Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
B&C COMMUNICATIONS, LLC Doing Business As: B&C COMMUNICATIONS, LLC |
William Smith, Manager 155 MIDDLE PLANTATION LANE GULF BREEZE, FL 32561 United States |
+1 (716) 310-3711 | BILLSMEDIA@GMAIL.COM | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Tony L. zumMallen President QCommunications, LLC |
Tony zumMallen 705B SE Melody LN Lees Summit, MO 64063 United States |
+1 (816) 729-1177 | tony@qcomm.tv |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | See attached Transition Plan Exhibit. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | NV8604e | |
Year | 2008 | |
Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power Capacity | 3.6 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | ULXTE-20 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 12.9 kW | |
Justification for New Transmitter | 3-9-2020-CH21- ERP of 620kW see attached- 3-9-power budget showing -TPO -11.82kW. The ULXTE-20- 12.9kW is the min available transmitter. OLD power budget for Ch. 31-was 84 kw ERP which required 7 kw. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 200.0 feet | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Heating and Cooling | |
Size | 10 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Transmitter Site Preparation |
Site prep for installation of the main transmitter and RF components not part of Gates SOW. |
Site Survey |
Site Survey - required to perform the engineering and design of new equipment at new ch21 site |
Electrical |
Install 200 amp panel, conduit, surge protector, etc. |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Other | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | Broadband Slot | |
ERP: | 33.5 kW | |
Manufacturer | ||
Model | CS-2030-5771-14 | |
Year | 2008 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Slot | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 24 | |
Lower Limit | 512.00 MHz | |
Upper Limit | 518.00 MHz | |
Design power capacity in use | 90.0 % | |
Other Antenna Type | N/A | |
ERP: | 620.0 kW | |
Manufacturer | ||
Model | ALP24M3-HSBx-21 | |
Year | 2020 | |
Justification for New Antenna | ch 21 requires new antenna model form ch 31 see the attached 3-9-WPAN_ERI-ALP24m3 -power budget file |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 6 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Sales Tax |
Sales tax for Antenna and transmission line |
Freight |
Freight for antenna and transmission line |
Move Antenna |
Orient antenna to fit compass heading as required. |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 790 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1270 feet per run | |
Justification for New Transmission Line | ch21 requires new line at new site. see the attached power budget for line details. 3-9-WPAN_ERI-ALP24M3-HSBx-21_TPO20200226 and quote WPAN ERI 20200218-051RevA ALP24 wMACX675 Line Installed |
Name | Description |
---|---|
Vertical spring hanger |
Vertical spring hangers that support transmission line. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
One or more FM, AM or TV radio broadcaster(s) | N/A | |
Others Types of Users | N/A | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1054512 | |
Coordinates (NAD83) | Latitude (NAD83) | 30° 42' 21.0" N- |
Longitude (NAD83) | 087° 24' 12.0" W- | |
Overall Structure Height | 1414.02 feet | |
Support Structure Height | 1328.72 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 134.51 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | B&C Communications, LLC | |
Date Constructed | 01/01/1997 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Serious Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Additional Reinforcement Materials |
Additional reinforcement materials and labor to install |
Engineering Services - Land survey |
3 separate visits to site to determine existing conditions, land survey, underground utilities, stake new tower centerline, new tower "as built" of base |
Angle Brackets |
Angle support brackets to reattach line to tower. |
RF Installation |
RF Installation |
Tower Lighting |
Tower Lighting due to height change. See letter attached to INV WPAN-37457F |
Tag Path Clearing |
Tag Path clearing - 500 to 600 feet to 50 feet tag path |
Reinforcing Analysis and Design |
Includes analysis and design of required tower reinforcements/modifications based on the previous ERI study |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 900 | |
Explanation | Scope and significance of project require outside management services to augment existing internal personnel to assist turnkey management of and ensure timely and safe execution of channel relocation. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 4 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 4 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 10 | |
Justification | the new ch21 site requires additional field engineering prior to and during the repack system installation due to the unknown nature of the new sites existing building and other tenants facilities to ensure proper engineering and designs are imposed |
Name | Description |
---|---|
Consulting and Permit costs |
Consulting Services for tower permitting for Repack. |
General Consulting Engineering Services |
Includes CP amendment, signal strength coverage map, change in tower height issues, general CP application |
General Legal |
General Legal services related to Repack activities |
Geotechnical Survey and Report |
Geotech survey, report, and associated borings. |
Vendor travel expenses |
Reimbursable Vendor Travel expenses for working in the field on behalf of the station for the Repack project |
On-Site PM |
On site project management services to coordinate Repack activities with all vendors |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Clear brush |
Clear trees and brush to accommodate guy wire installation |
Disconnect and decommission existing transmission and RF components |
Disconnect transmitter and RF components from existing configuration to make way for new facilities. |
Impedance Transformer |
Additional parts - impedance transformer. |
Portapotty |
Portapotty for installation activities |
Site Security |
Site security to provide protection overnight for indoor and outdoor equipment during installation activities at an unmanned site. |
Newspaper Legal Ads |
Legal advertising for notice of channel change |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $671,666.00 | $619,522.60 | N/A | $530,472.60 | N/A |
Total for all systems | $3,055,037.50 | $3,613,093.77 | N/A | $3,269,587.82 | N/A |
Primary Transmitter ULXTE-20 | $671,666.00 | $619,522.60 | $530,472.60 | ||
Electrical | $13,616.00 | $13,616.00 | Per Gulf Coast Electrical Contractors: install 200 am commercial panel with all breakers required to feed new tx, pump module and heat exchanger. Install conduit, surge protector. Remove unused conduit/wiring. Replace disconnecting eq on HVAC | $13,616.00 | N/A |
Site Survey | $14,000.00 | $14,000.00 | Site survey and report are required to be performed before the new transmitter and components installation plan can be finalized. | $14,000.00 | N/A |
Transmitter Site Preparation | $5,700.00 | $5,700.00 | Site prep for installation of the main transmitter and RF components not part of Gates SOW. | N/A | N/A |
2" Rigid Conduit and Wiring (Cost per foot) | $5,200.00 | $5,200.00 | N/A | N/A | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $25,550.00 | N/A | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW | $494,500.00 | $475,131.60 | N/A | $475,131.60 | Same as estimated |
10 Ton system | $60,500.00 | $27,725.00 | Purchase and installation of (2) 5-ton American St 20 SEER variable speed heat pum, air handlers, with associated duct runs, controllers, switches, permits per attached Climatech quote | $27,725.00 | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $14,400.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $38,200.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Electrical | |
Site Survey | |
Transmitter Site Preparation | Information not provided. |
2" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Transformer 3 phase/480v - 150 KVA | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW | |
10 Ton system | |
Service entrance 3 phase/800 amp/208 volt | Information not provided. |
Switchgear - industrial 800 amp | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $148,022.57 | $147,692.57 | N/A | $110,692.57 | N/A |
Total for all systems | $3,055,037.50 | $3,613,093.77 | N/A | $3,269,587.82 | N/A |
Primary Antenna ALP24M3-HSBx-21 | $148,022.57 | $147,692.57 | $110,692.57 | ||
Move Antenna | $0.00 | $0.00 | 6/2/21 Zeroed out. Submitted under another cost component. Mobilize, loosen antenna brackets & orient antenna to fit compass heading as required. Surveyor will ID exact direction antenna needs to be oriented. | $0.00 | N/A |
Freight | $5,593.46 | $5,593.46 | Freight for antenna and tx line per ERI invoice WPAN-56638 | $5,593.46 | N/A |
Sales Tax | $27,870.50 | $27,870.50 | Sales tax for antenna and tx line - ERI Proposal 20200218-051 Rev C - Charged on INV WPAN-56638 | $27,870.50 | N/A |
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 620 kW input, directional,, horizontally polarized | $70,978.61 | $70,978.61 | per attached proposal - 3-9- WPAN ERI 20200218-051RevA ALP24 wMACX675 Line Installed | $70,978.61 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $6,250.00 | N/A |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | $13,700.00 | $13,700.00 | N/A | N/A | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $23,150.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Move Antenna | Information not provided. |
Freight | |
Sales Tax | |
UHF - High Power, Side Mount, basic slot antenna, 24 bay,, 620 kW input, directional,, horizontally polarized | |
Sweep test of existing antenna | |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | Information not provided. |
Side mount brackets for high power antennas (if not included in antenna base cost) | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $257,919.61 | $200,879.61 | N/A | $174,684.41 | N/A |
Total for all systems | $3,055,037.50 | $3,613,093.77 | N/A | $3,269,587.82 | N/A |
Primary Transmission Line | $257,919.61 | $200,879.61 | $174,684.41 | ||
Rigid Transmission Line - copper, 6 1/8" | $256,540.00 | $199,500.00 | per attacehd proposal - 3-9-WPAN ERI 20200218-051RevA ALP24 wMACX675 Line Installed plus estimated freight | $173,304.80 | N/A |
Vertical spring hanger | $1,379.61 | $1,379.61 | Vertical spring hangers to support the transmission line. Per actual costs - ERI invoice 56550 | $1,379.61 | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 6 1/8" | |
Vertical spring hanger |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,492,380.42 | $2,174,118.99 | N/A | $2,106,714.24 | N/A |
Total for all systems | $3,055,037.50 | $3,613,093.77 | N/A | $3,269,587.82 | N/A |
Primary Tower TOWER | $1,492,380.42 | $2,174,118.99 | $2,106,714.24 | ||
RF Installation | $1,868.59 | $1,868.59 | PER ERI Order 37457P - INV 56731 | $1,868.59 | N/A |
Additional Reinforcement Materials | $10,486.80 | $10,486.80 | Additional reinforcement materials from ERI Order # 37457O - includes labor to install and FL sales tax | $10,486.80 | N/A |
Structural engineering tower load study for well documented tower | $12,600.00 | $29,975.00 | Two TAs needed to determine refurbished versus replaced. The 2nd TA was able to determine the tower can be refurbished if shortened and all tenents removed and with substantial reinforcements of tower and foundation work. see ERI 20200213-002 | $29,975.00 | N/A |
Angle Brackets | $13,531.70 | $13,531.70 | Per ERI change order 37457D.1 attached to invoice WPAN-56218. Includes sales tax on INV WPAN-56218-1 | $13,531.70 | N/A |
Reinforcing Analysis and Design | $5,250.00 | $5,250.00 | Per actual costs charged on ERI invoice #54843 | $5,250.00 | N/A |
Tag Path Clearing | $18,705.00 | $18,705.00 | Tag Path Clearing: 500 - 600 feet to 50 feet tag path. PER ERI Inv 56573 | $18,705.00 | N/A |
Engineering Services - Land survey | $29,280.00 | $29,280.00 | Per proposal from Electronics Research, Inc #20200103-684 for $29280.00. | N/A | N/A |
Tower Lighting | $138,158.33 | $138,158.33 | Tower lighting - includes sales tax. Per ERI invoice WPAN-37457F and WPAN-56505 (freight) | $138,158.33 | The total are actual costs and are the same as the estimated costs: $138,158.33 |
Tall Tower (greater than 500') | $210,500.00 | $291,175.00 | per ERI Proposal 20200218-05, line item 029 - TV Services. see attached | $253,050.25 | N/A |
Serious tower reinforcement/modifications | $1,052,000.00 | $1,635,688.57 | per ERI Proposal 20200213-002, line item 002 - TV Services. see attached WPAN-399-Tower mod summary-Final 3-9-2020 includes foundation repair Includes sales tax on INV WPAN-37457E | $1,635,688.57 | N/A |
Actual Information Description | File Name |
---|---|
RF Installation | |
Additional Reinforcement Materials | |
Structural engineering tower load study for well documented tower | |
Angle Brackets | |
Reinforcing Analysis and Design | |
Tag Path Clearing | |
Engineering Services - Land survey | Information not provided. |
Tower Lighting | |
Tall Tower (greater than 500') | |
Serious tower reinforcement/modifications |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $387,188.52 | $377,119.62 | N/A | $282,353.62 | N/A |
Total for all systems | $3,055,037.50 | $3,613,093.77 | N/A | $3,269,587.82 | N/A |
Outside Professional Services | $387,188.52 | $377,119.62 | $282,353.62 | ||
On-Site PM | $25,000.00 | $25,000.00 | Per actual costs | $25,000.00 | N/A |
Vendor travel expenses | $14,000.00 | $14,000.00 | estimated vendor travel for the project | N/A | N/A |
Geotechnical Survey and Report | $9,500.00 | $9,500.00 | Per ERI Proposals 2019717-126 and 20190913-739 attached to invoice 54838 | $9,500.00 | N/A |
General Legal | $6,835.00 | $6,835.00 | General Legal services related to Repack | $6,835.00 | Per actual invoice costs |
General Consulting Engineering Services | $13,890.00 | $13,890.00 | Consulting Engineering - several issues, including tower height changes, CP application amendment, signal strength coverage, FAA consulting, CP extension, Tolling waiver, CP review. Lohnes and Culver invoices | $13,890.00 | Per actual costs |
Consulting and Permit costs | $12,743.52 | $12,743.52 | Consulting and permitting costs for WPAN tower site | $12,743.52 | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $43,732.00 | Per QComm Quote 707CV/3001 attached to INV QC21-760. | $21,866.00 | N/A |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $2,000.00 | N/A | $210.00 | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $2,105.00 | N/A | $690.00 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $14,720.00 | $14,720.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,000.00 | N/A | $1,140.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $0.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $4,860.00 | N/A |
Prepare request for Special Temporary Authorization | $8,200.00 | $8,200.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | $0.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $2,975.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $6,000.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | $0.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $3,100.00 | Estimated Cost Justification WPAN-590-Prepare and_or Review Reimbursement Form v4 | $3,100.00 | Only asking for reimbursement of the $2500, but duplicate entry because adding required cover letter (can't delete or amend prior submission). |
Additional Field Engineering Service, 10 Days | $22,500.00 | $22,500.00 | estimated amount for 10 days of field engineering | N/A | N/A |
Project management of the transition | $142,200.00 | $173,544.10 | per actual invoices from QCommunications and Widelity. | $173,544.10 | Actual costs. |
Actual Information Description | File Name |
---|---|
On-Site PM | |
Vendor travel expenses | Information not provided. |
Geotechnical Survey and Report | |
General Legal | |
General Consulting Engineering Services | |
Consulting and Permit costs | |
Comprehensive coverage verification via field study, if needed | |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | |
ASR modification (prepare FCC Form 854) | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form | |
Additional Field Engineering Service, 10 Days | Information not provided. |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $97,860.38 | $93,760.38 | N/A | $64,670.38 | N/A |
Total for all systems | $3,055,037.50 | $3,613,093.77 | N/A | $3,269,587.82 | N/A |
Other Expenses | $97,860.38 | $93,760.38 | $64,670.38 | ||
Newspaper Legal Ads | $209.88 | $209.88 | Newspaper legal ad regarding channel change and resume broadcast date. NW Daily News - 34426797 | $209.88 | N/A |
Site Security | $21,600.00 | $21,600.00 | Overnight site security to protect indoor and outdoor equipment during installation activities at an unmanned site. | $21,600.00 | N/A |
Portapotty | $1,750.00 | $1,750.00 | Actual costs per XTreme Plumbing & Septic Invoices | $1,750.00 | N/A |
Impedance Transformer | $1,538.77 | $1,538.77 | Impedance transformer per ERI invoice 56408 - additional parts. | $1,538.77 | N/A |
Disconnect and decommission existing transmission and RF components | $14,000.00 | $14,000.00 | estimated amount to disconnect and decommission tx and rf components | N/A | N/A |
Clear brush | $9,650.00 | $9,650.00 | Clear trees and brush from guy paths per ERI invoice 56411 | $9,650.00 | N/A |
MVPD Notification of Channel Change | $1,000.00 | $1,000.00 | Prepare and send notices to MVPDs. | $0.00 | N/A |
Develop and air announcement of upcoming channel change | $250.00 | $250.00 | Voice talent to tape announcement. | $0.00 | N/A |
Equipment Delivery and Handling Charges | $8,500.00 | $8,500.00 | N/A | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $26,171.73 | $26,171.73 | Per actual costs | $26,171.73 | Actual costs the same as estimated |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $195.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | $0.00 | N/A |
DTV Medical Facility Notification | $11,550.00 | $7,500.00 | N/A | $3,750.00 | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,070.00 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Newspaper Legal Ads | |
Site Security | |
Portapotty | |
Impedance Transformer | |
Disconnect and decommission existing transmission and RF components | Information not provided. |
Clear brush | |
MVPD Notification of Channel Change | Information not provided. |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Delivery and Handling Charges | Information not provided. |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
DTV Medical Facility Notification | |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $3,055,037.50 | $3,613,093.77 | $3,269,587.82 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | William Smith Manager 03/21/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | William Smith Manager 03/21/2022 |