Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
WORD BROADCASTING NETWORK, INC. Doing Business As: WORD BROADCASTING NETWORK, INC. |
Tom Fawbush 3701 FERN VALLEY ROAD LOUISVILLE, KY 40219 United States |
+1 (502) 964-2121 | TOM@WBNA21.COM | Not-for-Profit |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
The Preparer is same as the reimbursement contact. |
|
|
|
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | We are going to transition to our post auction assigned channel by moving our transmission facility to ASR # 1023532. We will then decommission our existing facility following testing and licensing at the new facility. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | SCA132UB | |
Year | 2008 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 2.0 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | ULXTE-4 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 2.88 kW | |
Justification for New Transmitter | We will need a new transmitter because we are moving to a new location and existing transmitter is on the roof of a high-rise building and moving it for testing is problematic. Transmitter is as close of a match to current as we could get from manufacture |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Wiring for backup generator to replace existing existing backup generator at prior transmitter location | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 10 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 100.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Primary Transmitter - Ice Bridges |
Primary Transmitter - Ice Bridges |
Backup Generator |
Replacement for existing backup generator at prior transmitter site |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this antenna currently shared with any other stations? | No | |
Is this antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 5.3 kW | |
Manufacturer | ||
Model | SL8 | |
Year | 2001 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Class A |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ATC-BCE38C4S-V2-23 | |
Year | 2019 | |
Justification for New Antenna | We will need a new antenna tuned to the new channel position we have been assigned. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Air | |
Diameter | 1 5/8 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 200 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Flexible Foam | |
Diameter | 1 5/8 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 550 feet per run | |
Justification for New Transmission Line | Moving to new location and will have a new cable run. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | No | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1023532 | |
Coordinates (NAD83) | Latitude (NAD83) | 36° 14' 07.0" N- |
Longitude (NAD83) | 086° 45' 18.0" W- | |
Overall Structure Height | 474.08 feet | |
Support Structure Height | 474.08 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 574.14 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | 3201 Dickerson Properties LLC | |
Date Constructed | 04/19/1996 |
Users |
---|
W286CY FX |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Interim Dual Lease Expense |
Lease on new tower location while building out facility prior to licensing. |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | Located on Building | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | No | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Unknown | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1044629 | |
Coordinates (NAD83) | Latitude (NAD83) | 36° 09' 49.0" N- |
Longitude (NAD83) | 086° 46' 45.0" W- | |
Overall Structure Height | 607.93 feet | |
Support Structure Height | 607.93 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 489.17 feet | |
Structure Type | B - Building | |
Tower Owner | 401 CHURCH STREET LLC | |
Date Constructed | 09/01/1983 |
Users |
---|
Two way radio |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Located on Building |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Lease Termination Expense |
Early lease termination fee. |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 595 | |
Explanation | Pattern analysis, transmitter spec, antenna spec, installation and supervision. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Quantity | N/A | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 5 | |
Justification | These costs were incurred as the tower crew required management of WJDE antenna removal from L&C Building in Nashville, TN to arrange required permits and for tower crew safety during removal. |
Name | Description |
---|---|
RF Switch Plumbing |
RF Switch Plumbing |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
In House Labor |
160 Hours of Labor by senior management at $60 an hour. Total estimated cost of $9600. |
Studio Transfer Link |
Other Expenses - Studio Transfer Link required for repack |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $299,110.68 | $289,510.68 | N/A | $246,784.89 | N/A |
Total for all systems | $1,201,580.50 | $1,007,222.45 | N/A | $550,060.22 | N/A |
Primary Transmitter ULXTE-4 | $299,110.68 | $289,510.68 | $246,784.89 | ||
Other -- Building Addition Size: 100.0 | $16,200.00 | $16,200.00 | Please see WJDE TV HILLTOP EXCAVATING Quote | $14,350.00 | N/A |
10 Ton system | $38,900.00 | $30,000.00 | N/A | $0.00 | N/A |
Other Electrical Service: Wiring for backup generator to replace existing existing backup generator at prior transmitter location | $2,000.00 | $2,000.00 | Wiring needed to connect transmitter to new backup generator | $1,819.85 | N/A |
UHF - Liquid Cooled Solid State Transmitter 2.88 kW | $214,379.13 | $214,379.13 | see Estimated Cost Justification WJDE-110-1st Primary Transmitter - UHF Air-Cooled Solid State, 1-2.5 kW V1 | $214,379.11 | N/A |
Backup Generator | $6,521.82 | $6,521.82 | Please see Estimated Cost Justification WJDE-110-1st Primary Transmitter - Backup Generator V0 | $6,521.82 | N/A |
Primary Transmitter - Ice Bridges | $6,709.73 | $6,709.73 | Please see Valmont quote for order number 0729779 | $6,709.71 | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $13,700.00 | N/A | $3,004.40 | N/A |
Actual Information Description | File Name |
---|---|
Other -- Building Addition Size: 100.0 | |
10 Ton system | Information not provided. |
Other Electrical Service: Wiring for backup generator to replace existing existing backup generator at prior transmitter location | |
UHF - Liquid Cooled Solid State Transmitter 2.88 kW | |
Backup Generator | |
Primary Transmitter - Ice Bridges | |
Service entrance 3 phase/800 amp/208 volt |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $33,030.00 | $18,315.00 | N/A | $18,315.00 | N/A |
Total for all systems | $1,201,580.50 | $1,007,222.45 | N/A | $550,060.22 | N/A |
Primary Antenna ATC-BCE38C4S-V2-23 | $33,030.00 | $18,315.00 | $18,315.00 | ||
UHF - Lower Power Side Mount, Class A One Station antenna -- basic | $26,300.00 | $12,015.00 | see Estimated Cost Justification WJDE-210-Primary Antenna - Alive Telecom ATC-BCE38C4S-V2-23 Side Mount, Class A v0 | $12,015.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,300.00 | Please see WJDE-CD Sweep Test Revision Justification Cover Letter | $6,300.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF - Lower Power Side Mount, Class A One Station antenna -- basic | |
Sweep test of existing antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $13,200.00 | $16,100.00 | N/A | $7,225.00 | N/A |
Total for all systems | $1,201,580.50 | $1,007,222.45 | N/A | $550,060.22 | N/A |
Primary Transmission Line | $13,200.00 | $16,100.00 | $7,225.00 | ||
Flexible Foam Transmission Line - dielectric, 1 5/8" | $13,200.00 | $16,100.00 | Verified Budget Increase Justification uploaded - request will be uploaded with invoice 460124 | $7,225.00 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Foam Transmission Line - dielectric, 1 5/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $560,511.56 | $421,011.56 | N/A | $73,226.56 | N/A |
Total for all systems | $1,201,580.50 | $1,007,222.45 | N/A | $550,060.22 | N/A |
Primary Tower B | $435,201.04 | $314,201.04 | $33,041.04 | ||
Lease Termination Expense | $14,201.04 | $14,201.04 | see Estimated Cost Justification WJDE-460-Existing Alternate Tower - Lease Termination Expense v0 | $14,201.04 | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $300,000.00 | N/A | $18,840.00 | N/A |
Primary Tower TOWER | $125,310.52 | $106,810.52 | $40,185.52 | ||
Interim Dual Lease Expense | $14,810.52 | $14,810.52 | see Estimated Cost Justification WJDE-410-Existing Primary Tower - Interim Dual Lease Expense v0 | $14,810.52 | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $20,000.00 | N/A | $0.00 | N/A |
Short Tower (less than 500') | $84,200.00 | $72,000.00 | N/A | $25,375.00 | N/A |
Actual Information Description | File Name |
---|---|
Lease Termination Expense | |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | |
Interim Dual Lease Expense | |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | Information not provided. |
Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $217,655.00 | $186,761.95 | N/A | $157,026.95 | N/A |
Total for all systems | $1,201,580.50 | $1,007,222.45 | N/A | $550,060.22 | N/A |
Outside Professional Services | $217,655.00 | $186,761.95 | $157,026.95 | ||
RF Switch Plumbing | $2,575.00 | $2,575.00 | Please see WJDE RF Switch Plumbing Revision Justification Cover Letter | $2,575.00 | N/A |
Additional Field Engineering Service, 5 Days | $4,000.00 | $4,000.00 | Please see WJDE-CD RF Eng - 5 Additional Field Days Budget Revision Justification Letter | $4,000.00 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $357.50 | Please see WJDE-CD Attorney - Special Temporary Authorization Budget Revision Justification Letter. The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $357.50 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $10,626.95 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $10,626.95 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $220.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $0.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | $765.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $0.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $1,945.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | $247.50 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $837.50 | Staff request for change in category of reimbursement resulted in additional expense in this category. |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $40,000.00 | N/A | $30,000.00 | N/A |
Project management of the transition | $94,010.00 | $105,452.50 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $105,452.50 | N/A |
Actual Information Description | File Name |
---|---|
RF Switch Plumbing | |
Additional Field Engineering Service, 5 Days | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | |
Prepare and or review reimbursement form | |
Comprehensive coverage verification via field study, if needed | |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $78,073.26 | $75,523.26 | N/A | $47,481.82 | N/A |
Total for all systems | $1,201,580.50 | $1,007,222.45 | N/A | $550,060.22 | N/A |
Other Expenses | $78,073.26 | $75,523.26 | $47,481.82 | ||
Studio Transfer Link | $16,230.89 | $16,230.89 | Please see Estimated Cost Justification WJDE-610-Studio Transfer Link v0 | $15,630.89 | N/A |
In House Labor | $28,992.37 | $28,992.37 | Please see Estimated Cost Justification WJDE-610-In House Labor v1 | $28,992.37 | N/A |
MVPD Notification of Channel Change | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Develop and air announcement of upcoming channel change | $4,500.00 | $4,500.00 | N/A | N/A | N/A |
Equipment Storage | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $1,800.00 | $1,800.00 | N/A | $278.56 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $1,000.00 | $1,000.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $9,000.00 | N/A | $2,580.00 | N/A |
Local Zoning | $2,000.00 | $2,000.00 | N/A | N/A | N/A |
Non-zoning permits | $2,000.00 | $2,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Studio Transfer Link | |
In House Labor | |
MVPD Notification of Channel Change | Information not provided. |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | Information not provided. |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | Information not provided. |
DTV Medical Facility Notification | |
Local Zoning | Information not provided. |
Non-zoning permits | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $1,201,580.50 | $1,007,222.45 | $550,060.22 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Tom Fawbush General Manager 11/22/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Tom Fawbush GM 11/22/2021 |