Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
Board of Trustees, California State University for San Diego State University |
Leon Messenie 5200 Campanile Drive San Diego, CA 92182 United States |
+1 (619) 594-1515 | lmessenie@kpbs.org | Government Entity |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | See Attachment - "KPBS Repack Project Plan ver2" |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Retune Existing |
Use | Primary (Main) | |
Ownership | Owned | |
Owner | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | ROHDE AND SCHWARZ |
Model | NV8620V | |
Year | 2010 | |
Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 20 kW |
Section | Question | Response |
---|---|---|
New IOT Tubes | Number of Tubes (including accessories) needed | N/A |
New Mask Filter | ||
Power | 30 kW | |
Other Power | N/A | |
New Exciter | Is a new exciter needed? | No |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Inside RF System - Interconnection |
Inside RF System interconnection components to connect transmitter to mask filter I/O, power monitor, and 4 port switch. Includes 4 port switch with switch controller. |
Proof of Performance - Two Exciters |
Transmitter Manufacturer to perform a Proof of Performance on the primary transmitter with two exciters operation on CH-19. |
Site Layout, Construction drawings, as-builds |
Site construction drawings and as builds for the changes needed to the inside of the KPBS transmission facility |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Retune Existing |
Use | Auxiliary (Backup) | |
Ownership | Owned | |
Owner | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | ROHDE AND SCHWARZ |
Model | NV8610V | |
Year | 2010 | |
Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 10 kW |
Section | Question | Response |
---|---|---|
New IOT Tubes | Number of Tubes (including accessories) needed | N/A |
New Mask Filter | ||
Power | 30 kW | |
Other Power | N/A | |
New Exciter | Is a new exciter needed? | No |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Proof Of Performance - One Exciter |
Transmitter Manufacturer to perform a Proof of Performance on the auxiliary transmitter with one exciter operating on CH-19. |
Inside RF System - Interconnection |
Inside RF System interconnection components to connect transmitter to mask filter I/O, RF Power Monitor, to 4 port switch. |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 350.0 kW | |
Manufacturer | ||
Model | TFU-18GTH-R C170SP CH30 | |
Year | 2001 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 285.0 kW | |
Manufacturer | ||
Model | TFU18GTH/VP-R C170SP CH19 | |
Year | 2019 | |
Justification for New Antenna | The current DTV Antenna cannot be re-tuned from CH30 to CH19. Note: KPBS will be invoiced separately for the vertical component of the antenna. The FCC will not be charged for the vertical component of the new antenna. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 3 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Adapter plate to match tower top |
Adapter plate need to mount new antenna to top of tower |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 3 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 185 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Type | Rigid | |
Diameter | 3 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 185 feet per run | |
Justification for New Transmission Line | The current transmission line at 19'6" for CH30 is not recommended for use at CH19. 20 foot lengths is recommended |
Name | Description |
---|---|
Dehydrator System |
Dehydrator needed to keep transmission line dry current system is limited in capacity and will not be able to keep new line pressurized. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | No | |
One or more FM, AM or TV radio broadcaster(s) | N/A | |
Others Types of Users | N/A | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1213483 | |
Coordinates (NAD83) | Latitude (NAD83) | 32° 41' 52.7" N- |
Longitude (NAD83) | 116° 56' 06.3" W- | |
Overall Structure Height | 214.00 feet | |
Support Structure Height | 150.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 2495.00 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | KPBS | |
Date Constructed | 07/17/2001 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for tower with candelabra |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 260 | |
Explanation | See Attachment " KPBS Further Justification for Form 399" | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Construction Project Management |
General Contractor Project Management (moved to Other Expenses by Leon Messenie) |
Additional Legal Expenses |
Additional legal expenses for University-license public TV station |
Quarterly Progress Reports |
FCC-required Quarterly Progress Reports |
California Inspector |
Site Inspection for compliance with California Building Code regulations (see attachment OConnor Proposal FCC399 Outside Professional Services - California Inspector |
Project Management Consulting |
SDSU Representative to interface between the University and General Contractor. see attachment Barrie Company Proposal FCC399 Outside Professional Services - Project Management Consulting |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
General Contractor Expenses |
DRP Construction General Contractor Costs. See attachment July 28_2018 General Contractor Justification and Proposal. |
California Sales Tax |
California Sales Tax at 7.75 percent on all tangible items |
California State University System Charge |
Required California State University Fee for Financial fund administration. see July 28_2018 California State University System Charge |
Shipping Freight |
Shipping Antenna, Mask Filters, and other RF Componets to the WIS Storage Yard |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $506,404.17 | $496,510.17 | N/A | $298,510.17 | N/A |
Total for all systems | $2,101,947.58 | $1,824,613.43 | N/A | $1,205,825.52 | N/A |
Primary Transmitter NV8620V | $308,841.17 | $303,894.17 | $204,894.17 | ||
Site Layout, Construction drawings, as-builds | $8,500.00 | $8,500.00 | See attached reimbursement packet cover letter. file: 2019MAY04 KPBS Reimbursement Request 011.pdf | $8,500.00 | N/A |
Proof of Performance - Two Exciters | $9,890.00 | $9,890.00 | Actual cost came in higher than originally estimated. | $9,890.00 | see attachment 2020JULY18 KPBS REIMBURSEMENT REQUEST 015B.pdf for details. Part of Line 10 of DRP invoice. See Exhibit B.1 Line 7 for backup documentation. Cost was more than originally estimated |
30 kW mask filter | $32,600.00 | $33,853.00 | Adjusted August 15, 2018. See attachment "August 15_2018 WIS-KPBS Repack turnkey proposal with KPBS Breakdown.pdf" for details. Leon Messenie | $33,853.00 | N/A |
Inside RF System - Interconnection | $152,651.17 | $152,651.17 | see attachment 2020JULY18 KPBS Reimbursement Request 015B.pdf. Cost overrun was due to the need for a new dummy load, installation, and having to deliver and install the system twice due to a faulty dummy load. | $152,651.17 | see attachment 2020JULY18 KPBS REIMBURSEMENT REQUEST 015B.pdf for details. Cost increase was due in part to additional work need to replace dummy load. This was done twice due to a major failure of the dummy load |
UHF and VHF - minor banding issues | $105,200.00 | $99,000.00 | N/A | $0.00 | N/A |
Auxiliary Transmitter NV8610V | $197,563.00 | $192,616.00 | $93,616.00 | ||
30 kW mask filter | $32,600.00 | $33,853.00 | Adjusted August 15, 2018. See attachment "August 15_2018 WIS-KPBS Repack turnkey proposal with KPBS Breakdown.pdf" for details. Leon Messenie | $33,853.00 | N/A |
Proof Of Performance - One Exciter | $4,945.00 | $4,945.00 | Actual cost came in slightly higher than estimated | $4,945.00 | see attachment 2020JULY18 KPBS REIMBURSEMENT REQUEST 015B.pdf for details. Part of Line 10 of DRP invoice. See Exhibit B.1 Line 8 for backup documentation. Cost was more than originally estimated |
Inside RF System - Interconnection | $54,818.00 | $54,818.00 | Adjusted August 15, 2018. See attachment "August 15_2018 WIS-KPBS Repack turnkey proposal with KPBS Breakdown.pdf" for details. $6,368 Dielectric RF Components $48,450 Labor per WIS Proposal (1/2 of the estimated $96,900 labor cost per WIS proposal) | $54,818.00 | N/A |
UHF and VHF - minor banding issues | $105,200.00 | $99,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Site Layout, Construction drawings, as-builds | |
Proof of Performance - Two Exciters | |
30 kW mask filter | |
Inside RF System - Interconnection | |
UHF and VHF - minor banding issues | |
30 kW mask filter | |
Proof Of Performance - One Exciter | |
Inside RF System - Interconnection | |
UHF and VHF - minor banding issues | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $575,750.00 | $581,362.80 | N/A | $322,858.00 | N/A |
Total for all systems | $2,101,947.58 | $1,824,613.43 | N/A | $1,205,825.52 | N/A |
Primary Antenna TFU18GTH/VP-R C170SP CH19 | $575,750.00 | $581,362.80 | $322,858.00 | ||
Sweep test of existing antenna | $6,730.00 | $7,360.00 | Adjusted 6/6/2018 by L. Messenie as a result of the Wireless Infrastructure Service Budgetary Proposal and Wireless Infrastructure Service Invoice 6124AS | $7,360.00 | N/A |
Adapter plate to match tower top | $23,180.00 | $23,180.00 | Adjusted 6/6/2018 by L. Messenie as a result of the Wireless Infrastructure Service Budgetary Proposal and Wireless Infrastructure Service Invoice 6124AS | $20,862.00 | N/A |
Elbow complex, broadband, at antenna input, per 3 1/8. feedline (if needed) | $9,340.00 | $9,984.00 | Adjusted August 15, 2018. See attachment "August 15_2018 WIS-KPBS Repack turnkey proposal with KPBS Breakdown.pdf" for details. Leon Messenie | $9,984.00 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $284,652.00 | Added by L. Messenie per FCC to show Horizontal and Vertical Polarity. See attachment 2019May14 KPBS Reimbursement Request #011.pdf Exhibit C Detailed Breakdown Line 1 justification. NOTE: KPBS will pay vertical polarity cost separately. | $28,465.20 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized | $247,000.00 | $256,186.80 | ***System Notice: Estimate adjusted and locked because line has been superseded.***Adjusted 6/6/2018 by L. Messenie as a result of the Wireless Infrastructure Service Budgetary Proposal and Wireless Infrastructure Service Invoice 6124AS | $256,186.80 | N/A |
Actual Information Description | File Name |
---|---|
Sweep test of existing antenna | |
Adapter plate to match tower top | |
Elbow complex, broadband, at antenna input, per 3 1/8. feedline (if needed) | |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | |
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $24,690.00 | $46,005.00 | N/A | $28,271.00 | N/A |
Total for all systems | $2,101,947.58 | $1,824,613.43 | N/A | $1,205,825.52 | N/A |
Primary Transmission Line | $24,690.00 | $46,005.00 | $28,271.00 | ||
Rigid Transmission Line - copper, 3 1/8" | $19,240.00 | $40,555.00 | Adjusted August 15, 2018. See attachment "August 15_2018 WIS-KPBS Repack turnkey proposal with KPBS Breakdown.pdf" for details. Leon Messenie | $28,271.00 | N/A |
Dehydrator System | $5,450.00 | $5,450.00 | Adjusted August 15, 2018. See attachment "August 15_2018 WIS-KPBS Repack turnkey proposal with KPBS Breakdown.pdf" for details. Leon Messenie | N/A | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 3 1/8" | |
Dehydrator System | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $441,000.00 | $154,800.00 | N/A | $142,800.00 | N/A |
Total for all systems | $2,101,947.58 | $1,824,613.43 | N/A | $1,205,825.52 | N/A |
Primary Tower TOWER | $441,000.00 | $154,800.00 | $142,800.00 | ||
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $135,800.00 | Original Estimate did not include review of rigging safety plan by General Contractor | $135,800.00 | see attachment 2020JULY18 KPBS REIMBURSEMENT REQUEST 015B.pdf for details. Rigging plan review was not included in original estimates |
Structural engineering tower load study for a documented tower with candelabra | $20,000.00 | $19,000.00 | N/A | $7,000.00 | N/A |
Actual Information Description | File Name |
---|---|
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Structural engineering tower load study for a documented tower with candelabra |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $216,420.00 | $208,802.05 | N/A | $83,720.18 | N/A |
Total for all systems | $2,101,947.58 | $1,824,613.43 | N/A | $1,205,825.52 | N/A |
Outside Professional Services | $216,420.00 | $208,802.05 | $83,720.18 | ||
Project Management Consulting | $13,500.00 | $13,500.00 | Project Management consulting services to interface between San Diego State University and the project General Contractor. Also looks out for SDSU interests during construction projects | $13,099.05 | N/A |
California Inspector | $5,400.00 | $5,400.00 | Required by the California State University system to ensure compliance with California Building codes | N/A | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $2,000.00 | N/A | $750.00 | N/A |
Project management of the transition | $41,080.00 | $39,000.00 | N/A | $38,806.25 | N/A |
Additional Legal Expenses | $17,000.00 | $17,000.00 | 12-3-2018 (See attachment "KPBS Additional Legal Fee Justification" for explanation to overage and adjustment request for estimate increase.) | $15,787.39 | (See attachment "KPBS Additional Legal Fee Justification" for explanation to overage and adjustment request for estimate increase.) |
Quarterly Progress Reports | $5,000.00 | $5,000.00 | Prepare and file FCC-required progress reports for repacked station throughout transition. | $1,167.88 | N/A |
Construction Project Management | $0.00 | $0.00 | N/A | N/A | N/A |
RF Exposure Measurements | $21,050.00 | $20,000.00 | N/A | $3,500.00 | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | N/A | N/A |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $895.31 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $1,169.82 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | $500.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $1,687.50 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $1,037.50 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $3,652.05 | See attachment 2019APR22 Additional Cost Justification.pdf | $3,652.05 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $1,667.43 | N/A |
Actual Information Description | File Name |
---|---|
Project Management Consulting | |
California Inspector | Information not provided. |
ASR modification (prepare FCC Form 854) | |
Project management of the transition | |
Additional Legal Expenses | |
Quarterly Progress Reports | |
Construction Project Management | Information not provided. |
RF Exposure Measurements | |
Comprehensive coverage verification via field study, if needed | Information not provided. |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | |
Prepare and or review reimbursement form |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $337,683.41 | $337,133.41 | N/A | $329,666.17 | N/A |
Total for all systems | $2,101,947.58 | $1,824,613.43 | N/A | $1,205,825.52 | N/A |
Other Expenses | $337,683.41 | $337,133.41 | $329,666.17 | ||
Disposal Costs (for equipment and other waste, net of any salvage value) | $12,000.00 | $12,000.00 | N/A | $12,000.00 | N/A |
California State University System Charge | $20,302.83 | $20,302.83 | California State University required fee for project fund financial administration. (see attachment July 28_2018 California State University System Charge) | $19,509.93 | N/A |
Shipping Freight | $29,063.80 | $29,063.80 | Actual cost was higher than the estimate freight cost from Dielectric to deliver antenna, mask filters, transmission line and support items to tower rigger storage yard. | $29,063.80 | see attachment 2020JULY18 KPBS REIMBURSEMENT REQUEST 015B.pdf for details. Part of Line 10 of DRP invoice. See Exhibit B.1 Line 10 for backup documentation. Cost was more than originally estimated. |
California Sales Tax | $36,286.89 | $36,286.89 | Actual cost was higher than original estimate due to additional transmission line segments needed inside the transmitter building and the need for a new dummy load. | $36,286.89 | see attachment 2020JULY18 KPBS REIMBURSEMENT REQUEST 015B.pdf for details. Part of Line 10 of DRP invoice. See Exhibit B.1 Line 13 for backup documentation. Cost was more than originally estimated due to dummy load with install. |
General Contractor Expenses | $199,139.89 | $199,139.89 | General Contractor costs per DPR Construction Executive Summary. Does not include Contingency or RF Sitework. (see attachment July 28, 2018 General Contractor Justification and Proposal) | $199,139.89 | Please see attachment 2020JULY18 KPBS Reimbursement Request 015B.pdf for detailed breakdown on costs. |
MVPD Notification of Channel Change | $1,845.00 | $1,845.00 | Cost was more than originally estimated. Price adjusted per FCC email. | $1,845.00 | The original estimate cost used for the 399 form was low. This is the current going price for notifying MVPD facilities. |
Develop and air announcement of upcoming channel change | $2,545.00 | $2,545.00 | Please see attached KPBS Rate Card, KPBS Production Estimate, and Calculation Document | $2,545.00 | N/A |
Equipment Storage | $7,500.00 | $7,500.00 | N/A | $7,000.00 | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | $4,825.66 | N/A |
Equipment Delivery and Handling Charges | $17,450.00 | $17,450.00 | see attached file, 2019MAY04 KPBS Reimbursement Request 011.pdf. Reference cover letter "Justification for Additional Funds" section Item 2 | $17,450.00 | N/A |
Actual Information Description | File Name |
---|---|
Disposal Costs (for equipment and other waste, net of any salvage value) | |
California State University System Charge | |
Shipping Freight | |
California Sales Tax | |
General Contractor Expenses | |
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | |
Equipment Storage | |
DTV Medical Facility Notification | |
Equipment Delivery and Handling Charges |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $2,101,947.58 | $1,824,613.43 | $1,205,825.52 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Leon Messenie Director of Engineering, KPBS 12/27/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Leon Messenie Director of Engineering, KPBS 12/27/2021 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Leon Messenie Director of Engineering, KPBS 12/27/2021 |