Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
SAGAMOREHILL OF KANSAS CITY LICENSES, LLC Applicant Doing Business As: SAGAMOREHILL OF KANSAS CITY LICENSES, LLC |
Brian Short PO Box 10019 Suite 733 New York, NY 10019 United States |
+1 (913) 638-7373 | b@thegateway.tv | Other |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Tony zumMallen QCommunications, LLC |
705B SE Melody LN #314 Lee's Summit, MO 64063 United States |
+1 (816) 729-1177 | tony@qcomm.tv |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Replace the transmitter and antenna per the channel reassignment with reasonable and customary engineering and business practices. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | 1375W | |
Year | 2012 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 3 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TRN-5X-U-38-C | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 3.3 kW | |
Justification for New Transmitter | New channel requires additional filtering, so needing slightly larger transmitter to overcome and achieve original coverage. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | Yes | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | No | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Name | Description |
---|---|
Transmitter Shipping fee |
Transmitter Shipping and Handling fees |
Transmitter Decommissioning |
Harvesting and removal of old transmitter |
Site Prep |
Preparation of site for new transmitter |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | Yes | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | LP48/49 | |
Year | 2012 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | Yes | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Slotted Coaxial | |
ERP: | 15.0 kW | |
Manufacturer | ||
Model | ATC-BCE416UA-33 | |
Year | 2018 | |
Justification for New Antenna | New channel requires new antenna. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Antenna Mobilization expenses |
Mobilization and transportation fees for antenna installation |
Antenna Shipping fee |
Antenna Shipping and Handling fees |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Ownership | Leased | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1064715 | |
Coordinates (NAD83) | Latitude (NAD83) | 39° 01' 19.9" N- |
Longitude (NAD83) | 094° 30' 49.7" W- | |
Overall Structure Height | 1158.12 feet | |
Support Structure Height | 1061.34 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 886.14 feet | |
Structure Type | GTOWER - Guyed Structure Used for Communication Purposes | |
Tower Owner | American Towers LLC | |
Date Constructed | 02/14/2003 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study need for guyed or free-standing tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | No |
Name | Description |
---|---|
Travel Expenses |
Travel Expenses cost determined from quote. |
Structural Analysis and Mapping |
Structural Analysis and Mapping |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 350 | |
Explanation | Required to assist in the turnkey management of the channel relocation project in order that the existing internal personal can maintain and operate the stations daily operational requirements and plans. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Prepare Form 601 | Yes | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | No |
Name | Description |
---|---|
Engineering-General |
Engineering consultations |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | Yes |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $132,401.57 | $100,959.07 | N/A | $55,959.07 | N/A |
Total for all systems | $330,320.92 | $227,935.42 | N/A | $148,341.42 | N/A |
Primary Transmitter TRN-5X-U-38-C | $132,401.57 | $100,959.07 | $55,959.07 | ||
Site Prep | $8,000.00 | $8,000.00 | Site preparation including receiving and inventory of transmitter and components; prepare site for acceptance of transmitter; pre-assemble cabinets and subassemblies; ensure all installation materials are available for installation crew. Estimated cost. | N/A | N/A |
Transmitter Decommissioning | $7,000.00 | $7,000.00 | Estimated costs of harvesting and removal of old transmitter from site. Revised upon Site Survey. | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW | $106,300.00 | $54,857.50 | Cost determined from invoice and quote | $54,857.50 | N/A |
Transmitter Building Site Survey/Installation | $10,000.00 | $30,000.00 | 4/1/2020- Working to obtain quote which may be delayed due to coronavirus pandemic. | N/A | N/A |
Transmitter Shipping fee | $1,101.57 | $1,101.57 | Shipping cost determined from invoice and quote | $1,101.57 | N/A |
Actual Information Description | File Name |
---|---|
Site Prep | Information not provided. |
Transmitter Decommissioning | Information not provided. |
UHF - Air Cooled Solid State Transmitter 2.501 - 3.999 kW | |
Transmitter Building Site Survey/Installation | Information not provided. |
Transmitter Shipping fee |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $25,997.00 | $23,339.00 | N/A | $15,642.00 | N/A |
Total for all systems | $330,320.92 | $227,935.42 | N/A | $148,341.42 | N/A |
Primary Antenna ATC-BCE416UA-33 | $25,997.00 | $23,339.00 | $15,642.00 | ||
Side Mount antenna brackets | $4,625.00 | $4,625.00 | N/A | N/A | N/A |
Sweep test of transmission line and antenna | $5,730.00 | $3,072.00 | Cost determined from invoice | $3,072.00 | N/A |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Circular | $11,000.00 | $11,000.00 | Per attached invoice #2043 from Alive Telecom | $11,000.00 | N/A |
Antenna Shipping fee | $1,570.00 | $1,570.00 | Per attached Alive Telecom quote. | $1,570.00 | N/A |
Antenna Mobilization expenses | $3,072.00 | $3,072.00 | Per attached United Towers invoice | N/A | N/A |
Actual Information Description | File Name |
---|---|
Side Mount antenna brackets | Information not provided. |
Sweep test of transmission line and antenna | |
UHF-Low Power, Side Mount, Slotted Coaxial, 15.0kW input, Circular | |
Antenna Shipping fee | |
Antenna Mobilization expenses | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $26,812.00 | $20,612.00 | N/A | $17,540.00 | N/A |
Total for all systems | $330,320.92 | $227,935.42 | N/A | $148,341.42 | N/A |
Primary Tower GTOWER | $26,812.00 | $20,612.00 | $17,540.00 | ||
Structural Analysis and Mapping | $4,000.00 | $4,000.00 | Cost determined by invoice. | $4,000.00 | N/A |
Study needed for guyed or free-standing tower | $8,700.00 | $2,500.00 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $2,500.00 | N/A |
Travel Expenses | $3,072.00 | $3,072.00 | Cost determined from quote attached. | $0.00 | N/A |
Complex Tower (includes, e.g., towers with candelabras and/or stacked antennas) | $11,040.00 | $11,040.00 | Per attached United Towers quote. | $11,040.00 | N/A |
Actual Information Description | File Name |
---|---|
Structural Analysis and Mapping | |
Study needed for guyed or free-standing tower | |
Travel Expenses | |
Complex Tower (includes, e.g., towers with candelabras and/or stacked antennas) |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $138,400.35 | $76,315.35 | N/A | $59,200.35 | N/A |
Total for all systems | $330,320.92 | $227,935.42 | N/A | $148,341.42 | N/A |
Outside Professional Services | $138,400.35 | $76,315.35 | $59,200.35 | ||
Engineering-General | $6,798.75 | $6,798.75 | Cost determined by invoices. | $6,798.75 | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $26,625.00 | Cost determined by invoices. | $26,625.00 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $2,235.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $3,262.50 | $878.75 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,577.50 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $1,280.00 | $1,280.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $2,102.50 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $1,052.50 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,025.00 | N/A | N/A | N/A |
Prepare Form 601 | $755.00 | $755.00 | N/A | N/A | N/A |
Form 399 assistance or other Program Management costs | $23,276.60 | $23,276.60 | Cost determined by invoices. | $23,276.60 | Subtotal and estimated costs are the same. |
Project management of the transition | $36,925.00 | $2,960.00 | Required to assist in the turnkey management of the channel relocation project in order that the existing internal personal can maintain and operate the stations daily operational requirements and plans. | $0.00 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $2,500.00 | See attached QComm Proposal QC-19016. | $2,500.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $1,248.75 | N/A | $0.00 | N/A |
Actual Information Description | File Name |
---|---|
Engineering-General | |
Comprehensive coverage verification via field study, if needed | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare Form 601 | Information not provided. |
Form 399 assistance or other Program Management costs | |
Project management of the transition | |
Prepare/ Review 399 reimbursement form | |
Perform engineering study for displacement application |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $6,710.00 | $6,710.00 | N/A | $0.00 | N/A |
Total for all systems | $330,320.92 | $227,935.42 | N/A | $148,341.42 | N/A |
Other Expenses | $6,710.00 | $6,710.00 | $0.00 | ||
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $335.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,110.00 | N/A | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $305.00 | $305.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 Major change CP application | $4,960.00 | $4,960.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $330,320.92 | $227,935.42 | $148,341.42 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | No |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Brian Short Chief Engineer 12/16/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Brian Short Chief Engineer 12/16/2021 |