Facility ID:
20426
Service:
DTV
Call Sign:
WTWO
Channel:
35 (UHF)
File Number:
0000028709
FRN:
0009961889
Date Submitted:
02/04/2022

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

Nexstar Media Inc.

Elizabeth Ryder

545 E. JOHN CARPENTER FREEWAY

SUITE 700

IRVING, TX 75062

United States

+1 (972) 373-8800 eryder@nexstar.tv Corporation

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Elizabeth Ryder

General Counsel

Nexstar Media Inc.

Elizabeth Ryder

545 E. John Carpenter Freeway

Suite 700

Irving, TX 75062

United States

+1 (972) 373-8800 eryder@nexstar.tv

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan See attachment.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Auxiliary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Backup
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model 5 kW
Year 1900
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 5 kW

Auxiliary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model UAXTE-12
Transmitter Type Solid State
Solid State Cooling Air Cooled
Solid State Power capacity 6 kW
Justification for New Transmitter Existing transmitter cannot be converted to repacked channel per manufacturer.

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring Yes
Size 2 inches
Length 50.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Heating and Cooling
Size 5 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model UNKNOWN
Year 2009
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 50 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model THU9EVO-36
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 55 kW
Justification for New Transmitter Existing transmitter cannot be converted to repacked channel per manufacturer and manufacturer is no longer in business. See attached documentation from Comark for pricing. LCSS transmitter is less expensive than the IOT version.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) Yes
Switchgear (industrial 800 amp) Yes
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring Yes
Size 3 inches
Length 100.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 100.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Additional Transmitter Costs

Additional Transmitter Costs

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? Yes
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 2
Number of Panels 64
Design power capacity in use 75.0 %
Lower Limit 600.00 MHz
Upper Limit 630.00 MHz
Other Antenna Type N/A
ERP: 2000.0 kW
Manufacturer
Model 9551516
Year 2007

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
65247 WAWV-TV

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? Yes
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 2
Number of Panels/Bays 64
Lower Limit 470.00 MHz
Upper Limit 650.00 MHz
Design power capacity in use 75.0 %
Other Antenna Type N/A
ERP: 2000.0 kW
Manufacturer
Model TUA-O4-16/64H-1-R-T
Year 2017
Justification for New Antenna Existing broadband panel has VSWR problem at repacked channel. Manufacturer is no longer in business and no product support is available. It is known that antenna was modified earlier and could have reduced original operating range.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 2
Frequencies of channels supported RF channel
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? No
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Broadband
Feed Line Size 7 3/16 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna?
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Enter a list of RF channel numbers.

RF Channel Number
35
18

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Additional Antenna Costs

Additional Antenna Costs

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? Yes
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 2
Number of Panels/Bays 4
Lower Limit 470.00 MHz
Upper Limit 630.00 MHz
Design power capacity in use 25.0 %
Other Antenna Type N/A
ERP: 250.0 kW
Manufacturer
Model TUA-4/16-O4
Year 2017
Justification for New Antenna Station has no way to remain on the air except to acquire/use an interim antenna.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 2
Frequencies of channels supported RF channel
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? No
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? B
Feed Line Size 3 1/8 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Enter a list of RF channel numbers.

RF Channel Number
18

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Dielectric
Type Rigid
Diameter 7 3/16 inches
Other Diameter N/A
Segment Length 20 inches
Other Segment Length N/A
Number of parallel runs 1
Length 910 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
65247 WAWV-TV

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

T Line extension

Add 180 feet of 7" line to existing run to mate with antenna location.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex? No
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1027196
Coordinates (NAD83) Latitude (NAD83) 39° 14' 33.0" N-
Longitude (NAD83) 087° 23' 29.0" W-
Overall Structure Height 999.00 feet
Support Structure Height 892.38 feet
Ground Elevation Above Mean Sea Level (AMSL) 549.86 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner Nexstar Broadcasting, Inc.
Date Constructed 07/01/1965

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
65247 WAWV-TV DTV

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Major Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Additional Tower Modifications

Tower should have been classified as "Serious" instead of "Major".

Weather Days

Costs associated with tower crew unable to work due to adverse weather

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 500
Explanation It will be necessary to schedule and coordinate multiple vendors, complete progress reports, and update Schedule 399. Station does not have available personnel or personnel trained in project management for such complex projects.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements No
Additional Field Engineering Service Yes
Number of Days 15
Justification It is necessary to survey the site, plan the equipment, develop specifications for purchasing, & oversee multiple vendor RF projects. Station does not have available personnel trained in such services.

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Fencing

Fencing

Sales Tax

Sales and use tax for goods and services.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $2,148,640.00 $1,740,460.00 N/A $1,250,856.41 N/A
Total for all systems $4,479,566.07 $3,432,224.57 N/A $2,038,513.37 N/A
Primary Transmitter THU9EVO-36 $1,853,390.00 $1,452,260.00 $1,232,585.41
Service entrance 3 phase/800 amp/208 volt $14,400.00 $14,050.00 N/A $0.00 N/A
Additional Transmitter Costs $2,590.00 $2,590.00 See R&S quote 255981.0 $2,590.00 N/A
Other -- Building Addition Size: 100.0 $5,000.00 $5,000.00 Need to move walls, plumbing, electrical wiring, lighting fixtures, etc. This is the estimated share of WTWO's expense (50%) N/A N/A
3" Rigid Conduit and Wiring (Cost per foot) $5,200.00 $5,000.00 N/A N/A N/A
Switchgear - industrial 800 amp $38,200.00 $37,150.00 N/A N/A N/A
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW $1,788,000.00 $1,388,470.00 See attached Comark quote for 2 tube IOT. $1,229,995.41 N/A
Auxiliary Transmitter UAXTE-12 $295,250.00 $288,200.00 $18,271.00
Other -- HVAC Service Type: H Size:5 (Other) $19,250.00 $19,250.00 N/A $18,271.00 N/A
2" Rigid Conduit and Wiring (Cost per foot) $1,300.00 $1,300.00 N/A N/A N/A
Switchgear - industrial 800 amp $38,200.00 $37,150.00 N/A N/A N/A
UHF - Air Cooled Solid State Transmitter 4 - 6 kW $236,500.00 $230,500.00 N/A N/A N/A

Components

Actual Information Description File Name
Service entrance 3 phase/800 amp/208 volt Information not provided.
Additional Transmitter Costs

Component Description:
Additional transmitter component
Amount:
$2,590.00
Other -- Building Addition Size: 100.0 Information not provided.
3" Rigid Conduit and Wiring (Cost per foot) Information not provided.
Switchgear - industrial 800 amp Information not provided.
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW

Component Description:
Transmitter Single Cabinet Configuration
Amount:
$7,200.00

Component Description:
75% Balance due on WTWO transmitter. See remaining invoice balance 81253.20 sales tax. See also quote from Rohde Schwarz.
Amount:
$870,570.00

Component Description:
25% Down payment on WTWO transmitter system.
Amount:
$290,190.00

Component Description:
WTWO 50% share of installation costs. See also WAWV FAC 65247.
Amount:
$11,600.00

Component Description:
Transmitter building electric work
Amount:
$50,435.41
Other -- HVAC Service Type: H Size:5 (Other)

Component Description:
50% share of HVAC cost. See also $746.97 to sales tax and $19,017.97 to WAWV FAC 65247.
Amount:
$18,271.00
2" Rigid Conduit and Wiring (Cost per foot) Information not provided.
Switchgear - industrial 800 amp Information not provided.
UHF - Air Cooled Solid State Transmitter 4 - 6 kW Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,029,765.00 $624,235.00 N/A $264,074.48 N/A
Total for all systems $4,479,566.07 $3,432,224.57 N/A $2,038,513.37 N/A
Interim Antenna TUA-4/16-O4 $360,270.00 $272,080.00 $0.00
Elbow complex, broadband, at antenna input, per 3 1/8. feedline (if needed) $9,340.00 $8,880.00 N/A N/A N/A
New combiner, cost per channel (without antenna) $84,200.00 $0.00 Use same combiner as purchased for new primary antenna. N/A N/A
Sweep test of existing antenna $6,730.00 $3,200.00 WTWO's share of the cost at 50%. N/A N/A
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 250 horizontally polarized $260,000.00 $260,000.00 N/A N/A N/A
Primary Antenna TUA-O4-16/64H-1-R-T $669,495.00 $352,155.00 $264,074.48
Additional Antenna Costs $14,715.00 $14,715.00 See related Dielectric order confirmations, 50% shared cost with WAWV $10,998.21 N/A
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed) $16,850.00 $12,950.00 WTWO's share of the cost at 50%. Increased to match Dielectric quote. $11,786.27 N/A
Sweep test of existing antenna $6,730.00 $3,200.00 WTWO's share of the cost at 50%. $0.00 N/A
UHF - High Power Top Mount (200-1000 kW), Two Station broadband panel antenna, horizontally polarized $547,000.00 $241,290.00 WTWO's share of the cost at 50%. See attached quote from Dielectric. $241,290.00 N/A
New combiner, cost per channel (without antenna) $84,200.00 $80,000.00 N/A N/A N/A

Components

Actual Information Description File Name
Elbow complex, broadband, at antenna input, per 3 1/8. feedline (if needed) Information not provided.
New combiner, cost per channel (without antenna) Information not provided.
Sweep test of existing antenna Information not provided.
UHF – Broadband Panel, Side Mount Auxiliary/Interim, 250 horizontally polarized Information not provided.
Additional Antenna Costs

Component Description:
Additional antenna component, 50% shared cost with WAWV
Amount:
$111.50

Component Description:
Additional antenna components, 50% shared cost with WAWV
Amount:
$5,968.50

Component Description:
Additional antenna components, 50% shared cost with WAWV
Amount:
$1,031.25

Component Description:
Additional antenna components, 50% shared cost with WAWV
Amount:
$2,240.71

Component Description:
Additional antenna components, 50% shared cost with WAWV
Amount:
$1,646.25
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed)

Component Description:
T/L, 50% shared cost with WAWV
Amount:
($1,117.50)

Component Description:
T/L 7-75, balance due, 50% shared cost with WAWV
Amount:
$335.25

Component Description:
Test Transition, balance due, 50% shared cost with WAWV
Amount:
$239.62

Component Description:
WTWO share line 2 of invoice
Amount:
$3,219.75

Component Description:
WTWO share of line 2 of invoice. See also WAWV FAC 65247.
Amount:
$3,219.75

Component Description:
WTWO share of line 3 of invoice.
Amount:
$1,508.63

Component Description:
WTWO share of line 4 of invoice.
Amount:
$1,078.32

Component Description:
WTWO share of line 4 of invoice. See also WAWV FAC 65247.
Amount:
$1,078.32

Component Description:
WTWO share of line 3 of invoice. See also WAWV FAC 65247.
Amount:
$1,508.63

Component Description:
Elbow complex, balance due, 50% shared cost with WAWV
Amount:
$715.50
Sweep test of existing antenna

Component Description:
Dielectric sweep test canceled, 50% shared cost with WAWV
Amount:
($2,880.00)

Component Description:
WTWO share of line 5 of invoice. See also WAWV FAC 65247.
Amount:
$1,440.00

Component Description:
WTWO Share of line 5 of invoice. See also WAWV FAC 65247.
Amount:
$1,440.00
UHF - High Power Top Mount (200-1000 kW), Two Station broadband panel antenna, horizontally polarized

Component Description:
Antenna, balance due, 50% shared cost with WAWV
Amount:
$6,232.50

Component Description:
WTWO share of line 1 of invoice. See also WAWV FAC 65247.
Amount:
$108,580.50

Component Description:
Antenna, installment #4, 50% shared cost with WAWV
Amount:
$7,155.00

Component Description:
Antenna, installment #3, 50% shared cost with WAWV
Amount:
$10,741.50

Component Description:
WTWO share of line 1 of invoice; see also WAWV FAC 65247.
Amount:
$108,580.50
New combiner, cost per channel (without antenna) Information not provided.

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $28,530.00 $28,530.00 N/A $14,715.00 N/A
Total for all systems $4,479,566.07 $3,432,224.57 N/A $2,038,513.37 N/A
Primary Transmission Line $28,530.00 $28,530.00 $14,715.00
T Line extension $28,530.00 $28,530.00 180 feet of 7" BB T-Line. WTWO's share of the cost at 50%. $14,715.00 N/A

Components

Actual Information Description File Name
T Line extension

Component Description:
Transmission line component, 50% shared cost with WAWV
Amount:
$2,970.00

Component Description:
Transmission line component, 50% shared cost with WAWV
Amount:
$11,745.00

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $795,602.50 $572,768.50 N/A $367,968.50 N/A
Total for all systems $4,479,566.07 $3,432,224.57 N/A $2,038,513.37 N/A
Primary Tower TOWER $795,602.50 $572,768.50 $367,968.50
Structural engineering tower load study for well documented tower $12,600.00 $18,926.00 WTWO's share of the cost at 50%. See related quotes and invoices. $18,926.00 N/A
Major tower reinforcement/modifications $421,000.00 $197,340.00 See PCI quotes 17612-6 $492,060 and 17623-6 $99,420; WTWO 50% share of cost is $296,010 which should have been submitted as Serious tower instead of Major tower; reduced to $197340 for amounts already submitted; See Addl tower mods for bal. $197,340.00 N/A
Tall Tower (greater than 500') $210,500.00 $205,000.00 N/A $82,300.00 N/A
Additional Tower Modifications $109,802.50 $109,802.50 See PCI quotes 17612-6 $492,060 and 17623-6 $99,420; WTWO 50% share of cost is $296,010; $197,340 submitted as Major Tower Mods; Balance to be submitted as Additional Tower Mods. and addendum to 17623-6 $11,132.50 $27,702.50 N/A
Weather Days $41,700.00 $41,700.00 See attached quotes from Precision Communications, Inc. (PCI). $41,700.00 N/A

Components

Actual Information Description File Name
Structural engineering tower load study for well documented tower

Component Description:
Tower modifications design, installment #1, 50% shared cost with WAWV
Amount:
$5,638.00

Component Description:
Structural Analysis, 50% shared with WAWV
Amount:
$1,875.00

Component Description:
Structural analysis, installment #1
Amount:
$1,300.00

Component Description:
Tower modification design, installment #2, 50% shared cost with WAWV
Amount:
$5,638.00

Component Description:
Structural analysis, balance due
Amount:
$2,600.00

Component Description:
Structural Analysis, 50% shared with WAWV
Amount:
$1,875.00

Component Description:
Structural analysis, installment #1, 50% shared cost with WAWV
Amount:
$1,875.00

Component Description:
Structural analysis, installment #2, 50% shared cost with WAWV
Amount:
$1,875.00
Major tower reinforcement/modifications

Component Description:
Payment 2 on Tower Modifications; balance of invoice to sales tax
Amount:
$82,100.00

Component Description:
Amount due on proposal acceptance for Tower Modifications. See also sales tax $5747.00.
Amount:
$82,100.00

Component Description:
Amount due on acceptance for Foundation Mods
Amount:
$16,570.00

Component Description:
Second payment due on Foundation mods.
Amount:
$16,570.00

Component Description:
Foundation modifications, balance due on completion
Amount:
$27,702.50

Component Description:
Tower modifications balance due on completion
Amount:
$99,860.69
Tall Tower (greater than 500')

Component Description:
Main antenna replacement installment #3
Amount:
$27,500.00

Component Description:
Second installment due.
Amount:
$27,400.00

Component Description:
First installment due; see also sales tax
Amount:
$27,400.00
Additional Tower Modifications

Component Description:
Foundation modifications balance due and additional work
Amount:
$27,702.50
Weather Days

Component Description:
Weather days 2.14.18 through 4.3.18
Amount:
$15,750.00

Component Description:
Weather days 4.14.18 through 5.3.18
Amount:
$25,950.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $204,860.00 $196,849.50 N/A $27,657.90 N/A
Total for all systems $4,479,566.07 $3,432,224.57 N/A $2,038,513.37 N/A
Outside Professional Services $204,860.00 $196,849.50 $27,657.90
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $189.50 Please see WTWO Attorney Other Matters Budget Revision Justification Letter N/A N/A
Additional Field Engineering Service, 15 Days $81,000.00 $81,000.00 N/A N/A N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,050.00 N/A $850.00 N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $7,360.00 $7,170.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,305.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,120.00 N/A N/A N/A
Prepare request for Special Temporary Authorization $4,100.00 $3,070.00 N/A $0.00 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,535.00 N/A $625.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,170.00 N/A $3,762.50 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,560.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $2,560.00 N/A N/A N/A
Project management of the transition $79,000.00 $77,000.00 N/A $22,420.40 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,070.00 N/A N/A N/A
ASR modification (prepare FCC Form 854) $2,105.00 $2,050.00 N/A N/A N/A

Components

Actual Information Description File Name
Attorney Fees - Negotiation of lease and other matters for shared locations Information not provided.
Additional Field Engineering Service, 15 Days Information not provided.
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase

Component Description:
FAA 7460-1 preparation and filing
Amount:
$275.00

Component Description:
FCC DTV Repack Services
Amount:
$575.00
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare request for Special Temporary Authorization Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
Prepare License to Cover Application
Amount:
$625.00
Perform engineering study for new channel assignment and antenna development

Component Description:
Repack plan and revision, 399 form info, MCI Panel Analysis
Amount:
$700.00

Component Description:
Creation of initial repacked versus licensed map comparison. Info gather for both station transmission facilities and creation of repack plan in conjunction with engineer.
Amount:
$1,050.00

Component Description:
Evaluation of coverage with interim antenna versus top mount and impact upon transmission systems
Amount:
$787.50

Component Description:
Revise storyboard if needed, interference study, create CP and recalculate ERP if COR changed, transition plan document, create 399, coverage maps, and upload draft docs to ASANA.
Amount:
$700.00

Component Description:
Information gathering, creation of transition plan with definition of initial equipment and service needs.
Amount:
$525.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form Information not provided.
Project management of the transition

Component Description:
Project management services 09.2018
Amount:
$700.00

Component Description:
Project management services
Amount:
$1,134.00

Component Description:
Project management services Mar 2019
Amount:
$299.00

Component Description:
Project management services 12.1.18 through 12.31.18
Amount:
$75.00

Component Description:
Project Management
Amount:
$666.95

Component Description:
Project Management
Amount:
$1,404.75

Component Description:
Project management services 9.29.18 through 10.26.18
Amount:
$150.00

Component Description:
Project Management
Amount:
$616.70

Component Description:
Project management services Nov 2019
Amount:
$65.00

Component Description:
Project Management
Amount:
$232.50

Component Description:
Project management services May 2020
Amount:
$1,841.30

Component Description:
Project management services. See items 1, 2, 3 from the invoice summary.
Amount:
$1,296.00

Component Description:
Project management services 1.1.19 through 1.31.19
Amount:
$150.00

Component Description:
Project management services
Amount:
$556.50

Component Description:
Project management services
Amount:
$150.00

Component Description:
Project management services Feb 2019
Amount:
$84.50

Component Description:
Project management services from May 26, 2018 through June 29, 2018 including services from consultants Kessler and Gehman Associates.
Amount:
$600.00

Component Description:
Project management services Apr 2019
Amount:
$78.00

Component Description:
Project management services from July 28, 2018 through September 28, 2018 including services provided by consultants Kessler and Gehman Associates.
Amount:
$875.00

Component Description:
Professional Services from January 27, 2018 through March 30, 2018
Amount:
$375.00

Component Description:
Project Management
Amount:
$891.25

Component Description:
Project Management
Amount:
$348.75

Component Description:
Project Management
Amount:
$348.75

Component Description:
Project Management
Amount:
$852.50

Component Description:
Project Management
Amount:
$1,173.75

Component Description:
Project management services 08.2018
Amount:
$150.00

Component Description:
Project Management for Structural Analysis and Tower Modifications. Services from October 27, 2017 through December 31, 2017.
Amount:
$225.00

Component Description:
Project Management
Amount:
$312.50

Component Description:
Project Management for Structural Analysis and Tower Modifications. Services from January 1, 2018 through January 26, 2018.
Amount:
$75.00

Component Description:
Project management services
Amount:
$150.00

Component Description:
Project management services Dec 2019
Amount:
$50.00

Component Description:
Project Management
Amount:
$171.25

Component Description:
Project management services 10.27.18 through 11.30.18
Amount:
$775.00

Component Description:
Project management services
Amount:
$229.00

Component Description:
Project Management
Amount:
$1,564.60

Component Description:
Project management services Apr 2020
Amount:
$3,566.60

Component Description:
Project Management
Amount:
$31.25

Component Description:
Project Management
Amount:
$155.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
ASR modification (prepare FCC Form 854) Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $272,168.57 $269,381.57 N/A $113,241.08 N/A
Total for all systems $4,479,566.07 $3,432,224.57 N/A $2,038,513.37 N/A
Other Expenses $272,168.57 $269,381.57 $113,241.08
Sales Tax $210,000.00 $210,000.00 Sales and use tax for goods and services based on IN state rates. $89,334.98 N/A
Fencing $1,978.57 $1,978.57 Please see WTWO Fencing Budget Revision Justification Letter $1,978.57 N/A
MVPD Notification of Channel Change $2,500.00 $2,500.00 N/A N/A N/A
Develop and air announcement of upcoming channel change $1,500.00 $1,500.00 Costs to develop and produce crawls and spots for viewer notification. N/A N/A
Equipment Storage $1,000.00 $1,000.00 N/A N/A N/A
Equipment Delivery and Handling Charges $25,000.00 $25,000.00 N/A $2,583.53 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $16,500.00 $16,500.00 Disposal costs per attached quote from Kevin Ballentine/USA Commercial $16,500.00 N/A
Local Zoning $500.00 $500.00 N/A N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $1,000.00 See related invoice $1,000.00 Preparation and submission of STA filing quoted at fixed rate higher than original cost estimate submitted.
DTV Medical Facility Notification $11,550.00 $8,000.00 N/A $1,844.00 N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,070.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $333.00 N/A N/A N/A

Components

Actual Information Description File Name
Sales Tax

Component Description:
Tax on additional transmitter component
Amount:
$181.30

Component Description:
Request for sales tax component of this invoice. See related request for balance of Transmitter $870,570.00
Amount:
$81,253.20

Component Description:
50% share of sales tax related to invoice. See also WAWV FAC 65247.
Amount:
$746.97

Component Description:
Sales tax related to down payment for Tower Modifications.
Amount:
$5,747.00

Component Description:
Payment 2, sales tax balance;
Amount:
$1,253.00

Component Description:
Sales tax; see remaining $27400 in Tall Tower.
Amount:
$153.51
Fencing

Component Description:
Fencing installed
Amount:
$1,978.57
MVPD Notification of Channel Change Information not provided.
Develop and air announcement of upcoming channel change Information not provided.
Equipment Storage Information not provided.
Equipment Delivery and Handling Charges

Component Description:
Antenna shipping costs, 50% shared cost with WAWV
Amount:
$1,336.26

Component Description:
Antenna shipping cost, 50% shared cost with WAWV
Amount:
$33.48

Component Description:
Antenna shipping costs, 50% shared cost with WAWV
Amount:
$305.08

Component Description:
Antenna shipping cost, 50% shared cost with WAWV
Amount:
$77.16

Component Description:
Antenna shipping costs, 50% shared cost with WAWV
Amount:
$470.68

Component Description:
Antenna shipping cost, 50% shared cost with WAWV
Amount:
$331.06

Component Description:
Antenna shipping cost, 50% shared cost with WAWV
Amount:
$29.81
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
Deposit for disposal services
Amount:
$4,500.00

Component Description:
Balance due disposal services
Amount:
$12,000.00
Local Zoning Information not provided.
FCC Filing Fees - Special Temporary Authorization request

Component Description:
See item 4 from invoice summary
Amount:
$1,000.00
DTV Medical Facility Notification

Component Description:
Notification of Medical Facilities
Amount:
$1,844.00
FCC Filing Fees - Form 2100 minor change CP application Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $4,479,566.07 $3,432,224.57 $2,038,513.37

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Elizabeth Ryder

General Counsel


02/04/2022

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Elizabeth Ryder

General Counsel


02/04/2022

Attachments

Back to Top