00
Transformer 3 phase/480v - 150 KVA

Component Description:
Portion of invoice relating to stepdown transformer.
Amount:
$1,849.78

Component Description:
Portion of invoice relating to stepdown transformer.
Amount:
$1,849.78

Component Description:
Portion of invoice relating to installation of transformer.
Amount:
$1,849.78
4" Rigid Conduit and Wiring (Cost per foot)

Component Description:
Electrical wiring
Amount:
$14,635.00

Component Description:
Electrical services provided for the installation of temporary and additional outlets.
Amount:
$1,436.00

Component Description:
Electrical wiring (final payment)
Amount:
$13,762.00
High VHF - Air Cooled Solid State Transmitter 6.5 . 12.5 kW

Component Description:
Strut components used in transmitter construction.
Amount:
$195.78

Component Description:
Mounting apparatus for the transmitter output line.
Amount:
$43.08

Component Description:
Strut components used in transmitter construction.
Amount:
$10.98

Component Description:
Vendor supplied plastic panels to fill the blanks on the equipment rack associated with the transmitter.
Amount:
$118.00

Component Description:
Portion of invoice relating to installation of transmitter.
Amount:
$16,146.20

Component Description:
Portion of invoice relating to the transmitter.
Amount:
$92,762.29

Component Description:
Strut components used in transmitter construction.
Amount:
$103.92

Component Description:
Materials used to support the transmitter components.
Amount:
$781.93

Component Description:
Portion of invoice relating to the transmitter.
Amount:
$104,207.57

Component Description:
Portion of invoice relating to the transmitter.
Amount:
$98,289.63
Other Transmitter Expenses

Component Description:
Purchase of nameplates used to identify the Station's new equipment within the shared electrical distribution panel in the transmitter building.
Amount:
$90.00
Switchgear - industrial 800 amp

Component Description:
Panels
Amount:
$12,000.00

Component Description:
Switchboard and Meter
Amount:
$62,000.00

Component Description:
Electrical services provided for the installation of new 400A panel.
Amount:
$5,938.00

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $127,340.00 $105,770.15 N/A $104,409.70 N/A
Total for all systems $1,393,377.80 $1,450,814.33 N/A $1,294,975.98 N/A
Interim Antenna TLS-V4-R $29,880.00 $8,640.15 $8,247.20
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $0.00 0 N/A N/A
Sweep test of existing antenna $6,730.00 $8,640.15 Sweep test of existing antennas is complete. Weather forced cancellation of initial analysis, which was completed on another date. See Revised Exhibit 1. $8,247.20 N/A
High VHF - High Power Side Mount One Station horizontally polarized $0.00 $0.00 N/A N/A N/A
Primary Antenna THA-O4-1H/4UD2SP-1-R $97,460.00 $97,130.00 $96,162.50
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $6,400.00 N/A
Reducer $1,054.00 $1,054.00 N/A $86.50 N/A
High VHF - High Power Top Mount Shared Broadband Panel antenna --Three Station horizontally polarized $89,676.00 $89,676.00 N/A $89,676.00 N/A

Components

Actual Information Description File Name
Side mount brackets for high power antennas (if not included in antenna base cost) Information not provided.
Sweep test of existing antenna

Component Description:
Sweep test of interim antenna. See Revised Exhibit 1.
Amount:
$8,247.20
High VHF - High Power Side Mount One Station horizontally polarized Information not provided.
Sweep test of existing antenna

Component Description:
Sweep test
Amount:
$6,400.00
Reducer

Component Description:
Credit re purchase of reducer 4-50 EIA X 3-50 EIA STD 501
Amount:
($967.50)

Component Description:
Reducer
Amount:
$527.00

Component Description:
Reducer
Amount:
$527.00
High VHF - High Power Top Mount Shared Broadband Panel antenna --Three Station horizontally polarized

Component Description:
Work relating to the primary antenna.
Amount:
$44,838.00

Component Description:
Work relating to primary antenna.
Amount:
$44,838.00

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $154,245.02 $151,676.02 N/A $148,850.21 N/A
Total for all systems $1,393,377.80 $1,450,814.33 N/A $1,294,975.98 N/A
Interim Transmission Line $5,680.00 $6,886.00 $6,885.60
Rigid Transmission Line - copper, 4 1/16" $5,680.00 $6,886.00 Please refer to attached manufacturer's quote and invoice for 40 feet of line and supporting hangers. See Revised Exhibit 1. $6,885.60 N/A
Primary Transmission Line $148,565.02 $144,790.02 $141,964.61
Interior Transmission Line $14,340.02 $14,340.02 In light of some changes to the design of the transmission line, the cost increased slightly as reflected in the attached invoices, quotes and credits. $12,618.35 N/A
Patch Panel $89,825.00 $89,825.00 See explanation provided in Transmission Line segment of Form 399. See also Revised Exhibit 1. $89,825.00 N/A
Flexible Air Transmission Line - dielectric, 4" $44,400.00 $40,625.00 See Revised Exhibit 1. $39,521.26 N/A

Components

Actual Information Description File Name
Rigid Transmission Line - copper, 4 1/16"

Component Description:
Materials relating to the interim transmission line and hangers. Freight charge is not listed in attached quote.
Amount:
$6,885.60
Interior Transmission Line

Component Description:
Thinwall elbows, bullets and test flange
Amount:
$3,403.99

Component Description:
Amount of request adjusted per cover letter.
Amount:
N/A

Component Description:
Credit for purchase of the reducer.
Amount:
($670.60)

Component Description:
Interior transmission line components
Amount:
$5,792.41

Component Description:
Materials relating to interior transmission line.
Amount:
$1,757.85

Component Description:
Materials relating to the primary transmission line.
Amount:
$798.00

Component Description:
Elbows and flange adapters
Amount:
$1,501.57

Component Description:
Fittings and saw blades related to the transmission line.
Amount:
$35.13
Patch Panel

Component Description:
Patch panel
Amount:
$41,712.50

Component Description:
Patch panel
Amount:
$48,112.50
Flexible Air Transmission Line - dielectric, 4"

Component Description:
Materials relating to the primary transmission line.
Amount:
$39,522.26

Component Description:
Sale of former transmission line to former landlord, Sinclair Communications.
Amount:
($1.00)

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $329,205.00 $257,785.00 N/A $249,994.88 N/A
Total for all systems $1,393,377.80 $1,450,814.33 N/A $1,294,975.98 N/A
Interim Tower $221,655.00 $30,485.00 $30,119.88
Tall Tower (greater than 500') $210,500.00 $19,330.00 This expense, now completed, covers analysis of existing tower, transmission lines and antennas at proposed Interim site, and for transmission line installation prior to termination of interim site plans. See Revised Exhibit 1. $19,066.65 N/A
New tower $0.00 $0.00 N/A N/A N/A
Mapping, Inspection, Interim Tower $11,155.00 $11,155.00 See Revised Exhibit 1. $11,053.23 N/A
Primary Tower TOWER $107,550.00 $227,300.00 $219,875.00
Short Tower (less than 500') $84,200.00 $203,950.00 As detailed on the attached change order, the cost of the tower work exceeded the initial estimate because of repeated occurrences of inclement weather that unexpectedly extended the number of working days required for the crew to complete the project. (Please also see FCC File No. 150938, which contemporaneously noted the unsafe weather as a basis for a short extension of time to complete construction of the facility). However, relevant Commission deadlines made it necessary to retain the tower crew in place in hopes of completing construction as quickly as possible, whenever it was safe to do so. $203,950.00 N/A
Mapping, Tower $14,850.00 $14,850.00 N/A $7,425.00 N/A
Support Material $8,500.00 $8,500.00 N/A $8,500.00 N/A

Components

Actual Information Description File Name
Tall Tower (greater than 500')

Component Description:
Transmission line installation and analysis support
Amount:
$16,879.40

Component Description:
Sweep test support
Amount:
$2,187.25
New tower Information not provided.
Mapping, Inspection, Interim Tower

Component Description:
Tower inspection
Amount:
$2,642.48

Component Description:
Tower mapping and cable removal
Amount:
$8,410.75
Short Tower (less than 500')

Component Description:
Change order for inclement weather days.
Amount:
$21,000.00

Component Description:
Installation of Dielectric THB-Series Antenna.
Amount:
$63,332.50

Component Description:
Installation of Dielectric THB-Series Antenna.
Amount:
$63,332.50

Component Description:
Removal of the prior primary antenna from the WRGB transmitter tower.
Amount:
$2,000.00

Component Description:
Installation of Dielectric THB-Series Antenna.
Amount:
$54,285.00
Mapping, Tower

Component Description:
Inspection and mapping
Amount:
$7,425.00
Support Material

Component Description:
Set of angle irons drilled with mounting holes to allow the transmission line attachment to the tower.
Amount:
$2,975.00

Component Description:
Set of angle irons drilled with mounting holes to allow the transmission line attachment to the tower.
Amount:
$2,975.00

Component Description:
Set of angle irons drilled with mounting holes to allow the transmission line attachment to the tower.
Amount:
$2,550.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $230,270.00 $391,150.00 N/A $330,000.00 N/A
Total for all systems $1,393,377.80 $1,450,814.33 N/A $1,294,975.98 N/A
Outside Professional Services $230,270.00 $391,150.00 $330,000.00
Outside Legal Advice and Analysis $82,400.00 $82,400.00 Because of a series of issues that delayed the Station’s licensed transition to its repacked facility, as well as changes to its initial transition plan in 2018-21, the Station ultimately required additional time (until July 2021) and multiple additional filings to complete its repacking, which in turn necessitated additional attorney costs, including frequent updates to the FCC. $76,711.00 N/A
Site Survey, Main $5,600.00 $5,600.00 See Exhibit 1. $5,598.00 N/A
RF Exposure Measurements $21,050.00 $12,000.00 N/A N/A N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $24,600.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $7,360.00 $11,100.00 Attorney filed an STA and extension, as required. $9,051.50 N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $2,000.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $3,200.00 Unexpected changes in the timing of and circumstances of the license to cover application for the station, which was subject to a number of extensions/waivers, required a slight increase in costs. $3,064.50 N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $33,100.00 The estimate for these costs increased because the Station submitted additional modification filings to complete its repacking, which were ultimately approved by the Commission, but which required additional work and counsel. $29,090.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,250.00 The consultant had to modify the application for a different antenna. $3,250.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $5,000.00 N/A $2,875.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $204,900.00 This estimate reflects a total of all quotes to date for reimbursement assistance provided to the Station in an effort to complete reimbursement requests by the upcoming March 2022 deadline. $200,360.00 N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A N/A N/A

Components

Actual Information Description File Name
Outside Legal Advice and Analysis

Component Description:
Portion of the invoice related to the FCC transition requirement.
Amount:
$285.00

Component Description:
Portion of invoice related to the FCC transition requirement.
Amount:
$37.00

Component Description:
Portion of invoice related to the FCC transition requirement.
Amount:
$9,778.00

Component Description:
Portion of the invoice related to FCC transition requirement.
Amount:
$1,029.50

Component Description:
Portion of invoice related to the FCC transition requirement.
Amount:
$761.00

Component Description:
Portion of the invoice related to FCC transition requirement.
Amount:
$715.50

Component Description:
Portion of the invoice related to the FCC transition requirement.
Amount:
$1,286.00

Component Description:
Invoice related to the FCC transition requirement.
Amount:
$708.00

Component Description:
Invoice related to the FCC transition requirement.
Amount:
$236.00

Component Description:
Invoice relating to the FCC transition requirement.
Amount:
$913.00

Component Description:
Portion of invoice relating to the FCC transition requirement.
Amount:
$1,538.50

Component Description:
Portion of invoice related to the FCC transition requirement.
Amount:
$208.00

Component Description:
Portion of invoice relating to the FCC transition requirement.
Amount:
$1,781.00

Component Description:
Portion of invoice related to the FCC transition requirement.
Amount:
$729.50

Component Description:
Portion of invoice relating to the FCC transition requirement.
Amount:
$835.00

Component Description:
Portion of invoice relating to the FCC transition requirement.
Amount:
$1,357.50

Component Description:
Portion of the invoice related to FCC transition requirement.
Amount:
$1,281.50

Component Description:
Portion of invoice relating to the FCC transition requirement.
Amount:
$6,954.00

Component Description:
Portion of the invoice related to the FCC transition requirement.
Amount:
$791.00

Component Description:
Portion of invoice relating to the FCC transition requirement.
Amount:
$5,544.00

Component Description:
Portion of the invoice relating to the FCC transition requirement.
Amount:
$3,344.00

Component Description:
Portion of invoice relating to the FCC transition requirement.
Amount:
$1,408.00

Component Description:
Portion of the invoice related to FCC transition requirement.
Amount:
$622.50

Component Description:
Portion of invoice related to the FCC transition requirement.
Amount:
$267.00

Component Description:
Portion of invoice relating to the FCC transition requirement.
Amount:
$11,487.00

Component Description:
Invoice related to the FCC transition requirement.
Amount:
$88.00

Component Description:
Portion of invoice relating to the FCC transition requirement.
Amount:
$4,923.00

Component Description:
Portion of invoice relating to the FCC transition requirement.
Amount:
$3,166.00

Component Description:
Portion of invoice relating to the FCC transition requirement.
Amount:
$190.00

Component Description:
Portion of invoice relating to the FCC transition requirement.
Amount:
$452.50

Component Description:
Portion of invoice relating to the FCC transition requirement.
Amount:
$968.00

Component Description:
Invoice related to the FCC transition requirement.
Amount:
$513.00

Component Description:
Please disregard.
Amount:
N/A

Component Description:
Portion of invoice relating to the FCC transition requirement.
Amount:
$616.00

Component Description:
Invoice related to the FCC transition requirement.
Amount:
$855.00

Component Description:
Portion of the invoice related to the FCC transition requirement.
Amount:
$769.50

Component Description:
Portion of invoice related to the FCC transition requirement.
Amount:
$8,583.50

Component Description:
Portion of the invoice related to the FCC transition requirement.
Amount:
$633.00

Component Description:
Invoice relating to the FCC transition requirement.
Amount:
$264.00

Component Description:
Portion of invoice relating to the FCC transition requirement.
Amount:
$792.00
Site Survey, Main

Component Description:
Site survey
Amount:
$5,598.00
RF Exposure Measurements Information not provided.
Comprehensive coverage verification via field study, if needed Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization

Component Description:
Portion of invoice for legal fees related to the STA.
Amount:
$1,797.50

Component Description:
Portion of invoice for legal fees related to the STA.
Amount:
$1,435.50

Component Description:
Portion of invoice for legal fees relating to the STA.
Amount:
$2,972.00

Component Description:
Portion of invoice for legal fees related to the STA.
Amount:
$633.50

Component Description:
Portion of invoice for legal fees related to the STA.
Amount:
$2,213.00
Attorney Fees - Negotiation of lease and other matters for shared locations Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application

Component Description:
Portion of invoice for legal fees related to the license to cover.
Amount:
$456.50

Component Description:
Portion of invoice for legal fees related to the license to cover.
Amount:
$2,608.00
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
Portion of invoice for legal fees related to the construction permit.
Amount:
$1,538.50

Component Description:
Portion of the invoice for legal fees related to the construction permit.
Amount:
$70.00

Component Description:
Portion of the invoice for legal fees related to the construction permit.
Amount:
$171.00

Component Description:
Portion of the invoice for legal fees related to the construction permit.
Amount:
$2,267.50

Component Description:
Portion of invoice for legal fees related to the construction permit.
Amount:
$1,232.00

Component Description:
Portion of invoice related to legal fees relating to the construction permit.
Amount:
$8,756.00

Component Description:
Portion of invoice for legal fees related to the construction permit.
Amount:
$2,957.50

Component Description:
Portion of invoice for legal fees related to the construction permit.
Amount:
$1,706.00

Component Description:
Portion of invoice for legal fees related to the construction permit.
Amount:
$90.50

Component Description:
Legal fees related to the construction permit.
Amount:
$2,410.50

Component Description:
Portion of the invoice for legal fees related to the construction permit.
Amount:
$1,168.50

Component Description:
Portion of the invoice for legal fees related to the construction permit.
Amount:
$3,919.00

Component Description:
Portion of invoice for legal fees related to the construction permit.
Amount:
$1,834.50

Component Description:
Invoice for legal fees related to the construction permit.
Amount:
$968.50
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Complete Form 2100 with exhibits; special L-R study of Pittsfield; antenna design work.
Amount:
$2,500.00

Component Description:
Revise application to substitute a Dielectric antenna.
Amount:
$750.00
Perform engineering study for new channel assignment and antenna development

Component Description:
Antenna study for proposed interim operation.
Amount:
$125.00

Component Description:
Initial repack channel assignment review for Form 399.
Amount:
$250.00

Component Description:
Initial study of main transmitter relocation to CRB.
Amount:
$500.00

Component Description:
Further study of relocating main transmitter to CRB tower for Form 399.
Amount:
$2,000.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form

Component Description:
Portion of invoice relating to the review and preparation of the reimbursement form.
Amount:
$10,437.50

Component Description:
Portion of the invoice related to the review and preparation of the reimbursement form.
Amount:
$45,872.00

Component Description:
Portion of invoice related to the preparation and review of reimbursement form.
Amount:
$742.50

Component Description:
Portion of invoice related to the review and preparation of reimbursement form.
Amount:
$238.50

Component Description:
Portion of invoice relating to the review and preparation of the reimbursement form.
Amount:
$176.00

Component Description:
Portion of invoice related to the review and preparation of reimbursement form.
Amount:
$616.00

Component Description:
Portion of invoice relating to the review and preparation of the reimbursement form.
Amount:
$11,287.50

Component Description:
Invoice relating to the review and preparation of the reimbursement form.
Amount:
$6,519.00

Component Description:
Invoice relating to the review and preparation of the reimbursement form.
Amount:
$677.50

Component Description:
Invoice related to the review and preparation of reimbursement form.
Amount:
$318.00

Component Description:
Nolan Stephany's review of correspondence and invoices related to WNYA's Form 399 filing. The invoice is due and payable and is expected to get paid shortly.
Amount:
$750.00

Component Description:
Invoice related to the review and preparation of the reimbursement form.
Amount:
$79.50

Component Description:
Invoice related to the review and preparation of reimbursement form.
Amount:
$238.50

Component Description:
Invoice related to the review and preparation of reimbursement form.
Amount:
$79.50

Component Description:
Portion of invoice relating to the review and preparation of the reimbursement form.
Amount:
$528.00

Component Description:
Portion of invoice relating to the review and preparation of the reimbursement form.
Amount:
$5,016.00

Component Description:
Portion of invoice relating to the review and preparation of the reimbursement form.
Amount:
$271.50

Component Description:
Portion of invoice relating to the review and preparation of the reimbursement form.
Amount:
$105.00

Component Description:
Portion of invoice relating to the review and preparation of the reimbursement form.
Amount:
$440.00

Component Description:
Portion of invoice relating to the review and preparation of the reimbursement form.
Amount:
$5,539.50

Component Description:
Invoice related to the review and preparation of reimbursement form 399.
Amount:
$1,669.50

Component Description:
Invoice related to the review and preparation of the reimbursement form.
Amount:
$6,982.00

Component Description:
Portion of invoice related to the review and preparation of reimbursement form.
Amount:
$149.00

Component Description:
Portion of invoice relating to the review and preparation of the reimbursement form.
Amount:
$15,328.00

Component Description:
Invoice related to the review and preparation of the reimbursement form.
Amount:
$15,454.00

Component Description:
Portion of invoice related to the review and preparation of reimbursement form.
Amount:
$7,467.50

Component Description:
Portion of invoice relating to the review and preparation of the reimbursement form.
Amount:
$70.00

Component Description:
Portion of invoice relating to the review and preparation of reimbursement form.
Amount:
$1,192.50

Component Description:
Portion of invoice relating to the review and preparation of the reimbursement form.
Amount:
$3,693.50

Component Description:
Invoice relating to the review and preparation of the reimbursement form.
Amount:
$20,869.00

Component Description:
Portion of invoice relating to the review and preparation of the reimbursement form.
Amount:
$792.00

Component Description:
Portion of invoice related to the review and preparation of reimbursement form.
Amount:
$9,234.50

Component Description:
Portion of invoice relating to the review and preparation of the reimbursement form.
Amount:
$264.00

Component Description:
Portion of invoice relating to the review and preparation of the reimbursement form.
Amount:
$1,613.50

Component Description:
Invoice related to the review and preparation of the reimbursement form. This invoice is due and payable and is expected to be paid shortly.
Amount:
$15,967.00

Component Description:
Portion of invoice relating to the review and preparation of the reimbursement form.
Amount:
$7,995.50

Component Description:
Portion of invoice related to the review and preparation of reimbursement form.
Amount:
$715.50

Component Description:
Portion of invoice relating to the review and preparation of the reimbursement form.
Amount:
$271.50

Component Description:
Portion of invoice relating to the review and preparation of the reimbursement form.
Amount:
$176.00

Component Description:
Portion of invoice related to the review and preparation of reimbursement form.
Amount:
$79.50

Component Description:
Invoice related to the review and preparation of reimbursement form.
Amount:
$79.50

Component Description:
Invoice related to the review and preparation of reimbursement form.
Amount:
$364.50
Prepare request for Special Temporary Authorization Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $93,042.78 $85,637.78 N/A $31,326.47 N/A
Total for all systems $1,393,377.80 $1,450,814.33 N/A $1,294,975.98 N/A
Other Expenses $93,042.78 $85,637.78 $31,326.47
Other Miscellaneous Expenses $31.00 $31.00 N/A $31.00 N/A
Sales Tax $556.82 $556.82 The Station previously underestimated the expected sales tax in light of changes to and costs of the project, which resulted in a small increase in the sales tax estimate. To the extent this amount further changes, the Station will update the Fund Admin. $556.82 N/A
Remote Control and Monitoring, New Site $11,650.00 $11,650.00 The estimated cost slightly increased because the new site's remote control system requires a new computer, which may be purchased at retail. $10,684.00 N/A
Internal Staff Work $43,984.45 $43,984.45 See Exhibit 1 and August 2017 Supplement (including confidential salary information for which confidential treatment is requested). N/A N/A
Develop and air announcement of upcoming channel change $3,500.00 $3,500.00 See Exhibit 1. N/A N/A
Equipment Delivery and Handling Charges $16,130.51 $16,130.51 Additional shipping and delivery costs were necessary because certain items were delivered during periods of winter weather, which required additional equipment to bring to the new tower site. $16,130.51 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $2,500.00 $2,500.00 See Exhibit 1. ($1,535.86) N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $600.00 Ultimately, the Station required multiple special temporary authorizations and waivers, as approved by the Commission, in order to continue to broadcast on its post-repack channel until it was able to license its permanent facility in July 2021. Accordingly, additional expenses associated with STAs (including filing fees) were required. $600.00 N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,110.00 Minor modification permit submitted to and granted by FCC in part to facilitate overall rollout. $1,110.00 N/A
DTV Medical Facility Notification $11,550.00 $3,750.00 N/A $3,750.00 N/A
MVPD Notification of Channel Change $1,500.00 $1,500.00 See Exhibit 1. N/A N/A

Components

Actual Information Description File Name
Other Miscellaneous Expenses

Component Description:
Scanning of manufacturer Dielectric's antenna assembly drawings, which were requested in advance by the rigging company.
Amount:
$22.00

Component Description:
Blueprint scanning of interim site tower.
Amount:
$9.00
Sales Tax

Component Description:
Sales tax relating to forklift rental.
Amount:
$19.20

Component Description:
Sales tax relating to threaded rot used in transmitter construction.
Amount:
$3.45

Component Description:
Sales tax relating to interior transmission line components.
Amount:
$494.59

Component Description:
Sales tax relating to strut components used in transmitter construction.
Amount:
$15.66

Component Description:
Sales tax relating to strut components used in transmitter construction.
Amount:
$0.88

Component Description:
Please disregard this entry. At the request of the reimbursement team, the entire credit has been assigned to line item interior transmission line.
Amount:
($49.67)

Component Description:
Sales tax relating to scanning of Dielectric's antenna assembly drawings.
Amount:
$1.76

Component Description:
Sales tax relating to strut components used in transmitter construction.
Amount:
$8.31

Component Description:
Sales tax regarding blueprint scanning of interim site tower.
Amount:
$0.72

Component Description:
Sales tax relating to plastic panels used for the transmitter.
Amount:
$9.44

Component Description:
Sales tax relating to purchase of fittings and saw blades (transmission line).
Amount:
$2.81
Remote Control and Monitoring, New Site

Component Description:
RMS power sensors
Amount:
$1,056.00

Component Description:
WNYA TV Remote Control
Amount:
$9,628.00
Internal Staff Work Information not provided.
Develop and air announcement of upcoming channel change Information not provided.
Equipment Delivery and Handling Charges

Component Description:
Shipping cost relating to patch panel.
Amount:
$888.75

Component Description:
Shipping related to RMS power sensors.
Amount:
$25.00

Component Description:
Shipping and freight relating to interior transmission line components.
Amount:
$390.00

Component Description:
Freight and shipping related to thinwall elbows, bullets and test flange.
Amount:
$114.41

Component Description:
Invoice relating to the unloading on 1/22/21 of the antenna and patch panel.
Amount:
$3,100.00

Component Description:
Equipment rental used to unload mask filter.
Amount:
$400.00

Component Description:
Freight charge relating to the primary transmission line.
Amount:
$27.60

Component Description:
Freight charge relating to the interim transmission line.
Amount:
$584.63

Component Description:
Shipping cost for remote control.
Amount:
$13.90

Component Description:
Shipping cost relating to the antenna.
Amount:
$888.75

Component Description:
Freight charge relating to the transmitter.
Amount:
$6,824.97

Component Description:
Forklift rental used to unload the transmitter.
Amount:
$240.00

Component Description:
Shipping cost relating to transmission line.
Amount:
$2,632.50
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
Truck rental used to remove antenna and other items retained when WNYA left its pre-repack transmission site.
Amount:
$153.04

Component Description:
Sale of old copper wire to a scrap yard.
Amount:
($1,199.25)

Component Description:
Sale of old copper wire to a scrap yard.
Amount:
($279.50)

Component Description:
Station sold old copper wire from its pre-repack equipment to a scrap yard.
Amount:
($79.10)

Component Description:
Station sold old copper wire from its pre-repack equipment to a scrap yard.
Amount:
($131.05)
FCC Filing Fees - Special Temporary Authorization request

Component Description:
STA application fee.
Amount:
$200.00

Component Description:
STA extension application fee.
Amount:
$200.00

Component Description:
STA extension application fee.
Amount:
$200.00
FCC Filing Fees - Form 2100 license to cover application Information not provided.
FCC Filing Fees - Form 2100 minor change CP application

Component Description:
Construction permit application fee.
Amount:
$1,110.00
DTV Medical Facility Notification

Component Description:
Medical notification mailing
Amount:
$3,750.00
MVPD Notification of Channel Change Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $1,393,377.80 $1,450,814.33 $1,294,975.98

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. Yes

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Ryan Vandewiele

Vice President


04/19/2022

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Ryan Vandewiele

Vice President


04/19/2022

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Ryan Vandewiele

Vice President


04/19/2022

Attachments

Back to Top