Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
166986
Service:
LPD
Call Sign:
W25FC-D
Channel:
25 (UHF)
File Number:
0000089498
FRN:
0011406899
Eligibility Status:
Eligible
Date Submitted:
01/20/2022

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

Combs Broadcasting, Inc.

1812 5th Ave. South

Jasper, AL 35501

United States

+1 (205) 648-3000 jchautin@hardycarey.com Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Tony Zummallen

Anywave Communication Technologies

Tony Zummallen

300 Knightsbridge Parkway

Suite 150

Lincolnshire, IL 60069

United States

+1 (816) 882-5600 Tony@qcomm.tv

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan Replace the transmitter and antenna per the channel reassignment project using reasonable and customary engineering and business practices.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Ownership Owned
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model 800W
Year 2012
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 800 W

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model TRN-U-2000-FA
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 2.2 kW
Justification for New Transmitter New transmitter required for new channel.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Other Transmitter Costs
Does the transmitter installation require a Transmitter Building Site Survey/Installation? Yes
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Rigid Conduit and Wiring No
Other Electrical Service No
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 5 tons
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Shipping

Estimated shipping

Decommission

De-install old transmitter

Taxes

Estimated sales tax

Site Prep

Prepare site for new transmitter

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Ownership Owned
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
ERP: 15.0 kW
Manufacturer
Model 16-bay
Year 2012

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Change Type Purchase New
Ownership Owned
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
ERP: 15.0 kW
Manufacturer
Model ATC-BCH416M-25
Year 2019
Justification for New Antenna New antenna required for new channel.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? No
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Shipping

Estimated shipping and freight

Taxes

Estimated sales tax

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? No

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
Is tower documented for structural analysis? Unknown
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1050552
Coordinates (NAD83) Latitude (NAD83) 33° 50' 42.0" N-
Longitude (NAD83) 087° 18' 26.0" W-
Overall Structure Height 606.95 feet
Support Structure Height 606.95 feet
Ground Elevation Above Mean Sea Level (AMSL) 390.42 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner Combs Broadcasting, Inc.
Date Constructed 01/01/1968


Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Tower mapping and report for structural engineer
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 100
Explanation Required to assist in the turnkey management of the channel relocation project in order that the existing internal personnel can maintain and operate the stations daily operational requirements and plans.
Outside RF consulting Engineering Services Perform engineering study for displacement application Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Prepare Form 601 Yes
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Form 399 assistance or other program management costs Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements No
Additional Field Engineering Service Yes
Number of Days 5
Justification Estimated field engineering services during transition activities.

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

General Engineering

Engineering consultations pertaining to REPACK

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Permit and Filing Costs FCC Construction Permit Major Change Yes
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Point to Point Microwave (STL/ICR) Frequency Coordination for Unidirection System No
Frequency Coordination for Bi-Direction System No
New Point to Point Microwave System No

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $126,106.04 $99,898.04 N/A $74,148.04 N/A
Total for all systems $462,861.04 $455,829.24 N/A $161,834.24 N/A
Primary Transmitter TRN-U-2000-FA $126,106.04 $99,898.04 $74,148.04
Site Prep $5,156.04 $5,156.04 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic $5,156.04 N/A
Transmitter Building Site Survey/Installation $10,000.00 $11,500.00 Cost determined by invoices. $11,500.00 N/A
Taxes $2,000.00 $2,000.00 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic $0.00 N/A
Decommission $3,500.00 $3,500.00 Estimated costs to de-install, disconnect and decommission old transmitter in preparation for new transmitter. $0.00 N/A
Shipping $1,200.00 $1,200.00 Estimated shipping costs not included on quote. Actual costs to be determined. $1,200.00 N/A
5 Ton system $20,250.00 $20,250.00 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic $0.00 N/A
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW $84,000.00 $56,292.00 Cost determined by invoice $56,292.00 N/A

Components

Actual Information Description File Name
Site Prep

Component Description:
Cost of Site Prep
Amount:
$5,156.04
Transmitter Building Site Survey/Installation

Component Description:
Transmitter install and site survey
Amount:
$11,500.00

Component Description:
Transmitter installation
Amount:
$8,200.00

Component Description:
Credit memo for tx installation
Amount:
($8,200.00)
Taxes Information not provided.
Decommission Information not provided.
Shipping

Component Description:
Cost of shipping
Amount:
$1,200.00
5 Ton system Information not provided.
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW

Component Description:
Cost of Transmitter
Amount:
$56,292.00

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $31,355.00 $31,355.00 N/A $18,000.00 N/A
Total for all systems $462,861.04 $455,829.24 N/A $161,834.24 N/A
Primary Antenna ATC-BCH416M-25 $31,355.00 $31,355.00 $18,000.00
Sweep test of transmission line and antenna $5,730.00 $5,730.00 N/A N/A N/A
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal $18,000.00 $18,000.00 Per attached Alive quote. $18,000.00 N/A
Shipping $1,000.00 $1,000.00 Estimated shipping costs not included on quote. Actual costs to be determined. $0.00 N/A
Taxes $2,000.00 $2,000.00 Estimated sales tax N/A N/A
Side Mount antenna brackets $4,625.00 $4,625.00 N/A N/A N/A

Components

Actual Information Description File Name
Sweep test of transmission line and antenna Information not provided.
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal

Component Description:
Cost of antenna
Amount:
$18,000.00
Shipping Information not provided.
Taxes Information not provided.
Side Mount antenna brackets Information not provided.

Cost Information

Back to Top

Transmission Line

Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $188,750.00 $193,000.00 N/A $54,300.00 N/A
Total for all systems $462,861.04 $455,829.24 N/A $161,834.24 N/A
Primary Tower TOWER $188,750.00 $193,000.00 $54,300.00
Tower Rigging Tall Tower (greater than 500') $157,750.00 $157,750.00 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic $29,050.00 N/A
Minor tower reinforcement/modifications $10,000.00 $10,000.00 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic N/A N/A
Tower mapping and report for structural engineer $21,000.00 $25,250.00 Estimate determined by invoices. $25,250.00 N/A

Components

Actual Information Description File Name
Tower Rigging Tall Tower (greater than 500')

Component Description:
Antenna install
Amount:
$29,050.00
Minor tower reinforcement/modifications Information not provided.
Tower mapping and report for structural engineer

Component Description:
Structural Analysis
Amount:
$25,250.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $103,440.00 $118,366.20 N/A $15,386.20 N/A
Total for all systems $462,861.04 $455,829.24 N/A $161,834.24 N/A
Outside Professional Services $103,440.00 $118,366.20 $15,386.20
General Engineering $3,100.00 $3,100.00 Cost determined by invoices $3,100.00 N/A
Additional Field Engineering Service, 5 Days $12,500.00 $12,500.00 Estimated field engineering services during transition activities. N/A N/A
Comprehensive coverage verification via field study, if needed $52,600.00 $52,600.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $2,235.00 $2,235.00 N/A N/A N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $3,262.50 $3,262.50 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $1,577.50 $1,577.50 N/A N/A N/A
Prepare Form 601 $755.00 $755.00 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $3,025.00 $3,025.00 N/A N/A N/A
Prepare/ Review 399 reimbursement form $1,710.00 $11,786.20 Cost determined by invoices. $11,786.20 N/A
Prepare request for Special Temporary Authorization $1,280.00 $1,280.00 N/A N/A N/A
Project management of the transition $10,550.00 $15,400.00 Estimated 100 hours at $154/hour N/A N/A
Form 399 assistance or other Program Management costs $5,890.00 $5,890.00 Per attached Anywave quote. $500.00 N/A
Perform engineering study for displacement application $1,800.00 $1,800.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $2,102.50 $2,102.50 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,052.50 $1,052.50 N/A N/A N/A

Components

Actual Information Description File Name
General Engineering

Component Description:
Engineering Consultation
Amount:
$600.00

Component Description:
Engineering Consultation
Amount:
$1,500.00

Component Description:
Egnineering consultation
Amount:
$1,000.00
Additional Field Engineering Service, 5 Days Information not provided.
Comprehensive coverage verification via field study, if needed Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees - Negotiation of lease and other matters for shared locations Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare Form 601 Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare/ Review 399 reimbursement form

Component Description:
399 Form submittal
Amount:
$2,500.00

Component Description:
PM Paperwork
Amount:
$154.00

Component Description:
PM Paperwork
Amount:
$800.80

Component Description:
Pm Paperwork
Amount:
$1,170.40

Component Description:
PM Paperwork
Amount:
$693.00

Component Description:
PM Paperwork
Amount:
$1,324.40

Component Description:
PM Paperwork
Amount:
$831.60

Component Description:
PM Paperwork
Amount:
$1,170.40

Component Description:
PM Paperwork
Amount:
$831.60

Component Description:
PM Paperwork
Amount:
$1,247.40

Component Description:
PM Paperwork
Amount:
$1,262.80

Component Description:
PM Paperwork
Amount:
$1,801.80
Prepare request for Special Temporary Authorization Information not provided.
Project management of the transition Information not provided.
Form 399 assistance or other Program Management costs

Component Description:
399 assistance
Amount:
$500.00
Perform engineering study for displacement application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $13,210.00 $13,210.00 N/A $0.00 N/A
Total for all systems $462,861.04 $455,829.24 N/A $161,834.24 N/A
Other Expenses $13,210.00 $13,210.00 $0.00
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,110.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $335.00 N/A N/A N/A
FCC Filing Fees - Form 2100 Major change CP application $4,960.00 $4,960.00 3/30/2020- Working to obtain quote which may be delayed due to coronavirus pandemic N/A N/A
FCC Filing Fees - Special Temporary Authorization request $305.00 $305.00 N/A N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $2,000.00 $2,000.00 4-6 yard disposal bin on site to capture all waste from on site system integration and tower vendors. N/A N/A
Equipment Delivery and Handling Charges $2,500.00 $2,500.00 Transport, forklift rental and handling fees from staging area to transmitter site. N/A N/A
Equipment Storage $2,000.00 $2,000.00 Expecting multiple staggered equipment deliveries from different vendors and need to store and stage new equipment prior to installation date. Anticipate 6-24 months of storage time. N/A N/A

Components

Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $462,861.04 $455,829.24 $161,834.24

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Tommy Combs , Zummallen .

CEO


01/20/2022

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Tommy Combs , Solano .

CEO


01/20/2022

Attachments