Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
CENTRAL MICHIGAN UNIVERSITY |
1999 East Campus Drive Mount Pleasant, MI 48859 United States |
+1 (989) 774-3105 | radem2je@cmich.edu | Government Entity |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Wayne Henderson Director Technical Services Central Michigan University |
Wayne Henderson Public Broadcasting 1999 E. Campus Dr. Mt. Pleasant, MI 48859 United States |
+1 (989) 774-6864 | hende1ww@cmich.edu |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | Yes |
Briefly describe transition plan | New transmitters and combiner for WPBN-TV, WGTU, and WCMV to be installed, tested, and working into load prior to end of Transition Phase 6. It is not anticipated the buildup will affect current operations until night of cutover. See attached doc. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | NV7930V | |
Year | 2004 | |
Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power Capacity | 15.6 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | ULXTE-30 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 19.2 kW | |
Justification for New Transmitter | Transmitter no longer supported, end of life, no field service available, many parts required for retune not available, will not make new operating power. See attached notice from Rohde & Schwarz. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Electrical firm 1st site visit for evaluation. 2nd Visit install conduit, pull electrical wiring, and activate electrical to interim transmitter, 3rd trip get electrical activated to permanent transmitter via new panel. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Heating and Cooling | |
Size | Other | |
Other Size | 7 tons | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Concrete Pad for Heat Exchangers and AC Heat Pump Units |
Concrete Pad to be added under existing and new ice bridge for the Heat Exchangers and AC Heat Pump outdoor Units to be placed on and protected. |
Replacement Building Outside Wall Panels |
To Replace Building Outside Wall Panels to repair openings left when existing old AC Wall Mounted Units are Removed. Supplied by the building manufacturer. |
GatesAir Transmitter Install Services |
WCMV Interim UAXTE-8 Installation-Commissioning, WCMV ULXTE-30 Installation-Commissioning, WCMV HE-Pump Install Test, GatesAir Program Management at WCMV Site. |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase | |
Manufacturer | ||
Model | UAXTE-8R44 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 4.8 kW | |
Justification for New Transmitter | Space constraints due to the 3 cabinet Rohde & Schwarz, existing 4 channel high power combining system, 3 pumps stands, and other systems will have to be removed before space will be available for the new transmitter and combiner system can be installed. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | No | |
Description | N/A | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A | |
Inside RF System | Is an additional interior RF system required to support this interim transmitter? | Yes |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Retune Existing |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | Yes | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 3 | |
Number of Panels | 48 | |
Design power capacity in use | 35.0 % | |
Lower Limit | 482.00 MHz | |
Upper Limit | 608.00 MHz | |
Other Antenna Type | N/A | |
ERP: | 338.0 kW | |
Manufacturer | Dielectric | |
Model | TUF-P4-12/48H-1 | |
Year | 2002 |
Facility ID | Call Sign |
---|---|
59280 | WGTU |
21253 | WPBN-TV |
Section | Question | Response |
---|---|---|
Sweep Test of Existing Antenna | Do you need a sweep test of existing antenna? | Yes |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | Yes |
Type | New | |
Number of channels supported | 3 | |
Frequencies of channels supported | RF channel | |
Frequency | N/A |
RF Channel Number |
---|
34 |
29 |
35 |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Utilize Existing |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | Yes | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | Dielectric |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | Broadband | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1260 feet per run |
Facility ID | Call Sign |
---|---|
59280 | WGTU |
21253 | WPBN-TV |
Name | Description |
---|---|
Core two Holes through Building Walls |
The interbuilding transmission line will enter one building with a concrete block wall and the other building a 4 inch outside aggregate paneled wall; both require 9 inch holes cored for the line to enter. |
InterBuilding Transmission Line Installation Services |
The GatesAir installation group does not install outdoor transmission line; our Tower Consultants will secure a tower company to provide the line installation services. |
Expand Ice Shielding |
New Inter Building Transmission Line and Heat Exchangers Requires Ice Shield. |
WCMV WPBN WGTU CIF Combiner Output Connection to Antenna Feed |
3 Stations combined requires CIF/Combiner Output to be connected to the Antenna Feed the night of cutover. Items 6 1/8": 2 Transmission Lines, 1 Dir. Coupler, 3 Elbows, 1 Gas Stop, 3 Flange Field Soft Solder, 3 Anchor Connectors, 1 Fine Matcher, 4 Hngrs |
WGTU Transmitter Connection to Branch Combiner |
All Items 3 1/8": 2 Transmission Lines, 6 Elbows, 1 Fine Matcher, 5 Flange Field Soft Solder, 5 Anchor Connectors, 5 "O" Rings, 1 Ballast Load Kit, 4 Hangers. |
WPBN Transmitter Connection to Branch Combiner |
All Items 4 1/16": 2 Transmission Lines, 6 Elbows, 1 Fine Matcher, 5 Flange Field Soft Solder, 5 Anchor Connectors, 5 "O" Rings, 1 Ballast Load Kit, 4 Hangers. |
InterBuilding Horizontal Line Run Between Branch and CIF Combiner |
2 Buildings; 1 with Branch Combiner and 2nd Building with CIF/Combiner. Need Inter-Building Horizontal Line Run. All Items 6 1/8": 9 Transmission Lines, 7 Elbows, 1 Fine Matcher, 2 Gas Stops, 4 Flange Field Soft Solder, 6 Anchors, 2 "O" Rings, plus Misc |
Spare Transmission Components |
Qty 1 of each transmission line items as construction spares or in the event of shortage. 3 Elbows each size, 3 Flange Field Soft Solder each size, 3 Transmission Lines each size, 9 anchor connectors each size, 18 "O" Rings each size, 12 Caps & Hangers |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | No |
Number of Hours | N/A | |
Explanation | N/A | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | No |
RF exposure measurements | No | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Internal Field Engineering Staff Expenses |
Field Engineering Staff Initial Investigative Site Visits. Print workup, Manage Deliveries, On Site for Installations, Signal and Remote Control Wiring, Ice Bridge and RF Transmission Line Installation. |
Demolition Services |
Demolition Services to Remove old 4 Channel Manifold Combiner System from Ceiling including Disposal. |
Internal Project Management |
Director of Technical Services Project Management. CP, Form 399, Site Investigation, Bid Specs, Purchasing Activity, On Site during Construction, License to Cover. See Detailed Doc Attached. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,191,458.09 | $685,097.08 | N/A | $667,231.95 | N/A |
Total for all systems | $1,500,628.92 | $1,150,112.51 | N/A | $1,080,054.13 | N/A |
Interim Transmitter UAXTE-8R44 | $384,000.00 | $93,840.74 | $93,840.74 | ||
UHF - Air Cooled Solid State Transmitter 4 - 6 kW | $236,500.00 | $91,446.00 | N/A | $91,446.00 | ACTUAL COST PER QUOTE |
UHF inside RF system including switching | $147,500.00 | $2,394.74 | N/A | $2,394.74 | ACTUAL COST PER QUOTE |
Primary Transmitter ULXTE-30 | $807,458.09 | $591,256.34 | $573,391.21 | ||
GatesAir Transmitter Install Services | $61,254.45 | $61,254.45 | N/A | $61,254.45 | ACTUAL COST PER QUOTE |
Other Electrical Service: Electrical firm 1st site visit for evaluation. 2nd Visit install conduit, pull electrical wiring, and activate electrical to interim transmitter, 3rd trip get electrical activated to permanent transmitter via new panel. | $36,732.00 | $36,732.00 | Electrical firm 4 site visits, new distribution panel and breakers. This expense covers both main and interim transmitters full electrical hookup. Building wide Lightning and Surge Suppression also included as existing obsolete and modules are blown. | $36,732.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | $684,000.00 | $467,798.25 | N/A | $449,933.12 | Actual cost per quote from GatesAir |
Replacement Building Outside Wall Panels | $1,678.20 | $1,678.20 | Building manufacturer is providing replacement wall panels to repair opening left when old AC Units are removed. | $1,678.20 | N/A |
Concrete Pad for Heat Exchangers and AC Heat Pump Units | $2,931.00 | $2,931.00 | Additional Concrete Pad for the new AC Heat Pump Units and TV Transmitter outdoor exchangers to sit on under ice shield protection. | $2,931.00 | N/A |
Other -- HVAC Service Type: H Size:7 (Other) | $20,862.44 | $20,862.44 | Existing AC Units are 20 years old and are wall mounted right where the very large Waveguide CIF_Combiner has to be placed. Access to these will be cut off; the replacement units mount high on the walls out of the way. | $20,862.44 | N/A |
Actual Information Description | File Name |
---|---|
UHF - Air Cooled Solid State Transmitter 4 - 6 kW | |
UHF inside RF system including switching | |
GatesAir Transmitter Install Services | |
Other Electrical Service: Electrical firm 1st site visit for evaluation. 2nd Visit install conduit, pull electrical wiring, and activate electrical to interim transmitter, 3rd trip get electrical activated to permanent transmitter via new panel. | |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | |
Replacement Building Outside Wall Panels | |
Concrete Pad for Heat Exchangers and AC Heat Pump Units | |
Other -- HVAC Service Type: H Size:7 (Other) |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $90,930.00 | $258,225.10 | N/A | $258,225.10 | N/A |
Total for all systems | $1,500,628.92 | $1,150,112.51 | N/A | $1,080,054.13 | N/A |
Primary Antenna TUF-P4-12/48H-1 | $90,930.00 | $258,225.10 | $258,225.10 | ||
New combiner, cost per channel (without antenna) | $84,200.00 | $250,695.69 | CMU is sole owner of the channel combiner; by lease agreement we are responsible for its replacement in exchange for the property and tower use. CMU has entered the total cost for the three station combiner system as in the uploaded GatesAir Bid/Quotation | $250,695.69 | ACTUAL COST PER QUOTE / INVOICE |
Sweep test of existing antenna | $6,730.00 | $7,529.41 | See uploaded GatesAir Bid/Quote for Dielectric Field Engineer On-Site for One Day, Travel, Expenses, and Report. Sweep the Line Between Buildings, Align Fine Matchers, and Checkout Branch and CIF Combiners. | $7,529.41 | ACTUAL COST PER QUOTE |
Actual Information Description | File Name |
---|---|
New combiner, cost per channel (without antenna) | |
Sweep test of existing antenna |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $121,499.85 | $121,499.85 | N/A | $106,726.27 | N/A |
Total for all systems | $1,500,628.92 | $1,150,112.51 | N/A | $1,080,054.13 | N/A |
Primary Transmission Line | $121,499.85 | $121,499.85 | $106,726.27 | ||
WGTU Transmitter Connection to Branch Combiner | $8,564.40 | $8,564.40 | Reference the uploaded WCMV GatesAir Bid/Quotation Q-81065 Page 9. | $8,564.40 | ACTUAL COST |
Spare Transmission Components | $14,773.58 | $14,773.58 | Qty 1 of each transmission line items as construction spares or in the event of shortage. 3 Elbows each size, 3 Flange Field Soft Solder each size, 3 Transmission Lines each size, 9 anchor connectors each size, 18 "O" Rings each size, 12 Caps & Hangers. | $0.00 | ACTUAL COST PER QUOTE |
InterBuilding Horizontal Line Run Between Branch and CIF Combiner | $41,001.80 | $41,001.80 | Reference the uploaded WCMV GatesAir Bid/Quotation Q-81065 Page 10 & 11. | $41,001.80 | ACTUAL COST PER QUOTE |
WPBN Transmitter Connection to Branch Combiner | $12,806.07 | $12,806.07 | Reference the uploaded WCMV GatesAir Bid/Quotation Q-81065 Page 9 & 10. | $12,806.07 | ACTUAL COST PER QUOTE |
InterBuilding Transmission Line Installation Services | $16,220.00 | $16,220.00 | Tower consulting Company is providing the tower crews to install the interbuilding transmission line run. | $16,220.00 | N/A |
Core two Holes through Building Walls | $617.50 | $617.50 | Core two holes through two concrete building walls so the interbuilding transmission line can enter. | $617.50 | N/A |
Expand Ice Shielding | $6,767.00 | $6,767.00 | Ice Shield expansion for TV Transmitter heat exchangers and AC outdoor units; attached quotation from Isenhart Electric and CO to Purchase Orders. | $6,767.00 | N/A |
WCMV WPBN WGTU CIF Combiner Output Connection to Antenna Feed | $20,749.50 | $20,749.50 | Reference the uploaded WCMV GatesAir Bid/Quotation Q-81065 Page 11. | $20,749.50 | ACTUAL COST PER QUOTE |
Actual Information Description | File Name |
---|---|
WGTU Transmitter Connection to Branch Combiner | |
Spare Transmission Components | |
InterBuilding Horizontal Line Run Between Branch and CIF Combiner | |
WPBN Transmitter Connection to Branch Combiner | |
InterBuilding Transmission Line Installation Services | |
Core two Holes through Building Walls | |
Expand Ice Shielding | |
WCMV WPBN WGTU CIF Combiner Output Connection to Antenna Feed |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $34,920.00 | $32,834.50 | N/A | $15,047.75 | N/A |
Total for all systems | $1,500,628.92 | $1,150,112.51 | N/A | $1,080,054.13 | N/A |
Outside Professional Services | $34,920.00 | $32,834.50 | $15,047.75 | ||
Prepare request for Special Temporary Authorization | $2,050.00 | $1,500.00 | N/A | $918.50 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | $241.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | $3,000.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $2,718.75 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,584.50 | Total cost slightly higher than estimated cost. | $2,584.50 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $3,500.00 | N/A | $234.00 | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,000.00 | N/A | $1,414.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $393.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $2,428.50 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | $1,115.50 | N/A |
Actual Information Description | File Name |
---|---|
Prepare request for Special Temporary Authorization | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees - Negotiation of lease and other matters for shared locations | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare and or review reimbursement form |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $61,820.98 | $52,455.98 | N/A | $32,823.06 | N/A |
Total for all systems | $1,500,628.92 | $1,150,112.51 | N/A | $1,080,054.13 | N/A |
Other Expenses | $61,820.98 | $52,455.98 | $32,823.06 | ||
Internal Project Management | $10,524.00 | $10,524.00 | Dir. of Technical Services Project Management. CP, Form 399, Site Investigation, Bid Specs, Purchasing Activity, On Site during Construction, License to Cover. See Detailed Doc Attached. | $1,697.89 | N/A |
Demolition Services | $1,272.00 | $1,272.00 | Demolition Services to Remove old Manifold Combiner from Building Ceiling and Dispose of the System. | $0.00 | N/A |
Internal Field Engineering Staff Expenses | $10,909.00 | $10,909.00 | Field Engineering Staff Initial Investigative Site Visits. Print workup, Manage Deliveries, On Site for Installations, Signal and Remote Control Wiring, Ice Bridge and RF Transmission Line Installation. See Detailed Doc. | $1,759.19 | N/A |
DTV Medical Facility Notification | $11,550.00 | $2,185.00 | Quote from DTV Notifications for WCMV Medical Facility Notifications. | $2,185.00 | N/A |
MVPD Notification of Channel Change | $1,752.00 | $1,752.00 | Initial Work Up of Addresses and Contact Info for MVPD and Satellite Companies; then Preparation and Certified Mailing of Notices, Phone Time Working with Reception and Specifics of Receiving Station. | $1,752.00 | N/A |
Equipment Delivery and Handling Charges | $25,428.98 | $25,428.98 | Reference the uploaded WCMV GatesAir Bid/Quotation Q-84664 Page 18. Final Freight costs. | $25,428.98 | N/A |
Develop and air announcement of upcoming channel change | $385.00 | $385.00 | Set Up Scope of Effort and Make Assignments. Write and record copy; shoot, edit, export, and ingest the spot. Traffic and Programming staff efforts of spot placement and ensure FCC compliance. | N/A | N/A |
Actual Information Description | File Name |
---|---|
Internal Project Management | |
Demolition Services | Information not provided. |
Internal Field Engineering Staff Expenses | |
DTV Medical Facility Notification | |
MVPD Notification of Channel Change | |
Equipment Delivery and Handling Charges | |
Develop and air announcement of upcoming channel change | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $1,500,628.92 | $1,150,112.51 | $1,080,054.13 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Shannon Franz Manager Business Operations 09/29/2021 |