Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
59141
Service:
FM
Call Sign:
WTTS
File Number:
0000086562
FRN:
0002900330
Eligibility Status:
Eligible
Date Submitted:
04/17/2022

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

SARKES TARZIAN, INC.

Doing Business As: SARKES TARZIAN, INC.

Jamie Till

205 NORTH COLLEGE AVE.

SUITE 800

BLOOMINGTON, IN 47402

United States

+1 (812) 332-7251 JTILL@STFORTWAYNE.COM Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Nancy A Ory

Member

Lerman Senter PLLC

Nancy Ory

2001 L Street, NW, Suite 400

Washington, DC 20036

United States

+1 (202) 416-6791 NORY@LERMANSENTER.COM

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan Station WTTS was required to install a switch that would enable WTTS to switch between its main and auxiliary antenna remotely several times per day during the four week period required for the construction of WTTV's post-transition facilities.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? No

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? No

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? No

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? No

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 15
Explanation Professional services to prepare FCC Form 399 and manage reimbursement process.
Outside RF consulting Engineering Services Prepare engineering section of Form FCC Construction Permit Application No
Prepare engineering section of Form FCC License to Cover Application No
Prepare request for Special Temporary Authority No
Prepare Form 601 No
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application No
Prepare and file Form FCC License to Cover Application No
Prepare request for Special Temporary Authority No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Form 399 assistance or other program management costs Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service No

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Permit and Filing Costs FCC Construction Permit Major Change No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? No
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? No
Does this relocation require Equipment Storage? No
Point to Point Microwave (STL/ICR) Frequency Coordination for Unidirection System No
Frequency Coordination for Bi-Direction System No
New Point to Point Microwave System No
1 pair IP-only Codecs for fiber, internet or IP microwave systems No

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Dielectric Control Cable and Switch

WTTS had to purchase and install a control cable and switch to enable it to remotely switch between its main and auxiliary antenna during the construction of the co-located television station WTTV.

Cost Information

Back to Top

Transmitters

Information not provided.

Cost Information

Back to Top

Antennas

Information not provided.

Cost Information

Back to Top

Transmission Line

Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $4,792.50 $10,427.50 N/A $4,480.00 N/A
Total for all systems $8,377.33 $14,012.33 N/A $7,765.39 N/A
Outside Professional Services $4,792.50 $10,427.50 $4,480.00
Form 399 assistance or other Program Management costs $1,500.00 $1,500.00 Additional professional services to manage 399 reimbursement process. $280.00 N/A
Prepare/ Review 399 reimbursement form $1,710.00 $8,400.00 Additional costs incurred due to complicated LMS process. $4,200.00 Costs higher than estimate due to LMS difficulties
Project management of the transition $1,582.50 $527.50 N/A N/A N/A

Components

Actual Information Description File Name
Form 399 assistance or other Program Management costs

Component Description:
399 management
Amount:
$275.00

Component Description:
399 management
Amount:
$185.00

Component Description:
399 management
Amount:
$280.00

Component Description:
399 management
Amount:
$140.00
Prepare/ Review 399 reimbursement form

Component Description:
399 Preparation
Amount:
$4,200.00
Project management of the transition Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $3,584.83 $3,584.83 N/A $3,285.39 N/A
Total for all systems $8,377.33 $14,012.33 N/A $7,765.39 N/A
Other Expenses $3,584.83 $3,584.83 $3,285.39
Dielectric Control Cable and Switch $3,584.83 $3,584.83 Dielectric 25' Control Cable for 60000 switch and Dielectric/SPX Dual Universal Coax Switch Control Panel/3RU $3,285.39 N/A

Components

Actual Information Description File Name
Dielectric Control Cable and Switch

Component Description:
Dielectric Control Cable
Amount:
$299.44

Component Description:
Dielectric/spx dual universal coax switch control panel
Amount:
$3,285.39

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $8,377.33 $14,012.33 $7,765.39

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Attachments

Back to Top