Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
Community Television, Inc. |
1862 Enterprise Dr. Norcross, GA 30093 United States |
+1 (770) 300-9828 | scott@watc.tv | Not-for-Profit |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Joseph C. Chautin III Hardy, Carey, Chautin & Balkin, LLP |
1080 West Causeway Approach Mandeville, LA 70471 United States |
+1 (985) 629-0777 | jchautin@hardycarey.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Station plans to install new transmitter, filter, transmission line and antenna so that we may continue to serve our community fully during the transition time. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | NV7640 | |
Year | 2005 | |
Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power Capacity | 10 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | THU9evo-12 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 19.0 kW | |
Justification for New Transmitter | We are in receipt of an "end of life" letter from the manufacturer stating that any problems occurring from this day forward may result in a failure that cannot be corrected. The manufacturer states it is "a high risk." |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 5 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Spinner Load |
Spinner 25kW Station Smart Load. Dual 3-50 Input. See attached letter 190313 ltr-load-switch for explanations. |
Transmitter Install Kit |
SJ Ramer R&S installation kit including necessary materials for proper installation not supplied by R&S. |
RF Switch gear |
2X Dielectric 4 Port switch & accys. See attached letter 190313 ltr-load-switch for explanations. |
Mask Filter |
Dielectric RF System w/Floor Mount frame |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 330.0 kW | |
Manufacturer | ||
Model | SWMP22/OI-41 | |
Year | 2006 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 288.0 kW | |
Manufacturer | ||
Model | TLP 24B W/VP | |
Year | 2018 | |
Justification for New Antenna | Unable to retune old antenna for repack channel. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 4 1/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Interim Rent |
Additional rent costs. |
Dehydrator |
Dehydrator & accys needed to keep the line dry.. |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Air | |
Diameter | 4 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 225 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Type | Flexible Air | |
Diameter | 4 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 225 feet per run | |
Justification for New Transmission Line | Old transmission line in use with pre-transition system. Cannot be off air for the time needed to change over to new line and testing. |
Name | Description |
---|---|
Assessories to hang line |
Various accessories needed to properly mount transmission line to tower, ice-bridge, & building entrance. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | No | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
ASR Number | ||
Coordinates (NAD83) | Latitude (NAD83) | 34° 03' 59.3" N- |
Longitude (NAD83) | 084° 27' 16.7" W- | |
Overall Structure Height | 195.00 feet | |
Support Structure Height | 195.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 1883.00 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | American Tower, Inc. | |
Date Constructed | 01/01/0070 |
Users |
---|
Paging |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Antenna - Transmission line installers |
Crew to install new transmission line & antenna and remove old line / antenna after repack. |
Construction Project Management |
For Tower Modification reinforcements & facilities |
Tower permit Drawing Package |
If needed |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 150 | |
Explanation | In the unlikely event that our staff engineer is unable to complete the project, we will need to hire someone or for American Tower Project Mgr. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
NEPA Section 106 environmental review | Yes | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Pre-Transmitter installation site survey |
Our building is extremely small and we determined that a preliminary site survey was required for equipment placement. |
Transmitter Installation |
Transmitter install |
Electrial work |
Electrical needs for the new transmitter installation. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Site Coordination Meeting |
Coordination and transition planning with all parties onsite and management of the timelines and schedules occurring during the repack |
Decommissioning of old equipment |
Decommissioning of pre-auction equipment including transmitter, antenna and transmission line. |
Disposal Costs |
Removal of equipment that would interfere with placement of new repack equipment. |
Other Installation Costs |
Other transmitter/site installation costs. |
Public Hearing |
If necessary. |
Sales Tax expense |
Transmission Line & Antenna related sales tax. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $800,172.13 | $521,600.81 | N/A | $510,651.05 | N/A |
Total for all systems | $1,779,880.24 | $1,091,259.00 | N/A | $843,143.54 | N/A |
Primary Transmitter THU9evo-12 | $800,172.13 | $521,600.81 | $510,651.05 | ||
RF Switch gear | $22,522.13 | $22,522.13 | On Dielectric quote CLE-097-Rev A thru D, added as separate line item. Current quote CLE-097 rev D. Added Change Order dated 3/7/2019 explained on letter 190313 ltr-load-switch.pdf. Added freight charges for the RF gear on 7/23/19. | $22,522.13 | Freight charges applied to the cost of the RF gear not originally quoted. |
Transmitter Install Kit | $2,700.00 | $2,700.00 | SJ Ramer Associates installation kit for R&S transmitters. | $2,700.00 | N/A |
5 Ton system | $20,250.00 | $18,771.00 | N/A | $13,500.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | $684,000.00 | $406,907.68 | Estimated cost of replacement transmitter, less installation. | $406,907.68 | N/A |
Mask Filter | $48,700.00 | $48,700.00 | List price less 25%. Quote attached on CLE-097 Rev-D WATC. | $43,655.62 | N/A |
Spinner Load | $22,000.00 | $22,000.00 | Non-radiating load for transmitter set up and maintenance large enough to handle the output of the THU9 transmitter. Updated cost to reflect tax. Updated to reflect change in type. | $21,365.62 | N/A |
Actual Information Description | File Name |
---|---|
RF Switch gear | |
Transmitter Install Kit | |
5 Ton system | |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | |
Mask Filter | |
Spinner Load |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $303,837.00 | $134,992.00 | N/A | $53,227.49 | N/A |
Total for all systems | $1,779,880.24 | $1,091,259.00 | N/A | $843,143.54 | N/A |
Primary Antenna TLP 24B W/VP | $303,837.00 | $134,992.00 | $53,227.49 | ||
Interim Rent | $32,000.00 | $32,000.00 | 170630 American Tower cover letter with price.pdf. Rent for additional tower space required for pre-transition/post transition antenna. | N/A | N/A |
Dehydrator | $5,387.00 | $5,387.00 | N/A | $1,911.24 | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $21,900.00 | N/A | N/A | N/A |
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) | $9,570.00 | $9,255.00 | Cost provided by the factory. | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,450.00 | N/A | $6,450.00 | N/A |
UHF - Lower Power Side Mount, One station antenna -- 200-500 kW, elliptically or circularly polarized | $227,000.00 | $60,000.00 | N/A | $44,866.25 | N/A |
Actual Information Description | File Name |
---|---|
Interim Rent | Information not provided. |
Dehydrator | |
Side mount brackets for high power antennas (if not included in antenna base cost) | Information not provided. |
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) | Information not provided. |
Sweep test of existing antenna | |
UHF - Lower Power Side Mount, One station antenna -- 200-500 kW, elliptically or circularly polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $20,594.11 | $27,318.19 | N/A | $23,373.65 | N/A |
Total for all systems | $1,779,880.24 | $1,091,259.00 | N/A | $843,143.54 | N/A |
Primary Transmission Line | $20,594.11 | $27,318.19 | $23,373.65 | ||
Flexible Air Transmission Line - dielectric, 4" | $16,650.00 | $23,374.08 | CLE 097 RevD WATC. Updated Price estimate from a year ago. / Dielectric accounting department not applying payments to correct accounts and I added freight charges here for the transmission line. / Added Spreadsheet for explanation. | $23,373.65 | Dielectric, LLC changed accounting systems during the process and it appears they applied money to the wrong accounts to make it easy for themselves. Also applied here are freight charges that were not part of the original quote or PO. Credit 11/30/21 |
Assessories to hang line | $3,944.11 | $3,944.11 | CLE 097 Rev D WATC. Updated quote number. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Flexible Air Transmission Line - dielectric, 4" | |
Assessories to hang line | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $291,337.00 | $142,012.00 | N/A | $83,493.00 | N/A |
Total for all systems | $1,779,880.24 | $1,091,259.00 | N/A | $843,143.54 | N/A |
Primary Tower TOWER | $291,337.00 | $142,012.00 | $83,493.00 | ||
Structural engineering tower load study for well documented tower | $12,600.00 | $10,475.00 | N/A | $10,475.00 | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $50,000.00 | American Tower costs to modify the tower keep increasing. | $41,900.00 | N/A |
Short Tower (less than 500') | $84,200.00 | $45,000.00 | N/A | N/A | N/A |
Tower permit Drawing Package | $4,700.00 | $4,700.00 | The generation of a permitting drawing package. | N/A | N/A |
Construction Project Management | $5,000.00 | $5,000.00 | Project mgr for landlord during modification of tower. | $5,000.00 | N/A |
Antenna - Transmission line installers | $26,837.00 | $26,837.00 | Quote received from Allstate Tower, Inc. to install line and antenna, then a second trip to remove pre-repack antenna and line. | $26,118.00 | N/A |
Actual Information Description | File Name |
---|---|
Structural engineering tower load study for well documented tower | |
Minor tower reinforcement/modifications | |
Short Tower (less than 500') | Information not provided. |
Tower permit Drawing Package | Information not provided. |
Construction Project Management | |
Antenna - Transmission line installers |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $236,790.00 | $142,271.00 | N/A | $107,570.15 | N/A |
Total for all systems | $1,779,880.24 | $1,091,259.00 | N/A | $843,143.54 | N/A |
Outside Professional Services | $236,790.00 | $142,271.00 | $107,570.15 | ||
Electrial work | $8,500.00 | $8,500.00 | The transmitter requires a number of changes to the existing electrical system. | $6,380.00 | N/A |
Transmitter Installation | $59,450.00 | $59,450.00 | Transmitter installation costs, updated amount of time due to small building. See 190412 Ramer Revised Quote 1830R.pdf for details. Added $11K for other unforeseen expenses. update 9/23/21. Auxiliary transmitter re-installation added. | $59,450.00 | Aux Transmitter re-installation put costs over the $50K limit. |
Pre-Transmitter installation site survey | $8,600.00 | $8,600.00 | Our building is extremely small and it was determined that we needed to have CAD drawings made for equipment placement to determine exactly how all of the equipment would fit. | $8,600.00 | N/A |
RF Exposure Measurements | $21,050.00 | $8,300.00 | N/A | $6,500.00 | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $5,000.00 | N/A | N/A | N/A |
NEPA Section 106 environmental review, if needed | $6,310.00 | $6,000.00 | If necessary. | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,671.00 | Legal fees were higher due to unexpected issues and Hurricane Dorien postponing Phase 5. | $5,455.00 | Legal costs were slightly higher than anticipated. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $6,000.00 | N/A | N/A | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | $2,489.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $583.00 | N/A |
Project management of the transition | $23,700.00 | $23,000.00 | We have determined that additional assistance will be needed to manage the projects for the transition and have increased the original amount to $23K. | $18,113.15 | N/A |
Actual Information Description | File Name |
---|---|
Electrial work | |
Transmitter Installation | |
Pre-Transmitter installation site survey | |
RF Exposure Measurements | |
Comprehensive coverage verification via field study, if needed | Information not provided. |
NEPA Section 106 environmental review, if needed | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | Information not provided. |
Address transition timing and coordination issues w/ other stations and wireless | |
Prepare and or review reimbursement form | |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $127,150.00 | $123,065.00 | N/A | $64,828.20 | N/A |
Total for all systems | $1,779,880.24 | $1,091,259.00 | N/A | $843,143.54 | N/A |
Other Expenses | $127,150.00 | $123,065.00 | $64,828.20 | ||
Sales Tax expense | $10,000.00 | $10,000.00 | Sales Tax expense, primarily for antenna & transmission line, not included in original quotes. | $7,988.03 | N/A |
Public Hearing | $10,000.00 | $10,000.00 | If necessary. | N/A | N/A |
Other Installation Costs | $16,000.00 | $16,000.00 | Other installation costs needed to prepare and restore the site for the repack. | $15,866.51 | N/A |
Disposal Costs | $7,600.00 | $7,600.00 | Disposal of existing equipment to make room for repack equipment. 4/25 - Updated amount to more accurately reflect what will be required. | $7,550.70 | We had an enormous amount of retired equipment in our warehouse/studio that had to be moved in order to make room to receive the new transmitter before it can proceed to our very small transmitter building. Took more time than estimated. |
Decommissioning of old equipment | $45,000.00 | $45,000.00 | Decommissioning of pre-auction equipment including transmitter, antenna, transmission line & RF components. This expense was not set up in the original 399 and must be added now. | $15,000.00 | N/A |
Site Coordination Meeting | $2,500.00 | $2,500.00 | Coordination and transition planning with all parties onsite and management of the timelines and schedules occurring during the repack. | N/A | N/A |
MVPD Notification of Channel Change | $7,500.00 | $7,500.00 | If necessary. | $3,497.00 | N/A |
Develop and air announcement of upcoming channel change | $1,250.00 | $1,250.00 | N/A | N/A | N/A |
Equipment Storage | $750.00 | $750.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $7,500.00 | $7,500.00 | N/A | $7,460.96 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Local Zoning | $2,500.00 | $2,500.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $7,465.00 | N/A | $7,465.00 | N/A |
Actual Information Description | File Name |
---|---|
Sales Tax expense | |
Public Hearing | Information not provided. |
Other Installation Costs | |
Disposal Costs | |
Decommissioning of old equipment | |
Site Coordination Meeting | Information not provided. |
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | Information not provided. |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
Local Zoning | Information not provided. |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $1,779,880.24 | $1,091,259.00 | $843,143.54 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Scott Wills Chief Operator, WATC TV 11/30/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Scott Wills Chief Operator, WATC TV 11/30/2021 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Scott Wills Chief Operator, WATC TV 11/30/2021 |