Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
48481
Service:
DTV
Call Sign:
WNJS
Channel:
22 (UHF)
File Number:
0000028331
FRN:
0004368007
Date Submitted:
11/18/2021

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

NEW JERSEY PUBLIC BROADCASTING AUTHORITY

Doing Business As: NEW JERSEY PUBLIC BROADCASTING AUTHORITY

Richard Williams

25 S.Stockton St

TRENTON, NJ 08625

United States

+1 (609) 777-5257 Rick.Williams@treas.nj.gov Government Entity

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Richard Williams

Director of Engineering

New Jersey Public Broadcasting Authority

Richard Williams

25 South Stockton St.

Trenton, NJ 08625

United States

+1 (609) 777-5257 rick.williams@treas.nj.gov

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan The Licensee will utilize portions of the existing facility during the transition to the repacked channel. Please note that due to procurement delays, the NJPBA has revised our transition plan to include an interim facility. Details attached.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model ULTIMATE
Year 2006
Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power Capacity 10 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model Parallax
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 10.5 kW
Justification for New Transmitter The current transmitter will not be able to meet new ERP and has reached its service life.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) Yes
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring Yes
Size 2 inches
Length 300.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Interim Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Interim
Description of Use N/A
Change Type Purchase
Manufacturer
Model EC704HP-BB
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 3.4 kW
Justification for New Transmitter Due to procurement delays in obtaining a full-power transmitter, the licensee has developed an alternative transition plan to construct an interim facility. Please see the attached (revised) transition plan.

Interim Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring Yes
Size 1.25 inches
Length 60.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A
Inside RF System Is an additional interior RF system required to support this interim transmitter? No

Interim Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Auxiliary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Auxiliary (Backup)
Description of Use Used during tower maintenance and emergency broadcasting.
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 176.4 kW
Manufacturer
Model TFU-16DSB-B CH22
Year 2006

Auxiliary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Auxiliary (Backup)
Description of Use Used during tower maintenance and emergency operations
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? Yes
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 176.4 kW
Manufacturer
Model TFU-16DSB-B CH23
Year 2017
Justification for New Antenna Licensee required to change channel. Current auxiliary antenna can not be tuned to repacked channel.

Auxiliary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 4 1/16 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Auxiliary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Add Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmission currently shared with any other stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Dielectric
Type Rigid
Diameter 7 3/16 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 887 feet per run

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Main internal

Internal RF switching and rigid lines between new transmitter and load to main antenna.

Auxiliary Transmission Line

Back to Top

Add Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Auxiliary (Backup)
Description of Use Backup
Ownership Owned
Owner N/A
Site N/A
Is this transmission currently shared with any other stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Dielectric
Type Rigid
Diameter 3 1/8 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 850 feet per run

Auxiliary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Aux internal

Internal RF switching and rigid lines between new transmitter and load to auxiliary antenna.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users Yes
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? No
ASR Number
Coordinates (NAD83) Latitude (NAD83) 39° 43' 41.0" N-
Longitude (NAD83) 074° 50' 39.0" W-
Overall Structure Height 937.00 feet
Support Structure Height 821.80 feet
Ground Elevation Above Mean Sea Level (AMSL) 112.00 feet
Structure Type GTOWER - Guyed Structure Used for Communication Purposes
Tower Owner New Jersey Public Broadcasting Authority
Date Constructed 01/01/1972

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
48486 WNJS-FM FM
167543 WPSJ-CD DTV

Other Types of Users

Users
RP

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Rigging Costs

Rigging costs associated with the installation of the new auxiliary antenna.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 353
Explanation Due to the licensees limited staff, the NJPBA will utilize a State of NJ contract to manage preconstruction planning and project management.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service Yes
Number of Days 2
Justification Antenna system sweep testing with vector network analyzer. Coordinate transmission line and elbow complex adjustments with tower crew. Prepare hard copy plots of measurements and detailed report.

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Additional Attorney Fees

Additional FCC attorney fees to cover coordinating on state procurement issues, coordinating with other linked or dependent stations and FCC compliance matters relating to repack of WNJS.

Professional Engineer

Additional Professional Engineering fees to prepare FCC compliance matters relating to repack of WNJS.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? No
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Transmitter removal costs

Building space is required to install new transmitter and filter. Please refer to transition plan narrative for additional explanation.

Electrical Labor and Materials

Demolition and removal of retired electrical equipment and installation of new disconnects, panels, breakers associated with new transmitter systems. Price reflects NJ prevailing wage for 216 man-hours.

FCC Progress Reports

Required FCC Progress Reports

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $774,135.00 $780,092.00 N/A $609,500.00 N/A
Total for all systems $1,748,413.00 $1,548,414.40 N/A $880,443.56 N/A
Interim Transmitter EC704HP-BB $257,435.00 $257,435.00 $101,565.00
1.25" Rigid Conduit and Wiring $2,160.00 $2,160.00 N/A $1,890.00 N/A
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW $155,600.00 $155,600.00 N/A N/A N/A
UHF - Air Cooled Solid State Transmitter 3.4 kW $99,675.00 $99,675.00 ***System Notice: Estimate adjusted and locked because line has been superseded.*** $99,675.00 N/A
Primary Transmitter Parallax $516,700.00 $522,657.00 $507,935.00
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW $494,500.00 $500,757.00 Transmitter is over budget by $5,757 due to an increase in Waterford transmitter cost. $500,257.00 Transmitter costs increased over estimated cost by $5,757.00 due to final transmitter invoice submission from vendor Hitachi Comark.
Service entrance 3 phase/800 amp/208 volt $14,400.00 $14,400.00 N/A $7,678.00 N/A
2" Rigid Conduit and Wiring (Cost per foot) $7,800.00 $7,500.00 N/A N/A N/A

Components

Actual Information Description File Name
1.25" Rigid Conduit and Wiring

Component Description:
Interim professional broadcast engineering services.
Amount:
$1,890.00
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW Information not provided.
UHF - Air Cooled Solid State Transmitter 3.4 kW

Component Description:
Interim transmitter invoice for Waterford works.
Amount:
$99,675.00
UHF - Liquid Cooled Solid State Transmitter 8.2 - 13 kW

Component Description:
Waterford Transmitter invoice S10612-3.
Amount:
$17,420.00

Component Description:
Waterford Transmitter invoice S10612-2 Items 1,4, partial 3 and 5. Originally applied for reimbursement of $236,460.68. After review, per Mendenhall, reimbursement of $228,690.7435 requested for reimbursement.
Amount:
$228,690.74

Component Description:
Waterford Transmitter invoice S10612-1 lines 1,4 partial 3, and 5. Originally applied for reimbursement of $262,734.09. After review, per Mendenhall, reimbursement of $254,146.26 requested for reimbursement.
Amount:
$254,146.26
Service entrance 3 phase/800 amp/208 volt

Component Description:
Waterford electrical parts quotes. Requested amount $7,678.00.
Amount:
N/A

Component Description:
Waterford electrical parts.
Amount:
$7,678.00
2" Rigid Conduit and Wiring (Cost per foot) Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $134,110.00 $129,100.00 N/A $69,526.57 N/A
Total for all systems $1,748,413.00 $1,548,414.40 N/A $880,443.56 N/A
Auxiliary Antenna TFU-16DSB-B CH23 $134,110.00 $129,100.00 $69,526.57
Sweep test of existing antenna $6,730.00 $8,000.00 The Waterford antenna costs increased $1,270.00 over estimated costs due to increases in rigging labor required on the tower. $8,000.00 The $1,270 cost increase was due to rigging labor required on the tower.
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,000.00 N/A $0.00 N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $22,000.00 N/A $12,656.25 N/A
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) $9,570.00 $9,100.00 N/A N/A N/A
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized $89,400.00 $85,000.00 N/A $48,870.32 N/A

Components

Actual Information Description File Name
Sweep test of existing antenna

Component Description:
Waterford re-sweep package quote.
Amount:
N/A

Component Description:
Waterford re-sweep package.
Amount:
$8,000.00
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) Information not provided.
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
Waterford Aux Antenna Trains Towers invoice 17615 quote.
Amount:
N/A

Component Description:
Trains Towers invoice 17615: Side Antenna Mounts.
Amount:
$12,656.25
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) Information not provided.
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized

Component Description:
Trains Towers invoice 17729: quote.
Amount:
N/A

Component Description:
Trains Towers invoice 17729: Aux antenna Antenna Freight Costs
Amount:
$3,335.94

Component Description:
Waterford aux antenna quote.
Amount:
N/A

Component Description:
Trains Towers invoice 17615: Side Mount Antenna Dielectric TFU-16DSB-B Channel 23 Antenna.
Amount:
$45,534.38

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $50,000.00 $50,000.00 N/A $18,462.07 N/A
Total for all systems $1,748,413.00 $1,548,414.40 N/A $880,443.56 N/A
Primary Transmission Line $25,000.00 $25,000.00 $0.00
Main internal $25,000.00 $25,000.00 N/A N/A N/A
Auxiliary Transmission Line $25,000.00 $25,000.00 $18,462.07
Aux internal $25,000.00 $25,000.00 N/A $18,462.07 N/A

Components

Actual Information Description File Name
Main internal Information not provided.
Aux internal

Component Description:
Waterford interim transmitter installation, transmission line, parts quote. Requested amount $5,391.07.
Amount:
N/A

Component Description:
Waterford interim transmitter installation, transmission line, parts.
Amount:
$5,391.07

Component Description:
Waterford auxiliary antenna transmission line labor and parts.
Amount:
$13,071.00

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $581,100.00 $362,000.00 N/A $43,044.75 N/A
Total for all systems $1,748,413.00 $1,548,414.40 N/A $880,443.56 N/A
Primary Tower GTOWER $581,100.00 $362,000.00 $43,044.75
Structural engineering tower load study for well documented tower $12,600.00 $12,000.00 N/A N/A N/A
Minor tower reinforcement/modifications $158,000.00 $150,000.00 N/A N/A N/A
Tall Tower (greater than 500') $210,500.00 $0.00 N/A N/A N/A
Rigging Costs $200,000.00 $200,000.00 N/A $43,044.75 N/A

Components

Actual Information Description File Name
Structural engineering tower load study for well documented tower Information not provided.
Minor tower reinforcement/modifications Information not provided.
Tall Tower (greater than 500') Information not provided.
Rigging Costs

Component Description:
Waterford aux antenna rigging costs support. Requested amount $43,044.75.
Amount:
N/A

Component Description:
Waterford Aux Antenna Rigging Costs.
Amount:
$43,044.75

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $126,559.00 $144,713.40 N/A $74,473.02 N/A
Total for all systems $1,748,413.00 $1,548,414.40 N/A $880,443.56 N/A
Outside Professional Services $126,559.00 $144,713.40 $74,473.02
Project management of the transition $55,774.00 $72,343.40 Project management of the transition costs increased by $16,569.40 over original cost estimates due to increases in professional engineering project management costs for main and auxiliary antennas transition. $34,031.02 N/A
Professional Engineer $7,950.00 $7,950.00 Professional Engineering fees to perform the engineering study related to the interim repack facility for WNJS, prepare the exhibits for an STA request, and review of the engineering section of the 399 form. $2,047.50 N/A
Additional Attorney Fees $7,500.00 $7,500.00 Additional FCC attorney fees to cover interim transmitter plans, state procurement issues and delays impacting phase timing and to cover coordination with other linked and dependent repack stations. $3,752.50 N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $7,360.00 $7,360.00 N/A $711.00 N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,365.00 N/A $908.50 N/A
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application $4,210.00 $4,210.00 N/A $1,994.75 N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,260.00 N/A $5,056.00 N/A
Prepare request for Special Temporary Authorization $4,100.00 $4,100.00 N/A $2,429.25 N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $1,580.00 N/A N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $3,690.00 The RF Consulting Engineer Fee's - Aux Antenna prepare engineering section of FCC form 2100, construction permit application costs increased by $1,585 over original cost estimates due to increases in professional engineering costs. $3,690.00 The RF Consulting Engineer Fee's - Aux Antenna prepare engineering section of FCC form 2100, construction permit application costs increased by $1,585 over original cost estimates due to increases in professional engineering costs.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,155.00 N/A $1,732.50 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,360.00 N/A $3,097.50 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,630.00 N/A $1,659.00 N/A
Prepare and or review reimbursement form $2,630.00 $2,630.00 N/A $2,590.50 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,580.00 N/A N/A N/A
Additional Field Engineering Service, 2 Days $11,000.00 $11,000.00 N/A $10,773.00 N/A

Components

Actual Information Description File Name
Project management of the transition

Component Description:
Interim professional broadcast engineering services.
Amount:
$6,848.02

Component Description:
Waterford main and auxiliary antennas project management.
Amount:
$26,073.00

Component Description:
Waterford repack project management costs.
Amount:
$1,110.00

Component Description:
Non reimbursable per Mendenhall. Waterford transmitter. Partial item 3.
Amount:
N/A

Component Description:
Non reimbursable per Mendenhall. Waterford transmitter. Partial item 3.
Amount:
N/A
Professional Engineer

Component Description:
Waterford channel assignment review and interference study. MSW Inv 7148 Items 1 and 2.
Amount:
$2,047.50
Additional Attorney Fees

Component Description:
Waterford repack attorney service fee's.
Amount:
$79.00

Component Description:
Waterford repack attorney service fee's.
Amount:
$118.50

Component Description:
Waterford repack attorney service fee's.
Amount:
$395.00

Component Description:
Waterford repack attorney service fee's.
Amount:
$237.00

Component Description:
Waterford repack attorney service fee's.
Amount:
$158.00

Component Description:
Waterford repack attorney service fee's.
Amount:
$237.00

Component Description:
Waterford repack attorney service fee's.
Amount:
$316.00

Component Description:
Waterford repack attorney service fee's.
Amount:
$1,145.50

Component Description:
Waterford repack attorney service fee's.
Amount:
$158.00

Component Description:
Waterford repack attorney service fee's.
Amount:
$79.00

Component Description:
Waterford repack attorney service fee's.
Amount:
$671.50

Component Description:
Waterford repack attorney service fee's.
Amount:
$158.00
Attorney Fees - Prepare and File request for Special Temporary Authorization

Component Description:
Waterford repack special temporary authority filing attorney fee's.
Amount:
$158.00

Component Description:
Waterford repack special temporary authority filing attorney fee's.
Amount:
$39.50

Component Description:
Waterford repack special temporary authority filing attorney fee's.
Amount:
$513.50
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application

Component Description:
waterford repack form 2100(main) license to cover application attorney service fee's support. Requested amount $908.50.
Amount:
N/A

Component Description:
Waterford repack form 2100(main)license to cover application attorney service fee's.
Amount:
$908.50
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application

Component Description:
Waterford aux antenna construction permit and license application attorney fee's support. Requested amount $592.50.
Amount:
N/A

Component Description:
Waterford aux antenna construction permit and license application attorney fee's support. Requested amount $197.50
Amount:
N/A

Component Description:
Waterford aux antenna construction permit and license application attorney fee's support. Requested amount $118.50.
Amount:
N/A

Component Description:
Waterford aux antenna construction permit and license application attorney fee's.
Amount:
$118.50

Component Description:
Waterford aux antenna construction permit and license application attorney fee's.
Amount:
$651.75

Component Description:
Waterford aux antenna construction permit and license application attorney fee's.
Amount:
$197.50

Component Description:
Waterford aux antenna construction permit and license application attorney fee's.
Amount:
$592.50

Component Description:
attorney fees, aux antenna, prepare form 2100
Amount:
$434.50
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
Construction permit application attorney service fee's.
Amount:
$1,461.50

Component Description:
Construction permit application attorney service fee's.
Amount:
$197.50

Component Description:
Construction permit application attorney service fee's.
Amount:
$355.50

Component Description:
Construction permit application attorney service fee's support. Requested amount $276.50.
Amount:
N/A

Component Description:
Construction permit application attorney service fee's.
Amount:
$276.50

Component Description:
Construction permit application attorney service fee's.
Amount:
$237.00

Component Description:
Construction permit application attorney service fee's.
Amount:
$39.50

Component Description:
attorney fees, prepare & file form 2100 permit application
Amount:
$2,488.50
Prepare request for Special Temporary Authorization

Component Description:
Waterford repack special temporary authority filing preparation attorney service fee's .
Amount:
$197.50

Component Description:
Waterford repack special temporary authority filing preparation attorney service fee's.
Amount:
$39.50

Component Description:
Waterford repack special temporary authority filing preparation attorney service fee's .
Amount:
$474.00

Component Description:
Waterford repack special temporary authority filing preparation attorney service fee's.
Amount:
$553.00

Component Description:
Waterford repack special temporary authority filing preparation attorney service fee's support. Requested amount $118.50.
Amount:
N/A

Component Description:
Waterford repack special temporary authority filing preparation attorney service fee's .
Amount:
$118.50

Component Description:
Waterford repack special temporary authority filing preparation attorney service fee's .
Amount:
$730.75

Component Description:
Waterford repack special temporary authority filing preparation attorney service fee's .
Amount:
$316.00
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application

Component Description:
Waterford prepare and file FCC construction permit application and associated exhibits to maximize on post-repack channel. MSW item 2 and 3.
Amount:
$1,470.00

Component Description:
Waterford antenna's engineering services revised invoice. Requesting $2,220.00.
Amount:
N/A

Component Description:
Waterford antennas engineering services.
Amount:
$2,220.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Waterford FCC construction permit filing form 2100 and exhibits. MSW items 3 and 4.
Amount:
$1,732.50
Perform engineering study for new channel assignment and antenna development

Component Description:
Waterford study to determine max ERP and interference limitations. MSW item 1.
Amount:
$3,097.50
Address transition timing and coordination issues w/ other stations and wireless

Component Description:
Waterford repack transition timing and station coordination attorney service fee's.
Amount:
$513.50

Component Description:
Waterford repack transition timing and station coordination attorney service fee's.
Amount:
$434.50

Component Description:
Waterford repack transition timing and station coordination attorney service fee's.
Amount:
$355.50

Component Description:
Waterford repack transition timing and station coordination attorney service fee's.
Amount:
$158.00

Component Description:
Waterford repack transition timing and station coordination attorney service fee's.
Amount:
$197.50
Prepare and or review reimbursement form

Component Description:
Waterford FCC construction permit filing 399 form initial reimbursement budget form and estimates. MSW inv 7148 items 5 and 6.
Amount:
$1,050.00

Component Description:
Repack reimbursement related Attorney service fee's.
Amount:
$750.50

Component Description:
Repack reimbursement related Attorney service fee's.
Amount:
$197.50

Component Description:
Repack reimbursement related Attorney service fee's.
Amount:
$118.50

Component Description:
Repack reimbursement related Attorney service fee's.
Amount:
$158.00

Component Description:
Repack reimbursement related Attorney service fee's.
Amount:
$79.00

Component Description:
Repack reimbursement related Attorney service fee's.
Amount:
$118.50

Component Description:
Repack reimbursement related Attorney service fee's.
Amount:
$118.50
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Additional Field Engineering Service, 2 Days

Component Description:
Waterford interim transmitter installation, transmission line, parts quote. Requested amount $10,773.00.
Amount:
N/A

Component Description:
Waterford interim transmitter installation labor.
Amount:
$10,773.00

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $82,509.00 $82,509.00 N/A $65,437.15 N/A
Total for all systems $1,748,413.00 $1,548,414.40 N/A $880,443.56 N/A
Other Expenses $82,509.00 $82,509.00 $65,437.15
FCC Progress Reports $5,000.00 $5,000.00 Prepare and file quarterly FCC progress reports on Schedule 387. Reports required by FCC. $2,528.00 N/A
Electrical Labor and Materials $25,800.00 $25,800.00 NJ prevailing wage for 216 hours of labor and material costs associated with the electrical demolition, relocation and installation work related to the installation of new transmitter systems. $23,692.93 N/A
Transmitter removal costs $27,898.00 $27,898.00 Labor and materials cost based on New Jersey state contract and the New Jersey prevailing wage act. Further explanation provided in the transition plan narrative. Revised estimate increased $13,188 due to extra labor needed for transmitter removal. $27,897.22 N/A
MVPD Notification of Channel Change $3,261.00 $3,261.00 We are required to provide two medical facility notices. One prior to the commencement of our interim facility and the other prior to the commencement of full-power operations. Please see attached quotes for each notification service. $3,261.00 The original quote had an incorrect estimate. The updated quote has been attached.
Develop and air announcement of upcoming channel change $4,500.00 $4,500.00 N/A $118.50 N/A
DTV Medical Facility Notification $11,550.00 $11,550.00 N/A $7,939.50 N/A
Equipment Storage $2,000.00 $2,000.00 N/A N/A N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $2,500.00 $2,500.00 N/A N/A N/A

Components

Actual Information Description File Name
FCC Progress Reports

Component Description:
Waterford repack progress report attorney service fee's.
Amount:
$39.50

Component Description:
Waterford repack progress report attorney service fee's.
Amount:
$237.00

Component Description:
Waterford repack progress report attorney service fee's.
Amount:
$39.50

Component Description:
Waterford repack progress report attorney service fee's.
Amount:
$39.50

Component Description:
Waterford repack progress report attorney service fee's.
Amount:
$79.00

Component Description:
Waterford repack progress report attorney service fee's.
Amount:
$39.50

Component Description:
Waterford repack progress report attorney service fee's.
Amount:
$39.50

Component Description:
Waterford repack progress report attorney service fee's.
Amount:
$39.50

Component Description:
Waterford repack progress report attorney service fee's.
Amount:
$79.00

Component Description:
Waterford repack progress report attorney service fee's.
Amount:
$39.50

Component Description:
Waterford repack progress report attorney service fee's.
Amount:
$39.50

Component Description:
Waterford repack progress report attorney service fee's support. Requested amount $316.00.
Amount:
N/A

Component Description:
Waterford repack progress report attorney service fee's.
Amount:
$316.00

Component Description:
Waterford repack progress report attorney service fee's.
Amount:
$79.00

Component Description:
Waterford repack progress report attorney service fee's.
Amount:
$39.50

Component Description:
Waterford repack progress report attorney service fee's.
Amount:
$316.00

Component Description:
Waterford repack progress report attorney service fee's.
Amount:
$355.50

Component Description:
Waterford repack progress report attorney service fee's.
Amount:
$434.50

Component Description:
Waterford repack progress report attorney service fee's.
Amount:
$237.00

Component Description:
Waterford repack progress report attorney service fee's.
Amount:
$39.50
Electrical Labor and Materials

Component Description:
Professional broadcast engineering services.
Amount:
$4,522.50

Component Description:
Waterford electrical labor quote. Requested amount $19,107.43.
Amount:
N/A

Component Description:
Waterford electrical labor.
Amount:
$19,170.43
Transmitter removal costs

Component Description:
Decommission and dispose of WNJS channel 23 analog transmitter.
Amount:
$27,897.22

Component Description:
Decommision and dispose of WNJS channel 23 analog transmitter.
Amount:
$27,897.22
MVPD Notification of Channel Change

Component Description:
Notifications Services: MVPD and Cable for NJPBA channel change to CH23.
Amount:
$3,261.00
Develop and air announcement of upcoming channel change

Component Description:
Waterford repack develop and air announcement channel change attorney service fee's.
Amount:
$118.50
DTV Medical Facility Notification

Component Description:
Waterford repack notification attorney service fee's.
Amount:
$158.00

Component Description:
Notification for medical facilities. DTV Notifications Services. Invoice 2096 revised quote.
Amount:
$7,742.00

Component Description:
Waterford repack notification attorney service fee's.
Amount:
$39.50
Equipment Storage Information not provided.
Disposal Costs (for equipment and other waste, net of any salvage value) Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $1,748,413.00 $1,548,414.40 $880,443.56

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. Yes

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Richard A. Williams

Executive Director


11/18/2021

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Richard A. Williams

Executive Director


11/18/2021

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Richard A. Williams

Executive Director


11/18/2021

Attachments