FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
48977
Service:
LPT
Call Sign:
K20OC-D
Channel:
20 (UHF)
File Number:
0000089908
FRN:
0018223693
Eligibility Status:
Eligible
Date Submitted:
01/24/2022

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

GRAY TELEVISION LICENSEE, LLC

4370 PEACHTREE RD NE

ATLANTA, GA 30319

United States

+1 (404) 504-9828 Robert.Folliard@gray.tv Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Samuel Hariton

WIDELITY

Samuel Hariton

4031 University Dr

Suite 100

Fairfax, VA 22030

United States

+1 (339) 222-8107 sam.hariton@widelity.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan K18AB-D is planning purchase of an upgraded transmitter, a like-for-like antenna and transmission line, using the same tower.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Ownership Owned
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model MI501U
Year 2012
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 0.25 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model UAXTE-2
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 1.2 kW
Justification for New Transmitter The existing transmitter cannot be retuned to the new channel.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Other Transmitter Costs
Does the transmitter installation require a Transmitter Building Site Survey/Installation? No
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Rigid Conduit and Wiring Yes
Size 2 inches
Length 60.0 feet
Other Electrical Service Yes
Description The new main transmitter will require reconfiguration of the electrical service on site. See attached "Justification Other Electrical Service Lawrence Electric Co"
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Heating and Cooling
Size Other
Other Size 3 tons
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Primary Transmitter - Other Expenses

Primary Transmitter - Other Expenses

Mask Filter

Standard 1250 W Mask Filter included in transmitter quote

Electrical work to support transmitter and HVAC units

Electrical work to support transmitter and HVAC units

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Ownership Owned
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
ERP: 2.54 kW
Manufacturer
Model DLP-8
Year 2013

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Change Type Purchase New
Ownership Owned
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
ERP: 9.2 kW
Manufacturer
Model DLP-8
Year 2019
Justification for New Antenna The new antenna is necessary because the existing antenna is single channel and not re-tunable. The increase in power is due to the upgraded transmitter. The new antenna is like-for-like.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? No

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Ownership Owned
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Flexible Foam
Diameter 1 5/8 inches
Number of parallel runs 1
Length 100 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Flexible Foam
Diameter 1 5/8 inches
Number of parallel runs 1
Length 100 feet per run
Justification for New Transmission Line The new line is required in order to terminate the new transmitter with different connector types.
Interior RF Systems Does the Installation of the Transmission Line require an additional or replacement Inside RF system including switching, patch panels, and dehydrators? No

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
Is tower documented for structural analysis? No
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? No
Coordinates (NAD83) Latitude (NAD83) 33° 12' 42.0" N-
Longitude (NAD83) 092° 39' 50.3" W-
Overall Structure Height 96.00 feet
Support Structure Height 59.00 feet
Ground Elevation Above Mean Sea Level (AMSL) 279.00 feet
Structure Type BMAST - Building with Mast
Tower Owner Bankcorp South
Date Constructed 01/01/1969


Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: No study needed
Tower Reinforcements Please select whether tower reinforcements are needed: No reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 254
Explanation K18AB-D does not have sufficient resource capacity and expertise in house to handle all of the reimbursement filing, expense tracking, vendor coordination, progress reporting, budget creation, budget review, budget tracking, daisy-chain monitoring and all
Outside RF consulting Engineering Services Perform engineering study for displacement application Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority No
Prepare Form 601 Yes
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Form 399 assistance or other program management costs No
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service No

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Permit and Filing Costs FCC Construction Permit Major Change Yes
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? No
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? No
Does this relocation require Equipment Storage? No
Point to Point Microwave (STL/ICR) Frequency Coordination for Unidirection System No
Frequency Coordination for Bi-Direction System No
New Point to Point Microwave System No

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $107,929.56 $49,101.72 N/A $43,293.77 N/A
Total for all systems $217,721.14 $138,982.98 N/A $100,802.13 N/A
Primary Transmitter UAXTE-2 $107,929.56 $49,101.72 $43,293.77
Other -- HVAC Service Type: H Size:3 (Other) $9,178.00 $9,178.00 see Estimated Cost Justification K18AB-D-110-Primary Transmitter - HVAC Service v0 $5,298.00 N/A
2" Rigid Conduit and Wiring (Cost per foot) $1,560.00 $1,500.00 Estimate based on catalog pricing. N/A N/A
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW $84,000.00 $25,232.16 Please see Estimated Cost Justification K20OC-D-110-Primary Transmitter - UHF Air Cooled Solid State, 1 - 2.5kW v0 $25,232.16 N/A
Primary Transmitter - Other Expenses $1,524.04 $1,524.04 Please see K20OC-D Heartland Video quote WISQ53484-01, plus actual freight on invoice 66556 $1,524.03 N/A
Mask Filter $4,074.58 $4,074.58 Please see K18AB-D GatesAir Quote Q-78495 $3,646.64 N/A
Electrical work to support transmitter and HVAC units $6,805.65 $6,805.65 Please see "BANCORP TRANSMITTER BLDG PROP" $6,805.65 N/A
Other Electrical Service: The new main transmitter will require reconfiguration of the electrical service on site. See attached "Justification Other Electrical Service Lawrence Electric Co" $787.29 $787.29 Please see "Justification Other Electrical Services Lawrence Electric Co" $787.29 N/A

Components

Actual Information Description File Name
Other -- HVAC Service Type: H Size:3 (Other)

Component Description:
safe T switch for DMSS, HVAC Quote
Amount:
$5,298.00
2" Rigid Conduit and Wiring (Cost per foot) Information not provided.
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW

Component Description:
UATE-2 High Efficiency Transmitter
Amount:
$25,232.16
Primary Transmitter - Other Expenses

Component Description:
Other Expenses
Amount:
$1,524.03
Mask Filter

Component Description:
Freight, Mask 1.25KW
Amount:
$3,646.64
Electrical work to support transmitter and HVAC units

Component Description:
Total Lump Sum
Amount:
$6,805.65
Other Electrical Service: The new main transmitter will require reconfiguration of the electrical service on site. See attached "Justification Other Electrical Service Lawrence Electric Co"

Component Description:
Install 220V outlets and install duplex receptacle, ran conduit, pulled wire
Amount:
$787.29

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $5,977.08 $5,977.08 N/A $5,977.08 N/A
Total for all systems $217,721.14 $138,982.98 N/A $100,802.13 N/A
Primary Antenna DLP-8 $5,977.08 $5,977.08 $5,977.08
UHF-Low Power, Side Mount, Slotted Coaxial, 9.2kW input, Horizontal $5,977.08 $5,977.08 see Estimated Cost Justification K18AB-D-210-Primary Antenna - UHF Low Power Side Mount, H-POL v0 $5,977.08 N/A

Components

Actual Information Description File Name
UHF-Low Power, Side Mount, Slotted Coaxial, 9.2kW input, Horizontal

Component Description:
UHF Low Power Side Mount
Amount:
$5,977.08

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $2,400.00 $2,061.43 N/A $2,061.43 N/A
Total for all systems $217,721.14 $138,982.98 N/A $100,802.13 N/A
Primary Transmission Line $2,400.00 $2,061.43 $2,061.43
Flexible Foam Transmission Line - dielectric, 1 5/8" $2,400.00 $2,061.43 Estimated Cost Justification K18AB-D-310-Primary Transmission Line - 1 5_8_ Flexible Foam Dielectric v1 $2,061.43 a

Components

Actual Information Description File Name
Flexible Foam Transmission Line - dielectric, 1 5/8"

Component Description:
K18AB-D-310-Primary Transmission Line - 1 5/8" Flexible Foam Dielectric
Amount:
$1,775.17

Component Description:
Jumper flex 7/8 5ft long with 7/16 din male conn
Amount:
$286.26

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $56,190.00 $20,742.75 N/A $20,742.75 N/A
Total for all systems $217,721.14 $138,982.98 N/A $100,802.13 N/A
Primary Tower BMAST $56,190.00 $20,742.75 $20,742.75
Tower Rigging Short Tower (less than 500') $56,190.00 $20,742.75 see Estimated Cost Justification K18AB-D-410-Primary Tower - Tower Rigging v0 $20,742.75 N/A

Components

Actual Information Description File Name
Tower Rigging Short Tower (less than 500')

Component Description:
Low Power Antenna Install
Amount:
$6,914.25

Component Description:
Low Power Antenna install
Amount:
$6,914.25

Component Description:
Low power antenna install
Amount:
$6,914.25

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $38,819.50 $54,695.00 N/A $28,727.10 N/A
Total for all systems $217,721.14 $138,982.98 N/A $100,802.13 N/A
Outside Professional Services $38,819.50 $54,695.00 $28,727.10
Project management of the transition $26,797.00 $41,910.00 Please see K18AB-D LPTV Strategic Support Quote $26,164.60 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $1,577.50 $1,577.50 N/A N/A N/A
Prepare Form 601 $755.00 $755.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $3,025.00 $3,025.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,052.50 $1,052.50 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $2,102.50 $2,102.50 N/A N/A N/A
Perform engineering study for displacement application $1,800.00 $2,562.50 Please see Estimated Cost Justification K18AB-D-530-RF Eng - Engineering Study for Displacement Application v0 $2,562.50 N/A
Prepare/ Review 399 reimbursement form $1,710.00 $1,710.00 N/A N/A N/A

Components

Actual Information Description File Name
Project management of the transition

Component Description:
Project Management
Amount:
$144.85

Component Description:
Project Management
Amount:
$98.70

Component Description:
Project Management
Amount:
$155.00

Component Description:
Project Management
Amount:
$2,811.30

Component Description:
Project Management
Amount:
$193.75

Component Description:
Project Management
Amount:
$409.20

Component Description:
Project management
Amount:
$172.35

Component Description:
Project Management
Amount:
$38.75

Component Description:
Project Management
Amount:
$205.95

Component Description:
Project Management
Amount:
$708.40

Component Description:
Project Management
Amount:
$113.65

Component Description:
Project management
Amount:
$298.90

Component Description:
Project Management
Amount:
$49.45

Component Description:
Project Management
Amount:
$77.50

Component Description:
Project management
Amount:
$38.75

Component Description:
Project management
Amount:
$159.00

Component Description:
Project Management
Amount:
$38.75

Component Description:
Project Management
Amount:
$288.45

Component Description:
Project Management
Amount:
$155.00

Component Description:
Project Management
Amount:
$545.30

Component Description:
Project Management
Amount:
$1,391.60

Component Description:
Project Management
Amount:
$2,897.15

Component Description:
Project Management
Amount:
$3,992.45

Component Description:
Project Management
Amount:
$570.40

Component Description:
Project Management
Amount:
$25.35

Component Description:
Project management
Amount:
$348.00

Component Description:
Project management
Amount:
$3,831.65

Component Description:
Project management
Amount:
$2,403.25

Component Description:
Project Management
Amount:
$764.95

Component Description:
Project Management
Amount:
$61.40

Component Description:
Project Management
Amount:
$206.40

Component Description:
Project Management
Amount:
$1,231.95

Component Description:
Project Management
Amount:
$1,737.05
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare Form 601 Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
Perform engineering study for displacement application

Component Description:
Consulting Engineer - Hourly
Amount:
$525.00

Component Description:
Engineer Consulting
Amount:
$837.50

Component Description:
Regarding Ch-18 translator's displacement to Ch-20
Amount:
$1,200.00
Prepare/ Review 399 reimbursement form Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $6,405.00 $6,405.00 N/A $0.00 N/A
Total for all systems $217,721.14 $138,982.98 N/A $100,802.13 N/A
Other Expenses $6,405.00 $6,405.00 $0.00
FCC Filing Fees - Form 2100 Major change CP application $4,960.00 $4,960.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $335.00 N/A N/A N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,110.00 N/A N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $217,721.14 $138,982.98 $100,802.13

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Robert Folliard , III .

Assistant Secretary


01/24/2022

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Robert Folliard , III .

Assistant Secretary


01/24/2022