Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
8617
Service:
DTV
Call Sign:
WTVD
Channel:
9 (High VHF)
File Number:
0000026327
FRN:
0013597448
Date Submitted:
03/17/2022

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

WTVD TELEVISION, LLC

Doing Business As: WTVD TELEVISION, LLC

77 WEST 66TH STREET, 16TH FLR

ATTN: JOHN W. ZUCKER, ESQ.

NEW YORK, NY 10023

United States

+1 (212) 456-7387 john.w.zucker@abc.com Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

The Preparer is same as the reimbursement contact.

 

 

 

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan Please see attachment for WTVD facilities and transition plan details.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Auxiliary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Auxiliary (Backup)
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model PTCD40P4i
Year 2010
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 16 kW

Auxiliary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model VAXTE-24R37
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 19.2 kW
Justification for New Transmitter The current channel 11 Auxiliary (Backup) transmitter cannot be re-channeled to meet new assignment on channel 9.

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 150 kVA
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

HVAC Modifications

Modification of HVAC return ductwork

Electrical Installation

Electrical work related to replacement of old transmitter

Transmission line

Additional 3 inch unflanged transmission line required for transmitter installation.

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model PTCD40P4i
Year 2010
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 16 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model VAXTE-24R37
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 19.2 kW
Justification for New Transmitter The current channel 11 Primary (Main) transmitter cannot be re-channeled to meet new assignment on channel 9

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

HVAC modifications

Modification of HVAC return ductwork.

Electrical Installation

Electrical work related to replacement of old transmitters.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Auxiliary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Auxiliary (Backup)
Description of Use Auxiliary (Backup)
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Circular
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 45.0 kW
Manufacturer
Model TLS-V8/VP-R S180
Year 2010

Auxiliary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Auxiliary (Backup)
Description of Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Circular
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 45.0 kW
Manufacturer
Model TLS-V8/VPR S180
Year 2018
Justification for New Antenna The current channel 11 Auxiliary (Backup) antenna cannot be re-channeled to meet new assignment on channel 9.

Auxiliary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 4 1/16 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Auxiliary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Circular
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 45.0 kW
Manufacturer
Model THV-9A11/CP-R O4
Year 2010

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? Yes
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Circular
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 45.0 kW
Manufacturer
Model THV-9A9/CP-R O4
Year 2018
Justification for New Antenna The current channel 11 Primary (Main)antenna cannot be re-channeled to meet new assignment on channel 9

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Mounting pole

New channel 9 Primary (Main) antenna requires a shorter mounting pole to maintain current antenna aperture and HAAT.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? No

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex?
Is this tower currently shared with any other stations? No
One or more FM, AM or TV radio broadcaster(s) N/A
Others Types of Users N/A
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1010348
Coordinates (NAD83) Latitude (NAD83) 35° 40' 06.0" N-
Longitude (NAD83) 078° 31' 58.0" W-
Overall Structure Height 1994.07 feet
Support Structure Height 1885.80 feet
Ground Elevation Above Mean Sea Level (AMSL) 318.89 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner WTVD Television, LLC
Date Constructed 01/01/1978


Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Other
Helicopter Services Required Are helicopter services required? Yes

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Tower reinforcements

Reinforcements necessary to comply with ANSI/TIA-222-G standard

Top Beacon

Top beacon and cable, Quotation Q312202, dated March 12, 2020

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? No
Number of Hours N/A
Explanation N/A
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority No
Quantity N/A
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority No
Quantity N/A
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements No
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Structural Analysis

Structural analysis to comply with TIA/EIA-222-G and design of required reinforcement.

Structural project management

Structural Engineering services to manage tower reinforcements, antenna replacements and rigging plans.

Legal Advice re Reimbursement Process

Outside counsel advice re reimbursement and repacking procedures.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application Yes
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? No
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? No
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Equipment Delivery and Handling Charges

Complex site requires substantial handling equipment and charges.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,195,918.50 $1,097,597.96 N/A $1,039,883.16 N/A
Total for all systems $3,151,318.03 $2,552,140.49 N/A $2,311,914.75 N/A
Primary Transmitter VAXTE-24R37 $583,834.25 $545,743.21 $514,778.19
Switchgear - industrial 800 amp $38,200.00 $2,401.86 N/A $2,401.86 N/A
HVAC modifications $3,500.00 $3,500.00 Modifications to HVAC return ductwork to accommodate new transmitter $3,500.00 Sub total matches the estimated cost. Added updated file to the component needing more information and re-added the component with further information for the denied component.
Electrical Installation $16,134.25 $16,134.25 N/A $16,134.25 N/A
High VHF - Air Cooled Solid State Transmitter 16.6 . 20.7 kW $526,000.00 $523,707.10 See attached quote from GatesAir, which includes costs of power transformer, mask filter, shipping, and installation. $492,742.08 N/A
Auxiliary Transmitter VAXTE-24R37 $612,084.25 $551,854.75 $525,104.97
Transmission line $2,700.00 $2,700.00 Insufficient transmission line was included in GatesAir quote to complete installation of auxiliary transmitter. $2,656.76 N/A
Electrical Installation $16,134.25 $16,134.25 N/A $16,134.25 N/A
HVAC Modifications $3,500.00 $3,500.00 Modifications to HVAC return ductwork to accommodate new transmitter $3,500.00 Sub total matches the estimated cost. Added updated file to the component needing more information and re-added the component with further information for the denied component.
High VHF - Air Cooled Solid State Transmitter 16.6 . 20.7 kW $526,000.00 $523,707.10 See attached quote from GatesAir, which includes costs of power transformer, mask filter, shipping, and installation $497,000.56 N/A
Transformer 3 phase/480v - 150 KVA $25,550.00 $3,411.54 75 KVA transformer for auxiliary transmitter power supply. $3,411.54 N/A
Switchgear - industrial 800 amp $38,200.00 $2,401.86 N/A $2,401.86 N/A

Components

Actual Information Description File Name
Switchgear - industrial 800 amp

Component Description:
Switchgear for the Repack for WTVD TV, as agreed in Quote 1136
Amount:
$2,401.86
HVAC modifications

Component Description:
Inv # 36409 with Warren Hay for the 50/50 split of duct work removal and installation unknown at beginning of project with updated cover sheet.
Amount:
$1,500.00

Component Description:
Invoice 35892 to be split 50/50 between the Primary and Auxiliary Transmitters.
Amount:
$2,000.00

Component Description:
50/50 split for each transmitter
Amount:
$2,000.00
Electrical Installation

Component Description:
Main transmitter Electrical installation for the Repack for WTVD TV, as agreed in Quote 1136.
Amount:
$16,134.25
High VHF - Air Cooled Solid State Transmitter 16.6 . 20.7 kW

Component Description:
Main TX Second Payment Invoice US0329473
Amount:
$61,360.88

Component Description:
Electrical for main transmitter, Second Payment Invoice US0329473
Amount:
$226.62

Component Description:
Freight for main transmitter, Second Payment Invoice US0329473
Amount:
$1,185.00

Component Description:
installation and proof for main transmitter, Second Payment Invoice US0329473
Amount:
$3,485.13

Component Description:
Amount reduced in change order Q-80769, mask filter system, main Tx Second Payment Invoice US0329473
Amount:
$7,595.27

Component Description:
50/50 split cost for 4 GPS Antenna Kits. Two required for primary and auxiliary transmitter exciters.
Amount:
$911.10

Component Description:
70% down, install and proof for main transmitter
Amount:
$16,263.90

Component Description:
Main Tx Final Payment Invoice US0339061, requested amount is reduced by two cents, see attachment
Amount:
$66,737.27

Component Description:
70% down, Freight for main transmitter
Amount:
$5,530.00

Component Description:
70% down mask filter system for main transmitter
Amount:
$42,038.55

Component Description:
70% down payment, transmitter VAXTE-24, main
Amount:
$286,350.79

Component Description:
70% down Electrical for main transmitter
Amount:
$1,057.57
Transmission line

Component Description:
Additional Transmission line pieces were needed (plus expedited shipping due to timing of work, per Quote # 1931434). Cover sheet included
Amount:
$2,656.76

Component Description:
Additional Transmission line pieces were needed (plus exp shipping due to timing of work, per Quote # 1931434
Amount:
$2,656.76
Electrical Installation

Component Description:
Aux transmitter Electrical installation for the Repack for WTVD TV, as agreed in Quote 1136
Amount:
$16,134.25
HVAC Modifications

Component Description:
Invoice 36409 to be split 50/50 between the Primary and Auxiliary Transmitters.
Amount:
$1,500.00

Component Description:
Invoice 35892 to be split 50/50 between the Primary and Auxiliary Transmitters.
Amount:
$2,000.00

Component Description:
50/50 split cost for each transmitter
Amount:
$2,000.00
High VHF - Air Cooled Solid State Transmitter 16.6 . 20.7 kW

Component Description:
installation and proof for Aux transmitter, Second Payment Invoice #US0329472
Amount:
$3,485.13

Component Description:
Amount reduced in change order Q-80771, mask filter system main TX Second Payment Invoice #US0329472
Amount:
$8,231.81

Component Description:
Freight for Aux transmitter, Second Payment Invoice #US0329472
Amount:
$1,185.00

Component Description:
Electrical for Aux transmitter, Second Payment Invoice #US0329472
Amount:
$226.62

Component Description:
(Amount includes change order Q-80891) Aux TX Second Payment Invoice #US0329472
Amount:
$61,360.88

Component Description:
70% down payment, transmitter VAXTE-24, aux
Amount:
$286,350.79

Component Description:
70% down payment, install and proof for Aux transmitter
Amount:
$16,263.90

Component Description:
70% down, Freight for Aux transmitter
Amount:
$5,530.00

Component Description:
70% down Electrical for Aux transmitter
Amount:
$1,057.57

Component Description:
50/50 split cost for 4 GPS Antenna Kits. Two required for primary and auxiliary transmitter exciters.
Amount:
$911.10

Component Description:
70% down mask filter system for Aux transmitter
Amount:
$42,038.55

Component Description:
Aux TX Final Payment invoice US0336990 (see attachment)
Amount:
$70,359.21
Transformer 3 phase/480v - 150 KVA

Component Description:
Aux transmitter Electrical installation 480V transformer for the Repack for WTVD TV, as agreed in Quote 1136
Amount:
$3,411.54
Switchgear - industrial 800 amp

Component Description:
Aux transmitter Electrical installation Switchgear for the Repack for WTVD TV, as agreed in Quote 1136
Amount:
$2,401.86

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $595,297.00 $574,665.00 N/A $543,649.85 N/A
Total for all systems $3,151,318.03 $2,552,140.49 N/A $2,311,914.75 N/A
Primary Antenna THV-9A9/CP-R O4 $450,529.00 $444,923.00 $426,117.50
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $7,024.00 This cost is included in the attached Dielectric Main antenna quote. $5,926.50 N/A
High VHF - High Power Top Mount One Station elliptically or circularly polarized $305,777.00 $305,777.00 See attached quote from Dielectric. This Primary (Main) top-mount channel 9 antenna is a direct replacement for our current channel 11 Primary (Main) antenna. $299,540.50 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 This cost is included in the attached Dielectric Main antenna quote. $6,400.00 N/A
Mounting pole $125,722.00 $125,722.00 A shorter mounting pole for the new channel 9 Primary antenna is required to maintain current antenna aperture and HAAT. The cost for this mounting pole is included in the attached Dielectric Primary (Main) antenna quote. $114,250.50 See Main Antenna Attachment for vendor letter and Cost Breakdown (3-08-2019)
Auxiliary Antenna TLS-V8/VPR S180 $144,768.00 $129,742.00 $117,532.35
Sweep test of existing antenna $6,730.00 $6,400.00 This cost is included in the attached Dielectric Auxiliary (Backup) antenna quote. $5,658.35 N/A
High VHF - High Power Side Mount One Station elliptically or circularly polarized $105,318.00 $105,318.00 See attached quote from Dielectric. This Auxiliary (Backup) side-mount channel 9 antenna is a direct replacement for our current channel 11 Auxiliary (Backup) antenna. $94,976.00 N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $11,000.00 This cost is included in the attached Dielectric Auxiliary (Backup) antenna quote. $10,313.00 N/A
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) $9,570.00 $7,024.00 This cost is included in the attached Dielectric Auxiliary (Backup) antenna quote. $6,585.00 N/A

Components

Actual Information Description File Name
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
"prior to ship" invoice, line 4
Amount:
$4,280.25

Component Description:
25% down payment, line 4 of invoice
Amount:
$1,646.25

Component Description:
"prior to ship" invoice, line 4
Amount:
$4,280.25
High VHF - High Power Top Mount One Station elliptically or circularly polarized

Component Description:
"prior to ship" invoice, line 7
Amount:
$1,117.03

Component Description:
"prior to ship" invoice, line 1
Amount:
$176,735.65

Component Description:
"prior to ship" invoice, line 5
Amount:
$1,208.02

Component Description:
"prior to ship" invoice, line 8
Amount:
$1,376.38

Component Description:
Dielectric payment 3 for main antenna, see attachment
Amount:
$40,382.04

Component Description:
"prior to ship" invoice, line 6
Amount:
$864.50

Component Description:
25% down payment, line 5 of Invoice
Amount:
$464.62

Component Description:
25% down payment, line 7 of Invoice
Amount:
$429.63

Component Description:
Main Antenna, Invoice 843010, see attachment
Amount:
$430.50

Component Description:
25% down payment, line 6 of Invoice
Amount:
$332.50

Component Description:
"prior to ship" invoice, line 3
Amount:
$5,557.50

Component Description:
25% down payment, line 3 on invoice
Amount:
$2,137.50

Component Description:
25% down payment, line 8 of Invoice
Amount:
$529.38

Component Description:
25% down payment, Main Antenna, line 1
Amount:
$67,975.25
Sweep test of existing antenna

Component Description:
"prior to ship" invoice, line 9
Amount:
$4,160.00

Component Description:
final payment for sweep test
Amount:
$640.00

Component Description:
25% down payment, line 9 of Invoice
Amount:
$1,600.00
Mounting pole

Component Description:
"prior to ship" invoice, line 2
Amount:
$82,514.25

Component Description:
25% down payment
Amount:
$31,736.25
Sweep test of existing antenna

Component Description:
"prior to ship" invoice, line 7
Amount:
$2,560.00

Component Description:
25% down payment, line 7 of Aux Ant Invoice
Amount:
$1,600.00

Component Description:
Correct reimbursement amount is $2240.00 for invoice 675009rev (6400-1498.35). The $4901.65 credit issued under Invoice # 517014 was split into the final payment, ($1498.35 amount includes adjustment made to invoice 517014, see attachment
Amount:
$1,498.35
High VHF - High Power Side Mount One Station elliptically or circularly polarized

Component Description:
"prior to ship" invoice, line 6
Amount:
$712.04

Component Description:
final payment Aux Antenna invoice 517014 (lines 1,4, & 5)
Amount:
$31,576.33

Component Description:
25% down payment, line 5 of Aux Ant Invoice
Amount:
$217.00

Component Description:
25% down payment, line 6 of Aux Ant Invoice
Amount:
$445.03

Component Description:
"prior to ship" invoice, line 5
Amount:
$347.20

Component Description:
"prior to ship" invoice, line 1
Amount:
$35,028.00

Component Description:
freight, aux antenna invoice 608035
Amount:
$4,016.25

Component Description:
25% down payment, line 4 of Aux Ant Invoice
Amount:
$285.25

Component Description:
25% down payment, line 1 of Aux Ant Invoice
Amount:
$21,892.50

Component Description:
"prior to ship" invoice, line 4
Amount:
$456.40
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
final payment,Aux Ant invoice 517014, line 3
Amount:
$3,609.55

Component Description:
"prior to ship" invoice, line 3
Amount:
$4,125.20

Component Description:
25% down payment, line 3 of Aux Ant Invoice
Amount:
$2,578.25
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed)

Component Description:
final payment,Aux Ant invoice 517014, line 2
Amount:
$2,304.75

Component Description:
"prior to ship" invoice, line 2
Amount:
$2,634.00

Component Description:
25% down payment, line 2 of Aux Ant Invoice
Amount:
$1,646.25

Cost Information

Back to Top

Transmission Line

Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,143,528.00 $671,354.00 N/A $640,077.00 N/A
Total for all systems $3,151,318.03 $2,552,140.49 N/A $2,311,914.75 N/A
Primary Tower TOWER $1,143,528.00 $671,354.00 $640,077.00
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $65,000.00 ***System Notice: Estimate adjusted and locked because line has been superseded.***See attached quotes from Coast to Coast Tower Service which includes replacements of Primary and Auxiliary (Backup) antennas. $65,000.00 N/A
Top Beacon $3,415.00 $3,415.00 Basis of cost estimate – Parts Quotation Q312202, dated March 12, 2020 $3,415.00 N/A
Tower Helicopter Lift $488,863.00 $488,863.00 On 6/15/2020, CTC revised CTC Proposal #12081901T and replaced it with Proposal #06152001T, which sets forth a total cost of $468,113. On 6/24, a fee of $60,750 set forth in 1-E of CTC proposal #06242001T, was added, total cost is ($528,863-$40,000) $488,863.00 WTVD Television has updated the Schedule 399 cost estimate to reflect revised contract for HTS air crane install dated 06-24-2020 CTC Proposal: #06242001T. See attachment
Minor tower reinforcement/modifications $158,000.00 $47,726.00 Remaining Balance owed to CTC under CTC Proposal #06221704T - $47,726 $47,726.00 N/A
Tower reinforcements $59,650.00 $59,650.00 Tower reinforcements are necessary to comply with TIA/EIA-222-G standards with the new antenna loads. $30,173.00 See attachment for Tower Mod payment, $30,173.00 total amount,The $28,550 quote dated 07-03-2017 will not be used.
Structural engineering tower load study for well documented tower $12,600.00 $6,700.00 ORIGINAL ENGINEERING STUDY THAT WAS DONE TO DETERMINE REQUIREMENTS, BUT THIS WAS REIMBURSED IN A PREVIOUS FILING (TURRIS - $6,700).  NOTHING ELSE ON REINFORCEMENT. $4,900.00 N/A

Components

Actual Information Description File Name
Complex Tower (includes, for example, those with candelabras and/or stacked antennas)

Component Description:
Deposit for tower modifications and antenna replacements
Amount:
$65,000.00
Top Beacon

Component Description:
Skytec Inc. for $3,415, includes shipping for (2) 60 lb. and 26 lb. boxes
Amount:
$3,415.00
Tower Helicopter Lift

Component Description:
Progress Payment for the Repack for WTVD TV, as agreed in CTC proposal #06242001T & WTVD PO #4506101697 and WTVD PO #4506220994.
Amount:
$200,000.00

Component Description:
Deposit for the addition of the Helicopter lift to install the main antenna for the Repack for WTVD TV, as agreed in CTC proposal 12081901T.
Amount:
$114,106.00

Component Description:
(Line 1) Progress Payment for the Repack for WTVD TV, as agreed in CTC proposal #06242001T & WTVD PO #4506220994.
Amount:
$49,007.00

Component Description:
Line 2, Mobilization Fee for HTS Airlift, as agreed in, section 1-E of CTC proposal #06242001T, Coast to Coast was not able to complete the WTVD TV Repack project in conjunction with another airlift, this resulted in an additional $60,750
Amount:
$60,750.00

Component Description:
Progress Payment for the Repack for WTVD TV, as agreed in CTC proposal #06242001T & WTVD PO #4506220994.
Amount:
$65,000.00
Minor tower reinforcement/modifications

Component Description:
Balance owed to CTC under CTC Proposal #06221704T - $47,726
Amount:
$47,726.00
Tower reinforcements

Component Description:
deposit payment for tower mod, see attached.
Amount:
$10,560.00

Component Description:
remaining balance for tower mod payment, see attached.
Amount:
$19,613.00
Structural engineering tower load study for well documented tower

Component Description:
Construction Drawings
Amount:
$4,900.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $175,711.17 $173,927.17 N/A $55,919.13 N/A
Total for all systems $3,151,318.03 $2,552,140.49 N/A $2,311,914.75 N/A
Outside Professional Services $175,711.17 $173,927.17 $55,919.13
Legal Advice re Reimbursement Process $20,086.17 $20,086.17 Legal services relating to research and advice regarding reimbursable legal expenses and required backup support. See two attached quotes from Akin Gump. $20,086.17 N/A
Structural project management $28,550.00 $28,550.00 See attached quote from Turris Engineering to provide rigging plan and engineering services for antenna replacements and structural modifications. N/A N/A
Structural Analysis $10,000.00 $10,000.00 Structural analysis required to comply with current tower standards. See attached quote from Turris Engineering. $6,700.00 N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $79,955.00 Attached quote includes services for field strength study to verify antenna and coverage performance. $0.00 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A $1,572.01 N/A
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application $4,210.00 $4,511.00 cost of additional legal services/fees for Aux Antenna $4,510.52 N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $4,048.90 N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $1,500.00 N/A $1,200.00 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A $480.00 N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $3,000.00 Additional permit had to be received to allow WTVD to transition to Channel 9 early to coincide with the change over with other stations in our market to avoid viewer confusion and inconvenience and avoid a 2nd set of viewer announcements $2,902.50 Additional permit needed to move WTVD to Channel 9 early to coincide with the change over with other stations in our market to avoid viewer confusion and inconvenience and avoid a 2nd set of viewer announcements
Perform engineering study for new channel assignment and antenna development $7,360.00 $9,575.00 Additional engineering study had to be performed to determine if WTVD could transition to Channel 9 early to coincide with the change over with other stations in our market to avoid viewer confusion and inconvenience and avoid a 2nd set of viewer announce $9,573.75 Additional engineering study had to be performed to determine if WTVD could transition to Channel 9 early to coincide with the change over with other stations in our market to avoid viewer confusion and inconvenience and avoid a 2nd set of viewer announce
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A $2,002.78 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A $525.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $2,317.50 N/A

Components

Actual Information Description File Name
Legal Advice re Reimbursement Process

Component Description:
Legal Advice re: Reimbursement process
Amount:
$1,122.23

Component Description:
See Invoice for 399 line items (net of fee adjustment)
Amount:
$5,542.13

Component Description:
Legal Advice re: Reimbursement process
Amount:
$314.73

Component Description:
Legal fees
Amount:
$9,131.63

Component Description:
Legal Advice re: Reimbursement process
Amount:
$1,797.83

Component Description:
Legal Advice re: Reimbursement process
Amount:
$663.76

Component Description:
See Invoice for 399 line items (net of fee adjustment)
Amount:
$1,513.86
Structural project management Information not provided.
Structural Analysis

Component Description:
Structural analysis and report for WTVD 2000' transmission tower
Amount:
$6,700.00
Comprehensive coverage verification via field study, if needed

Component Description:
Engineering Feasibilty study
Amount:
N/A

Component Description:
Engineering fees for waiver to phase 5
Amount:
N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application

Component Description:
Legal fees to cover main application to FCC
Amount:
$1,572.01
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application

Component Description:
Legal fees for Aux Application
Amount:
$530.15

Component Description:
Attorney fees for Aux
Amount:
$2,516.94

Component Description:
Legal fees of Aux finalization
Amount:
$1,463.43
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
See Invoice 1727603 (2100) line items (net of fee adjustment)
Amount:
$491.44

Component Description:
See Invoice 1723104 (2100) line items (net of fee adjustment)
Amount:
$3,557.46
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application

Component Description:
Engineering fees for application for license of Aux
Amount:
$960.00

Component Description:
Engineering fees for additional work of Aux license fee
Amount:
$240.00
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
Engineering fees for application for license to cover main antenna
Amount:
$480.00
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application

Component Description:
Prep of application for Aux Construction permit to replace antenna for post repack channel 9. Transition to Aux and replace main antenna after
Amount:
$2,902.50
Perform engineering study for new channel assignment and antenna development

Component Description:
Preparation of waiver to change to Phase 5, Interference studies and report
Amount:
$5,760.00

Component Description:
Study to determine the feasibility of WTVD transitioning to Channel 9 early using the Aux construction permit facility with a Special Temporary Authority.
Amount:
$960.00

Component Description:
See Invoice # Item 1
Amount:
$2,853.75
Prepare and or review reimbursement form

Component Description:
Legal fees for FCC 399 Reimbursement
Amount:
$1,178.10

Component Description:
Legal fees for FCC 399 reimbursement
Amount:
$530.15

Component Description:
Legal review of FCC 399 Reimbursements of final invoices
Amount:
$58.91

Component Description:
Legal review of FCC 399 Reimbursements
Amount:
$117.81

Component Description:
Legal review of FCC 399 Reimbursements
Amount:
$117.81
Address transition timing and coordination issues w/ other stations and wireless

Component Description:
Engineering study re: transition plan and interim facilities
Amount:
$525.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
See Invoice # Item 2
Amount:
$2,317.50

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $40,863.36 $34,596.36 N/A $32,385.61 N/A
Total for all systems $3,151,318.03 $2,552,140.49 N/A $2,311,914.75 N/A
Other Expenses $40,863.36 $34,596.36 $32,385.61
DTV Medical Facility Notification $11,550.00 $4,868.00 N/A $4,868.00 N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $750.00 WTVD will be required to file license applications for both the Primary and Auxiliary facilities. $0.00 N/A
Equipment Delivery and Handling Charges $4,903.69 $4,903.69 Payments to Herc Rentals required for transmitter unloading and installation. $4,903.69 Estimated cost matches the sub-total provided of all invoices requesting reimbursement on.
Develop and air announcement of upcoming channel change $4,000.00 $4,000.00 N/A $2,539.25 N/A
MVPD Notification of Channel Change $5,354.00 $5,354.00 FCC Waiver to move from phase 9 to 10, due to Covid-19, scheduling conflicts with linked stations in phase 9, WTVD notified MVPD's of its transition to phase 10. Thus requiring a second set of notices and additional expenses incurred. $5,354.00 N/A
Equipment Delivery and Handling Charges $14,720.67 $14,720.67 Additional freight and storage costs for Main antenna billed at time of shipment. $14,720.67 N/A

Components

Actual Information Description File Name
DTV Medical Facility Notification

Component Description:
Required Notification to medical facilities
Amount:
$4,868.00
FCC Filing Fees - Form 2100 license to cover application Information not provided.
Equipment Delivery and Handling Charges

Component Description:
Herc Rentals Inv # 31275280-001 for Fork Lift rental fees
Amount:
$781.22

Component Description:
Herc Rentals Inv# 30900377-001 for Fork Lift Rental Fees
Amount:
$752.11

Component Description:
Herc Rentals Inv # 30998761-001 for Fork Lift rental fees
Amount:
$632.62

Component Description:
Herc Rentals invoice # 31279362-001 for Fork Lift Rental
Amount:
$1,891.50

Component Description:
invoice 31275280-001, Fork lift rental fees
Amount:
$781.22

Component Description:
invoice 30900377-001, Fork lift rental fees
Amount:
$752.11

Component Description:
invoice 30931718-001, Fork lift rental fees
Amount:
$846.24

Component Description:
invoice 31279362-001, Fork lift rental fees
Amount:
$1,891.50

Component Description:
invoice 30998761-001, Fork lift rental fees
Amount:
$632.62
Develop and air announcement of upcoming channel change

Component Description:
Tv rescan call center payment for Invoice 12537191
Amount:
$525.00

Component Description:
Tv rescan call center payment for Invoice 12523938
Amount:
$365.75

Component Description:
Tv rescan call center payment for Invoice 12528132
Amount:
$525.00

Component Description:
Tv rescan call center payment for Invoice 12510936
Amount:
$525.00

Component Description:
Tv rescan call center payment for Invoice 12519138
Amount:
$525.00

Component Description:
Tv rescan call center payment for Invoice 12514827
Amount:
$73.50
MVPD Notification of Channel Change

Component Description:
Second set of notices required for transition from phase 9 to phase 10
Amount:
$2,677.00

Component Description:
Notice to MVPDs
Amount:
$2,677.00
Equipment Delivery and Handling Charges

Component Description:
Dielectric Inv 837016 for Van storage and freight delivery on main antenna with cover sheet and backup
Amount:
$4,545.00

Component Description:
invoice 848003, freight fees with Fed Express NDA early morning for delivery of stored equipment needed for installation
Amount:
$774.43

Component Description:
Dielectric invoice # 853006 for Flatbed freight and delivery of main antenna
Amount:
$9,401.24

Component Description:
invoice 837016, Van storage & freight fees
Amount:
$4,545.00

Component Description:
invoice 853006, flatbed delivery & storage fees
Amount:
$9,401.24

Component Description:
invoice 848003, freight fees with Fed Express NDA early morning
Amount:
$774.43

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $3,151,318.03 $2,552,140.49 $2,311,914.75

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. Yes

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

John W Zucker

Assistant Secretary


03/17/2022

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

John W Zucker

Assistant Secretary


03/17/2022

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

John W Zucker

Assistant Secretary


03/17/2022

Attachments