FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
48662
Service:
DTV
Call Sign:
WSAV-TV
Channel:
16 (UHF)
File Number:
0000028596
FRN:
0009961889
Date Submitted:
10/08/2021

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

Nexstar Media Inc.

Elizabeth Ryder

545 E. John Carpenter Freeway

Suite 700

Irving, TX 75062

United States

+1 (972) 373-8800 eryder@nexstar.tv Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Elizabeth Ryder

General Counsel

Nexstar Media Inc.

Elizabeth Ryder

545 E. John Carpenter Freeway

Suite 700

Irving, TX 75062

United States

+1 (972) 373-8800 eryder@nexstar.tv

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan Replace transmitter and transmission line, using existing antenna. Acquire temporary antenna and line for continued operation during construction. Map and analyze tower; design and implement modifications if required. See attached

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model CD3200P2
Year 2005
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 42 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model THU9-EVO
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 73.5 kW
Justification for New Transmitter The manufacturer of the existing IOT transmitter advises that it cannot be re-tuned to the assigned channel. A THU9EVO 40 liquid cooled solid state or equivalent is required for a 55.1 kW TPO. A one step up equates to a THU9EVO 48 or equivalent for $1.9M

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring Yes
Size 3 inches
Length 100.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Additional Interior RF System

Interior RF System Existing Transmitter to Interim Transmission line

Transmitter Electrical Services

Transmitter Electrical Services

Transmitter Remote Control

Transmitter Remote Control

Electric Heater

Electric Heater

Interim Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Interim
Description of Use N/A
Change Type Purchase
Manufacturer
Model TMU9-3
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 1.8 kW
Justification for New Transmitter Required to replace existing ACSS interim TX that will not work on the post-auction channel.

Interim Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) Yes
Switchgear (industrial 800 amp) Yes
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring Yes
Size 2 inches
Length 300.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 5 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A
Inside RF System Is an additional interior RF system required to support this interim transmitter? No

Interim Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Transmitter Installation

Transmitter Installation

Transmitter Electrical Services

Transmitter Electrical Services

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TUV-28GTH/3L-R O4SP/O4
Year 2005

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU series
Year 2018
Justification for New Antenna The existing primary antenna is a single channel slotted coaxial which cannot accommodate the assigned channel.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna?
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Additional Antenna Costs

Additional Antenna Costs

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU-16WB C160
Year 2018
Justification for New Antenna An interim antenna is necessary to keep station on the air during main line replacement.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? S
Feed Line Size 3 1/8 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Additional Antenna Costs

Additional Antenna Costs

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Rigid
Diameter 7 3/16 inches
Segment Length 20'
Other Segment Length
Number of parallel runs 1
Length 1330 feet per run
Justification for New Transmission Line An interim line is necessary for the interim antenna to keep station on the air during main line replacement.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
One or more FM, AM or TV radio broadcaster(s) N/A
Others Types of Users N/A
Is tower documented for structural analysis? No
Is tower compliant with Rev G? No
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1049788
Coordinates (NAD83) Latitude (NAD83) 32° 03' 31.7" N-
Longitude (NAD83) 081° 17' 54.4" W-
Overall Structure Height 1478.98 feet
Support Structure Height 1426.16 feet
Ground Elevation Above Mean Sea Level (AMSL) 16.08 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner Nexstar Broadcasting, Inc.
Date Constructed 03/30/2004


Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for undocumented/poorly documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Major Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Weather Delays, Additional Charges

Weather Delays, Additional Charges

Tower Site Preparation Costs

Tower Site Preparation Costs

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 350
Explanation Schedule and coordinate multiple vendors, complete progress reports, and update Schedule 399. Station does not have available personnel or personnel trained in project management for such complex projects. Internal accounting and Project management.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service Yes
Number of Days 17
Justification It will be necessary to survey the site, plan the equipment, develop specifications for purchasing, and oversee multiple vendor RF projects. Station does not have available personnel or personnel trained in such services.

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Sales Tax

Sales and use tax on goods and services at the sate rate of 7.0%.

Equipment Rentals

Equipment Rentals

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $4,186,365.57 $1,982,649.32 N/A $1,854,771.00 N/A
Total for all systems $6,108,746.57 $3,712,257.57 N/A $2,817,906.36 N/A
Interim Transmitter TMU9-3 $223,636.00 $189,396.00 $155,646.00
Transmitter Electrical Services $686.00 $686.00 See Braddy Electric proposal 4/20/19 $686.00 N/A
5 Ton system $20,250.00 $19,250.00 N/A N/A N/A
2" Rigid Conduit and Wiring (Cost per foot) $7,800.00 $7,500.00 N/A $7,500.00 N/A
Switchgear - industrial 800 amp $38,200.00 $36,300.00 N/A $36,300.00 N/A
Service entrance 3 phase/800 amp/208 volt $14,400.00 $13,700.00 N/A $13,700.00 N/A
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW $126,000.00 $95,660.00 Adjusted down from 120,000 to 95,660; See Rohde & Schwarz quote 123821.1 attached. $81,160.00 N/A
Transmitter Installation $16,300.00 $16,300.00 See Land Communications estimate 1144 $16,300.00 N/A
Primary Transmitter THU9-EVO $3,962,729.57 $1,793,253.32 $1,699,125.00
Electric Heater $1,790.00 $1,790.00 Add heat to existing HVAC system $0.00 N/A
Transmitter Remote Control $2,459.57 $2,459.57 See Heartland Video quote WISQ50985-01 $0.00 N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $85,450.00 Increased from $35,000 to $85,450 by transferring from "Additional Interior RF System" to "Transformer 3 Phase/480v-300 KVA" to cover the required electrical costs. See attached cover letter and quote. $85,450.00 N/A
Switchgear - industrial 800 amp $38,200.00 $36,300.00 N/A $36,300.00 N/A
UHF - Liquid Cooled Solid State Transmitter 68.5 - 75 kW $1,999,000.00 $391,000.00 See Rohde & Schwarz quote 802-045879.1 and Rohde & Schwarz quote 118458.0, less costs previously submitted on different transmitter line $390,721.25 N/A
Transmitter Electrical Services $1,680.00 $1,680.00 See Braddy Electric proposal 3/22/19 $1,680.00 N/A
Additional Interior RF System $89,600.00 $89,600.00 Reduced from $140,000 to $89,600 and moved difference to the "Transformer 3 phase/480v - 300 KVA" component in order to cover the required electrical costs (see attached cover letter and quote) N/A N/A
3" Rigid Conduit and Wiring (Cost per foot) $5,200.00 $4,900.00 N/A $4,900.00 N/A
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW $1,788,000.00 $1,180,073.75 ***System Notice: Estimate adjusted and locked because line has been superseded.*** $1,180,073.75 N/A

Components

Actual Information Description File Name
Transmitter Electrical Services

Component Description:
Connect transformer for aux transmitter
Amount:
$686.00
5 Ton system Information not provided.
2" Rigid Conduit and Wiring (Cost per foot)

Component Description:
Various electrical.
Amount:
$7,500.00
Switchgear - industrial 800 amp

Component Description:
Various electrical.
Amount:
$36,300.00
Service entrance 3 phase/800 amp/208 volt

Component Description:
Electrical costs interim transmitter
Amount:
$13,700.00
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW

Component Description:
Credit for cancelled installation
Amount:
($14,500.00)

Component Description:
Interim transmitter
Amount:
$95,660.00
Transmitter Installation

Component Description:
Auxiliary transmitter installation
Amount:
$16,300.00
Electric Heater

Component Description:
Electrical Heater for Transmitter building
Amount:
$1,790.00
Transmitter Remote Control

Component Description:
Transmitter remote control; see also shipping and sales tax
Amount:
$2,459.57
Transformer 3 phase/480v - 300 KVA

Component Description:
Various electrical.
Amount:
$85,450.00
Switchgear - industrial 800 amp

Component Description:
Various electrical.
Amount:
$36,300.00
UHF - Liquid Cooled Solid State Transmitter 68.5 - 75 kW

Component Description:
Steel heat exchanger stacking stands. See also sales tax.
Amount:
$4,500.00

Component Description:
Final installment due on transmitter; see also sales tax.
Amount:
$386,221.25
Transmitter Electrical Services

Component Description:
Connect transformers for main transmitter
Amount:
$1,680.00
Additional Interior RF System Information not provided.
3" Rigid Conduit and Wiring (Cost per foot)

Component Description:
Various electrical.
Amount:
$4,900.00
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW

Component Description:
Additional transmitter components
Amount:
$21,410.00

Component Description:
Installment #2 THU9-EVO Transmitter package, due at delivery 3/30/18
Amount:
$772,442.50

Component Description:
Downpayment 25% of THU9-EVO 73.5kW ATSC / 67Kw OFDM - Transmitter Package
Amount:
$386,221.25

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $402,350.50 $406,512.00 N/A $318,298.75 N/A
Total for all systems $6,108,746.57 $3,712,257.57 N/A $2,817,906.36 N/A
Interim Antenna TFU-16WB C160 $119,885.00 $119,355.00 $105,555.00
Additional Antenna Costs $3,630.00 $3,630.00 See Dielectric order confirmation SO 692002 $3,630.00 N/A
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed) $7,600.00 $7,400.00 N/A N/A N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $0.00 N/A
UHF - High Power, Side Mount, basic slot antenna, 1000 kW input, horizontally polarized $101,925.00 $101,925.00 See Dielectric quote 700416CMZ-3 $101,925.00 N/A
Primary Antenna TFU series $282,465.50 $287,157.00 $212,743.75
Additional Antenna Costs $16,435.50 $16,435.50 See related invoices and costs per attached Dielectric order confirmations SO 692003, SO 1328002 and SO 1354002 $16,435.50 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $0.00 N/A
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized $247,000.00 $235,000.00 N/A $166,986.75 N/A
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $29,321.50 See related invoices $29,321.50 Costs for other components exceeded original estimate by $7,711. Request is made for adjustment. Revised costs for other components exceeded original estimate. See attached change order on invoice 136002. Request for adjustment of $17,621.50.

Components

Actual Information Description File Name
Additional Antenna Costs

Component Description:
Additional antenna component
Amount:
$3,630.00
Elbow complex, single channel, at antenna input, per 3 1/8. feedline (if needed) Information not provided.
Sweep test of existing antenna

Component Description:
Repack Sweep - one field engineer on-site for one day, travel expenses and report; item 22 on invoice.
Amount:
$2,880.00

Component Description:
Repack Sweep - one field engineer on-site for one day, travel expenses and report; item 22 on invoice.
Amount:
$2,880.00

Component Description:
Cost was not incurred with this vendor as previously quoted.
Amount:
($5,760.00)
UHF - High Power, Side Mount, basic slot antenna, 1000 kW input, horizontally polarized

Component Description:
UHF-Broadband panel, side mount aux, interim; item 1 on invoice
Amount:
$45,866.25

Component Description:
Remaining balance due on component.
Amount:
$10,192.50

Component Description:
UHF-Broadband panel, side mount aux, interim; item 1 on invoice
Amount:
$45,866.25
Additional Antenna Costs

Component Description:
Additional antenna costs
Amount:
$11,148.00

Component Description:
Additional antenna costs
Amount:
$3,052.50

Component Description:
Additional antenna cost
Amount:
$2,235.00
Sweep test of existing antenna

Component Description:
Second payment on component.
Amount:
$2,880.00

Component Description:
Service not provided by this vendor and credited from final invoice.
Amount:
($5,760.00)

Component Description:
First payment due.
Amount:
$2,880.00
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized

Component Description:
First payment due on component.
Amount:
$71,732.25

Component Description:
Balance due Antenna component - see summary at bottom of invoice
Amount:
$23,522.25

Component Description:
Second payment due on component.
Amount:
$71,732.25
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
Second payment due on component.
Amount:
$5,572.35

Component Description:
First payment due on component.
Amount:
$5,572.35

Component Description:
Balance due on components. See change order attached to invoice.
Amount:
$11,851.60

Component Description:
First payment due for component.
Amount:
$1,005.75

Component Description:
Second payment due on component.
Amount:
$1,005.75

Component Description:
First payment due on component.
Amount:
$2,156.85

Component Description:
Second payment due on component.
Amount:
$2,156.85

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $385,700.00 $227,085.75 N/A $218,145.75 N/A
Total for all systems $6,108,746.57 $3,712,257.57 N/A $2,817,906.36 N/A
Interim Transmission Line $385,700.00 $227,085.75 $218,145.75
Rigid Transmission Line - copper, 7 3/16" $385,700.00 $227,085.75 See Dielectric quote 700416CMZ-3 $218,145.75 N/A

Components

Actual Information Description File Name
Rigid Transmission Line - copper, 7 3/16"

Component Description:
Rigid Transmission line, copper; item 2 on invoice.
Amount:
$102,188.59

Component Description:
Balance due on component.
Amount:
$13,768.57

Component Description:
Rigid Transmission line, copper; item 2 on invoice.
Amount:
$102,188.59

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $701,460.50 $668,660.50 N/A $215,918.90 N/A
Total for all systems $6,108,746.57 $3,712,257.57 N/A $2,817,906.36 N/A
Primary Tower TOWER $701,460.50 $668,660.50 $215,918.90
Weather Delays, Additional Charges $42,000.00 $42,000.00 See related invoices $41,862.40 N/A
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study $26,300.00 $25,000.00 N/A $16,000.00 N/A
Major tower reinforcement/modifications $421,000.00 $400,000.00 N/A $237,045.00 N/A
Tall Tower (greater than 500') $210,500.00 $200,000.00 N/A ($80,649.00) N/A
Tower Site Preparation Costs $1,660.50 $1,660.50 Site prep required by Coast to Coast prior to tower work; see related invoices $1,660.50 N/A

Components

Actual Information Description File Name
Weather Delays, Additional Charges

Component Description:
Weather delays and additional work
Amount:
$28,185.00

Component Description:
Weather delays and additional charges
Amount:
$13,677.40
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study

Component Description:
Tower Analysis
Amount:
$6,000.00

Component Description:
Post Modification Inspection
Amount:
$2,500.00

Component Description:
Construction Drawings for Tower Modifications
Amount:
$7,500.00
Major tower reinforcement/modifications

Component Description:
Deposit for Repack Interim Antenna Installation and Top Mount TV Antenna Replacement Services - see also invoice 1829
Amount:
$36,750.00

Component Description:
Progress billing for tower services
Amount:
$68,705.00

Component Description:
Progress billing for tower services
Amount:
$85,000.00

Component Description:
Completion of tower services
Amount:
$17,706.00

Component Description:
Materials relating to tower reinforcement; see tax amount added in sales tax line.
Amount:
$1,660.50

Component Description:
Deposit for Repack Tower Modification Services, Interim Antenna Installation and Top Mount TV Antenna Replacement Services - see also invoice 1949 for amount applied
Amount:
$5,000.00

Component Description:
Progress billing Tower Services
Amount:
$29,245.80

Component Description:
Progress billing Tower Services
Amount:
$13,677.40

Component Description:
Progress billing Tower services
Amount:
$23,884.00
Tall Tower (greater than 500')

Component Description:
Deposit for Repack Tower Modification Services, Interim Antenna Installation and Top Mount TV Antenna Replacement Services - see also invoice 1944 for amount applied
Amount:
$5,000.00

Component Description:
Decrease due to incorrect mapping on first submission. See Major tower reinforcement/modifications.
Amount:
($85,000.00)

Component Description:
Progress billing Tower Service
Amount:
$17,706.00

Component Description:
Decrease is due to incorrect mapping on first submission. See Major tower reinforcement/modifications.
Amount:
($68,705.00)

Component Description:
Decrease due to incorrect mapping on previous submission. See Major tower reinforcements/ modifications
Amount:
($17,706.00)

Component Description:
Deposit for Repack Tower Modification Services - see also invoice 1829
Amount:
$36,750.00

Component Description:
Progress billing Tower Services
Amount:
$68,705.00

Component Description:
Clearing costs for Tower and Rigging
Amount:
$13,600.00

Component Description:
Progress billing Tower Services
Amount:
$85,000.00
Tower Site Preparation Costs

Component Description:
Tower site prep materials
Amount:
$1,660.50

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $124,220.00 $119,250.00 N/A $39,191.00 N/A
Total for all systems $6,108,746.57 $3,712,257.57 N/A $2,817,906.36 N/A
Outside Professional Services $124,220.00 $119,250.00 $39,191.00
Additional Field Engineering Service, 17 Days $34,000.00 $34,000.00 N/A N/A N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,000.00 N/A $550.00 N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A $0.00 N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $0.00 N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A $1,000.00 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A $625.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $2,500.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A N/A N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A N/A N/A
Project management of the transition $55,300.00 $52,500.00 N/A $34,516.00 N/A
ASR modification (prepare FCC Form 854) $2,105.00 $2,000.00 N/A N/A N/A

Components

Actual Information Description File Name
Additional Field Engineering Service, 17 Days Information not provided.
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase

Component Description:
FAA Consultation and preparation of FCC Form 7460, item 6 from invoice summary
Amount:
$550.00

Component Description:
FAA Consultation, item 6 from invoice summary
Amount:
$550.00
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application

Component Description:
License to Cover application, item 9 from invoice summary
Amount:
$625.00
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
Prepare engineering section of FCC Form 2100, modification, item 4 from invoice summary
Amount:
$2,500.00
Prepare request for Special Temporary Authorization

Component Description:
Prepare request for STA, item 7 from invoice summary
Amount:
$1,000.00

Component Description:
Prepare request for Special Temporary Authorization, item 7 from invoice summary
Amount:
$1,000.00
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
Prepare License to Cover application
Amount:
$625.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Prepare FCC Form 2100, item 3 from invoice summary
Amount:
$2,500.00

Component Description:
Prepare engineering section FCC Form 2100, item 3 from invoice summary
Amount:
$2,500.00
Perform engineering study for new channel assignment and antenna development Information not provided.
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form Information not provided.
Project management of the transition

Component Description:
Project management services, item 1 from invoice summary
Amount:
$4,212.50

Component Description:
Project management services, item 8 from invoice summary
Amount:
$5,424.00

Component Description:
Project management services, item 2 from invoice summary
Amount:
$300.00

Component Description:
Project management services
Amount:
$50.00

Component Description:
Project management services Mar 2019
Amount:
$117.00

Component Description:
Project management services Apr 2019
Amount:
$162.50

Component Description:
Engineering Consulting - 11/2018
Amount:
$100.00

Component Description:
Project management services April 2019
Amount:
$50.00

Component Description:
Project management services
Amount:
$520.00

Component Description:
Project management services 3.30.19 through 4.26.19
Amount:
$150.00

Component Description:
Project management services 3.2.19 through 3.29.19
Amount:
$5,075.00

Component Description:
Project Management for Structural Analysis and Tower Modifications. Services from October 27, 2017 through December 31, 2017.
Amount:
$1,612.50

Component Description:
Engineering Consulting - 10/2018
Amount:
$125.00

Component Description:
Project management services,various, item 8 from invoice summary
Amount:
$5,424.00

Component Description:
Project management services, item 5 from invoice summary
Amount:
$150.00

Component Description:
Project management services 6.30.18 through 7.27.18
Amount:
$150.00

Component Description:
Engineering Consulting - 8/2018
Amount:
$200.00

Component Description:
Project management services May 2019
Amount:
$162.50

Component Description:
Project management services
Amount:
$880.00

Component Description:
Project Management services 1.27.18 to 2.23.18
Amount:
$300.00

Component Description:
Project Management for Structural Analysis and Tower Modifications. Services from January 1, 2018 through January 26, 2018.
Amount:
$525.00

Component Description:
Prepare FCC Schedule 387, item 5 from invoice summary
Amount:
$150.00

Component Description:
Project management services, item 1 from invoice summary
Amount:
$4,212.50

Component Description:
Project Management for Structural Analysis and Tower Modifications with Kessler & Gehman consultant
Amount:
$13,500.00

Component Description:
Project management services 5.26.18 through 6.29.18
Amount:
$450.00

Component Description:
Project management services 7.28.18 through 9.28.18
Amount:
$150.00

Component Description:
Project management services 9.29.18 through 10.26.18
Amount:
$150.00

Component Description:
Prepare FCC Schedule 387 Progress Report, item 2 from invoice summary
Amount:
$300.00
ASR modification (prepare FCC Form 854) Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $308,650.00 $308,100.00 N/A $171,580.96 N/A
Total for all systems $6,108,746.57 $3,712,257.57 N/A $2,817,906.36 N/A
Other Expenses $308,650.00 $308,100.00 $171,580.96
Equipment Rentals $1,100.00 $1,100.00 See related invoices $1,060.50 N/A
Sales Tax $252,500.00 $252,500.00 Sales and use tax on goods and services based on GA state rate of 7.0%. $153,971.23 N/A
MVPD Notification of Channel Change $2,000.00 $2,000.00 N/A N/A N/A
Develop and air announcement of upcoming channel change $3,500.00 $3,500.00 N/A N/A N/A
Equipment Storage $9,000.00 $9,000.00 N/A $1,648.23 N/A
Equipment Delivery and Handling Charges $20,000.00 $20,000.00 N/A $12,397.00 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $9,000.00 $9,000.00 N/A N/A N/A
Non-zoning permits $0.00 $0.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A $2,504.00 N/A

Components

Actual Information Description File Name
Equipment Rentals

Component Description:
Equipment rentals
Amount:
$1,060.50
Sales Tax

Component Description:
Tax on storage container
Amount:
$36.60

Component Description:
Tax on tower site prep materials
Amount:
$116.24

Component Description:
Tax due on transmitter
Amount:
$71,500.00

Component Description:
Tax on storage container
Amount:
$40.79

Component Description:
Tax due on antenna components
Amount:
$36,718.51

Component Description:
Sales tax on interim transmitter
Amount:
$5,681.20

Component Description:
Sales tax related to transmitter components
Amount:
$1,498.70

Component Description:
Sales tax on heat exchanger stacking stands
Amount:
$315.00

Component Description:
Sales tax on 25% installment
Amount:
$25,135.69

Component Description:
Sales tax on transmitter remote control
Amount:
$175.30

Component Description:
Sales tax on materials;
Amount:
$116.24

Component Description:
Sales tax relating to R&S electrical invoice.
Amount:
$12,890.50

Component Description:
Tax on storage container
Amount:
$38.00
MVPD Notification of Channel Change Information not provided.
Develop and air announcement of upcoming channel change Information not provided.
Equipment Storage

Component Description:
Storage container for antenna
Amount:
$522.81

Component Description:
Storage container for antenna
Amount:
$582.66

Component Description:
Storage container for antenna
Amount:
$542.76
Equipment Delivery and Handling Charges

Component Description:
Freight cost for additional antenna components
Amount:
$1,938.94

Component Description:
Freight cost for additional antenna components
Amount:
$381.36

Component Description:
Freight cost for additional aux antenna components
Amount:
$1,395.50

Component Description:
Freight cost for transmission line component
Amount:
$623.20

Component Description:
Freight costs
Amount:
$8,058.00

Component Description:
Shipping costs, transmitter remote control
Amount:
$44.75
Disposal Costs (for equipment and other waste, net of any salvage value) Information not provided.
Non-zoning permits Information not provided.
DTV Medical Facility Notification

Component Description:
Notification of Medical Facilities
Amount:
$2,504.00

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $6,108,746.57 $3,712,257.57 $2,817,906.36

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. Yes

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Elizabeth Ryder

General Counsel


10/08/2021

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Elizabeth Ryder

General Counsel


10/08/2021

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Elizabeth Ryder

General Counsel


10/08/2021