Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
FOX TELEVISION STATIONS, LLC |
Ann West Bobeck 400 N. CAPITOL STREET, NW SUITE 890 WASHINGTON, DC 20001 United States |
+1 (202) 824-6503 | ann.bobeck@fox.com | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Dennis Wallace Managing Partner Meintel, Sgrignoli & Wallace, LLC |
Dennis Wallace 1282 Smallwood Drive Suite 372 Waldorf, MD 20603 United States |
+1 (202) 251-7589 | Dennis.Wallace@mswdtv.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | The WOFL Tower will require replacement in order to meet current structural standards. A new Aux Transmitter would be installed at Aux site. Then new main site antenna, line, and Transmitter would be installed. Narrative Attached. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Licensed Aux Facility | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | Yes | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Innovator HX | |
Year | 2007 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 10 kW |
Facility ID | Call Sign |
---|---|
54940 | WRBW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | THU9-20 EVO 31kW | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 31 kW | |
Justification for New Transmitter | Current aux transmitter is obsolete and manufacturer is no longer in business. Transmitter needs replacement for operation on new channel. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | Yes | |
Power | 500 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 3 inches | |
Length | 200.0 feet | |
Other Electrical Service | Yes | |
Description | Aux Transmitter Electrical Installation. Good faith estimated based upon similar projects. Total electrical costs will not be known until electrical distribution and installation drawings are completed. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 10 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Remote Control Wiring |
Wire up existing remote control to new aux transmitter. |
Remove Existing Equipment |
Remove Existing Equipment |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DCX-2H | |
Year | 2000 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 45 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | THU9-72 EVO | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 106 kW | |
Justification for New Transmitter | Existing transmitter is obsolete and no longer supported by its manufacturer. Thus, replacement is required. Comark IOT Quote is attached as directed by Reimbursement Contractor. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | Yes | |
Power | 500 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 3 inches | |
Length | 300.0 feet | |
Other Electrical Service | Yes | |
Description | Electrical for New Transmitter Installation. Firm quotes will not be available until electrical drawings are completed and installation layout is completed. New transmitter will require extensive changes. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 20 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Generator - Primary |
Primary generator for WOFL |
Battery Cabinets |
Battery Cabinets |
Removal of Existing Equipment |
Removal of Existing Equipment. |
Remote Control Wiring |
Wire up existing remote control to new transmitter. |
Probe and Connection Kit |
Probe and Connection Kit |
Power Conditioner |
Precision Power Conditioner |
UPS site prep |
Remove old tiles, lay new tiles under heavy UPS units |
Generator Site Work |
Concrete pads for generator |
STL Install |
Installation of STL equipment |
Microwave |
Microwave |
Output switch |
Output switch to antenna line |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Retune Existing |
Antenna Use | Auxiliary (Backup) | |
Description of Use | Licensed Aux Facility | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 2 | |
Number of Panels | 32 | |
Design power capacity in use | 100.0 % | |
Lower Limit | 518.00 MHz | |
Upper Limit | 524.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 227.0 kW | |
Manufacturer | Dielectric | |
Model | TUA-C4-10/32MSP-1-S | |
Year | 2008 |
Facility ID | Call Sign |
---|---|
54940 | WRBW |
Section | Question | Response |
---|---|---|
Sweep Test of Existing Antenna | Do you need a sweep test of existing antenna? | Yes |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 2 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A |
RF Channel Number |
---|
28 |
33 |
Name | Description |
---|---|
Combiner Layout and Install |
Layout of combiner and Installation. Develop layout and installation drawings and permit package for mechanicals. |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 607.0 kW | |
Manufacturer | ||
Model | TFU-26JTH/VP-R 06 | |
Year | 2009 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 770.0 kW | |
Manufacturer | ||
Model | ATW30H4-ETO-33H | |
Year | 2017 | |
Justification for New Antenna | Existing main antenna will not work on new channel. Antenna replacement is required. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 8 3/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Antenna repair |
Antenna repair, removal, staff costs, reinstall, sweep, plumb and tension |
Sales Tax and Freight |
Sales Tax and Freight on ERI antenna, transmission, sweep and nitrogen system |
Nitrogen Generation System |
Nitrogen Generation System |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Auxiliary (Backup) | |
Description of Use | Licensed Aux Site | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | Yes | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Dielectric |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1450 feet per run |
Facility ID | Call Sign |
---|---|
54940 | WRBW |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 8 3/16 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1500 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 8 3/16 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1500 feet per run | |
Justification for New Transmission Line | Existing line is incorrect length for new channel. Line replacement required. |
Name | Description |
---|---|
Layout |
ERI Transmission Line Layout. Develop layout for new transmission line runs building/ice bridge/Tower |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Auxiliary (Backup) | |
Description of Use | Licensed Aux Facility | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1040401 | |
Coordinates (NAD83) | Latitude (NAD83) | 28° 34' 51.9" N- |
Longitude (NAD83) | 081° 04' 31.2" W- | |
Overall Structure Height | 1605.95 feet | |
Support Structure Height | 1602.67 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 65.94 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Towers, LLC. | |
Date Constructed | 04/16/2008 |
Facility ID | Call Sign | Service |
---|---|---|
41225 | WOFL | DTV |
51983 | WJRR | FM |
47746 | WOMX-FM | FM |
53457 | WTKS-FM | FM |
59976 | WRUM | FM |
54940 | WRBW | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for tower with candelabra |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Serious Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Construct New |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
One or more FM, AM or TV radio broadcaster(s) | N/A | |
Others Types of Users | N/A | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1032097 | |
Coordinates (NAD83) | Latitude (NAD83) | 28° 36' 14.0" N- |
Longitude (NAD83) | 081° 05' 10.0" W- | |
Overall Structure Height | 1473.08 feet | |
Support Structure Height | 1407.46 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 62.99 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Fox Television Stations, LLC | |
Date Constructed | 12/01/1973 |
Section | Question | Response |
---|---|---|
Construct New Tower | Use | Primary (Main) |
Description of Use | N/A | |
Is this a request for upgraded equipment? | No | |
Height | 1473.00 feet | |
Justification for New Tower | Existing tower will not pass structural analysis under REV G.. Modification of the tower is not considered viable solution. See attached letter and quote from ERI regarding tower replacement. |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Tower Site Work |
Site work to prep for tower |
Structural Decommissioning |
Tower de-stack/structural decommissioning required for new tower to be built |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 1000 | |
Explanation | Outside project management will be required for replacement tower project as well as other aspects of the transition for both the main and aux sites. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | Yes | |
Environmental Assessment | Yes | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Local Zoning Attorney Fees |
Local Zoning Attorney Fees - See attached quote. |
Prepare and File FCC Progress Report |
Prepare and file FCC Progress Reports - see attached quote. |
Structural Engineering |
Structural Engineering Drawing |
Field Measurements |
Post repack signal measurement |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Consolidation and Last Mile Delivery |
Consolidation and Last Mile Delivery |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $4,936,522.25 | $4,221,795.60 | N/A | $3,144,599.76 | N/A |
Total for all systems | $13,848,805.13 | $11,649,461.53 | N/A | $9,331,715.83 | N/A |
Primary Transmitter THU9-72 EVO | $3,796,657.25 | $3,282,833.25 | $2,269,522.91 | ||
Output switch | $15,855.74 | $15,855.74 | N/A | $15,855.74 | N/A |
Microwave | $95,805.48 | $95,805.48 | fixed microwave equipment for the new tower providing the studio to transmitter link. | $95,805.48 | N/A |
STL Install | $55,994.00 | $55,994.00 | ERI STL install quote attached to invoices. | $29,842.02 | N/A |
Generator Site Work | $20,350.00 | $20,350.00 | N/A | $3,052.50 | N/A |
UPS site prep | $6,750.00 | $6,750.00 | N/A | $6,750.00 | N/A |
Power Conditioner | $96,532.70 | $96,532.70 | Precision Power Conditioner | $96,532.70 | N/A |
Probe and Connection Kit | $4,205.10 | $4,205.10 | N/A | $4,205.10 | N/A |
Remote Control Wiring | $3,500.00 | $3,500.00 | Wire up existing remote control to new transmitter | N/A | N/A |
Generator - Primary | $237,172.00 | $237,172.00 | Primary transmitter generator. Station chose to upgrade from a 400kW to a 800kW so invoices include variance sheets. | $213,454.80 | N/A |
Other -- HVAC Service Type: C Size:20 (Other) | $70,948.00 | $70,948.00 | 2, 20 ton HVAC units including install and duct work | $70,948.00 | HVAC |
Battery Cabinets | $57,649.68 | $57,649.68 | N/A | $57,649.68 | N/A |
Other Electrical Service: Electrical for New Transmitter Installation. Firm quotes will not be available until electrical drawings are completed and installation layout is completed. New transmitter will require extensive changes. | $297,168.39 | $297,168.39 | See quotes from Diamond Electrical attached to invoices. | $297,168.39 | Electrical |
3" Rigid Conduit and Wiring (Cost per foot) | $15,600.00 | $14,700.00 | Catalog | N/A | N/A |
Generator | $125,726.16 | $125,726.16 | ***System Notice: Estimate adjusted and locked because line has been superseded.***See quote #O1804-0105 TAW Power Systems, attached to invoice | $125,726.16 | N/A |
Removal of Existing Equipment | $15,000.00 | $15,000.00 | Removal of existing main transmitter. | $0.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 86.8 . 106 kW | $2,630,000.00 | $2,119,476.00 | N/A | $1,252,532.34 | N/A |
Transformer 3 phase/480v - 500 KVA | $48,400.00 | $46,000.00 | Catalog | N/A | N/A |
Auxiliary Transmitter THU9-20 EVO 31kW | $1,139,865.00 | $938,962.35 | $875,076.85 | ||
Remote Control Wiring | $3,500.00 | $3,500.00 | Wire up existing remote control to new transmitter. | N/A | N/A |
Remove Existing Equipment | $15,000.00 | $15,000.00 | Removal of existing Aux transmitter. | $10,415.00 | N/A |
10 Ton system | $38,900.00 | $34,270.00 | N/A | $34,269.50 | N/A |
Other Electrical Service: Aux Transmitter Electrical Installation. Good faith estimated based upon similar projects. Total electrical costs will not be known until electrical distribution and installation drawings are completed. | $76,665.00 | $76,665.00 | See attached vendor quote for electrical installation of new transmitter. Aux electrical costs will be similar to main transmitter costs. | $76,665.00 | Aux electrical |
3" Rigid Conduit and Wiring (Cost per foot) | $10,400.00 | $9,800.00 | Catalog | N/A | N/A |
Transformer 3 phase/480v - 500 KVA | $48,400.00 | $46,000.00 | Catalog | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | $947,000.00 | $753,727.35 | Transmitter. Quote didn't include tax (found on invoices) | $753,727.35 | Quote didn't include tax |
Actual Information Description | File Name |
---|---|
Output switch | |
Microwave | |
STL Install | |
Generator Site Work | |
UPS site prep | |
Power Conditioner | |
Probe and Connection Kit | |
Remote Control Wiring | Information not provided. |
Generator - Primary | |
Other -- HVAC Service Type: C Size:20 (Other) | |
Battery Cabinets | |
Other Electrical Service: Electrical for New Transmitter Installation. Firm quotes will not be available until electrical drawings are completed and installation layout is completed. New transmitter will require extensive changes. | |
3" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Generator | |
Removal of Existing Equipment | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 86.8 . 106 kW | |
Transformer 3 phase/480v - 500 KVA | Information not provided. |
Remote Control Wiring | Information not provided. |
Remove Existing Equipment | |
10 Ton system | |
Other Electrical Service: Aux Transmitter Electrical Installation. Good faith estimated based upon similar projects. Total electrical costs will not be known until electrical distribution and installation drawings are completed. | |
3" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Transformer 3 phase/480v - 500 KVA | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,078,154.69 | $967,600.69 | N/A | $262,485.67 | N/A |
Total for all systems | $13,848,805.13 | $11,649,461.53 | N/A | $9,331,715.83 | N/A |
Primary Antenna ATW30H4-ETO-33H | $958,524.69 | $853,200.69 | $262,485.67 | ||
Sweep test of existing antenna | $6,730.00 | $6,250.00 | N/A | $6,250.00 | N/A |
Antenna repair | $576,215.02 | $576,215.02 | Cost to remove, repair, reinstall, sweep ERI antenna. Includes staff costs and plumb and tension tower. | $0.00 | Antenna repair |
Sales Tax and Freight | $46,890.17 | $46,890.17 | N/A | $46,890.17 | N/A |
Nitrogen Generation System | $23,939.50 | $23,939.50 | N/A | $23,939.50 | N/A |
Elbow complex, single channel, at antenna input, per 8 3/16. feedline (if needed) | $15,250.00 | $14,500.00 | Catalog | N/A | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $185,406.00 | N/A | $185,406.00 | N/A |
Auxiliary Antenna TUA-C4-10/32MSP-1-S | $119,630.00 | $114,400.00 | $0.00 | ||
Combiner Layout and Install | $15,000.00 | $15,000.00 | Install combiner and interconnecting coaxial lines at Aux site. $ 2,500/Day x 6 Days. | N/A | N/A |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | $13,700.00 | $13,000.00 | Catalog | N/A | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $80,000.00 | Catalog | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | Catalog | N/A | N/A |
Actual Information Description | File Name |
---|---|
Sweep test of existing antenna | |
Antenna repair | |
Sales Tax and Freight | |
Nitrogen Generation System | |
Elbow complex, single channel, at antenna input, per 8 3/16. feedline (if needed) | Information not provided. |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | |
Combiner Layout and Install | Information not provided. |
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) | Information not provided. |
New combiner, cost per channel (without antenna) | Information not provided. |
Sweep test of existing antenna | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $531,875.00 | $380,254.50 | N/A | $368,879.50 | N/A |
Total for all systems | $13,848,805.13 | $11,649,461.53 | N/A | $9,331,715.83 | N/A |
Primary Transmission Line | $531,875.00 | $380,254.50 | $368,879.50 | ||
Rigid Transmission Line - copper, 8 3/16" | $520,500.00 | $368,879.50 | N/A | $368,879.50 | Transmission line |
Layout | $11,375.00 | $11,375.00 | ERI Estimate for T/L layout and plan. See attached quote. | N/A | N/A |
Auxiliary Transmission Line | $0.00 | $0.00 | $0.00 |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 8 3/16" | |
Layout | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $6,481,372.46 | $5,231,390.01 | N/A | $5,225,390.01 | N/A |
Total for all systems | $13,848,805.13 | $11,649,461.53 | N/A | $9,331,715.83 | N/A |
Primary Tower TOWER | $0.00 | $0.00 | $0.00 | ||
Auxiliary Tower GTOWER | $1,289,084.40 | $314,752.56 | $308,752.56 | ||
Structural engineering tower load study for a documented tower with candelabra | $20,000.00 | $5,237.50 | 50/50 split with WRBW | $5,237.50 | N/A |
Tower Mapping | $6,584.40 | $6,584.40 | 50/50 split with WRBW | $6,584.40 | N/A |
Serious tower reinforcement/modifications | $1,052,000.00 | $302,930.66 | N/A | $296,930.66 | See final true up for revised total. Does not include tax. |
Tall Tower (greater than 500') | $210,500.00 | $0.00 | N/A | N/A | N/A |
Primary Tower | $5,192,288.06 | $4,916,637.45 | $4,916,637.45 | ||
Tall Tower (greater than 500') | $210,500.00 | $0.00 | Catalog | N/A | N/A |
New tower between 1000' and 1500' without elevator, presumptive soil conditions | $3,873,990.00 | $3,808,839.39 | See ERI Quote Attached. Replacement of tower required due to Rev G of Structural Standard. | $3,808,839.39 | Tower |
Structural Decommissioning | $550,694.00 | $550,694.00 | N/A | $550,694.00 | N/A |
Tower Site Work | $557,104.06 | $557,104.06 | N/A | $557,104.06 | Tower construction |
Actual Information Description | File Name |
---|---|
Structural engineering tower load study for a documented tower with candelabra | |
Tower Mapping | |
Serious tower reinforcement/modifications | |
Tall Tower (greater than 500') | Information not provided. |
Tall Tower (greater than 500') | Information not provided. |
New tower between 1000' and 1500' without elevator, presumptive soil conditions | |
Structural Decommissioning | |
Tower Site Work |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $463,322.50 | $491,467.50 | N/A | $226,176.46 | N/A |
Total for all systems | $13,848,805.13 | $11,649,461.53 | N/A | $9,331,715.83 | N/A |
Outside Professional Services | $463,322.50 | $491,467.50 | $226,176.46 | ||
Field Measurements | $53,500.00 | $53,500.00 | N/A | $53,500.00 | N/A |
Structural Engineering | $687.50 | $687.50 | N/A | N/A | N/A |
Prepare and File FCC Progress Report | $27,030.00 | $27,030.00 | Prepare and file quarterly reports. See attached vendor quote. | N/A | N/A |
Local Zoning Attorney Fees | $55,000.00 | $55,000.00 | Estimate for attorneys for zoning and permitting for new tower. See attached quote from Holland & Knight. | $19,368.89 | N/A |
RF Exposure Measurements | $21,050.00 | $20,000.00 | Catalog | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | Catalog | $24,277.36 | N/A |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $2,000.00 | Catalog Estimate | N/A | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $2,000.00 | New Tower | N/A | N/A |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | $10,520.00 | $50,000.00 | Good Faith Estimate of environmental studies and assessments required by State of Florida for construction of new tower. $250/Hour X 200 hours | N/A | N/A |
NEPA Section 106 environmental review, if needed | $6,310.00 | $6,000.00 | Catalog | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $7,000.00 | Catalog | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | Catalog | N/A | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $3,000.00 | Catalog | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $1,500.00 | Catalog | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | Catalog | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $2,000.00 | Catalog | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | Catalog | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | Catalog | N/A | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | Catalog | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | Catalog | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,000.00 | Catalog | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | Catalog | N/A | N/A |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | $4,210.00 | $4,000.00 | Catalog | N/A | N/A |
Project management of the transition | $158,000.00 | $150,000.00 | Catalog Estimate 1,000 hours | $129,030.21 | N/A |
Actual Information Description | File Name |
---|---|
Field Measurements | |
Structural Engineering | Information not provided. |
Prepare and File FCC Progress Report | Information not provided. |
Local Zoning Attorney Fees | |
RF Exposure Measurements | Information not provided. |
Comprehensive coverage verification via field study, if needed | |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | Information not provided. |
ASR modification (prepare FCC Form 854) | Information not provided. |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | Information not provided. |
NEPA Section 106 environmental review, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | Information not provided. |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | Information not provided. |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $357,558.23 | $356,953.23 | N/A | $104,184.43 | N/A |
Total for all systems | $13,848,805.13 | $11,649,461.53 | N/A | $9,331,715.83 | N/A |
Other Expenses | $357,558.23 | $356,953.23 | $104,184.43 | ||
Consolidation and Last Mile Delivery | $71,007.74 | $71,007.74 | N/A | $71,007.74 | Consolidation |
Develop and air announcement of upcoming channel change | $1,500.00 | $1,500.00 | N/A | N/A | N/A |
Equipment Storage | $56,287.35 | $56,287.35 | On Site Cargo Container Storage for transmission line materials, tower materials, transmitter. $1,500 x 9 Months = $13,500. | $0.00 | Additional storage needed |
Disposal Costs (for equipment and other waste, net of any salvage value) | $80,000.00 | $80,000.00 | Removal and disposal of old tower and guy materials, $45K. Disposal Main TX $ 20K. Disposal Aux TX $ 15K See attached vendor Quote. | $24,421.69 | N/A |
Non-zoning permits | $56,205.00 | $56,205.00 | Estimated building permit fee for new tower. Orange County, Florida. 1.5% of tower project total cost. ($3,747,000 x 1.5%) = $56,205. | $0.00 | N/A |
Local Zoning | $5,000.00 | $5,000.00 | Replacement tower zoning submittals. | $1,560.00 | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,070.00 | Catalog | N/A | N/A |
Equipment Delivery and Handling Charges | $69,368.14 | $69,368.14 | Tower and Guy Wire and materials delivery from Indiana to Florida per ERI. See attached ERI Freight Quote. | $0.00 | Storage |
MVPD Notification of Channel Change | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | Catalog | $7,195.00 | N/A |
Actual Information Description | File Name |
---|---|
Consolidation and Last Mile Delivery | |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
Non-zoning permits | Information not provided. |
Local Zoning | |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | Information not provided. |
Equipment Delivery and Handling Charges | Information not provided. |
MVPD Notification of Channel Change | Information not provided. |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $13,848,805.13 | $11,649,461.53 | $9,331,715.83 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Angelo Servedio SVP Controller 03/10/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Angelo Servedio SVP Controller 03/10/2022 |