Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
JBS, INC. Doing Business As: JBS, INC. |
Neal Rosenbaum 708-C THIMBLE SHOALS BLVD. NEWPORT NEWS, VA 23606 United States |
+1 (757) 873-2111 | NEALROSENBAUM@GMAIL.COM | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
David Burns Counsel Lerman Senter PLLC |
David Burns 2001 L Street NW Suite 400 Washington, CT 20036 United States |
+1 (202) 416-6752 | dburns@lermansenter.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Replace the antenna and obsolete analog transmitter (Acrodyne Industries, Inc, Model TLU1.5K). Install encoding equipment to broadcast ATSC 1.0. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | TLU/1.5K | |
Year | 1997 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 1.5 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TRN-U-3000-FA | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 3 kW | |
Justification for New Transmitter | Existing transmitter is analog. New digital transmitter is required to produce 15 kW of ERP as per CP. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | Upgrade to 80 amps, 240 VAC single phase. Figures for HVAC and transmitter building size below are approximate. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Heating and Cooling | |
Size | 5 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 100.0 square feet |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Leased | |
Owner | In Site | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 150.0 kW | |
Manufacturer | ||
Model | ALP 8 | |
Year | 1998 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ARF-U8-LP-34 Premium | |
Year | 2019 | |
Justification for New Antenna | Existing antenna not capable of broadcasting on displacement channel |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1047304 | |
Coordinates (NAD83) | Latitude (NAD83) | 36° 51' 39.5" N- |
Longitude (NAD83) | 076° 21' 11.8" W- | |
Overall Structure Height | 499.01 feet | |
Support Structure Height | 496.06 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 9.84 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | InSite Towers Development, LLC | |
Date Constructed | 11/23/1999 |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 20 | |
Explanation | Coordinating procedure, Vendors and installations and equipment selection. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | No |
Prepare engineering section of Form FCC Construction Permit Application | No | |
Prepare engineering section of Form FCC License to Cover Application | No | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 10 | |
Justification | Site management of tower crew and antenna removal and new antenna installation. New transmitter installation and commissioning. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $149,366.00 | $151,371.00 | N/A | $131,371.00 | N/A |
Total for all systems | $266,771.00 | $301,094.85 | N/A | $237,109.85 | N/A |
Primary Transmitter TRN-U-3000-FA | $149,366.00 | $151,371.00 | $131,371.00 | ||
Other -- HVAC Service Type: H Size:5 (Other) | $23,066.00 | $23,066.00 | see WJHJ-LP Carrick Contracting Quote_ HVAC Upgrade | $23,066.00 | N/A |
Other Electrical Service: Upgrade to 80 amps, 240 VAC single phase. Figures for HVAC and transmitter building size below are approximate. | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW | $106,300.00 | $108,305.00 | see WJHJ-LP ProService Inc Proposal 200340 | $108,305.00 | N/A |
Other -- Building Addition Size: 100.0 | $10,000.00 | $10,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Other -- HVAC Service Type: H Size:5 (Other) | |
Other Electrical Service: Upgrade to 80 amps, 240 VAC single phase. Figures for HVAC and transmitter building size below are approximate. | Information not provided. |
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW | |
Other -- Building Addition Size: 100.0 | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $11,850.00 | $11,850.00 | N/A | $11,850.00 | N/A |
Total for all systems | $266,771.00 | $301,094.85 | N/A | $237,109.85 | N/A |
Primary Antenna ARF-U8-LP-34 Premium | $11,850.00 | $11,850.00 | $11,850.00 | ||
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal | $11,850.00 | $11,850.00 | Please see Pro Service, Inc. Proposal 200341 | $11,850.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Horizontal |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,190.00 | $51,855.00 | N/A | $51,855.00 | N/A |
Total for all systems | $266,771.00 | $301,094.85 | N/A | $237,109.85 | N/A |
Primary Tower TOWER | $56,190.00 | $51,855.00 | $51,855.00 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $51,855.00 | Please see WJHJ-LP Carrick Contracting Quote_rev1 | $51,855.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $41,420.00 | $78,073.85 | N/A | $42,033.85 | N/A |
Total for all systems | $266,771.00 | $301,094.85 | N/A | $237,109.85 | N/A |
Outside Professional Services | $41,420.00 | $78,073.85 | $42,033.85 | ||
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $7,281.25 | Please see WJHJ-LP Attorney-STA Budget Revision Justification Letter. The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $7,281.25 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $10,843.33 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $6,905.83 | N/A |
Form 399 assistance or other Program Management costs | $0.00 | $0.00 | N/A | N/A | N/A |
Project management of the transition | $2,110.00 | $18,803.85 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $18,803.85 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $9,042.92 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $9,042.92 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Additional Field Engineering Service, 10 Days | $27,500.00 | $27,500.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Form 399 assistance or other Program Management costs | Information not provided. |
Project management of the transition | |
Prepare/ Review 399 reimbursement form | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Additional Field Engineering Service, 10 Days | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $7,945.00 | $7,945.00 | N/A | $0.00 | N/A |
Total for all systems | $266,771.00 | $301,094.85 | N/A | $237,109.85 | N/A |
Other Expenses | $7,945.00 | $7,945.00 | $0.00 | ||
Equipment Delivery and Handling Charges | $3,500.00 | $3,500.00 | N/A | N/A | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $3,000.00 | $3,000.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $266,771.00 | $301,094.85 | $237,109.85 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | William Thomas Barrow Pro Service, Inc. (Administrator for WJHJ) 02/01/2022 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | William Thomas Barrow President, Pro Service, Inc. 02/01/2022 |