Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
KVOS-TV LLC |
Norman H. Shapiro 26 NORTH HALSTED STREET CHICAGO, IL 60661 United States |
+1 (312) 705-2600 | nshapiro@wciu.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | See attached Transition Plan Narrative. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | QXD1 | |
Year | 2009 | |
Type | Inductive Output Tube | |
IOT Power Type | Single | |
Power Capacity | 33 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | THU9evo-12 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 19.0 kW | |
Justification for New Transmitter | Existing transmitter is no longer supported by the manufacturer. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | 5 |
Name | Description |
---|---|
Electrical and Room Prep |
Electrical distribution to new transmitter and removal of abandoned equipment to make space for the new equipment. |
Channel 14 Mask Filter Installation |
Installation of the new Primary transmitter Channel 14 Mask Filter, RF system, and removal of the existing channel 35 RF system. |
Extended Group Delay Option |
The Extended Group Delay Option was required for the main and backup exciter to correct for group delay issues discovered during initial operation as a result of the Channel 14 RF system. |
Primary Transmitter Installation |
Installation of the new Primary Transmitter and removal of the existing transmitter. |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 580.0 kW | |
Manufacturer | ||
Model | TFU-31JTH-R O4SP | |
Year | 2009 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 535.0 kW | |
Manufacturer | ||
Model | TFU-24JTH-R 04SP | |
Year | 2019 | |
Justification for New Antenna | Existing antenna is fixed on CH35 and is not retunable. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 6 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Slot | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 16 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 602.00 MHz | |
Design power capacity in use | 100.0 % | |
Other Antenna Type | N/A | |
ERP: | 100.0 kW | |
Manufacturer | ||
Model | ATC-BCSH16S1-U1 | |
Year | 2019 | |
Justification for New Antenna | Provide interim service on pre-auction or post-auction channel when top mount antenna is replaced with post-auction channel antenna. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Dielectric |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 500 feet per run |
Name | Description |
---|---|
End Caps and Reducer |
End caps for pressuring the existing line while the top mount antenna was removed and a reducer used to transition the existing 6-50 RF to the 4-50 transmission system. |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Flexible Air | |
Diameter | 3 inches | |
Segment Length | N/A | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 500 feet per run | |
Justification for New Transmission Line | Provide interim service for current channel while re-assigned facility is built out. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Terrain Constrained | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1251758 | |
Coordinates (NAD83) | Latitude (NAD83) | 48° 40' 49.4" N- |
Longitude (NAD83) | 122° 50' 26.4" W- | |
Overall Structure Height | 498.68 feet | |
Support Structure Height | 498.68 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 2270.31 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Marsha Coulthurst ET AL.DBA Mt. Constitution Sites Inc | |
Date Constructed | 07/14/2006 |
Facility ID | Call Sign | Service |
---|---|---|
14506 | KWPZ | FM |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Terrain constrained |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Interim Installation |
Install interim antenna and transmission line |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 300 | |
Explanation | The ownership group has multiple transmitter sites (14 TV) and operates with minimal staff. It does not have personnel available for any of these tasks, nor is the staff trained to provide any of these services. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Site Survey |
Site visit to determine final layout and required equipment needed. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $967,049.39 | $592,248.60 | N/A | $592,248.60 | N/A |
Total for all systems | $1,893,497.52 | $1,432,055.92 | N/A | $1,432,055.92 | N/A |
Primary Transmitter THU9evo-12 | $967,049.39 | $592,248.60 | $592,248.60 | ||
Primary Transmitter Installation | $37,500.00 | $37,500.00 | This is the cost for the installation of the Primary transmitter and the removal of the existing transmitter | $37,500.00 | N/A |
Extended Group Delay Option | $4,107.42 | $4,107.42 | Extended Group Delay option required to mitigate group delay issues discovered as a result of the complex Channel 14 RF system | $4,107.42 | N/A |
Channel 14 Mask Filter Installation | $27,900.00 | $27,900.00 | This is the cost for the installation of the Channel 14 Mask Filter system and the removal of the existing channel 35 RF system | $27,900.00 | N/A |
Electrical and Room Prep | $10,281.97 | $10,281.97 | Add distribution of electrical to new transmitter. Incorporates removal of some abandoned station equipment. Difficult access to this site. | $10,281.97 | N/A |
Channel 14 -- Additional field engineering time, 5 days | $8,500.00 | $8,500.00 | A technician from Dielectric was required to come back on site to address de-tuning issues as a result of the higher elevation of Mt Constitution and the extensive moving logistics. | $8,500.00 | N/A |
Channel 14 Mask Filter | $189,500.00 | $112,912.16 | N/A | $112,912.16 | N/A |
RF Consulting Engineer | $5,260.00 | $4,255.57 | N/A | $4,255.57 | N/A |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | $684,000.00 | $386,791.48 | N/A | $386,791.48 | N/A |
Actual Information Description | File Name |
---|---|
Primary Transmitter Installation | |
Extended Group Delay Option | |
Channel 14 Mask Filter Installation | |
Electrical and Room Prep | |
Channel 14 -- Additional field engineering time, 5 days | |
Channel 14 Mask Filter | |
RF Consulting Engineer | |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $367,420.00 | $344,413.69 | N/A | $344,413.69 | N/A |
Total for all systems | $1,893,497.52 | $1,432,055.92 | N/A | $1,432,055.92 | N/A |
Interim Antenna ATC-BCSH16S1-U1 | $101,390.00 | $49,387.00 | $49,387.00 | ||
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $0.00 | N/A | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $1,250.00 | N/A | $1,250.00 | N/A |
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized | $89,400.00 | $48,137.00 | N/A | $48,137.00 | N/A |
Primary Antenna TFU-24JTH-R 04SP | $266,030.00 | $295,026.69 | $295,026.69 | ||
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | $12,300.00 | $0.00 | This is included in the antenna package | N/A | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized | $247,000.00 | $288,626.69 | KVOS is located on top of Mt Constitution. Shipping costs are non-typical due to the difficult site location. The Elbow Complex, previously its own line item, is included in this category. Taxes are also included in the actual submitted costs. | $288,626.69 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $6,400.00 | N/A |
Actual Information Description | File Name |
---|---|
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | Information not provided. |
Sweep test of existing antenna | |
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized | |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | Information not provided. |
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized | |
Sweep test of existing antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $31,916.98 | $30,514.98 | N/A | $30,514.98 | N/A |
Total for all systems | $1,893,497.52 | $1,432,055.92 | N/A | $1,432,055.92 | N/A |
Interim Transmission Line | $29,500.00 | $28,098.00 | $28,098.00 | ||
Flexible Air Transmission Line - dielectric, 3" | $29,500.00 | $28,098.00 | N/A | $28,098.00 | N/A |
Primary Transmission Line | $2,416.98 | $2,416.98 | $2,416.98 | ||
End Caps and Reducer | $2,416.98 | $2,416.98 | End caps for pressuring the existing line while the top mount antenna was removed and a reducer used to transition the existing 6-50 RF to the 4-50 transmission system. | $2,416.98 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Air Transmission Line - dielectric, 3" | |
End Caps and Reducer |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $433,600.00 | $449,442.10 | N/A | $449,442.10 | N/A |
Total for all systems | $1,893,497.52 | $1,432,055.92 | N/A | $1,432,055.92 | N/A |
Primary Tower TOWER | $433,600.00 | $449,442.10 | $449,442.10 | ||
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $447,192.10 | Cost includes the installation of the side mount Interim antenna and transmission line, Washington state taxes. KVOS is located on Mt Constitution. Access to the site is challenging and expenses exceed a typical site due to tourists on the island. | $447,192.10 | N/A |
Interim Installation | $0.00 | $0.00 | Included in quote for tower rigging work. | N/A | N/A |
Structural engineering tower load study for well documented tower | $12,600.00 | $2,250.00 | N/A | $2,250.00 | N/A |
Actual Information Description | File Name |
---|---|
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Interim Installation | Information not provided. |
Structural engineering tower load study for well documented tower |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $75,480.00 | $6,845.40 | N/A | $6,845.40 | N/A |
Total for all systems | $1,893,497.52 | $1,432,055.92 | N/A | $1,432,055.92 | N/A |
Outside Professional Services | $75,480.00 | $6,845.40 | $6,845.40 | ||
Site Survey | $0.00 | $0.00 | N/A | $0.00 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $118.50 | N/A | $118.50 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,520.00 | Fees were higher than the estimated amount due to channel 14 procedural requirements | $2,520.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $619.20 | N/A | $619.20 | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $750.00 | N/A | $750.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $0.00 | N/A | $0.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $0.00 | N/A | $0.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $2,025.00 | N/A | $2,025.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $812.70 | N/A | $812.70 | The original estimate was only for the consulting engineer and did not include attorney's fees. |
Project management of the transition | $47,400.00 | $0.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Site Survey | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Prepare and or review reimbursement form | |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $18,031.15 | $8,591.15 | N/A | $8,591.15 | N/A |
Total for all systems | $1,893,497.52 | $1,432,055.92 | N/A | $1,432,055.92 | N/A |
Other Expenses | $18,031.15 | $8,591.15 | $8,591.15 | ||
MVPD Notification of Channel Change | $0.00 | $0.00 | N/A | N/A | N/A |
Develop and air announcement of upcoming channel change | $0.00 | $0.00 | N/A | N/A | N/A |
Equipment Storage | $0.00 | $0.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $4,841.15 | $4,841.15 | Freight for transportation and logistics between the mainland (Seattle) and Orcas Island, WA as well as the handling or large or heavy component delivery to the top of Mt Constitution. | $4,841.15 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $0.00 | $0.00 | N/A | N/A | N/A |
Non-zoning permits | $0.00 | $0.00 | N/A | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $0.00 | N/A | $0.00 | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $0.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $3,750.00 | N/A | $3,750.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $0.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
MVPD Notification of Channel Change | Information not provided. |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | Information not provided. |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Non-zoning permits | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
DTV Medical Facility Notification | |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $1,893,497.52 | $1,432,055.92 | $1,432,055.92 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Kyle Walker VP, Technology 04/07/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Kyle Walker VP, Technology 04/07/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|