Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
14050
Service:
DTV
Call Sign:
WCCT-TV
Channel:
33 (UHF)
File Number:
0000028238
FRN:
0028358455
Date Submitted:
07/27/2021

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

TEGNA BROADCAST HOLDINGS, LLC

Denise A. Branson, Sr. Paralegal

8350 BROAD STREET

SUITE 2000

TYSONS, VA 22102

United States

+1 (703) 873-6606 DBRANSON@TEGNA.COM Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Bill Vanduynhoven , Vanduynhov .

Director of Engineering operations

Tribune broadcasting

Bill Vanduynhoven

2211 Rabbit Hill Cir

Dacula, GA 30019

United States

+1 (404) 312-8693 BillV@Tribunemedia.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan Replace antenna and replace shared Transmission line with new transmission line. Replace transmitter

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Auxiliary Transmitter

Back to Top

Add Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Auxiliary (Backup)
Description of Use Auxiliary
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Ultimate 8K8
Year 2010
Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power Capacity 6 kW

Auxiliary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model ULXTE-10
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 6.2 kW
Justification for New Transmitter Current transmitter is not supported or re-tunable as stated by the manufacturer

Auxiliary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service Yes
Description Electrical Install
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Auxiliary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model DCX-2
Year 2000
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 40 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model ULXTE-30
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 19.2 kW
Justification for New Transmitter Current transmitter can not be re-tuned as stated by Manufacturer

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) Yes
Switchgear (industrial 800 amp) Yes
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring Yes
Size 2 inches
Length 100.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Other Transmitter Costs

Other Transmitter Costs

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Top
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 50.0 kW
Manufacturer
Model TFU-10JTH/VP-R O4
Year 2008

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Top
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 70.0 kW
Manufacturer
Model TFU-11JTH/VP-R 04
Year 2019
Justification for New Antenna Current antenna will not work on assigned frequency

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 4 1/16 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna?
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Interim Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Interim
Description of Use N/A
Change Type Purchase New
Ownership Owned
Owner N/A
Is antenna shared? Yes
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Broadband Slot
Number of Stations Supported 3
Number of Panels/Bays 16
Lower Limit 470.00 MHz
Upper Limit 665.00 MHz
Design power capacity in use 95.0 %
Other Antenna Type N/A
ERP: 500.0 kW
Manufacturer
Model TFU -WB16
Year 2019
Justification for New Antenna Temporary antenna to use during construction and transition.

Interim Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 3
Frequencies of channels supported RF channel
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? No
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? B
Feed Line Size 6 1/8 inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for an antenna? No
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Enter a list of RF channel numbers.

RF Channel Number
45
20
31

Interim Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Lease Cost

Tower lease cost for adding temporary antenna per station

Combiner connection

Interim antenna combiner connection and mounting

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 7 3/16 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1375 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
14050 WCCT-TV
147 WTIC-TV

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1420 feet per run
Justification for New Transmission Line Current shared line is not supported and will not work on new channel. Also tower will not support heavier line. With the new channel assignments WCCT and WTIC cannot share a transmission line.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Interim Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Interim
Description of Use N/A
Change Type Purchase New
Type Rigid
Diameter 6 1/8 inches
Segment Length Broadband
Other Segment Length
Number of parallel runs 1
Length 1200 feet per run
Justification for New Transmission Line Transmission line for temporary operation Will be installed by WTIC.

Interim Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? Candelabra
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? No
ASR Number
Coordinates (NAD83) Latitude (NAD83) 41° 42' 13.0" N-
Longitude (NAD83) 072° 49' 55.0" W-
Overall Structure Height 1338.89 feet
Support Structure Height 1291.98 feet
Ground Elevation Above Mean Sea Level (AMSL) 709.97 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner COMMUNICATIONS SITE MANAGEMENT, LLC
Date Constructed 09/01/1984

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
13602 WEDH DTV
66465 WTIC-FM FM
1910 WRCH FM
1900 WZMX FM
147 WTIC-TV DTV

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Candelabra
Helicopter Services Required Are helicopter services required? Yes

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Additional Insurance

Insurance increase required by Site owner

Weather delays

Delays in construction due to weather

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 100
Explanation Landlord management of project
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 2
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application No
For Auxiliary Facility N/A
For Main Facility N/A
Prepare and file Form FCC License to Cover Application No
For Auxiliary Facility N/A
For Main Facility N/A
Prepare request for Special Temporary Authority No
Quantity N/A
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers No
RF Field Engineering Services Comprehensive coverage verification via field study No
RF exposure measurements Yes
Additional Field Engineering Service Yes
Number of Days 10
Justification Intermodulation study

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Information not provided.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? Yes
Is Remediation needed? Yes
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application No
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? No
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,043,330.57 $952,291.57 N/A $711,367.04 N/A
Total for all systems $2,912,482.26 $2,156,181.26 N/A $1,750,704.83 N/A
Primary Transmitter ULXTE-30 $744,830.57 $697,291.57 $518,597.19
Other Transmitter Costs $5,630.57 $5,630.57 N/A $5,630.57 N/A
2" Rigid Conduit and Wiring (Cost per foot) $2,600.00 $2,500.00 N/A N/A N/A
Switchgear - industrial 800 amp $38,200.00 $35,461.00 N/A $35,461.00 N/A
Service entrance 3 phase/800 amp/208 volt $14,400.00 $13,700.00 N/A N/A N/A
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW $684,000.00 $640,000.00 N/A $477,505.62 N/A
Auxiliary Transmitter ULXTE-10 $298,500.00 $255,000.00 $192,769.85
Other Electrical Service: Electrical Install $25,000.00 $25,000.00 N/A $23,342.00 N/A
UHF - Liquid Cooled Solid State Transmitter 4.9 . 6.5 kW $273,500.00 $230,000.00 N/A $169,427.85 N/A

Components

Actual Information Description File Name
Other Transmitter Costs

Component Description:
Gates US0324193 v210517pmv3
Amount:
$5,630.57
2" Rigid Conduit and Wiring (Cost per foot) Information not provided.
Switchgear - industrial 800 amp

Component Description:
Eastside 166092REVC v210727pmv1
Amount:
$5,687.60

Component Description:
Eastside 165667COR v210727pmv1
Amount:
$15,589.00

Component Description:
Eastside 165056CORR v210727pmv1
Amount:
$7,092.20

Component Description:
Eastside 164867-1RC v210727pmv1
Amount:
$7,092.20
Service entrance 3 phase/800 amp/208 volt Information not provided.
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW

Component Description:
Gates US0327106 v200810pmv2
Amount:
$29,939.02

Component Description:
Gates US0324193 v200519pmv2
Amount:
N/A

Component Description:
Deposit for Primary Transmitter ULXTE-30
Amount:
$140,620.08

Component Description:
3rd Payment ULXTE-30
Amount:
$132,969.13

Component Description:
Gates GO10004877-Install v200226pmv1
Amount:
$29,286.40

Component Description:
Second payment for ULXTE-30
Amount:
$144,690.99
Other Electrical Service: Electrical Install

Component Description:
D'Amato 09965 v200226pmv1
Amount:
$23,342.00
UHF - Liquid Cooled Solid State Transmitter 4.9 . 6.5 kW

Component Description:
Deposit for Aux Antenna ULXTE-10
Amount:
$56,821.65

Component Description:
3rd payment ULXTE-10
Amount:
$31,901.01

Component Description:
2nd payment for ULXTE-10
Amount:
$55,911.19

Component Description:
Gates GO10004878-Install v200225pmv1
Amount:
$24,794.00

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $482,430.00 $235,700.00 N/A $222,636.50 N/A
Total for all systems $2,912,482.26 $2,156,181.26 N/A $1,750,704.83 N/A
Interim Antenna TFU -WB16 $176,630.00 $72,000.00 $65,000.00
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) $13,700.00 $0.00 N/A N/A N/A
UHF - High Power, Side Mount, basic slot antenna, 16 bay,, 500 kW input, directional,, horizontally polarized $0.00 $0.00 N/A N/A N/A
New combiner, cost per channel (without antenna) $84,200.00 $0.00 N/A N/A N/A
Sweep test of existing antenna $6,730.00 $0.00 N/A N/A N/A
Lease Cost $65,000.00 $65,000.00 N/A $65,000.00 N/A
Combiner connection $7,000.00 $7,000.00 N/A N/A N/A
Primary Antenna TFU-11JTH/VP-R 04 $305,800.00 $163,700.00 $157,636.50
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized $289,500.00 $147,000.00 N/A $140,939.00 N/A
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed) $9,570.00 $10,300.00 See Invoicing $10,297.50 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A $6,400.00 N/A

Components

Actual Information Description File Name
Elbow complex, broadband, at antenna input, per 6 1/8. feedline (if needed) Information not provided.
UHF - High Power, Side Mount, basic slot antenna, 16 bay,, 500 kW input, directional,, horizontally polarized Information not provided.
New combiner, cost per channel (without antenna) Information not provided.
Sweep test of existing antenna Information not provided.
Lease Cost

Component Description:
Comm Site WCCT01 v210517pmv3
Amount:
$65,000.00
Combiner connection Information not provided.
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized

Component Description:
Die 449034 v200226pmv1
Amount:
$10,875.00

Component Description:
Die 461033 v200225pmv2
Amount:
$1,672.50

Component Description:
freight charges
Amount:
$2,189.00

Component Description:
INPUT COMPLEX 4-50 EHT
Amount:
$7,526.25

Component Description:
ANT TFU- 11JTH/VP-R 04 (SP) CH 33
Amount:
$48,937.50

Component Description:
deposit ANT TFU- 11JTH/VP-R 04 (SP) CH 33
Amount:
$48,937.50

Component Description:
deposit - INPUT COMPLEX 4-50 EHT
Amount:
$7,526.25

Component Description:
VPOL Components
Amount:
$5,973.75

Component Description:
Die 449034 v200226pmv1
Amount:
$1,327.50

Component Description:
deposit - VPOL Components
Amount:
$5,973.75
Elbow complex, single channel, at antenna input, per 4 1/16. feedline (if needed)

Component Description:
Die 461033 v200225pmv2
Amount:
$1,029.75

Component Description:
Die 449034 v200226pmv1
Amount:
$0.01

Component Description:
deposit - elbow complex
Amount:
$4,633.87

Component Description:
elbow complex
Amount:
$4,633.87
Sweep test of existing antenna

Component Description:
Die 580030 v200226pmv1
Amount:
$640.00

Component Description:
Eng on site
Amount:
$2,880.00

Component Description:
deposit - Eng on site
Amount:
$2,880.00

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $565,240.00 $205,000.00 N/A $190,411.60 N/A
Total for all systems $2,912,482.26 $2,156,181.26 N/A $1,750,704.83 N/A
Interim Transmission Line $278,400.00 $0.00 $0.00
Rigid Transmission Line - copper, 6 1/8" broadband $278,400.00 $0.00 N/A N/A N/A
Primary Transmission Line $286,840.00 $205,000.00 $190,411.60
Rigid Transmission Line - copper, 6 1/8" $286,840.00 $205,000.00 N/A $190,411.60 N/A

Components

Actual Information Description File Name
Rigid Transmission Line - copper, 6 1/8" broadband Information not provided.
Rigid Transmission Line - copper, 6 1/8"

Component Description:
deposit - 6-1-8" 75 OHM - 1443 FT
Amount:
$82,511.42

Component Description:
Die 541012 v210512pmv1
Amount:
$8,816.20

Component Description:
Die 366003 v200305pmv2
Amount:
$14,854.06

Component Description:
deposit - T/L 6-75 EIA LENGTH 15' TO 20' FIXED FLG 1 END/ SWIVEL FLG 1
Amount:
$2,319.98

Component Description:
6-1-8" 75 OHM - 1443 FT
Amount:
$82,511.42

Component Description:
Die 449034 v200226pmv1
Amount:
($4,639.96)

Component Description:
T/L 6-75 EIA LENGTH 15' TO 20' FIXED FLG 1 END/ SWIVEL FLG 1
Amount:
$2,319.98

Component Description:
TLSCR's
Amount:
$1,718.50

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $660,600.00 $612,800.00 N/A $595,750.00 N/A
Total for all systems $2,912,482.26 $2,156,181.26 N/A $1,750,704.83 N/A
Primary Tower TOWER $660,600.00 $612,800.00 $595,750.00
Structural engineering tower load study for well documented tower $12,600.00 $12,000.00 N/A N/A N/A
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $531,800.00 As quoted by Vendor. Includes Helicopter lift $531,600.00 N/A
Minor tower reinforcement/modifications $158,000.00 $0.00 Included in tower quote N/A N/A
Additional Insurance $19,000.00 $19,000.00 Included in tower quote $18,150.00 N/A
Tower Helicopter Lift $0.00 $0.00 Included in Tower quote N/A N/A
Weather delays $50,000.00 $50,000.00 Actual costs $46,000.00 N/A

Components

Actual Information Description File Name
Structural engineering tower load study for well documented tower Information not provided.
Complex Tower (includes, for example, those with candelabras and/or stacked antennas)

Component Description:
Mobilization payment
Amount:
$52,180.00

Component Description:
Down payment for rigging
Amount:
$130,450.00

Component Description:
Plumb and Tension
Amount:
$9,800.00

Component Description:
Completion and Acceptance
Amount:
$52,180.00

Component Description:
Mobilization of Tower Crew
Amount:
$52,180.00

Component Description:
Materials ready to ship
Amount:
$78,270.00

Component Description:
In progress during field installation
Amount:
$104,360.00

Component Description:
In progress - Antenna installation
Amount:
$52,180.00
Minor tower reinforcement/modifications Information not provided.
Additional Insurance

Component Description:
Insurance increase
Amount:
$18,150.00
Tower Helicopter Lift Information not provided.
Weather delays

Component Description:
Weather days
Amount:
$14,375.00

Component Description:
Weather days
Amount:
$2,875.00

Component Description:
Weather days
Amount:
$5,175.00

Component Description:
Weather days
Amount:
$18,975.00

Component Description:
Turris TE-6766 v210517pmv2
Amount:
$4,600.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $60,675.00 $52,173.00 N/A $6,823.00 N/A
Total for all systems $2,912,482.26 $2,156,181.26 N/A $1,750,704.83 N/A
Outside Professional Services $60,675.00 $52,173.00 $6,823.00
Additional Field Engineering Service, 10 Days $5,000.00 $5,000.00 N/A N/A N/A
RF Exposure Measurements $21,050.00 $11,000.00 N/A N/A N/A
Prepare request for Special Temporary Authorization $4,100.00 $3,000.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A N/A N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A N/A N/A
Project management of the transition $15,800.00 $15,000.00 N/A $150.00 N/A
Prepare and or review reimbursement form $2,630.00 $6,673.00 The Estimated Cost includes Form 399 submissions including ongoing Actual Cost invoice prep and submission, and amendments as needed. $6,673.00 N/A

Components

Actual Information Description File Name
Additional Field Engineering Service, 10 Days Information not provided.
RF Exposure Measurements Information not provided.
Prepare request for Special Temporary Authorization Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application Information not provided.
Perform engineering study for new channel assignment and antenna development Information not provided.
Project management of the transition

Component Description:
KGA 980-03 v210617jgv1
Amount:
$150.00
Prepare and or review reimbursement form

Component Description:
KGA 980-119 v210611jgv1
Amount:
$175.00

Component Description:
KGA 980-104 v210611jgv1
Amount:
$285.00

Component Description:
KGA 980-53 v210611jgv1
Amount:
$3,340.00

Component Description:
KGA 980-64 v210611jgv1
Amount:
$205.00

Component Description:
KGA 980-124 v210611jgv1
Amount:
$405.00

Component Description:
KGA 980-136 v210611jgv1
Amount:
$50.00

Component Description:
KGA 980-201 v210629jgv1
Amount:
$1,448.00

Component Description:
KGA 980-73 v210611jgv1
Amount:
$25.00

Component Description:
KGA 980-147 v210611jgv1
Amount:
$60.00

Component Description:
KGA 980-80 v210611jgv1
Amount:
$680.00

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $100,206.69 $98,216.69 N/A $23,716.69 N/A
Total for all systems $2,912,482.26 $2,156,181.26 N/A $1,750,704.83 N/A
Other Expenses $100,206.69 $98,216.69 $23,716.69
MVPD Notification of Channel Change $11,000.00 $11,000.00 N/A N/A N/A
Develop and air announcement of upcoming channel change $0.00 $0.00 N/A N/A N/A
Equipment Delivery and Handling Charges $23,716.69 $23,716.69 See attached / uploaded PDF file titled, "Gates US0327106 v200227pmv1.pdf". $23,716.69 No error
Disposal Costs (for equipment and other waste, net of any salvage value) $25,000.00 $25,000.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A N/A N/A
AM Pattern Disturbance -- Remedy $21,050.00 $20,000.00 N/A N/A N/A
AM Pattern Disturbance -- Impact study $7,890.00 $7,500.00 N/A N/A N/A

Components

Actual Information Description File Name
MVPD Notification of Channel Change Information not provided.
Develop and air announcement of upcoming channel change Information not provided.
Equipment Delivery and Handling Charges

Component Description:
Die 541023 v210512pmv1
Amount:
$2,762.03

Component Description:
Gates US0327106 v200810pmv2
Amount:
$15,554.66

Component Description:
Gates US0326509 v200225pmv1
Amount:
$5,400.00
Disposal Costs (for equipment and other waste, net of any salvage value) Information not provided.
DTV Medical Facility Notification Information not provided.
AM Pattern Disturbance -- Remedy Information not provided.
AM Pattern Disturbance -- Impact study Information not provided.

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $2,912,482.26 $2,156,181.26 $1,750,704.83

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Jeffrey C Gehman

Engineering Associate


07/27/2021

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Jeffrey C Gehman

Engineering Associate


07/27/2021

Attachments

Back to Top