Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
IHM LICENSES, LLC Doing Business As: IHM LICENSES, LLC |
7136 S. YALE AVENUE SUITE 501 TULSA, OK 74136 United States |
+1 (918) 664-4581 | FCCCONTACT@IHEARTMEDIA.COM |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | New aux to be shared while work is ongoing at main and "big" aux tower. Each station had 2 aux, 1 on tower with main and 1 that does not provide for full coverage. This is for a 3rd site that is removed from where work area is and provides needed coverage |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | GV10 | |
Year | 2016 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Model Type | Hybrid | |
Solid State Power Capacity | 7 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | GV5D | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Model Type | Hybrid | |
Solid State Power capacity | 5 kW | |
Justification for New Transmitter | To build new aux location | |
Does the transmitter require the purchase of a new HD Importer? | No | |
Does the transmitter require the purchase of a new HD Exporter? | No |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | Does the transmitter installation require an Additional Exciter? | No |
Does the transmitter installation require any additional transmitter installation costs? | Yes | |
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | UPSs Electrical installation labor miscellaneous parts and wire for electrical installations | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Other Transmitter-Related Expenses | Does the replacement transmitter require a Remote Control? | Yes |
Does the replacement transmitter require an RDS Encoder? | No | |
Does the replacement transmitter require Audio Processing? | Yes | |
Audio Processing | Analog/HD Upgraded |
Name | Description |
---|---|
Other Xmt Costs |
Equipment Racks |
Equipment Delivery and Handling Charges |
Equipment Delivery and Handling Charges |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Cross Dipole | |
ERP: | 65.0 kW | |
Manufacturer | ||
Model | MPX-4E | |
Year | 2016 |
Facility ID | Call Sign |
---|---|
35022 | KRRL |
19218 | KIIS-FM |
6360 | KBIG |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | Yes | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Cross Dipole | |
ERP: | 10.0 kW | |
Manufacturer | ||
Model | SHPXA-8BC-HW-SP | |
Year | 2018 | |
Justification for New Antenna | To construct a new shared aux at different location to provide service for all 4 stations. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 4 | |
Frequencies of channels supported | Upper and lower frequency | |
Frequency | 90.1 MHz - 107.9 MHz | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
FM Band Pass Filters | Do you require an FM band pass filter? | No |
Notch Filter | Do you require a Notch filter? | No |
De-Icers | Do you require De-Icers? | No |
Radomes | Do you require Radomes? | No |
Name | Description |
---|---|
Equipment Delivery and Handling Charges |
Equipment Delivery and Handling Charges |
Other Ant Costs |
Antenna Mount |
Other Ant Costs |
Antenna Controller |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 3 1/8 inches | |
Segment Length | 20 inches | |
Number of parallel runs | 1 | |
Length | 200 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Air | |
Diameter | Other | |
Other Diameter | 3 1/8 inches | |
Number of parallel runs | 1 | |
Length | 300 feet per run | |
Justification for New Transmission Line | To construct a new shared aux at different location to provide service for all 4 stations. | |
Interior RF Systems | Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? | Yes |
Does the Installation of the Transmission Line require additional or replacement Inside RF system elbows, fitting, hangers, etc.? | Yes |
Name | Description |
---|---|
Equipment Delivery and Handling Charges |
Equipment Delivery and Handling Charges |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1062721 | |
Coordinates (NAD83) | Latitude (NAD83) | 34° 13' 36.0" N- |
Longitude (NAD83) | 118° 04' 02.0" W- | |
Overall Structure Height | 286.74 feet | |
Support Structure Height | 286.74 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 5700.06 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | InSite Towers Development | |
Date Constructed | 11/22/2005 |
Facility ID | Call Sign | Service |
---|---|---|
19218 | KIIS-FM | FM |
34424 | KOST | FM |
35022 | KRRL | FM |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | No study needed |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Prepare engineering section of Form FCC Construction Permit Application | No |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Prepare and or review reimbursement form |
Prepare and or review reimbursement form |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | Yes | |
Type | 6/11 GHz Licensed Part 101 | |
1 pair IP-only Codecs for fiber, internet or IP microwave systems | Yes |
Name | Description |
---|---|
STL |
Starlink for backup |
Equipment Delivery and Handling Charges |
Equipment Delivery and Handling Charges |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $148,153.12 | $85,136.14 | N/A | $55,136.14 | N/A |
Total for all systems | $307,432.09 | $183,884.01 | N/A | $145,759.01 | N/A |
Primary Transmitter GV5D | $148,153.12 | $85,136.14 | $55,136.14 | ||
Transmitter Installation | $70,500.00 | $30,000.00 | N/A | N/A | N/A |
Other Electrical Service: UPSs Electrical installation labor miscellaneous parts and wire for electrical installations | $975.00 | $975.00 | N/A | $975.00 | N/A |
5 Ton system | $20,250.00 | $3,387.50 | N/A | $3,387.50 | N/A |
Air Cooled Solid State FM Transmitter 3.5 - 6 kW Hybrid | $40,350.00 | $38,886.00 | Config with importer and exporter built in | $38,886.00 | N/A |
Other Xmt Costs | $1,593.64 | $1,593.64 | miscellaneous connectors, audio and computer equipment racks Rackmount computer and accessory shipping | $1,593.64 | N/A |
Equipment Delivery and Handling Charges | $1,084.48 | $1,084.48 | N/A | $1,084.48 | N/A |
Audio Processing - Analog /HD upgraded | $11,000.00 | $7,042.02 | Processor and Justin HD align | $7,042.02 | N/A |
Other Transmitter-Related Expenses Remote Control | $2,400.00 | $2,167.50 | ESE GPS and 4-way output Arc Plus Touch remote control system | $2,167.50 | N/A |
Actual Information Description | File Name |
---|---|
Transmitter Installation | Information not provided. |
Other Electrical Service: UPSs Electrical installation labor miscellaneous parts and wire for electrical installations | |
5 Ton system | |
Air Cooled Solid State FM Transmitter 3.5 - 6 kW Hybrid | |
Other Xmt Costs | |
Equipment Delivery and Handling Charges | |
Audio Processing - Analog /HD upgraded | |
Other Transmitter-Related Expenses Remote Control |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $31,479.84 | $45,398.29 | N/A | $45,398.29 | N/A |
Total for all systems | $307,432.09 | $183,884.01 | N/A | $145,759.01 | N/A |
Primary Antenna SHPXA-8BC-HW-SP | $31,479.84 | $45,398.29 | $45,398.29 | ||
Equipment Delivery and Handling Charges | $2,612.34 | $2,612.34 | N/A | $2,612.34 | N/A |
High Power 6 kW - 10 kW Circularly-polarized | $5,885.00 | $23,053.95 | ERI Axiom | $23,053.95 | N/A |
New FM combiner, cost per channel (depends on power input and min. frequency separation) | $21,782.50 | $18,532.00 | High power combiner. | $18,532.00 | N/A |
Other Ant Costs | $1,200.00 | $1,200.00 | supplies for antenna switch controller Custom antenna mount and installation | $1,200.00 | N/A |
Actual Information Description | File Name |
---|---|
Equipment Delivery and Handling Charges | |
High Power 6 kW - 10 kW Circularly-polarized | |
New FM combiner, cost per channel (depends on power input and min. frequency separation) | |
Other Ant Costs |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $4,029.62 | $4,029.62 | N/A | $4,029.62 | N/A |
Total for all systems | $307,432.09 | $183,884.01 | N/A | $145,759.01 | N/A |
Primary Transmission Line | $4,029.62 | $4,029.62 | $4,029.62 | ||
Flexible Air Transmission Line - 3 1/8" 1 parallel runs 300 feet | $2,736.24 | $2,736.24 | N/A | $2,736.24 | N/A |
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators | $196.01 | $196.01 | Andrew Dehydrator | $196.01 | N/A |
Interior RF Systems: Elbows, fitting, hangers, etc. | $628.53 | $628.53 | Connectors and Hangers | $628.53 | N/A |
Equipment Delivery and Handling Charges | $468.84 | $468.84 | N/A | $468.84 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Air Transmission Line - 3 1/8" 1 parallel runs 300 feet | |
Interior RF Systems: Inside RF system including switching, patch panels and dehydrators | |
Interior RF Systems: Elbows, fitting, hangers, etc. | |
Equipment Delivery and Handling Charges |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $73,650.00 | $6,041.48 | N/A | $6,041.48 | N/A |
Total for all systems | $307,432.09 | $183,884.01 | N/A | $145,759.01 | N/A |
Primary Tower TOWER | $73,650.00 | $6,041.48 | $6,041.48 | ||
Tower Rigging Short Tower (less than 500') | $73,650.00 | $6,041.48 | N/A | $6,041.48 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $7,355.00 | $7,355.00 | N/A | $7,355.00 | N/A |
Total for all systems | $307,432.09 | $183,884.01 | N/A | $145,759.01 | N/A |
Outside Professional Services | $7,355.00 | $7,355.00 | $7,355.00 | ||
Prepare and or review reimbursement form | $7,355.00 | $7,355.00 | See attached invoices. | $7,355.00 | N/A |
Actual Information Description | File Name |
---|---|
Prepare and or review reimbursement form |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $42,764.51 | $35,923.48 | N/A | $27,798.48 | N/A |
Total for all systems | $307,432.09 | $183,884.01 | N/A | $145,759.01 | N/A |
Other Expenses | $42,764.51 | $35,923.48 | $27,798.48 | ||
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $225.00 | FCC 302 | N/A | N/A |
Point to Point Microwave (STL/ICR): 1 pair IP-only Codecs for fiber, internet or IP microwave systems | $5,850.00 | $9,463.38 | See attached invoices. Cisco catalyst GatesAir IP100 GatesAir IP MPXp | $9,463.38 | Prior cost estimates did not include necessary redundant equipment |
STL | $6,800.00 | $6,800.00 | 6' dish for 950 MHz pair of 950 MHz Moseley Starlinks | N/A | N/A |
Equipment Delivery and Handling Charges | $1,079.51 | $1,079.51 | N/A | $1,079.51 | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $200.00 | $1,100.00 | FCC 301 | N/A | N/A |
New Point to Point Microwave System: 6/11 GHz Licensed Part 101 | $28,500.00 | $17,255.59 | 11 GHz radio system with antennas power supplies for 11 GHz IDUs 11 GHz antenna installations 18 GHz radio system with antennas 1.625" coax | $17,255.59 | N/A |
Actual Information Description | File Name |
---|---|
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
Point to Point Microwave (STL/ICR): 1 pair IP-only Codecs for fiber, internet or IP microwave systems | |
STL | Information not provided. |
Equipment Delivery and Handling Charges | |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
New Point to Point Microwave System: 6/11 GHz Licensed Part 101 |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $307,432.09 | $183,884.01 | $145,759.01 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jeffrey C Gehman Engineering Associate 03/10/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jeffrey C Gehman Engineering Associate 03/10/2022 |