Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
WALKER RIVER PAIUTE TRIBE Applicant Doing Business As: WALKER RIVER PAIUTE TRIBE |
Roy Begay, Walker River Paiute Tribe P. O. BOX 220 1022 Hospital Road SCHURZ, NV 89427 United States |
+1 (775) 773-2002 | rbegay@wrpt.org | Other |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Roy Begay Nonpoint Source Coordinator Walker River Paiute Tribe |
Roy Begay, Walker River Paiute Tribe P.O. Box 220 1022 Hospital Road Schurz, NV 89427 United States |
+1 (775) 773-2002 | rbegay@wrpt.org |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Our Facility ID: 70727 currently is not sharing with another station, but has other Translators Equipment for other TV Station Channels (ABC, CBS, Fox, and PBS) housed in the same room. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | No |
Prepare engineering section of Form FCC Construction Permit Application | No | |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | No |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | No | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Tim Stoffel |
Engineering service, equipment installation and assistance to re-channel other equipment for re-pack. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Name | Description |
---|---|
Mask Filter Equipment |
Mask equipment purchased to meet standards for the re-pack translator. |
Parts for Mask Filter |
Connector parts for new mast filter. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,957.50 | $843.75 | N/A | $0.00 | N/A |
Total for all systems | $3,258.49 | $2,273.47 | N/A | $0.00 | N/A |
Outside Professional Services | $1,957.50 | $843.75 | $0.00 | ||
Tim Stoffel | $380.00 | $380.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $463.75 | N/A | N/A | N/A |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,300.99 | $1,429.72 | N/A | $0.00 | N/A |
Total for all systems | $3,258.49 | $2,273.47 | N/A | $0.00 | N/A |
Other Expenses | $1,300.99 | $1,429.72 | $0.00 | ||
Mask Filter Equipment | $829.36 | $829.36 | The Tribe purchased new equipment to meet standards for the re-pack, the Mask Filter was tuned to meet transition to new channel. | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $463.73 | Attorney fees for license to cover CP for TV Translator. | N/A | N/A |
Parts for Mask Filter | $136.63 | $136.63 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $3,258.49 | $2,273.47 | $0.00 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |