Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
HME EQUITY FUND II, LLC Doing Business As: HME EQUITY FUND II, LLC |
Seth Ellis 509 West Colonial Drive Suite 100 ORLANDO, FL 32804 United States |
+1 (407) 906-2484 | sellis@assurancemezz.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Davina Sashkin Fletcher, Heald & Hildreth, PLC |
Davina Sashkin Fletcher, Heald & Hildreth, PLC 1300 N. 17th Street, Suite 1100 Arlington, VA 22209 United States |
+1 (703) 812-0400 | sashkin@fhhlaw.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Build according to FCC transition plan. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | TMU9-570 | |
Year | 2013 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | .6 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | TMU9-4 Evo | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.5 kW | |
Justification for New Transmitter | Can't use current Transmitter so need to purchase a new one, need more power per construction permit approved by FCC |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | Yes | |
Size | 3 inches | |
Length | 100.0 feet | |
Other Electrical Service | Yes | |
Description | Will need some electrical work to get it up and running, will submit quote from an electrician. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | Other | |
Other Size | 2 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Removal |
Cost to just remove the transmitter from building Transmitter Removal Quote # 102 |
Installation |
Cost to Install Transmitter Transmitter Install Quote # 101 |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 5.0 kW | |
Manufacturer | ||
Model | PSILP8BH-39 | |
Year | 2014 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | TLP-8VP-R P300-SP | |
Year | 2020 | |
Justification for New Antenna | Higher power antenna is necessary for modification application parameters (filed in 1st priority window). |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Pipe and Mounting Pieces |
Materials and Labor to fabricate custom tower leg transition mounts. Mounts needed to hold a 3 and a half inch OD pipe off the angle tower leg |
Labor to install Antenna and Disposal Cost |
Labor to install Antenna and then remove the old one. This will include travel. |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Foam | |
Diameter | 7/8 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 250 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Type | Flexible Foam | |
Diameter | 7/8 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 250 feet per run | |
Justification for New Transmission Line | Sweep test results will determine need. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Located on Building | |
Is this tower currently shared with any other stations? | No | |
One or more FM, AM or TV radio broadcaster(s) | N/A | |
Others Types of Users | N/A | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1037283 | |
Coordinates (NAD83) | Latitude (NAD83) | 39° 24' 10.4" N- |
Longitude (NAD83) | 076° 36' 10.9" W- | |
Overall Structure Height | 279.85 feet | |
Support Structure Height | 189.96 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 477.03 feet | |
Structure Type | BTWR - Building with Tower | |
Tower Owner | Towson City Center, LLC | |
Date Constructed | 06/25/2013 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Located on Building |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 600 | |
Explanation | Applicant has no internal resources capable of overseeing, identifying, purchasing, installing and commissioning this repack project. It will rely solely on outside services to manage all work required. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Other Transition- Related Professional Service Costs |
Project Management of the transition. Preparation and review of reimbursement form. |
Quarterly Transition Reports |
Quarterly Transition Reports |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Other Miscellaneous Expenses |
Other Miscellaneous Expenses |
Travel to Antenna Site |
Travel to antenna site to walk the site to see if they can get the antenna on the roof without a crane |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $164,180.00 | $94,442.00 | N/A | $72,341.20 | N/A |
Total for all systems | $829,983.75 | $588,958.75 | N/A | $347,944.74 | N/A |
Primary Transmitter TMU9-4 Evo | $164,180.00 | $94,442.00 | $72,341.20 | ||
Other -- HVAC Service Type: C Size:2 (Other) | $2,130.00 | $2,130.00 | No quote yet but Licensee is going with a wall unit instead. Total expenses to date in regards to HVAC service is $2130 | $2,130.00 | N/A |
Removal | $3,000.00 | $3,000.00 | Removal only of old Transmitter. Transmitter Removal Quote 102 attached. | $1,000.00 | N/A |
Other Electrical Service: Will need some electrical work to get it up and running, will submit quote from an electrician. | $1,500.00 | $1,500.00 | Waiting on Quotes to submit | N/A | N/A |
3" Rigid Conduit and Wiring (Cost per foot) | $5,200.00 | $4,900.00 | N/A | N/A | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $13,700.00 | N/A | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $126,000.00 | $57,262.00 | Please see document entitled " Updated #2 Narrative for Transmitter Change WMJF-CD" for the cost justification to increase the transmitter amount to now include the sales tax. | $57,261.20 | N/A |
Installation | $11,950.00 | $11,950.00 | Cost to install the new transmitter Transmitter Install Quote 101 attached. | $11,950.00 | N/A |
Actual Information Description | File Name |
---|---|
Other -- HVAC Service Type: C Size:2 (Other) | |
Removal | |
Other Electrical Service: Will need some electrical work to get it up and running, will submit quote from an electrician. | Information not provided. |
3" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Service entrance 3 phase/800 amp/208 volt | Information not provided. |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | |
Installation |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $51,080.00 | $72,950.00 | N/A | $72,520.42 | N/A |
Total for all systems | $829,983.75 | $588,958.75 | N/A | $347,944.74 | N/A |
Primary Antenna TLP-8VP-R P300-SP | $51,080.00 | $72,950.00 | $72,520.42 | ||
Pipe and Mounting Pieces | $3,050.00 | $3,050.00 | See Narrative | $3,050.00 | N/A |
Labor to install Antenna and Disposal Cost | $15,000.00 | $15,000.00 | See attached narrative | $14,800.00 | N/A |
UHF - Lower Power Side Mount, Class A One Station antenna -- basic | $26,300.00 | $48,500.00 | See document entitled "Narrative for Antenna Estimate Change WMJF-CD" for cost justification and details on corresponding quotes. | $48,270.42 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | Quote for this was originally provided in 2017 and since then prices have gone up and the new standard for a sweep test is $6400 and this is still below the predetermined amount. See line #6 on quote # 900237CMZ-2 from Dielectric | $6,400.00 | N/A |
Actual Information Description | File Name |
---|---|
Pipe and Mounting Pieces | |
Labor to install Antenna and Disposal Cost | |
UHF - Lower Power Side Mount, Class A One Station antenna -- basic | |
Sweep test of existing antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,750.00 | $4,000.00 | N/A | $0.00 | N/A |
Total for all systems | $829,983.75 | $588,958.75 | N/A | $347,944.74 | N/A |
Primary Transmission Line | $2,750.00 | $4,000.00 | $0.00 | ||
Flexible Foam Transmission Line - dielectric, 7/8" | $2,750.00 | $4,000.00 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $433,600.00 | $162,000.00 | N/A | $0.00 | N/A |
Total for all systems | $829,983.75 | $588,958.75 | N/A | $347,944.74 | N/A |
Primary Tower BTWR | $433,600.00 | $162,000.00 | $0.00 | ||
Structural engineering tower load study for well documented tower | $12,600.00 | $12,000.00 | N/A | N/A | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $150,000.00 | Crane required to install antenna, transmitter and HVAC. Phone quote min $50,000 per day for crane rental and crew, and assuming 2 non-contiguous days (only able to shut down street/building on Sundays). Additional $50,000 sought to cover tower crew. | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $132,310.00 | $210,700.00 | N/A | $182,337.99 | N/A |
Total for all systems | $829,983.75 | $588,958.75 | N/A | $347,944.74 | N/A |
Outside Professional Services | $132,310.00 | $210,700.00 | $182,337.99 | ||
Other Transition- Related Professional Service Costs | $2,500.00 | $2,500.00 | Prepare and/or review reimbursement form | $0.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $2,625.00 | The actual hours on the engineering studies came in a little higher than originally estimated. |
Project management of the transition | $94,800.00 | $159,000.00 | Project management exp- I have attached a narrative and a detailed spreadsheet of the exp that are associated with this cost estimate & why we are requesting more funds. File names are Narrative for Project Management... and Data for Narrative for More... | $154,768.99 | N/A |
Quarterly Transition Reports | $8,450.00 | $8,450.00 | see attached quote for preparation and filing of reports by counsel and technical consultant | $2,655.00 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $15,000.00 | Attorneys fees for negotiation of Unable to Construct Channel Resolution Agreement with WETA and MPT, preparation and filing and related CP modification and updated 399. | $11,006.75 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $675.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $1,610.63 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $2,000.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $7,000.00 | Originally best estimates were made off the original cost catalog at the time. As they went thru to complete the form there were a lot of revisions for transmitter&antenna costs that got revised. Repack-05A and Repack-08 have $500 more in legal fees | $6,996.62 | N/A |
Actual Information Description | File Name |
---|---|
Other Transition- Related Professional Service Costs | |
Perform engineering study for new channel assignment and antenna development | |
Project management of the transition | |
Quarterly Transition Reports | |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Prepare and or review reimbursement form |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $46,063.75 | $44,866.75 | N/A | $20,745.13 | N/A |
Total for all systems | $829,983.75 | $588,958.75 | N/A | $347,944.74 | N/A |
Other Expenses | $46,063.75 | $44,866.75 | $20,745.13 | ||
Local Zoning | $2,000.00 | $2,000.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $10,353.00 | Adjusting cost to the current market rate for this service, original amount was put in over 2 years ago. Attached is INV-002398 & EST-001750 | $10,353.00 | N/A |
Travel to Antenna Site | $2,208.75 | $2,208.75 | Legacy EE traveled to Antenna site to meet engineer to walk site to see if they could get the antenna on top of the building without a crane. See attached"Updated Narrative for Antenna Estimate Change WMJF-CD dated 13Oct20" This should be under Antenna | $2,087.13 | N/A |
MVPD Notification of Channel Change | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Equipment Storage | $2,500.00 | $2,500.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $8,305.00 | $8,305.00 | Please find attached the document entitled "Narrative for Equipment Delivery and Handling Charges" to request more funds. | $8,305.00 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Non-zoning permits | $2,000.00 | $2,000.00 | N/A | N/A | N/A |
Other Miscellaneous Expenses | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Develop and air announcement of upcoming channel change | $2,500.00 | $2,500.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Local Zoning | Information not provided. |
DTV Medical Facility Notification | |
Travel to Antenna Site | |
MVPD Notification of Channel Change | Information not provided. |
Equipment Storage | Information not provided. |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Non-zoning permits | Information not provided. |
Other Miscellaneous Expenses | Information not provided. |
Develop and air announcement of upcoming channel change | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $829,983.75 | $588,958.75 | $347,944.74 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Ann Olsen Consultant 03/20/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Ann Olsen Consultant 03/20/2022 |