Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
NPG OF IDAHO, INC. Doing Business As: NPG OF IDAHO, INC. |
Tim Hannan 825 Edmond Street Saint Joseph, MO 64501 United States |
+1 (816) 271-8505 | TIM.HANNAN@NPGCO.COM | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | PURCHASE AND INSTALL NEW ANTENNA, MASK FILTER, FEED LINE AND MASK FILTER. PURCHASE NEW TRANSMITTER TO MEET MAXIMIZATION REQUIREMENTS. |
Question | Response |
---|---|
Sharee Station Facility ID | 28231 |
Call Sign | KXPI-LD |
Type | |
Licensee Name | NPG of Idaho, Inc. |
Status | LICENSED |
DTS | No |
Community of License | POCATELLO, ID |
Pre-auction RF Channel | 35 |
Post-auction RF Channel | |
Neilsen DMA | |
Network Affiliation |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | TXR-SX-2-U-C | |
Year | 2015 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 0.28 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | UAXTE-3R44 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 1.8 kW | |
Justification for New Transmitter | K49ND-D will install a new transmitter due to the fact that its previous transmitter cannot be retuned and is no longer supported. Please see letter from Anywave explaining the situation. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Single-Phase, 208-240 Volts Install new conduit, wiring, breaker, and misc from existing main panel board to new equipment. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Other | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | Parapanel | |
ERP: | 0.8 kW | |
Manufacturer | ||
Model | 4DR-4-2HW | |
Year | 2015 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | Yes | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Other | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | Parapanel | |
ERP: | 5.0 kW | |
Manufacturer | ||
Model | SFN-2030-2346-10 (E/P) | |
Year | 2017 | |
Justification for New Antenna | Existing antenna will only produce 656-862 mhz. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 2 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | No | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
RF Channel Number |
---|
35 |
34 |
Name | Description |
---|---|
Primary Antenna - Custom Mount |
Primary Antenna - Custom Mount |
Shared Transmission Line Parts |
Transmission line parts for new antenna, shared with KXPI |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | No | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
ASR Number | ||
Coordinates (NAD83) | Latitude (NAD83) | 42° 52' 25.35" N- |
Longitude (NAD83) | 112° 30' 49.4" W- | |
Overall Structure Height | 180.00 feet | |
Support Structure Height | 180.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 5826.00 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Day Wireless Systems | |
Date Constructed | 08/26/2018 |
Users |
---|
Fybercom LLC |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | No study needed |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
One or more FM, AM or TV radio broadcaster(s) | N/A | |
Others Types of Users | N/A | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
ASR Number | ||
Coordinates (NAD83) | Latitude (NAD83) | 42° 48' 25.0" N- |
Longitude (NAD83) | 112° 29' 18.1" W- | |
Overall Structure Height | 60.00 feet | |
Support Structure Height | 60.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 7212.00 feet | |
Structure Type | LTOWER - Lattice Tower | |
Tower Owner | Teton Communications | |
Date Constructed | 06/30/1980 |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 595 | |
Explanation | K49ND-D requires the aid of Project Management services in order to fulfill the requirements of the re-pack transition. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Additional Repack Legal Services Not Otherwise Specified in Form 399 |
NON-CATALOG LEGAL SERVICES SUCH AS REVIEW OF QUARTERLY TRANSITION STATUS REPORTS AND OTHER MISCELLANEOUS NON-CATALOG LEGAL FEES |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $127,755.00 | $40,099.50 | N/A | $40,099.50 | N/A |
Total for all systems | $590,792.54 | $324,833.59 | N/A | $287,903.67 | N/A |
Primary Transmitter UAXTE-3R44 | $127,755.00 | $40,099.50 | $40,099.50 | ||
Other Electrical Service: Single-Phase, 208-240 Volts Install new conduit, wiring, breaker, and misc from existing main panel board to new equipment. | $1,755.00 | $1,755.00 | Please see attached Intermountain Electric Estimate 45895 | $1,755.00 | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $126,000.00 | $38,344.50 | Please see GatesAir Quote #Q82697 & Invoice #US0332280 | $38,344.50 | N/A |
Actual Information Description | File Name |
---|---|
Other Electrical Service: Single-Phase, 208-240 Volts Install new conduit, wiring, breaker, and misc from existing main panel board to new equipment. | |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $131,669.84 | $36,818.62 | N/A | $32,422.94 | N/A |
Total for all systems | $590,792.54 | $324,833.59 | N/A | $287,903.67 | N/A |
Primary Antenna SFN-2030-2346-10 (E/P) | $131,669.84 | $36,818.62 | $32,422.94 | ||
Shared Transmission Line Parts | $4,509.84 | $4,509.84 | Please see Myat quote 90004931, Micronetixx proposal 07772AA, Rev. 2.0 (both split 50/50 between KXPI and K49ND-D), and actual freight from Micronetixx invoices C-2209A and C-2209B | $4,384.42 | N/A |
Primary Antenna - Custom Mount | $9,930.00 | $9,930.00 | Please see Wireless Infrastructure Services proposal dated August 15, 2019 and please note, cost is split with KXPI, estimated cost will be 50% of the quoted amount | $9,930.00 | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $5,107.94 | see Estimated Cost Justification K34NC-D-210-New Combiner v0 | $5,107.94 | N/A |
Sweep test of existing antenna | $6,730.00 | $5,000.00 | N/A | $3,000.00 | N/A |
UHF - Lower Power Side Mount, Class A One Station antenna -- basic | $26,300.00 | $12,270.84 | Please see Estimated Cost Justification K49ND-D-210-Primary Antenna, UHF Lower Power Side Mount v0 | $10,000.58 | N/A |
Actual Information Description | File Name |
---|---|
Shared Transmission Line Parts | |
Primary Antenna - Custom Mount | |
New combiner, cost per channel (without antenna) | |
Sweep test of existing antenna | |
UHF - Lower Power Side Mount, Class A One Station antenna -- basic |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $168,400.00 | $54,680.00 | N/A | $30,900.00 | N/A |
Total for all systems | $590,792.54 | $324,833.59 | N/A | $287,903.67 | N/A |
Primary Tower LTOWER | $84,200.00 | $10,000.00 | $5,150.00 | ||
Short Tower (less than 500') | $84,200.00 | $10,000.00 | Please see attached Wireless Infrastructure Services NPG K49ND Repack antenna system installation budgetary proposal Rev.1 and supporting email correspondence for expenses related to removal of equipment at previous tower. | $5,150.00 | N/A |
Primary Tower TOWER | $84,200.00 | $44,680.00 | $25,750.00 | ||
Short Tower (less than 500') | $84,200.00 | $44,680.00 | Please see attached Wireless Infrastructure Services NPG K49ND Repack Rev.1 and supporting email correspondence. Please note that the tower is shared with three LPTV stations and translators that are not part of this repack. | $25,750.00 | N/A |
Actual Information Description | File Name |
---|---|
Short Tower (less than 500') | |
Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $144,932.70 | $184,750.47 | N/A | $179,308.72 | N/A |
Total for all systems | $590,792.54 | $324,833.59 | N/A | $287,903.67 | N/A |
Outside Professional Services | $144,932.70 | $184,750.47 | $179,308.72 | ||
Additional Repack Legal Services Not Otherwise Specified in Form 399 | $20,212.70 | $20,212.70 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $20,212.70 | Additional expenses were incurred as indicated in the attached invoices. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,291.90 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $3,291.90 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $1,500.00 | N/A | $641.88 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $3,500.00 | N/A | $2,291.37 | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $750.00 | Please see K34NC-D RF Eng STA Budget Revision Justification Letter. The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $750.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $2,000.00 | du Treil, Lundin & Rackley, Inc. invoice 242335 | $2,000.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $1,937.50 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $1,562.50 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $9,068.97 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $9,068.97 | Additional expenses were incurred as indicated in the attached invoices. |
Project management of the transition | $94,010.00 | $139,489.40 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $139,489.40 | N/A |
Actual Information Description | File Name |
---|---|
Additional Repack Legal Services Not Otherwise Specified in Form 399 | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form | |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $18,035.00 | $8,485.00 | N/A | $5,172.51 | N/A |
Total for all systems | $590,792.54 | $324,833.59 | N/A | $287,903.67 | N/A |
Other Expenses | $18,035.00 | $8,485.00 | $5,172.51 | ||
Develop and air announcement of upcoming channel change | $750.00 | $750.00 | N/A | $561.00 | N/A |
Equipment Delivery and Handling Charges | $1,500.00 | $1,500.00 | N/A | $1,126.51 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $1,500.00 | $1,500.00 | N/A | $250.00 | N/A |
DTV Medical Facility Notification | $11,550.00 | $2,000.00 | N/A | $2,000.00 | N/A |
MVPD Notification of Channel Change | $900.00 | $900.00 | Please see Widelity quote K49ND-D MVPD Notification | $900.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | Please see K34NC-D News-Press & Gazette Co Invoice #26PTU6BL Budget Revision Justification Letter | $335.00 | N/A |
Equipment Storage | $1,500.00 | $1,500.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Develop and air announcement of upcoming channel change | |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
DTV Medical Facility Notification | |
MVPD Notification of Channel Change | |
FCC Filing Fees - Form 2100 license to cover application | |
Equipment Storage | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $590,792.54 | $324,833.59 | $287,903.67 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | J Timothy Hannan EVP & CFO of Parent, NPGCO 03/21/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | J Timothy Hannan EVP & CFO of Parent, NPGCO 03/21/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | J Timothy Hannan EVP & CFO of Parent, NPGCO 03/21/2022 |