Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
SCRIPPS BROADCASTING HOLDINGS LLC Doing Business As: SCRIPPS BROADCASTING HOLDINGS LLC |
DAVE GILES 312 WALNUT STREET 28TH FLOOR CINCINNATI, OH 45202 United States |
+1 (513) 977-3000 | DAVE.GILES@SCRIPPS.COM | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Dan Perschke Assistant Controller The E.W. Scripps Company |
Dan Perschke 312 Walnut Street 2800 Scripps Center CINCINNATI, OH 45202 United States |
+1 (513) 898-4050 | daniel.perschke@scripps.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | American tower is replacing the shared combiner system to accommodate the repacked stations. Replace the WTVR Transmitter |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Backup | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Inovator HU5000BD | |
Year | 2008 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 5 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAXTE-8 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 4.8 kW | |
Justification for New Transmitter | Current transmitter is not supported by manufacturer see justification. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | 100 Amp 208 service | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Auxiliary Transmitter Installation |
Auxiliary Transmitter Installation |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | DCX-1 | |
Year | 2002 | |
Type | Inductive Output Tube | |
IOT Power Type | Single | |
Power Capacity | 25 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-50 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 32 kW | |
Justification for New Transmitter | Current transmitter can not be re-tuned as stated by the manufacturer. One step up from minimum size is ULXTE-50 |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 200.0 feet | |
Other Electrical Service | Yes | |
Description | Wiring for primary transmitter and other electrical expenses | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Primary Transmitter - Transmitter Installation |
Primary Transmitter - Transmitter Installation |
Ice Bridge |
Ice Bridge over cooling system |
Primary Transmitter Mask Filter |
Mask filter for the primary transmitter |
Primary Transmitter Demolition |
Primary Transmitter Demolition |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Retune Existing |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Owner | American Tower | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Top | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 2 | |
Number of Panels | 14 | |
Design power capacity in use | 90.0 % | |
Lower Limit | 470.00 MHz | |
Upper Limit | 700.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 1500.0 kW | |
Manufacturer | Dielectric | |
Model | TUD-05-14/70H-1-B | |
Year | 2002 |
Facility ID | Call Sign |
---|---|
74416 | WRIC-TV |
Section | Question | Response |
---|---|---|
Sweep Test of Existing Antenna | Do you need a sweep test of existing antenna? | Yes |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 2 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A |
RF Channel Number |
---|
28 |
23 |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 200 | |
Explanation | Landlord management services for shares antenna system modification | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
For Auxiliary Facility | N/A | |
For Main Facility | N/A | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Address transition timing and coordination issues w/ other stations and wireless providers | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,443,517.40 | $1,346,278.91 | N/A | $1,000,465.20 | N/A |
Total for all systems | $1,632,043.30 | $1,581,904.21 | N/A | $1,161,960.30 | N/A |
Primary Transmitter ULXTE-50 | $1,188,761.02 | $1,185,961.02 | $849,163.86 | ||
Primary Transmitter Demolition | $1,368.00 | $1,368.00 | Please see WTVR-TV Transmitter Demolition Budget Revision Justification Letter | $1,368.00 | N/A |
Primary Transmitter Mask Filter | $44,008.85 | $44,008.85 | Please see WTVR GatesAir quote Q-78565 | $44,008.85 | N/A |
Ice Bridge | $36,000.00 | $36,000.00 | N/A | $35,104.52 | N/A |
Primary Transmitter - Transmitter Installation | $105.60 | $105.60 | Please see WTVR-TV Primary Transmitter - Transmitter Installation Budget Revision Justification Letter | $105.60 | N/A |
2" Rigid Conduit and Wiring (Cost per foot) | $5,200.00 | $5,000.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | N/A | N/A | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $13,700.00 | N/A | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 32 kW | $971,423.00 | $971,423.00 | N/A | $690,521.32 | N/A |
Other Electrical Service: Wiring for primary transmitter and other electrical expenses | $78,055.57 | $78,055.57 | Please see Estimated Cost Justification WTVR-TV-110-1st Primary Transmitter - Other Electrical v1 | $78,055.57 | N/A |
Auxiliary Transmitter UAXTE-8 | $254,756.38 | $160,317.89 | $151,301.34 | ||
Auxiliary Transmitter Installation | $8,883.45 | $8,883.45 | Please see GatesAir quote Q-86090 | $8,883.45 | N/A |
UHF - Air Cooled Solid State Transmitter 4 - 6 kW | $236,500.00 | $142,061.51 | Please see Estimated Cost Justification WTVR-TV-150-1st Auxiliary Transmitter - UHF Air Cooled Solid State, 4.8 kW V0 | $133,044.96 | N/A |
Other Electrical Service: 100 Amp 208 service | $9,372.93 | $9,372.93 | see Estimated Cost Justification WTVR-TV-150-1st Auxiliary Transmitter - Other Electrical Service v2 | $9,372.93 | N/A |
Actual Information Description | File Name |
---|---|
Primary Transmitter Demolition | |
Primary Transmitter Mask Filter | |
Ice Bridge | |
Primary Transmitter - Transmitter Installation | |
2" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Switchgear - industrial 800 amp | Information not provided. |
Service entrance 3 phase/800 amp/208 volt | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 32 kW | |
Other Electrical Service: Wiring for primary transmitter and other electrical expenses | |
Auxiliary Transmitter Installation | |
UHF - Air Cooled Solid State Transmitter 4 - 6 kW | |
Other Electrical Service: 100 Amp 208 service |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $90,930.00 | $86,400.00 | N/A | $61,285.00 | N/A |
Total for all systems | $1,632,043.30 | $1,581,904.21 | N/A | $1,161,960.30 | N/A |
Primary Antenna TUD-05-14/70H-1-B | $90,930.00 | $86,400.00 | $61,285.00 | ||
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | $4,000.00 | N/A |
New combiner, cost per channel (without antenna) | $84,200.00 | $80,000.00 | N/A | $57,285.00 | N/A |
Actual Information Description | File Name |
---|---|
Sweep test of existing antenna | |
New combiner, cost per channel (without antenna) |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $75,000.00 | $127,174.40 | N/A | $80,848.40 | N/A |
Total for all systems | $1,632,043.30 | $1,581,904.21 | N/A | $1,161,960.30 | N/A |
Outside Professional Services | $75,000.00 | $127,174.40 | $80,848.40 | ||
RF Exposure Measurements | $21,050.00 | $10,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $1,275.80 | Please see WTVR-TV Attorney - Special Temporary Authorization Budget Revision Justification Letter. The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $1,275.80 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,003.75 | Please see WTVR-TV Attorney - Other Matters Budget Revision Justification Letter.pdf. The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $4,003.75 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $719.85 | Please see WTVR-TV Attorney - License to Cover (main) Budget Revision Justification Letter.pdf | $719.85 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $300.00 | N/A |
Project management of the transition | $31,600.00 | $99,675.00 | see Estimated Cost Justification WTVR-TV-510-Project Management v0 | $69,549.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $5,000.00 | N/A |
Actual Information Description | File Name |
---|---|
RF Exposure Measurements | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Project management of the transition | |
Perform engineering study for new channel assignment and antenna development |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $22,595.90 | $22,050.90 | N/A | $19,361.70 | N/A |
Total for all systems | $1,632,043.30 | $1,581,904.21 | N/A | $1,161,960.30 | N/A |
Other Expenses | $22,595.90 | $22,050.90 | $19,361.70 | ||
MVPD Notification of Channel Change | $5,000.00 | $5,000.00 | N/A | $3,738.30 | N/A |
Develop and air announcement of upcoming channel change | $0.00 | $0.00 | N/A | N/A | N/A |
Equipment Storage | $3,635.90 | $3,635.90 | Please see Estimated Cost Justification WTVR-TV-610-Equipment Storage V1 | $3,635.90 | N/A |
Equipment Delivery and Handling Charges | $1,880.00 | $1,880.00 | Please see Virginia Rigging and Crating, Inc. quote dated June 11, 2020 | $1,880.00 | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $200.00 | Please see WTVR-TV FCC Filing Fees - STA Budget Revision Justification Letter.pdf | $200.00 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | Please see WTVR-TV FCC Filing Fees - LTC Budget Revision Justification Letter.pdf | $335.00 | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | $9,572.50 | N/A |
Actual Information Description | File Name |
---|---|
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | |
Equipment Delivery and Handling Charges | |
FCC Filing Fees - Special Temporary Authorization request | |
FCC Filing Fees - Form 2100 license to cover application | |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $1,632,043.30 | $1,581,904.21 | $1,161,960.30 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Sravan Reddy Senior Director, General Accounting 02/14/2022 |