Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
CBS OPERATIONS INVESTMENTS INC. Doing Business As: CBS OPERATIONS INVESTMENTS INC. |
Daniel G. Ryson 2020 M. St., NW - Licensing DEPT WASHINGTON, DC 20036 United States |
+1 (202) 457-4505 | DRYSON@CBS.COM | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Daniel G Ryson ViacomCBS |
Daniel G. Ryson 2020 M. St., NW - Licensing DEPT Washington, DC 20036 United States |
+1 (202) 457-4074 | dryson@cbs.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Temporarily move to an interim site with a broadband antenna. Install a broadband transmitter capable of operating on pre and post transition channels for use when primary site is rebuilt with new antenna, transmission line, and transmitter equipment. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DCX | |
Year | 2001 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 50 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTED-80 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 50.6 kW | |
Justification for New Transmitter | Comark will not re-tune any IOT transmitter (see Attachment 1). Proposed "upgraded" transmitter (see Attachment 15) costs more than "non-upgraded" transmitter (see Attachment 3) which is basis for reimbursement. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 500 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 200.0 feet | |
Other Electrical Service | Yes | |
Description | 100 linear feet of 4-inch conduit. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 15 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 3200.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Reproof Transmitter |
Adjust primary transmitter to operate at final (revised) output power. Conduct new Proof of Performance at adjusted power level. Please see estimate provided as Attachment 157. |
Florida State Sales Tax |
Florida State Sales Tax |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase | |
Manufacturer | ||
Model | ULXTE-60 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 30 kW | |
Justification for New Transmitter | Interim transmitter and site required while main tower is reinforced and main site is rebuilt. Broadband PAs specified. See Statement 2. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 3 inches | |
Length | 100.0 feet | |
Other Electrical Service | Yes | |
Description | Prepare electrical engineering drawings for work required at Interim Site. Install electrical wiring for transmitter, racks, etc. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A | |
Inside RF System | Is an additional interior RF system required to support this interim transmitter? | Yes |
Name | Description |
---|---|
Sales Tax |
State of Florida Sales Tax |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Auxiliary (Backup) | |
Description of Use | Emergency Only | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this antenna currently shared with any other stations? | No | |
Is this antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 298.0 kW | |
Manufacturer | ||
Model | SW-16 | |
Year | 1988 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Auxiliary (Backup) |
Description of Use | Auxiliary (Post Transition) | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 298.0 kW | |
Manufacturer | ||
Model | TFU-24DSC-R O4 | |
Year | 2019 | |
Justification for New Antenna | Existing auxiliary antenna is narrowband and not suitable for use on channel 19. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 6 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Bottom | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 550.0 kW | |
Manufacturer | ||
Model | TFU-30E | |
Year | 1987 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Bottom | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 700.0 kW | |
Manufacturer | ||
Model | TFU-24EBT/VP-R O6 | |
Year | 2021 | |
Justification for New Antenna | Present owned antenna is narrowband and will not work on post-transition channel. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 7 3/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Feed Through Complex |
Feed Through Complex for Upper Antenna in Stack |
Mounting Adapter |
Two Mounting Adapters required to support stacked antennas. |
Sweep Test - Sales Tax |
State sales tax on sweep test. Please see Attachment 161A |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Rent Temporary | |
Ownership | Leased | |
Owner | Florida West Coast Public Broadcasting, Inc. | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Bottom | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 12 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 713.00 MHz | |
Design power capacity in use | 0.0 % | |
Other Antenna Type | N/A | |
ERP: | 417.0 kW | |
Manufacturer | ||
Model | TUP-05-12-60-1 | |
Year | 2006 | |
Justification for New Antenna | Renting Existing Antenna. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Test Adapter |
Test adapter for detailed measurement of interim antenna and line. |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Backup | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmission currently shared with any other stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 8 3/16 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1000 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Auxiliary (Backup) |
Description of Use | Backup | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1330 feet per run | |
Justification for New Transmission Line | Please see Statement 2 and Attachment 90. Note: We propose to replace 1,000 feet of 8 3/16-inch line with a greater length of less expensive 6 1/8-inch line to maintain pre-transition coverage without excessive transmitter power or tower windloading. |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Waveguide | |
Diameter | N/A | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1492 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1600 feet per run | |
Justification for New Transmission Line | WTOG owns no transmission line on the leased tower. Existing WTOG tower found structurally insufficient for repack. |
Name | Description |
---|---|
Nitrogen Generator |
Required to pressurize new transmission line at new site with moisture and oxygen-free nitrogen gas. |
STL Line Parts |
Components required to install Studio Transmitter Link Line. |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Segment Length | 20' | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 100 feet per run | |
Justification for New Transmission Line | Required for interconnect to interim antenna. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Auxiliary (Backup) | |
Description of Use | Interim | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1211242 | |
Coordinates (NAD83) | Latitude (NAD83) | 27° 50' 51.5" N- |
Longitude (NAD83) | 082° 15' 49.4" W- | |
Overall Structure Height | 1571.83 feet | |
Support Structure Height | 1451.10 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 76.11 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Florida West Coast Public Broadcasting, Inc. | |
Date Constructed | 12/07/1999 |
Facility ID | Call Sign | Service |
---|---|---|
21808 | WEDU | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | No study needed |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Rent |
Monthly Rental Fee for existing Tower, Antenna, Line, and Transmitter Room. |
FL State Use Tax |
Florida 8.5% State Use Tax |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
One or more FM, AM or TV radio broadcaster(s) | N/A | |
Others Types of Users | N/A | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1030952 | |
Coordinates (NAD83) | Latitude (NAD83) | 27° 49' 47.1" N- |
Longitude (NAD83) | 082° 15' 58.3" W- | |
Overall Structure Height | 1574.13 feet | |
Support Structure Height | 1451.75 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 74.80 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Towers LLC | |
Date Constructed | 02/01/2018 |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Structural Engineering Primary Tower |
Structural Analysis of Proposed Tower Loading |
Tower Permit Packages |
Construction drawings for tower, ground and building. Required for local permits. |
Rigging Sales Tax |
Sales Tax for Tower Rigging |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 250 | |
Explanation | Company lacks sufficient internal resources. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare and file Form FCC License to Cover Application | No | |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | Yes | |
Environmental Assessment | Yes | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Architect Mechanical Electrical |
Architect, Mechanical, and Electrical Engineering for Interim Site. |
Electrical Engineering - Primary Transmitter |
Electrical Engineering for WTOG Transmitter Installation design, drawings for electrical permits. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | No | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Tower Decommission |
Tower Decommissioning and Hazardous Materials Removal. See Attachment 115. |
UPS Units |
Replicate Small Percentage of Prior Site UPS Capability. |
Waveguide Switch Controller |
Unit that controls the transmitter/antenna system waveguide switch. |
Florida State Sales Tax |
Florida State Sales Tax |
Microwave Frequency Coordination |
Required Frequency Coordination for Relocation of the WTOG studio-to-transmitter microwave link. |
STL and TSL FCC Fees |
Application Processing Fees for License Application to relocate studio to transmitter and transmitter to studio microwave equipment. Please see Attachment 109 for a "quotation" of Fees. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,987,659.07 | $2,980,529.51 | N/A | $2,680,743.67 | N/A |
Total for all systems | $6,788,924.62 | $5,813,603.79 | N/A | $5,401,115.95 | N/A |
Interim Transmitter ULXTE-60 | $1,219,241.16 | $1,229,073.38 | $1,101,379.94 | ||
Sales Tax | $61,260.16 | $61,260.16 | State of Florida Sales Tax. Please see Attachment 59 ($60,005.85) plus Attachment 88 ($1,254.31). | $61,260.16 | N/A |
UHF inside RF system including switching | $147,500.00 | $143,500.00 | Includes Attachment 21 Item C. There will also be some labor involved to install switching and transmission line. | $100,047.68 | N/A |
Other Electrical Service: Prepare electrical engineering drawings for work required at Interim Site. Install electrical wiring for transmitter, racks, etc. | $32,731.00 | $32,731.00 | See Attachment 50 for electrical engineering drawings necessary to seek bids for actual wiring. See Attachment 64 for proposal of interim transmitter electrical installation. | $15,492.40 | N/A |
3" Rigid Conduit and Wiring (Cost per foot) | $5,200.00 | $5,000.00 | N/A | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | $947,000.00 | $977,574.60 | Includes Attachment 21 Items A,B, E and change orders shown in Attachment 22. Does not include RF Accessories, Step-Down transformer, and shipping shown elsewhere. | $915,572.08 | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $9,007.62 | See Attachment 21, Item D | $9,007.62 | N/A |
Primary Transmitter ULXTED-80 | $1,768,417.91 | $1,751,456.13 | $1,579,363.73 | ||
Florida State Sales Tax | $89,753.53 | $89,753.53 | See statement and Table 1 in Attachment 80B. Also sales tax on new change orders shown in Attachment 89. | $89,753.53 | N/A |
Reproof Transmitter | $1,996.00 | $1,996.00 | Adjust primary transmitter to operate at final (revised) output power. Conduct new Proof of Performance at adjusted power level. Please see estimate provided as Attachment 157. | $1,996.00 | N/A |
Other -- Building Addition Size: 3200.0 | $91,200.00 | $91,200.00 | 2 story building with tiltup walls to match existing broadcast facility. Includes galvanized stairs, steel doors, and concrete block walls for separate tenant suites. See Attachments 5 and 6. | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 50.6 kW | $1,419,628.38 | $1,419,628.38 | Please See Statement 2A. Includes installation; excludes freight. Also includes change orders shown in Attachment 89. | $1,419,628.38 | Sub total is equal to estimated cost. |
Switchgear - industrial 800 amp | $38,200.00 | $78,298.22 | Labor and Materials for WTOG transmitter replacement. See Attachments 55 ($28,731.00) 97A ($47,863.02), and 129 ($1704.20). | $67,525.82 | N/A |
Other Electrical Service: 100 linear feet of 4-inch conduit. | $3,840.00 | $3,840.00 | 100' L/F of 4" conduit and larger conductor to adequately bring an additional 500 KVA power needed for the new transmitters, HVAC, Air handlers, and house power. See Attachment 5. | N/A | N/A |
15 Ton system | $55,800.00 | $42,400.00 | See Attachment 5. | N/A | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $5,480.00 | Pro rata cost. See Attachment 5. | N/A | N/A |
Transformer 3 phase/480v - 500 KVA | $48,400.00 | $18,400.00 | Install 500 KVA transformer to support transmitter, heat exchangers and other equipment on the new repack frequency into the broadband antenna. See Attachment 5. | N/A | N/A |
2" Rigid Conduit and Wiring (Cost per foot) | $5,200.00 | $460.00 | Additional lights at transmitter and receptacles at switching section. Please see Attachment 118 for quotation. | $460.00 | N/A |
Actual Information Description | File Name |
---|---|
Sales Tax | |
UHF inside RF system including switching | |
Other Electrical Service: Prepare electrical engineering drawings for work required at Interim Site. Install electrical wiring for transmitter, racks, etc. | |
3" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW | |
Transformer 3 phase/480v - 150 KVA | |
Florida State Sales Tax | |
Reproof Transmitter | |
Other -- Building Addition Size: 3200.0 | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 50.6 kW | |
Switchgear - industrial 800 amp | |
Other Electrical Service: 100 linear feet of 4-inch conduit. | Information not provided. |
15 Ton system | Information not provided. |
Service entrance 3 phase/800 amp/208 volt | Information not provided. |
Transformer 3 phase/480v - 500 KVA | Information not provided. |
2" Rigid Conduit and Wiring (Cost per foot) |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,041,779.11 | $841,503.48 | N/A | $835,878.38 | N/A |
Total for all systems | $6,788,924.62 | $5,813,603.79 | N/A | $5,401,115.95 | N/A |
Interim Antenna TUP-05-12-60-1 | $374,144.11 | $11,099.11 | $11,099.11 | ||
Interim antenna rental and installation - Cost will depend on antenna size and height and/or complexity of tower. | $115,500.00 | $0.00 | Antenna Rental Cost included in Tower Rent. | N/A | N/A |
Test Adapter | $4,914.11 | $4,914.11 | See Attachment 30 for quote. Also Includes shipping shown in invoice 237003, Attachment 33B. | $4,914.11 | Includes shipping. |
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized | $247,000.00 | $0.00 | Renting an existing but unused antenna. | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,185.00 | Please see estimates in Attachment 34 (preliminary measurement) and Attachment 36 (final measurement). | $6,185.00 | N/A |
Primary Antenna TFU-24EBT/VP-R O6 | $393,195.00 | $632,334.37 | $630,219.27 | ||
Mounting Adapter | $45,600.00 | $45,600.00 | Please see Attachment 138 line items 2 ($20,175.00) and 3 ($25,425.00) for two mounting adapters required for this bottom-stacked antenna. | $45,600.00 | N/A |
Feed Through Complex | $21,511.00 | $21,511.00 | Required to support existing, top-mounted stacked antenna after replacing bottom-mounted stacked antenna. Please see Attachment 138, line 5 for quote. | $19,395.90 | N/A |
Elbow complex, single channel, at antenna input, per 7 3/16. feedline (if needed) | $13,900.00 | $653.30 | With a change in line size, the elbow complex changed. The estimated $653.30 represents the increase in estimated cost (see Attachment 138 line item 4) over the value of prior reimbursements in a now-locked cost category. | $653.30 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | See Attachment 13 - Line item 24 | $6,400.00 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $545,241.37 | See Attachment 173 for Statement and reconciliation. Includes Prior Antenna write-down cost ($148,000 minus $18,609.63 V-Pol, plus $415,851.00 Future H-Pol Antenna estimate). | $545,241.37 | N/A |
Sweep Test - Sales Tax | $704.00 | $704.00 | Based on actual amount. Please see Attachment 161A. | $704.00 | N/A |
Elbow complex, single channel, at antenna input, per 8 3/16. feedline (if needed) | $15,250.00 | $12,224.70 | ***System Notice: Estimate adjusted and locked because line has been superseded.***See Attachment 138 Line Item 4. | $12,224.70 | N/A |
Auxiliary Antenna TFU-24DSC-R O4 | $274,440.00 | $198,070.00 | $194,560.00 | ||
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,260.00 | Per Cost Catalog | $1,750.00 | N/A |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | $12,300.00 | $10,710.00 | See Attachment 16A Line Item 4. This is for the comparable Dielectric TFU-16DSC-R O4 antenna, not the upgraded Dielectric TFU-24DSC-R O4 antenna (Attachment 19A) that we're installing. | $10,710.00 | N/A |
UHF - Lower Power Side Mount, One station antenna -- 200-500 kW, elliptically or circularly polarized | $227,000.00 | $150,675.00 | See Attachment 19A Line Item 1. This is for the Dielectric TFU-24DSC-R O4 antenna (Attachment 19A) that is now serving as an interim antenna. Cost shown here excludes V-Pol upgrade. | $150,675.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $9,675.00 | Existing Auxiliary and Interim antenna were measured at the same time so measurement cost was split 50/50 between cost categories. Also includes new antenna measurements. See Attachments 38 and 16A. | $9,675.00 | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $21,750.00 | See Attachment 19A for the Dielectric TFU-24DSC-R O4 side mount bracket estimate. | $21,750.00 | N/A |
Actual Information Description | File Name |
---|---|
Interim antenna rental and installation - Cost will depend on antenna size and height and/or complexity of tower. | Information not provided. |
Test Adapter | |
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized | Information not provided. |
Sweep test of existing antenna | |
Mounting Adapter | |
Feed Through Complex | |
Elbow complex, single channel, at antenna input, per 7 3/16. feedline (if needed) | |
Sweep test of existing antenna | |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | |
Sweep Test - Sales Tax | |
Elbow complex, single channel, at antenna input, per 8 3/16. feedline (if needed) | |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | |
UHF - Lower Power Side Mount, One station antenna -- 200-500 kW, elliptically or circularly polarized | |
Sweep test of existing antenna | |
Side mount brackets for high power antennas (if not included in antenna base cost) |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,611,391.68 | $545,606.54 | N/A | $526,208.64 | N/A |
Total for all systems | $6,788,924.62 | $5,813,603.79 | N/A | $5,401,115.95 | N/A |
Interim Transmission Line | $20,200.00 | $340.86 | $340.86 | ||
Rigid Transmission Line - copper, 6 1/8" | $20,200.00 | $340.86 | Transmission Line Rent included in Tower Rent. One connector was required to interface to existing line. Please see Attachment 75. | $340.86 | N/A |
Primary Transmission Line | $1,032,531.68 | $334,776.93 | $315,381.03 | ||
STL Line Parts | $277.99 | $277.99 | Parts required to hoist new studio-transmitter microwave link transmission line on new tower. | $277.99 | N/A |
Rigid Transmission Line - copper, 7 3/16" | $464,000.00 | $17,168.75 | The transmission line and feed through section cost of $321,445.25 (see Attachment 173 page 5) is $17,168.75 more than the $304,276.50 in prior reimbursements, in a now locked cost category. | ($2,227.15) | N/A |
Nitrogen Generator | $13,053.69 | $13,053.69 | Required to pressurize new transmission line with moisture and oxygen-free nitrogen gas. Please see quotation in Attachment 176. | $13,053.69 | N/A |
Rigid Transmission Line - copper, 8 3/16" | $555,200.00 | $304,276.50 | ***System Notice: Estimate adjusted and locked because line has been superseded.***See Attachment 13, Line Item 4 and Attachment 39. | $304,276.50 | N/A |
Auxiliary Transmission Line | $558,660.00 | $210,488.75 | $210,486.75 | ||
Rigid Transmission Line - copper, 6 1/8" | $268,660.00 | $110,969.79 | We've replaced 1,000 feet of 8 3/16-inch line with 1,300 feet of less expensive 6 1/8-inch line. Cost shown adds $115.50 Saddle Kit (see Attachment 87) and excludes already reimbursed $99,518.96 in locked cost category. | $110,967.79 | N/A |
Rigid Transmission Line - copper, 7 3/16" | $290,000.00 | $99,518.96 | ***System Notice: Estimate adjusted and locked because line has been superseded.***Please see quote provided as Attachment 19A and Changer Order Attachment 90. Note: We are replacing existing 8 3/16-inch line with less expensive 6 1/8-inch line. | $99,518.96 | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 6 1/8" | |
STL Line Parts | |
Rigid Transmission Line - copper, 7 3/16" | |
Nitrogen Generator | |
Rigid Transmission Line - copper, 8 3/16" | |
Rigid Transmission Line - copper, 6 1/8" | |
Rigid Transmission Line - copper, 7 3/16" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $715,917.10 | $1,045,322.10 | N/A | $1,033,893.28 | N/A |
Total for all systems | $6,788,924.62 | $5,813,603.79 | N/A | $5,401,115.95 | N/A |
Auxiliary Tower TOWER | $454,860.00 | $244,360.00 | $242,331.18 | ||
Rent | $227,500.00 | $227,500.00 | $17,500 per month rental fee for existing tower, antenna, transmission line, and transmitter room. Based on presumed 13 month construction period (May 1, 2019 through May 31, 2020). | $226,916.57 | N/A |
FL State Use Tax | $16,860.00 | $16,860.00 | Florida State Sales and Use Tax calculated using procedures explained in Attachment 69. Tax is $1,405.00 for most months. The total is based on a May 2019 through May 2020 construction period. | $15,414.61 | N/A |
Tall Tower (greater than 500') | $210,500.00 | $0.00 | No Rigging Necessary. Antenna and Line are existing. | N/A | N/A |
Primary Tower GTOWER | $261,057.10 | $800,962.10 | $791,562.10 | ||
Rigging Sales Tax | $39,657.10 | $39,657.10 | 7% Florida State Sales Tax on $539,880 (see Attachment 142) plus $1,865 in tax on weather delays (see Attachment 155). | $39,657.10 | N/A |
Tower Permit Packages | $9,400.00 | $9,400.00 | Generate construction drawings of tower, ground, and building for local permits. See Attachments 5 and 6. | N/A | N/A |
Structural Engineering Primary Tower | $1,500.00 | $1,500.00 | Please see Attachment 122 for Preliminary Structural Analysis Quote | $1,500.00 | N/A |
Tall Tower (greater than 500') | $210,500.00 | $750,405.00 | Please see quotes in Attachments 132 ($156,495.00 for auxiliary antenna), 134 ($27,380.00 for microwave antenna) 142 ($539,880 for main antenna) and 155 ($26,650 for actual weather delays). Excludes sales tax, listed separately. | $750,405.00 | N/A |
Actual Information Description | File Name |
---|---|
Rent | |
FL State Use Tax | |
Tall Tower (greater than 500') | Information not provided. |
Rigging Sales Tax | |
Tower Permit Packages | Information not provided. |
Structural Engineering Primary Tower | |
Tall Tower (greater than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $119,865.00 | $82,704.50 | N/A | $56,254.72 | N/A |
Total for all systems | $6,788,924.62 | $5,813,603.79 | N/A | $5,401,115.95 | N/A |
Outside Professional Services | $119,865.00 | $82,704.50 | $56,254.72 | ||
Electrical Engineering - Primary Transmitter | $4,000.00 | $4,000.00 | Transmitter installation electrical engineering design for permits. Please see Attachment 99. | $4,000.00 | N/A |
Architect Mechanical Electrical | $17,500.00 | $17,500.00 | Architect, Mechanical, Electrical. Please see proposal provided as Attachment 84. Does not include expenses or additional hourly fees. | $10,184.09 | N/A |
RF Exposure Measurements | $21,050.00 | $3,750.00 | RF Exposure measurements to demonstrate RF fields are less than FCC limits. See Attachment 5. | N/A | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $167.00 | See Attachment 5. | N/A | N/A |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | $10,520.00 | $1,250.00 | See Attachment 5. | N/A | N/A |
NEPA Section 106 environmental review, if needed | $6,310.00 | $1,350.00 | See Attachment 5. | N/A | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,500.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $2,050.00 | Cost Catalog Pricing. | $1,050.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Project management of the transition | $39,500.00 | $37,500.00 | Company lacks sufficient internal resources. See also Attachment 5. | $32,845.63 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $5,000.00 | See Attachment 5. | $3,537.50 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $4,637.50 | Additional engineering work and Construction Permit modification was required when initial site became unavailable. See Exhibits 20, 27, 29, 156, and 177. | $4,637.50 | Unexpected loss of main and interim site. See Statement 2. |
Actual Information Description | File Name |
---|---|
Electrical Engineering - Primary Transmitter | |
Architect Mechanical Electrical | |
RF Exposure Measurements | Information not provided. |
ASR modification (prepare FCC Form 854) | Information not provided. |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | Information not provided. |
NEPA Section 106 environmental review, if needed | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Project management of the transition | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Perform engineering study for new channel assignment and antenna development | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $312,312.66 | $317,937.66 | N/A | $268,137.26 | N/A |
Total for all systems | $6,788,924.62 | $5,813,603.79 | N/A | $5,401,115.95 | N/A |
Other Expenses | $312,312.66 | $317,937.66 | $268,137.26 | ||
STL and TSL FCC Fees | $340.00 | $340.00 | Two FCC Wireless Bureau License Modification Application Processing Fees - $170 each. Please see "quotation" in Attachment 109 the Wireless Bureau Fee Filing Guide. | $340.00 | N/A |
Microwave Frequency Coordination | $900.00 | $900.00 | Required Frequency Coordination for Relocating WTOG microwave equipment to the new tower. See quote as Attachment 107. | $900.00 | N/A |
Florida State Sales Tax | $47,337.66 | $47,337.66 | Sales tax based on actual cost. See Attachments 133 (10,954.65), 135 (1,916.60), 165 (23,624.22), 166 (146.07), 167 (434.33), 168 (146.07), 169 (9.82), 172 (882.56), 173 (286.83), 174, (7,807.49), 176 (1,109.56), and 178 (19.46). | $47,337.66 | Actually, sub-total equals estimated cost. |
Waveguide Switch Controller | $3,815.70 | $3,815.70 | Please see Attachment 125 for a quotation for the waveguide switch controller, cable, shipping, and tax. Required to safely control the switch. | $3,815.70 | N/A |
UPS Units | $4,482.96 | $4,482.96 | Uninterruptible Power Supply Units. Functionally replace a very large unit at the prior WTOG site that could not be rebuilt for repack. Includes tax and freight. Please see Attachment 120 for quotation. | $4,482.96 | N/A |
Tower Decommission | $89,745.00 | $89,745.00 | Flat rate cost to remove hazardous materials from pre-transition WTOG site that could not economically support repack. Please see Attachment 115. | $89,745.00 | N/A |
MVPD Notification of Channel Change | $1,950.00 | $1,950.00 | See quotation in Attachment 105 | $1,950.00 | N/A |
Equipment Delivery and Handling Charges | $111,151.34 | $111,151.34 | See Attachments 2A and 21 ($11,000 each) plus Attachment 43 ($2,925). Includes actual shipping shown in Attachments 88, 89, 101, 131, 146, 153, 163, 164, 173, 176, and 178. | $100,940.94 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $30,000.00 | $30,000.00 | Assorted disposal cost for equipment and other waste. For example, see Attachments 10 and 11. | N/A | N/A |
Non-zoning permits | $4,700.00 | $4,700.00 | N/A | N/A | N/A |
Local Zoning | $4,700.00 | $4,700.00 | N/A | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $670.00 | Please see "quote" FCC Media Bureau Fee Filing Guide Attachment 112. Two fees are required; one for the main and one for the auxiliary antenna system. | $670.00 | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $3,330.00 | Please see "quote" - FCC Media Bureau Filing Fee Guide provided as Attachment 112. Applications were filed for both the main (two each) and the auxiliary antenna. | $3,330.00 | N/A |
DTV Medical Facility Notification | $11,550.00 | $14,625.00 | See Attachments 12, 103, and 150. Due to ongoing changes and construction delays, there have been three DTV Notification mailings at $3,750 and one at $3,375. | $14,625.00 | N/A |
Actual Information Description | File Name |
---|---|
STL and TSL FCC Fees | |
Microwave Frequency Coordination | |
Florida State Sales Tax | |
Waveguide Switch Controller | |
UPS Units | |
Tower Decommission | |
MVPD Notification of Channel Change | |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Non-zoning permits | Information not provided. |
Local Zoning | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | |
FCC Filing Fees - Form 2100 minor change CP application | |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $6,788,924.62 | $5,813,603.79 | $5,401,115.95 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Martha E Heller VP, Government Relations and Regulatory 02/28/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Martha E Heller VP, Government Relations and Regulatory 02/28/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Martha E Heller VP, Government Relations and Regulatory 02/28/2022 |