Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
BOARD OF TRUSTEES OF SOUTHERN ILLINOIS UNIVERSITY Doing Business As: SOUTHERN ILLINOIS UNIVERSITY |
Fred Martino PO Box 62708 MAILCODE 6602 CARBONDALE, IL 62901 United States |
+1 (618) 453-6181 | fred.martino@wsiu.org | Government Entity |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Greg Best Consulting Engineer Greg Best Consulting, Inc. |
16100 Outlook Avenue Stilwell, KS 66085 United States |
+1 (816) 792-2913 | gbconsulting54@gmail.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | WSEC requires a new tower as two structural analyses confirmed it is required. A new antenna & xmtr will be purchased to replicate coverage. Final xmtr facility will be constructed with new tower & antenna. See attached Transition plan document. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DCD20PL1 | |
Year | 2001 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 5 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAXTE-12 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 6.7 kW | |
Justification for New Transmitter | Existing Harris DiamondCD transmitter is not supported for new channel of operation. New xmtr will be needed. See transition plan document. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | Yes | |
Size | 3 inches | |
Length | 50.0 feet | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Heating and Cooling | |
Size | 10 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 150.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Interim |
Description of Use | N/A | |
Change Type | Lease New | |
Manufacturer | ||
Model | Custom | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 19 kW | |
Justification for New Transmitter | Transmitter is temporary unit self contained in a trailer with all cooling and RF interconnect included. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Portable generator to provide power for temporary transmitter. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A | |
Inside RF System | Is an additional interior RF system required to support this interim transmitter? | No |
Name | Description |
---|---|
Trailer rental |
trailer for temporary transmitter unit and associated equipment required for operation |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this antenna currently shared with any other stations? | No | |
Is this antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Other | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | Slot Antenna - single channel tuned | |
ERP: | 75.0 kW | |
Manufacturer | ||
Model | TFU-24GTH-R O4 | |
Year | 2002 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 80.8 kW | |
Manufacturer | ||
Model | ATW28H3-ETO12-18H | |
Year | 2019 | |
Justification for New Antenna | Existing antenna will not function on the assigned frequency. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 4 1/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Dehydrator |
Replace existing dehydration system no longer supported. |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 120.0 kW | |
Manufacturer | ||
Model | ALP24L3-HSO-18 | |
Year | 2020 | |
Justification for New Antenna | Antenna will be used as an interim until tower and top mount antenna is completed and installed. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | S | |
Feed Line Size | 4 1/16 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 4 1/16 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1000 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 4 1/16 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1000 feet per run | |
Justification for New Transmission Line | New transmission line must be in place at the time transmission begins on new tower or a loss of service will occur. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Construct New |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | No | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1221865 | |
Coordinates (NAD83) | Latitude (NAD83) | 39° 36' 09.2" N- |
Longitude (NAD83) | 090° 02' 47.4" W- | |
Overall Structure Height | 976.04 feet | |
Support Structure Height | 915.67 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 672.89 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | West Central Illinois Educational Telecommunications Corporation | |
Date Constructed | 09/23/2002 |
Users |
---|
W40CV-D |
Section | Question | Response |
---|---|---|
Construct New Tower | Use | Primary (Main) |
Description of Use | N/A | |
Is this a request for upgraded equipment? | No | |
Height | 912.00 feet | |
Justification for New Tower | Two structural analyses were conducted and both found that the existing structure and foundation do not meet current tower standard. See attachment WSEC Documentation for new tower.pdf (attached). |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Tower site restoration |
Installation of rock and fencing to be lease compliant. |
Interim Tower structural analysis |
Structural analysis to determine interim tower height available to support antenna for interim plan. |
Rental of heavy equipment mats. |
Rental of mats for heavy equipment for tower and foundation installation. |
STL-TSL Equipment |
Please refer to file - WSEC-Microwave Justification.PDF This tower is the 2nd in a string of 7 towers sending programming, transmitter control & telemetry between master control and our three broadcast stations. |
Weather Days for tower crew |
Additional costs for tower crew based on unforecasted weather days where it was impossible to work. |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Construct New |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | No | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1221865 | |
Coordinates (NAD83) | Latitude (NAD83) | 39° 36' 09.2" N- |
Longitude (NAD83) | 090° 02' 47.4" W- | |
Overall Structure Height | 976.04 feet | |
Support Structure Height | 915.67 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 672.89 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | West Central Illinois Educational Telecommunications Corporation | |
Date Constructed | 09/23/2002 |
Users |
---|
W40CV-D |
Section | Question | Response |
---|---|---|
Construct New Tower | Use | Primary (Main) |
Description of Use | N/A | |
Is this a request for upgraded equipment? | No | |
Height | 912.00 feet | |
Justification for New Tower | EXISTING STRUCTURE DOES NOT MEET CURRENT TOWER STANDARDS |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Construct New Tower | Use | Interim |
Description of Use | N/A | |
Height | 900.00 feet | |
Justification for New Tower | Existing tower will be rigged for interim antenna and existing transmission line will be used. |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Tower Inspection |
Post Construction Tower Inspection |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 320 | |
Explanation | 399 Forms assistance, onsite planning and supervision during transmitter, antenna & tower work; coordination of involved entities in the project. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Fiber equipment for WSEC |
See justification & explanation of lower tower cost without microwave. Fiber equipment replaces STL-TSL equipment. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,084,691.00 | $420,591.00 | N/A | $299,545.10 | N/A |
Total for all systems | $7,175,199.30 | $5,570,938.90 | N/A | $3,266,334.80 | N/A |
Interim Transmitter Custom | $708,991.00 | $47,991.00 | $22,995.24 | ||
Trailer rental | $20,991.00 | $20,991.00 | See Quote 20-0165-A | $20,991.00 | N/A |
Other Electrical Service: Portable generator to provide power for temporary transmitter. | $4,000.00 | $4,000.00 | N/A | $2,004.24 | N/A |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | $684,000.00 | $23,000.00 | N/A | $0.00 | N/A |
Primary Transmitter UAXTE-12 | $375,700.00 | $372,600.00 | $276,549.86 | ||
10 Ton system | $60,500.00 | $58,900.00 | N/A | $24,109.00 | N/A |
UHF - Air Cooled Solid State Transmitter 6.7 kW | $245,000.00 | $245,000.00 | N/A | $239,795.86 | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $14,050.00 | N/A | N/A | N/A |
3" Rigid Conduit and Wiring (Cost per foot) | $2,600.00 | $2,500.00 | N/A | N/A | N/A |
Other -- Building Addition Size: 150.0 | $15,000.00 | $15,000.00 | Building size expansion to accomodate new transmitter and HVAC ductwork. | $12,645.00 | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $37,150.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Trailer rental | |
Other Electrical Service: Portable generator to provide power for temporary transmitter. | |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | Information not provided. |
10 Ton system | |
UHF - Air Cooled Solid State Transmitter 6.7 kW | |
Service entrance 3 phase/800 amp/208 volt | Information not provided. |
3" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Other -- Building Addition Size: 150.0 | |
Switchgear - industrial 800 amp | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $665,000.00 | $241,105.60 | N/A | $215,529.48 | N/A |
Total for all systems | $7,175,199.30 | $5,570,938.90 | N/A | $3,266,334.80 | N/A |
Interim Antenna ALP24L3-HSO-18 | $105,700.00 | $56,300.00 | $39,466.15 | ||
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) | $9,570.00 | $9,570.00 | N/A | $0.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,730.00 | N/A | $0.00 | N/A |
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized | $89,400.00 | $40,000.00 | N/A | $39,466.15 | N/A |
Primary Antenna ATW28H3-ETO12-18H | $559,300.00 | $184,805.60 | $176,063.33 | ||
Dehydrator | $6,500.00 | $6,500.00 | N/A | $1,681.30 | Invoice WSEC-1000 is meant to replace Invoice WSEC-001. No additional payment is requested for Invoice WSEC-1000. |
Sweep test of existing antenna | $6,730.00 | $6,250.00 | Sweep test of new line and antenna. See ERI Proposal 20190207-592 Rev A | $6,250.00 | Invoice WSEC-1000 is meant to replace Invoice WSEC-001. No additional payment is requested for Invoice WSEC-1000. |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $72,785.60 | N/A | $72,785.60 | N/A |
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) | $9,570.00 | $9,320.00 | N/A | $5,396.43 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized | $247,000.00 | $89,950.00 | ***System Notice: Estimate adjusted and locked because line has been superseded.***ERI Proposal 20190207-592 Rev A- Attached. Price above indicates deduction for Hpol version. | $89,950.00 | N/A |
Actual Information Description | File Name |
---|---|
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) | Information not provided. |
Sweep test of existing antenna | Information not provided. |
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized | |
Dehydrator | |
Sweep test of existing antenna | |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | |
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) | |
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $142,000.00 | $135,000.00 | N/A | $134,669.33 | N/A |
Total for all systems | $7,175,199.30 | $5,570,938.90 | N/A | $3,266,334.80 | N/A |
Primary Transmission Line | $142,000.00 | $135,000.00 | $134,669.33 | ||
Rigid Transmission Line - copper, 4 1/16" | $142,000.00 | $135,000.00 | See ERI proposal 20190207-592 Rev A. This quote includes transmission line and air dryer. Additional materials not included in original proposal. | $134,669.33 | Inv WSEC-1000 intended to replace Inv WSEC-001 that was previously paid 70%. No additional payment is requested for Inv WSEC-1000. |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 4 1/16" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $5,065,769.00 | $4,417,870.00 | N/A | $2,351,521.81 | N/A |
Total for all systems | $7,175,199.30 | $5,570,938.90 | N/A | $3,266,334.80 | N/A |
Primary Tower TOWER | $0.00 | $0.00 | $0.00 | ||
Primary Tower TOWER | $0.00 | $0.00 | $0.00 | ||
Interim Tower | $237,000.00 | $26,501.00 | $6,471.00 | ||
Tower Inspection | $6,500.00 | $6,500.00 | Tower Inspection, post construction | $6,471.00 | N/A |
Tall Tower (greater than 500') | $210,500.00 | $1.00 | The interim tower is the existing tower so no modifications are necessary except rigging. | N/A | N/A |
New tower | $20,000.00 | $20,000.00 | N/A | $0.00 | N/A |
Primary Tower | $4,129,269.00 | $3,902,369.00 | $1,860,009.41 | ||
New tower | $1,842,469.00 | $1,842,469.00 | See attached quote 20190207-592 REV. D | $0.00 | Inv WSEC-1000 intended to replace Inv WSEC-001 that was previously reimbursed 70%. No additional funds requested for WSEC-1000. |
New tower | $1,852,000.00 | $1,852,000.00 | Estimate increased to include freight on final delivery. See ERI Proposal 20190207-592. Manufacture (discounted), construct and equip replacement 912' tower and decommission existing tower. | $1,850,109.41 | N/A |
Interim Tower structural analysis | $1,200.00 | $1,200.00 | N/A | N/A | N/A |
STL-TSL Equipment | $0.00 | $0.00 | Please refer to file - WSEC - Microwave Justification ... and per quote from Heartland Video Systems - see file - WSEC - HVS Commscope Antennas Gear.PDF. This amount is zero as fiber equipment costs were substituted for microwave equipment & install. | N/A | N/A |
Tall Tower (greater than 500') | $210,500.00 | $200,000.00 | Replacement antennae and waveguide for microwave on new tower plus rigging to remove old antennae and replaced tower structure once new structure is complete and online. | $3,200.00 | N/A |
Structural engineering tower load study for well documented tower | $12,600.00 | $6,700.00 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $6,700.00 | N/A |
Tall Tower (greater than 500') | $210,500.00 | $0.00 | N/A | N/A | N/A |
Primary Tower | $699,500.00 | $489,000.00 | $485,041.40 | ||
Interim Tower structural analysis | $0.00 | $0.00 | N/A | N/A | N/A |
Tall Tower (greater than 500') | $210,500.00 | $0.00 | N/A | N/A | N/A |
New tower | $0.00 | $0.00 | N/A | N/A | N/A |
Rental of heavy equipment mats. | $397,000.00 | $397,000.00 | second round of crane mats and temporary stone road required for installation of equipment and to protect property around the tower site. | $395,565.00 | N/A |
Weather Days for tower crew | $30,000.00 | $30,000.00 | N/A | $29,830.00 | N/A |
STL-TSL Equipment | $0.00 | $0.00 | N/A | N/A | N/A |
Tower site restoration | $62,000.00 | $62,000.00 | install fencing around guy anchors and the transmitter/tower compound; install ground cover inside the fenced areas. | $59,646.40 | N/A |
Actual Information Description | File Name |
---|---|
Tower Inspection | |
Tall Tower (greater than 500') | Information not provided. |
New tower | Information not provided. |
New tower | |
New tower | |
Interim Tower structural analysis | Information not provided. |
STL-TSL Equipment | Information not provided. |
Tall Tower (greater than 500') | |
Structural engineering tower load study for well documented tower | |
Tall Tower (greater than 500') | Information not provided. |
Interim Tower structural analysis | Information not provided. |
Tall Tower (greater than 500') | Information not provided. |
New tower | Information not provided. |
Rental of heavy equipment mats. | |
Weather Days for tower crew | |
STL-TSL Equipment | Information not provided. |
Tower site restoration |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $83,960.00 | $224,145.00 | N/A | $187,259.83 | N/A |
Total for all systems | $7,175,199.30 | $5,570,938.90 | N/A | $3,266,334.80 | N/A |
Outside Professional Services | $83,960.00 | $224,145.00 | $187,259.83 | ||
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $2,050.00 | N/A | N/A | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,095.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $4,500.00 | Please refer to uploaded file "WSEC Legal Counsel Budget.PDF" -- Additional legal counsel costs incurred due to unanticipated need for a new tower at this site. | $2,416.50 | Additional legal counsel required due to problems with 'saving' the 399 schedule without losing tower work dollar amounts. Received numerous errors on "saving & exiting'. Required repeated contact with FCC I.T. personnel (Raphael) to rectify. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $65,000.00 | Additional amount added to budget for legal counsel expenses due to legal complexities associated with unanticipated construction of a new tower at this site. | $55,689.66 | Additional legal fees due to unanticipated need to replace tower. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $2,343.50 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | N/A | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Project management of the transition | $50,560.00 | $130,000.00 | Unanticipated equipment delays and project changes required additional engineering services beyond the initial expectations. | $126,810.17 | Unanticipated equipment delays and project changes required additional engineering services beyond the initial expectations. |
Actual Information Description | File Name |
---|---|
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | Information not provided. |
ASR modification (prepare FCC Form 854) | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | Information not provided. |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form | Information not provided. |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $133,779.30 | $132,227.30 | N/A | $77,809.25 | N/A |
Total for all systems | $7,175,199.30 | $5,570,938.90 | N/A | $3,266,334.80 | N/A |
Other Expenses | $133,779.30 | $132,227.30 | $77,809.25 | ||
Fiber equipment for WSEC | $90,394.30 | $90,394.30 | This cost is substituted in place of the microwave STL-TSL equipment and installation services. See attached justification and quote from HVS for fiber equipment. | $70,511.25 | N/A |
MVPD Notification of Channel Change | $5,000.00 | $5,000.00 | N/A | $2,758.00 | N/A |
Develop and air announcement of upcoming channel change | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Equipment Storage | $2,500.00 | $2,500.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $15,000.00 | $15,000.00 | Tx @ 5400 Antenna @ 7700 Misc @ 1900 | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $4,000.00 | $4,000.00 | Antenna, transmitter, packaging materials. | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $333.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $10,000.00 | N/A | $4,540.00 | N/A |
Actual Information Description | File Name |
---|---|
Fiber equipment for WSEC | |
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | Information not provided. |
Equipment Delivery and Handling Charges | Information not provided. |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $7,175,199.30 | $5,570,938.90 | $3,266,334.80 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Dan Mahony President, Southern Illinois University 04/20/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Dan Mahony President, Southern Illinois University 04/20/2022 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Dan Mahony President, Southern Illinois University 04/20/2022 |