Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
Tri-Cities (WEMT-TV) Licensee, Inc. |
Lisa Asher 200 W 41st St Baltimore, MD 21211 United States |
+1 (410) 662-9688 | Lasher@cunninghambroadcasting.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Paul A. Cicelski , Esq . Lerman Senter PLLC |
Paul A. Cicelski, Esq. 2001 L St NW Suite 400 Washington, DC 20036 United States |
+1 (202) 416-6756 | pcicelski@lermansenter.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | Install interim channel 28 antenna, line, and transmitter before switchover date. At switchover date, begin operation on channel 28 interim system. Remove channel 38 equipment. Install full power channel 28 equipment and begin operations |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Quantum | |
Year | 2005 | |
Type | Inductive Output Tube | |
IOT Power Type | Single | |
Power Capacity | 30 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | THU9evo-24 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 37 kW | |
Justification for New Transmitter | Manufacturer states old transmitter cannot be re-tuned to new channel. See attachment. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 4 inches | |
Length | 50.0 feet | |
Other Electrical Service | Yes | |
Description | Wiring from breaker box to interim transmitter and wiring from breaker box to new main transmitter. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Additional parts |
Additional parts |
Install Kit and Services |
Install Kit and Services |
RS Manufacturer Calibration |
R&S Manufacturer Calibration |
RF System |
RF System |
Ice Bridge |
Ice Bridge |
Channel 35 Mask Filter |
Channel 35 Mask Filter |
Electrical Installation |
Electrical Installation |
Additional Site Requirements |
Additional Site Requirements |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase | |
Manufacturer | ||
Model | ULXTE-20 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 12.9 kW | |
Justification for New Transmitter | Currently, there is no interim ch. 28 transmitter. We will have to go on air with interim ch. 28 equipment first; then remove the ch. 37 equipment; and install the full power ch. 28 equipment. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Inside building wiring from breaker box to interim transmitter. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A | |
Inside RF System | Is an additional interior RF system required to support this interim transmitter? | Yes |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | ATW20H6-ESPX-38H | |
Year | 2011 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 710.0 kW | |
Manufacturer | ||
Model | TFU-20DSC/VP-R P260 | |
Year | 2017 | |
Justification for New Antenna | Manufacturer states old antenna cannot be re-tuned to new channel. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 6 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Broadband Slot | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 8 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 698.00 MHz | |
Design power capacity in use | 64.0 % | |
Other Antenna Type | N/A | |
ERP: | 100.0 kW | |
Manufacturer | ||
Model | TFU-WB | |
Year | 2017 | |
Justification for New Antenna | Currently, there is no interim ch. 28 antenna. We will have to go on air with interim ch. 28 equipment first; then remove the ch. 38 equipment; and install the full power ch. 28 equipment. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | B | |
Feed Line Size | 3 1/8 inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 400 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 3/4 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 400 feet per run | |
Justification for New Transmission Line | Existing line sections are 19.5 ft. and cannot be used with new channel 28 that requires 19.75 ft. sections. |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Flexible Air | |
Diameter | 3 inches | |
Segment Length | N/A | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 250 feet per run | |
Justification for New Transmission Line | Currently, there is no interim ch. 28 transmission line. We plan to go on air with the interim ch. 28 equipment first. Then we would remove the ch. 38 equipment and install the new full power ch. 28 equipment. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1225306 | |
Coordinates (NAD83) | Latitude (NAD83) | 36° 26' 58.2" N- |
Longitude (NAD83) | 082° 06' 28.7" W- | |
Overall Structure Height | 419.94 feet | |
Support Structure Height | 419.94 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 4211.89 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Appalachian Broadcasting LLC | |
Date Constructed | 05/08/2002 |
Facility ID | Call Sign | Service |
---|---|---|
2455 | WCYB-TV | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 300 | |
Explanation | Not enough experienced station personnel to manage this large of a project | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | Yes | |
Environmental Assessment | Yes | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Sinclair Internal Costs |
Internal Employee Time Costs |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Forklift Rental |
Forklift Rental |
Tax |
Tax |
True-up |
True-up |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,587,914.50 | $2,160,567.50 | N/A | $934,329.70 | N/A |
Total for all systems | $3,747,075.15 | $3,284,079.43 | N/A | $1,518,580.28 | N/A |
Interim Transmitter ULXTE-20 | $657,000.00 | $626,753.00 | $133,685.82 | ||
Other Electrical Service: Inside building wiring from breaker box to interim transmitter. | $15,000.00 | $15,000.00 | N/A | $0.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW | $494,500.00 | $471,753.00 | See attached quote from GatesAir | $127,656.50 | Second item should be removed as we've uploaded new version. |
UHF inside RF system including switching | $147,500.00 | $140,000.00 | N/A | $6,029.32 | N/A |
Primary Transmitter THU9evo-24 | $1,930,914.50 | $1,533,814.50 | $800,643.88 | ||
Additional Site Requirements | $18,285.00 | $18,285.00 | N/A | $18,285.00 | N/A |
Electrical Installation | $38,750.00 | $38,750.00 | N/A | $38,750.00 | N/A |
Channel 35 Mask Filter | $5,595.00 | $5,595.00 | N/A | $5,595.00 | N/A |
Ice Bridge | $12,122.50 | $12,122.50 | N/A | $12,122.50 | Invoice #10397 with status Need More Information can be removed. An updated version has been submitted. |
RF System | $97,078.00 | $97,078.00 | See attached quote from Acrodyne. | $97,078.00 | N/A |
RS Manufacturer Calibration | $1,030.00 | $1,030.00 | N/A | $0.00 | N/A |
Additional parts | $61,724.00 | $61,724.00 | N/A | $61,724.00 | N/A |
Other Electrical Service: Wiring from breaker box to interim transmitter and wiring from breaker box to new main transmitter. | $15,000.00 | $15,000.00 | N/A | N/A | N/A |
4" Rigid Conduit and Wiring (Cost per foot) | $5,050.00 | $4,800.00 | N/A | N/A | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $24,300.00 | N/A | $0.00 | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | N/A | N/A | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $13,700.00 | N/A | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | $1,473,000.00 | $1,080,000.00 | See Response to August 21 Inquiry. | $441,959.38 | The item "$404,167.97" can be removed. |
Install Kit and Services | $125,130.00 | $125,130.00 | N/A | $125,130.00 | N/A |
Actual Information Description | File Name |
---|---|
Other Electrical Service: Inside building wiring from breaker box to interim transmitter. | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW | |
UHF inside RF system including switching | |
Additional Site Requirements | |
Electrical Installation | |
Channel 35 Mask Filter | |
Ice Bridge | |
RF System | |
RS Manufacturer Calibration | |
Additional parts | |
Other Electrical Service: Wiring from breaker box to interim transmitter and wiring from breaker box to new main transmitter. | Information not provided. |
4" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Transformer 3 phase/480v - 150 KVA | |
Switchgear - industrial 800 amp | Information not provided. |
Service entrance 3 phase/800 amp/208 volt | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 35 - 50 kW | |
Install Kit and Services |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $369,020.00 | $358,299.20 | N/A | $190,965.77 | N/A |
Total for all systems | $3,747,075.15 | $3,284,079.43 | N/A | $1,518,580.28 | N/A |
Interim Antenna TFU-WB | $147,580.00 | $139,024.00 | $41,320.87 | ||
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $4,000.00 | N/A | N/A | N/A |
Elbow complex, broadband, at antenna input, per 3 1/8. feedline (if needed) | $9,340.00 | $8,624.00 | N/A | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
UHF - Lower Power Side Mount, One Station antenna . medium power (50-200 kW), elliptically or circularly polarized | $103,100.00 | $98,000.00 | N/A | $41,320.87 | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $22,000.00 | N/A | N/A | N/A |
Primary Antenna TFU-20DSC/VP-R P260 | $221,440.00 | $219,275.20 | $149,644.90 | ||
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $4,000.00 | N/A | N/A | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $18,320.00 | N/A | $17,395.65 | N/A |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | $12,300.00 | $13,406.40 | See attached quote. | $3,930.15 | N/A |
UHF - High Power, Side Mount, basic slot antenna, 710 kW input, directional,, elliptically or circularly polarized | $174,000.00 | $174,000.00 | N/A | $118,770.30 | N/A |
Sweep test of existing antenna | $6,730.00 | $9,548.80 | N/A | $9,548.80 | N/A |
Actual Information Description | File Name |
---|---|
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | Information not provided. |
Elbow complex, broadband, at antenna input, per 3 1/8. feedline (if needed) | Information not provided. |
Sweep test of existing antenna | Information not provided. |
UHF - Lower Power Side Mount, One Station antenna . medium power (50-200 kW), elliptically or circularly polarized | |
Side mount brackets for high power antennas (if not included in antenna base cost) | Information not provided. |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | Information not provided. |
Side mount brackets for high power antennas (if not included in antenna base cost) | |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | |
UHF - High Power, Side Mount, basic slot antenna, 710 kW input, directional,, elliptically or circularly polarized | |
Sweep test of existing antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $95,550.00 | $86,159.40 | N/A | $72,823.69 | N/A |
Total for all systems | $3,747,075.15 | $3,284,079.43 | N/A | $1,518,580.28 | N/A |
Interim Transmission Line | $14,750.00 | $16,130.20 | $11,730.83 | ||
Flexible Air Transmission Line - dielectric, 3" | $14,750.00 | $16,130.20 | Quote from DTV Pro, attached. | $11,730.83 | N/A |
Primary Transmission Line | $80,800.00 | $70,029.20 | $61,092.86 | ||
Rigid Transmission Line - copper, 6 1/8" | $80,800.00 | $70,029.20 | N/A | $61,092.86 | N/A |
Actual Information Description | File Name |
---|---|
Flexible Air Transmission Line - dielectric, 3" | |
Rigid Transmission Line - copper, 6 1/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $268,500.00 | $283,162.80 | N/A | $216,875.50 | N/A |
Total for all systems | $3,747,075.15 | $3,284,079.43 | N/A | $1,518,580.28 | N/A |
Primary Tower TOWER | $268,500.00 | $283,162.80 | $216,875.50 | ||
Short Tower (less than 500') | $84,200.00 | $108,162.80 | See FDH Quote and Invoices. | $74,804.80 | N/A |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $25,000.00 | N/A | $11,000.00 | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $150,000.00 | N/A | $131,070.70 | N/A |
Actual Information Description | File Name |
---|---|
Short Tower (less than 500') | |
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
Minor tower reinforcement/modifications |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $206,954.08 | $181,838.96 | N/A | $79,458.26 | N/A |
Total for all systems | $3,747,075.15 | $3,284,079.43 | N/A | $1,518,580.28 | N/A |
Outside Professional Services | $206,954.08 | $181,838.96 | $79,458.26 | ||
Sinclair Internal Costs | $1,499.08 | $1,499.08 | N/A | $1,499.08 | x |
RF Exposure Measurements | $21,050.00 | $20,000.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | $27,000.00 | N/A |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | $10,520.00 | $10,000.00 | N/A | N/A | N/A |
NEPA Section 106 environmental review, if needed | $6,310.00 | $6,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $0.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $0.00 | N/A | N/A | N/A |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | $4,210.00 | $0.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $99.92 | N/A | $99.92 | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $4,755.00 | See Carl T. Jones Corporation invoice. | $4,755.00 | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,562.50 | See Carl T. Jones Corporation invoice. | $3,562.50 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $1,234.30 | N/A |
Project management of the transition | $47,400.00 | $41,422.46 | N/A | $41,307.46 | N/A |
Actual Information Description | File Name |
---|---|
Sinclair Internal Costs | |
RF Exposure Measurements | Information not provided. |
Comprehensive coverage verification via field study, if needed | |
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet | Information not provided. |
NEPA Section 106 environmental review, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | Information not provided. |
Prepare and or review reimbursement form | |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $128,206.57 | $127,651.57 | N/A | $24,127.36 | N/A |
Total for all systems | $3,747,075.15 | $3,284,079.43 | N/A | $1,518,580.28 | N/A |
Other Expenses | $128,206.57 | $127,651.57 | $24,127.36 | ||
True-up | $0.00 | $0.00 | N/A | ($19,953.33) | N/A |
Tax | $3,213.42 | $3,213.42 | N/A | $3,213.42 | N/A |
Forklift Rental | $7,500.75 | $7,500.75 | N/A | $2,682.75 | N/A |
MVPD Notification of Channel Change | $20,000.00 | $20,000.00 | N/A | N/A | N/A |
Develop and air announcement of upcoming channel change | $28,050.00 | $28,050.00 | See Response to August 21 Inquiry. | N/A | N/A |
Equipment Storage | $8,131.40 | $8,131.40 | N/A | $8,131.40 | N/A |
Equipment Delivery and Handling Charges | $20,000.00 | $20,000.00 | N/A | $14,409.12 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $28,566.00 | $28,566.00 | See Response to August 21 Inquiry. | $12,694.00 | N/A |
Local Zoning | $1,000.00 | $1,000.00 | N/A | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | $2,950.00 | N/A |
Actual Information Description | File Name |
---|---|
True-up | |
Tax | |
Forklift Rental | |
MVPD Notification of Channel Change | Information not provided. |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
Local Zoning | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $3,747,075.15 | $3,284,079.43 | $1,518,580.28 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | Yes |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Lisa Asher Secretary 10/08/2021 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Lisa Asher Secretary 10/08/2021 |