FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
43424
Service:
DTV
Call Sign:
WFXV
Channel:
34 (UHF)
File Number:
0000028517
FRN:
0009961889
Date Submitted:
03/18/2022

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

Nexstar Media Inc.

Elizabeth Ryder

545 E. JOHN CARPENTER FREEWAY

SUITE 700

IRVING, TX 75062

United States

+1 (972) 373-8800 eryder@nexstar.tv Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Elizabeth Ryder

General Counsel

Nexstar Media Inc.

Elizabeth Ryder

545 E. John Carpenter Freeway

Suite 700

Irving, TX 75062

United States

+1 (972) 373-8800 eryder@nexstar.tv

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan Replace transmitter, antenna, and transmission line. Acquire interim antenna system during construction and duration of the assigned phase. Map and analyze tower; design and implement modifications if required. See attached.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Auxiliary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Auxiliary
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Affinity UD5000C-500
Year 2005
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 0.5 kW

Auxiliary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model TMU9
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 0.6 kW
Justification for New Transmitter The manufacturer of the existing solid state transmitter advises that the transmitter cannot be re-tuned to the assigned channel. See attachment.

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service Yes
Description Labor and materials to disconnect existing and to install new transmitter to existing electrical service
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Retune Channel Filter

Retune Channel Filter

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model CCT-U-DCX Millennium
Year 2006
Type Inductive Output Tube
IOT Power Type Single
Power Capacity 21.5 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model THU9EVO-24
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 37 kW
Justification for New Transmitter The manufacturer of the existing IOT transmitter advises that the transmitter cannot be re-tuned to the assigned channel. A new Comark Paragon MSDC IOT transmitter is used as the price estimate for reimbursement.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 150 kVA
Rigid Conduit and Wiring Yes
Size 3 inches
Length 100.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Transmitter Electrical and Installation

Transmitter electrical and installation

Additional Transmitter Costs

Additional transmitter costs

Additional Interior RF System

Interior RF System Existing Transmitter to Interim Transmission line

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU-26GTH-R P260SP
Year 2006

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 539.0 kW
Manufacturer
Model TFU-27ETT/VP-R C170
Year 2019
Justification for New Antenna The existing primary antenna is a single channel slotted coaxial which cannot accommodate the assigned channel. Moving to top mount.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna?
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 200.0 kW
Manufacturer
Model TBD
Year 2018
Justification for New Antenna An interim antenna is necessary to keep station on the air during primary antenna replacement and for the duration of the assigned phase. Station will attempt to rent if renting is available at time of acquisition.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? S
Feed Line Size 3 1/8 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 410 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 500 feet per run
Justification for New Transmission Line The antenna is moving from side to top mount so new line is needed for a new antenna. The existing antenna and line will serve as interim throughout the phase.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Additional Transmission Line Components

Additional Transmission Line Components

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Flexible Air
Diameter 3 inches
Segment Length N/A
Other Segment Length
Number of parallel runs 1
Length 260 feet per run
Justification for New Transmission Line A temporary transmission line is necessary for the temporary antenna to keep station on the air during primary antenna work. Station will attempt to rent if renting is available at time of acquisition

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? No
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1003764
Coordinates (NAD83) Latitude (NAD83) 43° 08' 41.1" N-
Longitude (NAD83) 075° 10' 32.2" W-
Overall Structure Height 428.80 feet
Support Structure Height 372.70 feet
Ground Elevation Above Mean Sea Level (AMSL) 1219.80 feet
Structure Type GTOWER - Guyed Structure Used for Communication Purposes
Tower Owner Mission Broadcasting, Inc.
Date Constructed 03/11/2015

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
57837 WUTR DTV

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for undocumented/poorly documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Major Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Geotechnical Study Report

Soil Study for Tower Analysis

Weather Delays, Additional Charges

Weather Delays, Additional Charges

Additional antenna removal costs

Additional antenna removal costs

Tower Modification Materials

Tower modification materials

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 295
Explanation Schedule and coordinate multiple vendors, complete progress reports, and update Schedule 399. Station does not have available personnel or personnel trained in project management for such complex projects. Internal accounting and Project management.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service Yes
Number of Days 14
Justification It will be necessary to survey the site, plan the equipment, develop specifications for purchasing, and oversee multiple vendor RF projects. Station does not have available personnel or personnel trained in such services.

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Snow Removal During RePack Work

Excessive Snow Removal during RePack Work at the Site. Please see attachments Glenn Stevener Inc. Estimates # 1115 & 1116

Equipment Rentals

Equipment Rentals

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,783,704.00 $1,011,854.00 N/A $1,011,854.00 N/A
Total for all systems $3,246,182.00 $2,561,981.80 N/A $2,228,280.30 N/A
Primary Transmitter THU9EVO-24 $1,723,184.00 $951,334.00 $951,334.00
Additional Interior RF System $0.00 $0.00 See Transmitter Electrical and Installation N/A N/A
Switchgear - industrial 800 amp $38,200.00 $0.00 See Transmitter Electrical and Installation N/A N/A
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW $1,473,000.00 $770,100.00 See Rohde & Schwarz quote 230176.0 and Transmitter Justification Statement $770,100.00 N/A
Transformer 3 phase/480v - 150 KVA $25,550.00 $0.00 See Transmitter Electrical and Installation N/A N/A
3" Rigid Conduit and Wiring (Cost per foot) $5,200.00 $0.00 See Transmitter Electrical and Installation N/A N/A
Transmitter Electrical and Installation $130,576.00 $130,576.00 See Land Communications estimate 1097 $130,576.00 N/A
Additional Transmitter Costs $50,658.00 $50,658.00 See Rohde & Schwarz quotes 280426.0, 307679.0 and 304848.0 $50,658.00 N/A
Auxiliary Transmitter TMU9 $60,520.00 $60,520.00 $60,520.00
Retune Channel Filter $1,750.00 $1,750.00 See ERI quote 03607 $1,750.00 N/A
Other Electrical Service: Labor and materials to disconnect existing and to install new transmitter to existing electrical service $8,475.00 $8,475.00 See Land Communications quote 1074 $8,475.00 N/A
UHF - Air Cooled Solid State Transmitter 0.6 kW $50,295.00 $50,295.00 See Land Communications quote 1074 $50,295.00 N/A

Components

Actual Information Description File Name
Additional Interior RF System Information not provided.
Switchgear - industrial 800 amp Information not provided.
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW

Component Description:
Transmitter, installment #2
Amount:
$577,575.00

Component Description:
Transmitter, installment #1
Amount:
$192,525.00
Transformer 3 phase/480v - 150 KVA Information not provided.
3" Rigid Conduit and Wiring (Cost per foot) Information not provided.
Transmitter Electrical and Installation

Component Description:
Transmitter electrical and installation
Amount:
$130,576.00
Additional Transmitter Costs

Component Description:
Additional transmitter costs
Amount:
$35,440.00

Component Description:
Additional transmitter costs
Amount:
$9,761.00

Component Description:
Additional transmitter costs
Amount:
$5,457.00
Retune Channel Filter

Component Description:
Retune channel filter
Amount:
$1,750.00
Other Electrical Service: Labor and materials to disconnect existing and to install new transmitter to existing electrical service

Component Description:
Transmitter electrical and installation
Amount:
$8,475.00
UHF - Air Cooled Solid State Transmitter 0.6 kW

Component Description:
Auxiliary transmitter
Amount:
$50,295.00

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $512,360.00 $430,473.00 N/A $236,673.00 N/A
Total for all systems $3,246,182.00 $2,561,981.80 N/A $2,228,280.30 N/A
Interim Antenna TBD $203,830.00 $193,800.00 $0.00
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized $189,500.00 $180,000.00 N/A N/A N/A
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed) $7,600.00 $7,400.00 N/A N/A N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A N/A N/A
Primary Antenna TFU-27ETT/VP-R C170 $308,530.00 $236,673.00 $236,673.00
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $6,400.00 N/A
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $10,710.00 See Dielectric quote DMS148-5 $10,710.00 N/A
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized $289,500.00 $219,563.00 See Dielectric quote DMS148-5 $219,563.00 N/A

Components

Actual Information Description File Name
UHF - Lower Power Side Mount, One station - 200-500 kW, horizontally polarized Information not provided.
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed) Information not provided.
Sweep test of existing antenna Information not provided.
Sweep test of existing antenna

Component Description:
Sweep test
Amount:
$6,400.00
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
Elbow complex, balanced due
Amount:
$1,071.00

Component Description:
Elbow complex, installment #2
Amount:
$4,819.50

Component Description:
Elbow complex, installment #1
Amount:
$4,819.50
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized

Component Description:
Antenna, balance due
Amount:
$21,956.30

Component Description:
Antenna, installment #1
Amount:
$98,803.35

Component Description:
Antenna, installment #2
Amount:
$98,803.35

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $124,540.00 $97,571.80 N/A $77,354.30 N/A
Total for all systems $3,246,182.00 $2,561,981.80 N/A $2,228,280.30 N/A
Interim Transmission Line $15,340.00 $14,560.00 $0.00
Flexible Air Transmission Line - dielectric, 3" $15,340.00 $14,560.00 N/A N/A N/A
Primary Transmission Line $109,200.00 $83,011.80 $77,354.30
Rigid Transmission Line - copper, 6 1/8" $101,000.00 $74,811.80 See Dielectric quote DMS148-5 $69,656.30 N/A
Additional Transmission Line Components $8,200.00 $8,200.00 See Dielectric order confirmations 1698761,1931505 and 1931586 and Mega Industries invoice $7,698.00 N/A

Components

Actual Information Description File Name
Flexible Air Transmission Line - dielectric, 3" Information not provided.
Rigid Transmission Line - copper, 6 1/8"

Component Description:
Transmission line, installment #3
Amount:
$2,325.68

Component Description:
Transmission line, installment #1
Amount:
$33,665.31

Component Description:
Transmission line, installment #2
Amount:
$33,665.31
Additional Transmission Line Components

Component Description:
Additional transmission line components
Amount:
$1,820.00

Component Description:
Waveguide to coax transition piece
Amount:
$3,120.00

Component Description:
Additional transmission line component
Amount:
$924.00

Component Description:
Additional transmission line components
Amount:
$1,834.00

Component Description:
Additional transmission line
Amount:
$924.00

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $580,208.00 $769,408.00 N/A $754,978.00 N/A
Total for all systems $3,246,182.00 $2,561,981.80 N/A $2,228,280.30 N/A
Primary Tower GTOWER $580,208.00 $769,408.00 $754,978.00
Weather Delays, Additional Charges $33,000.00 $33,000.00 See Precision Communications Addendum to Proposal 20311-5 $33,000.00 N/A
Tower Modification Materials $4,712.00 $4,712.00 See FDH Infrastructure quote P19_2119_004 $4,712.00 N/A
Geotechnical Study Report $4,550.00 $4,550.00 See Tower Engineering proposal May 21, 2019 $4,450.00 N/A
Short Tower (less than 500') $84,200.00 $495,900.00 See PCI proposals 20310-5 Interim installation $97,800; 20357-5 Main antenna installation $249,600; 20358-5 Interim antenna removal $148,500 $495,900.00 N/A
Major tower reinforcement/modifications $421,000.00 $199,800.00 See PCI quote 20311-5 $199,800.00 N/A
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study $26,300.00 $25,000.00 N/A $17,116.00 N/A
Additional antenna removal costs $6,446.00 $6,446.00 See Precision Communications Addendum to Proposal 20358-5 $0.00 N/A

Components

Actual Information Description File Name
Weather Delays, Additional Charges

Component Description:
Weather delays and additional costs
Amount:
$33,000.00
Tower Modification Materials

Component Description:
Tower modification materials, installment #1
Amount:
$2,356.00

Component Description:
Tower modification materials, installment #2
Amount:
$2,356.00
Geotechnical Study Report

Component Description:
Geotechnical study
Amount:
$4,450.00
Short Tower (less than 500')

Component Description:
Interim antenna installation, installment #2
Amount:
$32,600.00

Component Description:
Main antenna installation, installment #2
Amount:
$83,200.00

Component Description:
Interim antenna removal, installment #2
Amount:
$49,500.00

Component Description:
Interim antenna installation, installment #1
Amount:
$65,200.00

Component Description:
Main antenna installation, installment #1
Amount:
$166,400.00

Component Description:
Interim antenna removal, installment #1
Amount:
$99,000.00
Major tower reinforcement/modifications

Component Description:
Tower modifications, installment #1
Amount:
$133,200.00

Component Description:
Tower modifications, installment #2
Amount:
$66,600.00
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study

Component Description:
Tower mapping services
Amount:
$1,125.00

Component Description:
Tower site survey
Amount:
$773.00

Component Description:
Structural analysis, 50% deposit
Amount:
$2,750.00

Component Description:
Tower mapping, installment #2
Amount:
$4,459.00

Component Description:
Climatic evaluation
Amount:
$800.00

Component Description:
Structural analysis, installment #2
Amount:
$2,750.00

Component Description:
Tower mapping, installment #1
Amount:
$4,459.00
Additional antenna removal costs

Component Description:
Additional interim antenna removal costs
Amount:
$6,446.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $105,320.00 $113,175.00 N/A $68,175.00 N/A
Total for all systems $3,246,182.00 $2,561,981.80 N/A $2,228,280.30 N/A
Outside Professional Services $105,320.00 $113,175.00 $68,175.00
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A $2,500.00 N/A
Project management of the transition $46,610.00 $44,250.00 N/A $41,375.00 N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A N/A N/A
Prepare request for Special Temporary Authorization $2,050.00 $3,000.00 See related invoices attached $3,000.00 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A $625.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $6,675.00 WFXV is first priority window filer; see related invoices $6,675.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $14,000.00 WFXV is first priority window filer; see related invoices $14,000.00 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A N/A N/A
Additional Field Engineering Service, 14 Days $28,000.00 $28,000.00 N/A N/A N/A

Components

Actual Information Description File Name
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form

Component Description:
Prepare reimbursement form; item 2 from invoice summary
Amount:
$2,500.00
Project management of the transition

Component Description:
Project Management for Structural Analysis and Tower Modifications May 26, 2018 through June 29, 2018 including consultants Kessler and Gehman Associates - June 2018 progress report.
Amount:
$975.00

Component Description:
Project management services
Amount:
$250.00

Component Description:
Project management services Aug 2019
Amount:
$50.00

Component Description:
Project management services 3.30.19 through 4.26.19
Amount:
$1,725.00

Component Description:
Project management services May 2019
Amount:
$50.00

Component Description:
Project management services 9.29.18 through 10.26.18
Amount:
$1,650.00

Component Description:
Project management services
Amount:
$237.00

Component Description:
Vendor has issued a revised invoice; see 29378R
Amount:
($300.00)

Component Description:
Project management services 11.2018
Amount:
$85.00

Component Description:
Project management services 4.27.19 through 5.31.19
Amount:
$1,350.00

Component Description:
Project management services March 2019
Amount:
$32.50

Component Description:
Project management services April 2019
Amount:
$123.50

Component Description:
Project Management for Structural Analysis and Tower Modifications including consultants Kessler and Gehman Associates. Services from May 27, 2017 through June 30, 2017.
Amount:
$13,500.00

Component Description:
Project management services
Amount:
$1,475.00

Component Description:
Project management services 1.1.19 through 1.31.19
Amount:
$2,475.00

Component Description:
Project management services
Amount:
$675.00

Component Description:
Vendor has issued a revised invoice; see 29378R
Amount:
($13,500.00)

Component Description:
Project management services June 2019
Amount:
$60.00

Component Description:
Project management services
Amount:
$79.00

Component Description:
Project management services
Amount:
$7,318.50

Component Description:
Project management services
Amount:
$2,528.00

Component Description:
Project management services May 2020
Amount:
$50.00

Component Description:
Project management services Oct 2019
Amount:
$10.00

Component Description:
Project management services Sep 2019
Amount:
$95.00

Component Description:
Project management services; items 1,7-10 from invoice summary
Amount:
$7,562.00

Component Description:
Project management services
Amount:
$150.00

Component Description:
Project management services Nov 2020
Amount:
$55.00

Component Description:
Project management services Apr 2020
Amount:
$50.00

Component Description:
Project management services February 2019
Amount:
$91.00

Component Description:
Project management services 2.1.19 through 3.1.19
Amount:
$1,050.00

Component Description:
Project management services June 2019
Amount:
$162.50

Component Description:
Project management services, items 1 and 4 from invoice summary
Amount:
$305.00

Component Description:
Project management services
Amount:
$150.00

Component Description:
Project ,management services
Amount:
$861.00

Component Description:
Project management services Jun 2020
Amount:
$230.00

Component Description:
Project management services 7.28.18 through 9.28.18
Amount:
$3,600.00

Component Description:
Project management services Jul 2020
Amount:
$30.00

Component Description:
Project management services 6.1.19 through 6.28.19
Amount:
$525.00

Component Description:
Project management services Aug 2020
Amount:
$65.00

Component Description:
Project management services 3.2.19 through 3.29.19
Amount:
$1,275.00

Component Description:
Project Management for Structural Analysis and Tower Modifications including consultants Kessler and Gehman Associates. Services from January 1, 2018 through February 23, 2018.
Amount:
$300.00

Component Description:
Project management services 12.1.18 through 12.31.18
Amount:
$1,050.00

Component Description:
Project management services May 2019
Amount:
$520.00

Component Description:
Project management services 10.27.18 through 11.30.18
Amount:
$2,350.00
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare request for Special Temporary Authorization

Component Description:
Prepare STA
Amount:
$1,500.00

Component Description:
Prepare STA
Amount:
$1,500.00
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
Prepare License to Cover
Amount:
$625.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Prepare Construction Permit Application; item 6 from invoice summary
Amount:
$3,000.00

Component Description:
Prepare Construction Permit Application; item 4 from invoice summary
Amount:
$3,000.00

Component Description:
Prepare Construction Permit Extension Application
Amount:
$675.00
Perform engineering study for new channel assignment and antenna development

Component Description:
Perform engineering study for new channel assignment; item 5 from invoice summary
Amount:
$7,000.00

Component Description:
Perform engineering study for new channel assignment; item 3 from invoice summary
Amount:
$7,000.00
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Additional Field Engineering Service, 14 Days Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $140,050.00 $139,500.00 N/A $79,246.00 N/A
Total for all systems $3,246,182.00 $2,561,981.80 N/A $2,228,280.30 N/A
Other Expenses $140,050.00 $139,500.00 $79,246.00
Equipment Rentals $100.00 $100.00 See related invoices $81.56 N/A
Snow Removal During RePack Work $600.00 $600.00 Excessive Snow Removal During RePack Work at the Site $600.00 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $45,800.00 $45,800.00 See USA Commercial Estimate 49 and related invoices $45,760.16 N/A
MVPD Notification of Channel Change $2,000.00 $2,000.00 N/A N/A N/A
Equipment Storage $25,000.00 $25,000.00 N/A $3,510.00 N/A
Equipment Delivery and Handling Charges $28,500.00 $28,500.00 N/A $27,210.28 N/A
Non-zoning permits $25,000.00 $25,000.00 N/A N/A N/A
Develop and air announcement of upcoming channel change $1,500.00 $1,500.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A $2,084.00 N/A

Components

Actual Information Description File Name
Equipment Rentals

Component Description:
Pallet jack rental
Amount:
$81.56
Snow Removal During RePack Work

Component Description:
Snow removal from repack site
Amount:
$300.00

Component Description:
Snow removal from repack site
Amount:
$300.00
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
Dumpster rental
Amount:
$1,015.07

Component Description:
Dumpster rental
Amount:
$119.77

Component Description:
Fluid disposal cost
Amount:
$1,725.32

Component Description:
Antenna disposal cost
Amount:
$400.00

Component Description:
Disposal costs
Amount:
$42,500.00
MVPD Notification of Channel Change Information not provided.
Equipment Storage

Component Description:
Antenna storage costs
Amount:
$3,510.00
Equipment Delivery and Handling Charges

Component Description:
Antenna shipping cost
Amount:
$431.24

Component Description:
Freight cost retuned channel filter
Amount:
$78.35

Component Description:
Shipping cost
Amount:
$100.00

Component Description:
Antenna freight costs
Amount:
$3,968.72

Component Description:
Transmitter consolidation services
Amount:
$21,342.00

Component Description:
Transmission line shipping
Amount:
$153.51

Component Description:
Transmission line shipping cost
Amount:
$1,136.46

Component Description:
Shipping cost for transmission line piece
Amount:
$153.51
Non-zoning permits Information not provided.
Develop and air announcement of upcoming channel change Information not provided.
DTV Medical Facility Notification

Component Description:
Notification of medical facilities
Amount:
$2,084.00

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $3,246,182.00 $2,561,981.80 $2,228,280.30

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Elizabeth Ryder

General Counsel


03/18/2022