Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
CORNERSTONE TELEVISION, INC. Doing Business As: CORNERSTONE TELEVISION, INC. |
Steve Johnson 1 SIGNAL HILL DRIVE WALL, PA 15148 United States |
+1 (412) 824-3930 | sjohnson@ctvn.org | Not-for-Profit |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Joseph C. Chautin III Attorney Hardy, Carey, Chautin & Balkin, LLP |
1080 West Causeway Approach Mandeville, LA 70471 United States |
+1 (985) 629-0777 | jchautin@hardycarey.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | Prepare and execute equipment orders Prepare tower for new Antenna and transmission line Install Antenna and Transmission line Install Transmitter and related plumbing Begin testing on appropriate date |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Emergency Backup | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | ITS/Axcera 830D | |
Year | 2000 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | .5 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAXTE-1-G2 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | .6 kW | |
Justification for New Transmitter | We have a concern that due to its age, our existing transmitter will not be able to be retuned. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | No | |
Size | N/A | |
Length | N/A | |
Other Electrical Service | Yes | |
Description | Provide final connect wiring for Backup Transmitter, Provide Surge Protection Device Installed on UPS Panel, and other work as required by the repack. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Auxiliary Transmitter - Plumbing Installation |
Auxiliary Transmitter - Plumbing Installation |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | HP20SDW | |
Year | 2002 | |
Type | Inductive Output Tube | |
IOT Power Type | Single | |
Power Capacity | 25 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE-50 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 31.7 kW | |
Justification for New Transmitter | Transmitter no longer supported and manufacturer will not retune |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | Yes | |
Size | 2.5 inches | |
Length | 250.0 feet | |
Other Electrical Service | Yes | |
Description | Provide and install 250 AMP main breaker, 3 wire panelboard. (verify location of installation with customer) Wiring fromtransformer to 250 main breaker 3 wire panelboard. Install and wire surge suppressor. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Name | Description |
---|---|
Electrical Install |
This estimate is to install the electric components needed for the primary and backup transmitters |
Site Survey |
urvey of Transmitter Site in order to determine materials and components necessary for proposed transmitter changes |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 362.0 kW | |
Manufacturer | ||
Model | SWCSD160I/50 | |
Year | 1999 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 530.0 kW | |
Manufacturer | ||
Model | SWCDT18OI/28 | |
Year | 2017 | |
Justification for New Antenna | Existing Antenna cannot be tuned to channel 28 |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 6 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Slot | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 8 | |
Lower Limit | 686.00 MHz | |
Upper Limit | 692.00 MHz | |
Design power capacity in use | 8.0 % | |
Other Antenna Type | N/A | |
ERP: | 112.0 kW | |
Manufacturer | ||
Model | SWEDM8OI/28 | |
Year | 2018 | |
Justification for New Antenna | Interim antenna required to remain on air during repack while primary antenna is installed |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmission currently shared with any other stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Flexible Air | |
Diameter | 4 inches | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 778 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 3/4 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 869 feet per run | |
Justification for New Transmission Line | Needed to stay on the air with current channel during build of new channel |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | Candelabra | |
Is this tower currently shared with any other stations? | No | |
One or more FM, AM or TV radio broadcaster(s) | N/A | |
Others Types of Users | N/A | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | No | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1056234 | |
Coordinates (NAD83) | Latitude (NAD83) | 40° 23' 34.0" N- |
Longitude (NAD83) | 079° 46' 53.0" W- | |
Overall Structure Height | 852.03 feet | |
Support Structure Height | 791.33 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 1196.85 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Cornerstone Television, Inc | |
Date Constructed | 04/13/1999 |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for tower with candelabra |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | Candelabra |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 605 | |
Explanation | Project management - invoice processing, progress reporting, daisy chain monitoring and analysis, program management, site visits and travel costs as required. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No | |
Number of Days | N/A | |
Justification | N/A |
Name | Description |
---|---|
Attorney - Other Services |
Other Matters |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
FAA Tower Height Notification |
FAA Tower Height Notification |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $994,183.72 | $770,602.48 | N/A | $747,371.73 | N/A |
Total for all systems | $2,260,616.72 | $1,875,794.14 | N/A | $1,616,905.55 | N/A |
Primary Transmitter ULXTE-50 | $940,757.28 | $717,176.04 | $693,945.29 | ||
Site Survey | $13,942.00 | $13,942.00 | Please see attached GatesAir Quote Q-74011 and Cornerstone Purchase Order 10364 | $13,942.00 | N/A |
Electrical Install | $0.00 | $0.00 | N/A | $0.00 | N/A |
Other Electrical Service: Provide and install 250 AMP main breaker, 3 wire panelboard. (verify location of installation with customer) Wiring fromtransformer to 250 main breaker 3 wire panelboard. Install and wire surge suppressor. | $32,793.00 | $32,793.00 | per WPCB-110- 1st Primary Transmitter - Other Electrical Service - 250 Amp Main Breaker Budget Increase Justification v0 | $32,793.00 | N/A |
2.5" Rigid Conduit and Wiring | $5,000.00 | $5,000.00 | N/A | $0.00 | N/A |
UHF - Liquid Cooled Solid State Transmitter 31.7 kW | $205,022.28 | $205,022.28 | see Estimated Cost Justification WPCB-110-1st Primary Transmitter - UHF Liquid Cooled v0 | $186,791.53 | N/A |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | $684,000.00 | $460,418.76 | ***System Notice: Estimate adjusted and locked because line has been superseded.***Transmitter quote includes replacement switch and dummy load for switching to backup transmitter. | $460,418.76 | N/A |
Auxiliary Transmitter UAXTE-1-G2 | $53,426.44 | $53,426.44 | $53,426.44 | ||
Auxiliary Transmitter - Plumbing Installation | $1,731.50 | $1,731.50 | Please see SWR, LP Quote #23684-03 & Invoice #21204 | $1,731.50 | N/A |
Other Electrical Service: Provide final connect wiring for Backup Transmitter, Provide Surge Protection Device Installed on UPS Panel, and other work as required by the repack. | $4,684.00 | $4,684.00 | Please see Sargent Electric Company Estimate # 0221S473 | $4,684.00 | N/A |
UHF - Air Cooled Solid State Transmitter .6 kW | $47,010.94 | $47,010.94 | Please see GatesAir quote Q-90043, plus actual freight on invoice JWG0004757-1 | $47,010.94 | N/A |
Actual Information Description | File Name |
---|---|
Site Survey | |
Electrical Install | |
Other Electrical Service: Provide and install 250 AMP main breaker, 3 wire panelboard. (verify location of installation with customer) Wiring fromtransformer to 250 main breaker 3 wire panelboard. Install and wire surge suppressor. | |
2.5" Rigid Conduit and Wiring | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 31.7 kW | |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | |
Auxiliary Transmitter - Plumbing Installation | |
Other Electrical Service: Provide final connect wiring for Backup Transmitter, Provide Surge Protection Device Installed on UPS Panel, and other work as required by the repack. | |
UHF - Air Cooled Solid State Transmitter .6 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $397,930.00 | $197,694.95 | N/A | $168,734.95 | N/A |
Total for all systems | $2,260,616.72 | $1,875,794.14 | N/A | $1,616,905.55 | N/A |
Interim Antenna SWEDM8OI/28 | $89,400.00 | $17,634.95 | $17,634.95 | ||
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized | $89,400.00 | $17,634.95 | Please see attached SWR Quote 20447 and Cornerstone Purchase Order 10470 | $17,634.95 | N/A |
Primary Antenna SWCDT18OI/28 | $308,530.00 | $180,060.00 | $151,100.00 | ||
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | $12,300.00 | $7,960.00 | Please see the attached quote from SWR # 19810 | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $3,200.00 | Please see quote 19800-01 | $3,200.00 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized | $289,500.00 | $168,900.00 | Please see SWR quote 19800-01 (not including sweep test, tax, or shipping) | $147,900.00 | N/A |
Actual Information Description | File Name |
---|---|
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized | |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | Information not provided. |
Sweep test of existing antenna | |
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $175,538.00 | $139,959.36 | N/A | $66,962.52 | N/A |
Total for all systems | $2,260,616.72 | $1,875,794.14 | N/A | $1,616,905.55 | N/A |
Primary Transmission Line | $175,538.00 | $139,959.36 | $66,962.52 | ||
Rigid Transmission Line - copper, 6 1/8" | $175,538.00 | $139,959.36 | Please see the attached quote form SWR # 19810. Transmission Line is an upgrade, and are only requesting compensation up to Quote SWR #19809 and shipping charges ($3100) | $66,962.52 | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 6 1/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $441,000.00 | $519,800.00 | N/A | $509,300.00 | N/A |
Total for all systems | $2,260,616.72 | $1,875,794.14 | N/A | $1,616,905.55 | N/A |
Primary Tower TOWER | $441,000.00 | $519,800.00 | $509,300.00 | ||
Structural engineering tower load study for a documented tower with candelabra | $20,000.00 | $19,000.00 | N/A | $12,400.00 | N/A |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) | $421,000.00 | $500,800.00 | Per VTS Quote 18122-PA Rev 1 Tower Rigging and International Towers Proposal WPCB Tower Section 1-24-19 | $496,900.00 | N/A |
Actual Information Description | File Name |
---|---|
Structural engineering tower load study for a documented tower with candelabra | |
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $229,970.00 | $226,287.35 | N/A | $114,314.35 | N/A |
Total for all systems | $2,260,616.72 | $1,875,794.14 | N/A | $1,616,905.55 | N/A |
Outside Professional Services | $229,970.00 | $226,287.35 | $114,314.35 | ||
Attorney - Other Services | $1,050.00 | $1,050.00 | see Estimated Cost Justification WPCB-530-Outside Professional Services - Attorney Fees - Other Matters v0 | $720.00 | N/A |
RF Exposure Measurements | $21,050.00 | $20,000.00 | N/A | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $3,680.00 | $375.00 | Please see attached Justification for Attorney Fees - Prepare request for Special Temporary Authority | $375.00 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | $640.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,815.00 | Attorney fees incurred | $1,692.00 | N/A |
Prepare request for Special Temporary Authorization | $2,050.00 | $1,250.00 | Please see the attached invoice form du Treil, Lundin & Rackley, Inc. #243425 | $1,250.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | $250.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,750.00 | see Estimated Cost Justification WPCB-530-RF Eng - Construction Permit Application (Main) v0 | $3,750.00 | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $2,500.00 | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,580.00 | Invoiced amount | $2,420.00 | N/A |
Project management of the transition | $95,590.00 | $100,717.35 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $100,717.35 | N/A |
Actual Information Description | File Name |
---|---|
Attorney - Other Services | |
RF Exposure Measurements | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare request for Special Temporary Authorization | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for new channel assignment and antenna development | |
Prepare and or review reimbursement form | |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $21,995.00 | $21,450.00 | N/A | $10,222.00 | N/A |
Total for all systems | $2,260,616.72 | $1,875,794.14 | N/A | $1,616,905.55 | N/A |
Other Expenses | $21,995.00 | $21,450.00 | $10,222.00 | ||
FAA Tower Height Notification | $250.00 | $250.00 | WPCB-TV Justification New Category FAA Notification Tower Height Adjustment | $250.00 | N/A |
MVPD Notification of Channel Change | $5,000.00 | $5,000.00 | N/A | $2,864.00 | N/A |
Develop and air announcement of upcoming channel change | $5,000.00 | $5,000.00 | N/A | N/A | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $200.00 | Please see attached Justification for Other Expenses - Filing Fees for FCC Special Temporary Authority Application | $200.00 | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | $6,908.00 | N/A |
Actual Information Description | File Name |
---|---|
FAA Tower Height Notification | |
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | Information not provided. |
FCC Filing Fees - Special Temporary Authorization request | |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $2,260,616.72 | $1,875,794.14 | $1,616,905.55 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Steve Johnson President & CEO 08/23/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Steve Johnson President & CEO 08/23/2021 |