Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
VIDEOHIO, INC. |
Denise A. Branson, Sr. Paralegal 8350 BROAD STREET, SUITE 2000 Tysons, VA 22102 United States |
+1 (703) 873-6606 | dbranson@tegna.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Gary Davis Regional Head of Technology and Operations TEGNA |
Gary Davis 8350 Broad Street Suite 2000 Tysons, VA 22102 United States |
+1 (404) 873-9199 | gadavis@tegna.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Remove and replace existing antenna. Remove and replace existing transmission line. Remove and replace main transmitter. Co-located on tower shared with WTHR. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Sigma CD | |
Year | 1998 | |
Type | Inductive Output Tube | |
IOT Power Type | Other | |
Other IOT Power Type | Former IOT transmitter converted to 1.1 kW solid state for LPTV | |
Power Capacity | 1.1 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | EC704HP-BB | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 3.4 kW | |
Justification for New Transmitter | Per attached Gates Air letter, existing transmitter cannot be retuned to low band channel 17. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Conduit and wiring run from switchgear to new transmitter. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | TFU-30 DSC-R O4 | |
Year | 2002 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 8.18 kW | |
Manufacturer | ||
Model | AL8-17-PMC | |
Year | 2019 | |
Justification for New Antenna | Existing antenna cannot be retuned. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 3 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 926 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 3 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 926 feet per run | |
Justification for New Transmission Line | Existing transmission line section length incompatible with channel 17 |
Name | Description |
---|---|
Replace coax switch and load |
Coax switch and load are high band UHF, not compatible with channel 17 |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1024109 | |
Coordinates (NAD83) | Latitude (NAD83) | 39° 55' 43.0" N- |
Longitude (NAD83) | 086° 10' 55.0" W- | |
Overall Structure Height | 1039.36 feet | |
Support Structure Height | 929.45 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 823.81 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | VideoIndiana, Inc. | |
Date Constructed | 01/01/1984 |
Facility ID | Call Sign | Service |
---|---|---|
70162 | WTHR | DTV |
Users |
---|
Echostar LCF |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 300 | |
Explanation | Antenna analysis and spec, transmitter spec, installation drawings, installation supervision, accounting, legal, internal | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Other Engineering Services |
Other Engineering Services |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Equipment Delivery and Handling Charges |
Equipment Delivery and Handling Charges |
Sales Tax |
Sales Tax |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $249,600.00 | $214,024.00 | N/A | $5,250.00 | N/A |
Total for all systems | $1,155,246.58 | $880,713.85 | N/A | $308,929.80 | N/A |
Primary Transmitter EC704HP-BB | $249,600.00 | $214,024.00 | $5,250.00 | ||
5 Ton system | $20,250.00 | $19,250.00 | N/A | N/A | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $5,250.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | N/A | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW | $155,600.00 | $143,224.00 | See attached / uploaded PDF files titled "Comark S10430-1 v200312jgv3.pdf" and "See attached / uploaded PDF file titled "Comark S10430-2 v200312jgv3.pdf" | $0.00 | N/A |
Other Electrical Service: Conduit and wiring run from switchgear to new transmitter. | $10,000.00 | $10,000.00 | N/A | $5,250.00 | N/A |
Actual Information Description | File Name |
---|---|
5 Ton system | Information not provided. |
Transformer 3 phase/480v - 150 KVA | Information not provided. |
Switchgear - industrial 800 amp | Information not provided. |
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW | |
Other Electrical Service: Conduit and wiring run from switchgear to new transmitter. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $42,130.00 | $26,978.00 | N/A | $26,978.00 | N/A |
Total for all systems | $1,155,246.58 | $880,713.85 | N/A | $308,929.80 | N/A |
Primary Antenna AL8-17-PMC | $42,130.00 | $26,978.00 | $26,978.00 | ||
Weather Days | $9,100.00 | $9,100.00 | See attached invoice and it's quote and change order | $9,100.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,250.00 | See attached / uploaded PDF file titled "ERI WALV-500 v210324jgv2.pdf" | $6,250.00 | N/A |
UHF - Lower Power Side Mount, Class A One Station antenna -- basic | $26,300.00 | $11,628.00 | See attached / uploaded PDF file titled "ERI WALV-500 v210324jgv2.pdf" | $11,628.00 | N/A |
Actual Information Description | File Name |
---|---|
Weather Days | |
Sweep test of existing antenna | |
UHF - Lower Power Side Mount, Class A One Station antenna -- basic |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $102,150.00 | $70,265.24 | N/A | $64,419.24 | N/A |
Total for all systems | $1,155,246.58 | $880,713.85 | N/A | $308,929.80 | N/A |
Primary Transmission Line | $102,150.00 | $70,265.24 | $64,419.24 | ||
Replace coax switch and load | $5,846.00 | $5,846.00 | N/A | N/A | N/A |
Rigid Transmission Line - copper, 3 1/8" | $96,304.00 | $64,419.24 | See attached / uploaded PDF file titled "ERI WALV-500 v210324jgv2.pdf" | $64,419.24 | N/A |
Actual Information Description | File Name |
---|---|
Replace coax switch and load | Information not provided. |
Rigid Transmission Line - copper, 3 1/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $223,100.00 | $180,447.00 | N/A | $175,447.00 | N/A |
Total for all systems | $1,155,246.58 | $880,713.85 | N/A | $308,929.80 | N/A |
Primary Tower TOWER | $223,100.00 | $180,447.00 | $175,447.00 | ||
Structural engineering tower load study for well documented tower | $12,600.00 | $5,000.00 | N/A | N/A | N/A |
Tall Tower (greater than 500') | $210,500.00 | $175,447.00 | See attached / uploaded PDF file titled "ERI WALV-500 v210324jgv2.pdf" | $175,447.00 | N/A |
Actual Information Description | File Name |
---|---|
Structural engineering tower load study for well documented tower | Information not provided. |
Tall Tower (greater than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $178,082.50 | $178,599.50 | N/A | $22,897.50 | N/A |
Total for all systems | $1,155,246.58 | $880,713.85 | N/A | $308,929.80 | N/A |
Outside Professional Services | $178,082.50 | $178,599.50 | $22,897.50 | ||
RF Exposure Measurements | $21,050.00 | $20,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | $675.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $11,767.00 | The Estimated Cost includes Form 399 submissions including ongoing Actual Cost invoice prep and submission, and amendments as needed. | $11,767.00 | N/A |
Other Engineering Services | $3,082.50 | $3,082.50 | Engineering services not included in any other Form 399 Outside Professional Services component | $3,082.50 | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | N/A | N/A |
Project management of the transition | $47,400.00 | $45,000.00 | N/A | $7,373.00 | N/A |
Actual Information Description | File Name |
---|---|
RF Exposure Measurements | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare and or review reimbursement form | |
Other Engineering Services | |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | Information not provided. |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $51,654.08 | $47,984.08 | N/A | $13,938.06 | N/A |
Total for all systems | $1,155,246.58 | $880,713.85 | N/A | $308,929.80 | N/A |
Other Expenses | $51,654.08 | $47,984.08 | $13,938.06 | ||
Sales Tax | $14,648.08 | $14,648.08 | See attached / uploaded PDF files titled "Comark S10430-1 v200312jgv3.pdf", "Comark S10430-2 v200312jgv3.pdf" and "ERI WALV-500 v210324jgv2.pdf" | $5,598.06 | N/A |
Equipment Delivery and Handling Charges | $6,511.00 | $6,511.00 | See attached / uploaded PDF files titled "Comark S10430-1 v200312jgv3.pdf", "Comark S10430-2 v200312jgv3.pdf" and "ERI WALV-500 v210324jgv2.pdf" | $2,225.00 | N/A |
MVPD Notification of Channel Change | $5,000.00 | $5,000.00 | N/A | $1,743.00 | N/A |
Develop and air announcement of upcoming channel change | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $7,500.00 | $7,500.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $0.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $9,000.00 | N/A | $4,372.00 | N/A |
Actual Information Description | File Name |
---|---|
Sales Tax | |
Equipment Delivery and Handling Charges | |
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | Information not provided. |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $1,155,246.58 | $880,713.85 | $308,929.80 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jeffrey C Gehman Engineering Associate 03/22/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jeffrey C Gehman Engineering Associate 03/22/2022 |