FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
35908
Service:
DTV
Call Sign:
WVLT-TV
Channel:
34 (UHF)
File Number:
0000028735
FRN:
0018223693
Date Submitted:
07/08/2021

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

GRAY TELEVISION LICENSEE, LLC

Doing Business As: WVLT-TV

4370 Peachtree Road, NE

Atlanta, GA 30319

United States

+1 (404) 504-9828 allfcclms@gray.tv Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Samuel Hariton

Widelity

Samuel Hariton

4031 University Dr

Suite 100

Fairfax, VA 22030

United States

+1 (339) 222-8107 sam.hariton@widelity.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan The station will continue to use the existing broadband antenna and transmission line and replacing the existing transmitter with a new transmitter. Interim facilities are not needed.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Sigma DD, 3200P2CFUPG
Year 2002
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 50 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model ULXTE90
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 56.4 kW
Justification for New Transmitter Transmitter cannot be retuned and must be replaced.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) Yes
Power 300 kVA
Rigid Conduit and Wiring No
Size N/A
Length N/A
Other Electrical Service Yes
Description The new transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors.
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Heating and Cooling
Size 20 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Mask Filter

Mask filter required for the new transmitter model

Freight

Freight to the station location

RF Accessories

Accessories required for new transmitter installation

Installation and Proof

Installation of the new Transmitter

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? No

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? No

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? No

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 900
Explanation Strategic Support
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority No
Quantity N/A
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements No
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Sweep Test of Existing Antenna

WVLT's share of sweep test costs during transition as part of ATC Capital Contribution. See ATC document 460204845

Sweep Test of New Primary Antenna

WVLT's share of sweep test costs post-transition as part of ATC Capital Contribution. See ATC document 460204845

Attorney Fees - Other Matters

Legal Service

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change No
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Combiner

Anticipated 1/3 expense on new combiner TBD by American Tower

Security

On site security during equipment storage period

Tower Analysis

Tower Analysis required by American Tower

Use Tax

Use tax paid to the Tennessee Department of Revenue on costs relevant to the repack

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $2,210,433.56 $1,647,254.79 N/A $1,643,119.22 N/A
Total for all systems $2,696,347.68 $2,120,138.61 N/A $1,858,189.34 N/A
Primary Transmitter ULXTE90 $2,210,433.56 $1,647,254.79 $1,643,119.22
RF Accessories $40,944.26 $40,944.26 Please see Estimated Cost Justification WVLT-110-RF Accessories v0 $40,944.26 N/A
Freight $15,541.46 $15,541.46 Please see Estimated Cost Justification WVLT-110-Freight v0 $15,541.46 z
Mask Filter $80,680.12 $80,680.12 Please see Estimated Cost Justification WVLT-110-Mask Filter System v0 $80,680.11 N/A
20 Ton system $115,500.00 $30,610.98 Please see Estimated Cost Justification WVLT-110-HVAC New 1st Primary Transmitter v2 $30,610.98 N/A
Other Electrical Service: The new transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors. $40,653.37 $40,653.37 see Estimated Cost Justification WVLT-110-Electrical Service New 1st Primary Transmitter v0 $37,022.82 N/A
Transformer 3 phase/480v - 300 KVA $36,800.00 $2,943.91 GatesAir Quote Q-75837 $2,943.90 N/A
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW $1,788,000.00 $1,343,566.34 Please see Estimated Cost Justification WVLT-110-New 1st Primary Transmitter v1 $1,343,061.34 invoices
Installation and Proof $92,314.35 $92,314.35 Please see attached Gatesair invoice JW30004400-1 $92,314.35 N/A

Components

Actual Information Description File Name
RF Accessories

Component Description:
WVLT-110-RF Accessories
Amount:
$14,115.11

Component Description:
WVLT-110-RF Accessories
Amount:
$237.51

Component Description:
RF Accessories
Amount:
$26,591.64
Freight

Component Description:
WVLT-110-Freight
Amount:
$6,091.46

Component Description:
Freight
Amount:
$9,450.00
Mask Filter

Component Description:
WVLT-110-Mask Filter System
Amount:
$27,813.62

Component Description:
Mask Filter
Amount:
$52,398.48

Component Description:
WVLT-110-Mask Filter System
Amount:
$468.01
20 Ton system

Component Description:
Core drill (9) 2 1/2" diameter holes x 8" filled block wall
Amount:
$505.00

Component Description:
Water
Amount:
$119.85

Component Description:
20 Ton Installation for Sharps Ridge Site
Amount:
$7,374.00

Component Description:
20 Ton Installation for Sharps Ridge Site
Amount:
$22,123.00

Component Description:
Core drill (8) 2 1/2" dia holes x 12" filled block wall
Amount:
$410.00

Component Description:
Steel Logtite
Amount:
$79.13
Other Electrical Service: The new transmitter will require reconfiguration of the electrical service on site. The electrical work cost has been estimated based on verbal guidance from local electrical contractors.

Component Description:
Electrical Service
Amount:
$8,471.27

Component Description:
Labor
Amount:
$28,551.55
Transformer 3 phase/480v - 300 KVA

Component Description:
WVLT-110-New 1st Primary Transmitter - Transformer
Amount:
$2,877.69

Component Description:
WVLT-110-New 1st Primary Transmitter - Transformer
Amount:
$66.21
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW

Component Description:
Transmitter
Amount:
$387,918.94

Component Description:
RTLSCR650-5 T/L a Lenght up to 5'
Amount:
$3,440.19

Component Description:
REMOVAL OF TRANSMITTER
Amount:
$3,240.00

Component Description:
R40624 Elbow 6-50
Amount:
$1,715.26

Component Description:
Transmitter
Amount:
$857,174.54

Component Description:
ULXTE90 Transmitter
Amount:
$89,572.41
Installation and Proof

Component Description:
WVLT-110-Installation & Proof
Amount:
$27,694.31

Component Description:
Installation & Proof
Amount:
$64,620.04

Cost Information

Back to Top

Antennas

Information not provided.

Cost Information

Back to Top

Transmission Line

Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Information not provided.

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $261,670.00 $257,317.20 N/A $131,023.67 N/A
Total for all systems $2,696,347.68 $2,120,138.61 N/A $1,858,189.34 N/A
Outside Professional Services $261,670.00 $257,317.20 $131,023.67
Attorney Fees - Other Matters $740.00 $740.00 WVLT-TV Justification New Category Attorney Other Matters $740.00 N/A
Sweep Test of New Primary Antenna $5,000.00 $5,000.00 See ATC document 460204845 - WVLT's share of sweep test costs post transition as part of ATC Capital Contribution. $5,000.00 N/A
Sweep Test of Existing Antenna $2,500.00 $2,500.00 See ATC document 460204845 - WVLT's share of sweep test costs during transition as part of ATC Capital Contribution. $2,500.00 N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $87,400.00 Allen Dick antenna system has no documentation, will require coverage verification for new channel. N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,458.13 State and local taxes included $305.00 N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,462.50 State and local taxes included $936.50 N/A
Prepare request for Special Temporary Authorization $2,050.00 $730.82 Estimated Cost Justification WVLT-590-Prepare Request for Special Temporary Authorization v0 $730.82 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,638.75 State and local taxes included $250.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,277.50 State and local taxes included $1,687.50 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,647.00 State and local taxes included $5,662.50 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,731.25 State and local taxes included $1,332.00 N/A
Prepare and or review reimbursement form $2,630.00 $2,731.25 State and Local Taxes included N/A N/A
Project management of the transition $142,200.00 $135,000.00 900 hours at $150 per hour $111,879.35 N/A

Components

Actual Information Description File Name
Attorney Fees - Other Matters

Component Description:
Total Professional Services
Amount:
$740.00
Sweep Test of New Primary Antenna

Component Description:
Sweep Test of New Primary Antenna
Amount:
$5,000.00
Sweep Test of Existing Antenna

Component Description:
Sweep Test of Existing Antenna
Amount:
$2,500.00
Comprehensive coverage verification via field study, if needed Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application

Component Description:
WVLT-550-Attorney License to Cover
Amount:
$305.00
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
WVLT-550-Attorney CP
Amount:
$740.00

Component Description:
Work on and file WVLT initial repack CP
Amount:
$196.50
Prepare request for Special Temporary Authorization

Component Description:
Total Professional Services
Amount:
$105.82

Component Description:
Develop technical parameters for operation at reduced power on pre-auction ch-30.
Amount:
$625.00
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
WVLT-530-RF Eng License to Cover
Amount:
$250.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
CP application
Amount:
$1,562.50

Component Description:
support response to review of reimbursement form 399
Amount:
$125.00
Perform engineering study for new channel assignment and antenna development

Component Description:
Perform engineering study for new channel assignment
Amount:
$537.50

Component Description:
Regarding Operation of repack Ch-34
Amount:
$125.00

Component Description:
RF Eng Study
Amount:
$5,000.00
Address transition timing and coordination issues w/ other stations and wireless

Component Description:
Review linked set for WVLT; work on coordination with linked group for transition logistics.
Amount:
$1,332.00
Prepare and or review reimbursement form Information not provided.
Project management of the transition

Component Description:
Project Management
Amount:
$2,877.85

Component Description:
Project Management
Amount:
$1,656.85

Component Description:
Project Management
Amount:
$2,443.05

Component Description:
Project management
Amount:
$155.00

Component Description:
Project Management
Amount:
$934.40

Component Description:
Project Management
Amount:
$1,356.25

Component Description:
Project Management
Amount:
$2,874.95

Component Description:
Project management
Amount:
$503.75

Component Description:
Project Management
Amount:
$1,374.40

Component Description:
Project Management
Amount:
$2,240.45

Component Description:
Project Management
Amount:
$6,260.75

Component Description:
Project Management
Amount:
$4,032.15

Component Description:
Project Management
Amount:
$2,858.75

Component Description:
Project Management
Amount:
$2,664.70

Component Description:
Project Management
Amount:
$3,422.00

Component Description:
Project Mgt
Amount:
$2,656.30

Component Description:
Project Management
Amount:
$2,949.90

Component Description:
Project Management
Amount:
$2,881.20

Component Description:
Project Management
Amount:
$2,158.20

Component Description:
Project Management
Amount:
$2,034.35

Component Description:
Project Management
Amount:
$3,280.65

Component Description:
Project Management
Amount:
$1,835.40

Component Description:
Project Management
Amount:
$2,292.65

Component Description:
Project Management
Amount:
$2,249.65

Component Description:
Project management
Amount:
$2,442.65

Component Description:
Project Management
Amount:
$2,314.90

Component Description:
Project Management
Amount:
$2,397.10

Component Description:
Project Management
Amount:
$2,694.40

Component Description:
Project Management
Amount:
$1,642.75

Component Description:
Project Management
Amount:
$2,216.05

Component Description:
Project Management
Amount:
$1,984.45

Component Description:
Project Mgt
Amount:
$802.25

Component Description:
Project Mgt
Amount:
$28.20

Component Description:
Project Management
Amount:
$2,198.50

Component Description:
Project management
Amount:
$2,231.90

Component Description:
Project Management
Amount:
$2,487.05

Component Description:
Project Mgt
Amount:
$2,927.30

Component Description:
Project Management
Amount:
$1,927.35

Component Description:
Project Management
Amount:
$2,777.30

Component Description:
Project Mgt
Amount:
$951.45

Component Description:
Project Management
Amount:
$3,883.15

Component Description:
Transition Related Project Management Costs
Amount:
$2,100.00

Component Description:
Project management
Amount:
$1,328.55

Component Description:
Project Management
Amount:
$1,203.30

Component Description:
Project Mgt
Amount:
$755.80

Component Description:
Project Management
Amount:
$1,941.85

Component Description:
Project Management
Amount:
$2,373.80

Component Description:
Project Management
Amount:
$77.50

Component Description:
Project Management
Amount:
$2,071.40

Component Description:
Project Management
Amount:
$2,273.85

Component Description:
Project Management
Amount:
$1,818.75

Component Description:
Project Management
Amount:
$2,034.20

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $224,244.12 $215,566.62 N/A $84,046.45 N/A
Total for all systems $2,696,347.68 $2,120,138.61 N/A $1,858,189.34 N/A
Other Expenses $224,244.12 $215,566.62 $84,046.45
Use Tax $374.49 $374.49 Please see WVLT-TV Use Tax Budget Revision Justification Letter $374.48 N/A
Tower Analysis $7,500.00 $7,500.00 See vendor invoice N/A N/A
Security $12,000.00 $12,000.00 N/A N/A N/A
Combiner $109,814.63 $109,814.63 See American Tower attachment $71,200.00 N/A
MVPD Notification of Channel Change $2,000.00 $2,000.00 Justifying Quote - Wiley Rein MVPD quote - all gray stations $2,000.00 N/A
Develop and air announcement of upcoming channel change $10,000.00 $10,000.00 N/A N/A N/A
Equipment Storage $12,000.00 $12,000.00 N/A $792.65 N/A
Equipment Delivery and Handling Charges $18,138.00 $18,138.00 N/A $1,554.82 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $40,337.00 $40,337.00 See attached Funderburk Electrical Services, Inc. quote for transformer removal and disposal, cost $4,912. See attached quote from Kevin Duplantis for transmitter removal and disposal, cost per quote, $35,425. $4,912.00 N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $335.00 Please see Estimated Cost Justification WVLT-610-License to Cover FCC Filing Fees v0 $335.00 N/A
DTV Medical Facility Notification $11,550.00 $2,877.50 N/A $2,877.50 N/A

Components

Actual Information Description File Name
Use Tax

Component Description:
Repack Use Tax
Amount:
$374.48
Tower Analysis Information not provided.
Security Information not provided.
Combiner

Component Description:
Capital Contribution- Knoxville TN
Amount:
$71,200.00
MVPD Notification of Channel Change

Component Description:
Total Professional Services
Amount:
$2,000.00
Develop and air announcement of upcoming channel change Information not provided.
Equipment Storage

Component Description:
25'X10' PREMIUM DOOR CONTAINER DX25SZJ1092
Amount:
$792.65
Equipment Delivery and Handling Charges

Component Description:
Forklift variable reach 7000# 38-44'
Amount:
$1,554.82
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
FURNISH LABOR AND MATERIAL
Amount:
$4,912.00
FCC Filing Fees - Special Temporary Authorization request Information not provided.
FCC Filing Fees - Form 2100 license to cover application

Component Description:
WVLT-610-License to Cover FCC Filing Fees
Amount:
$335.00
DTV Medical Facility Notification

Component Description:
Medical Notification
Amount:
$2,877.50

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $2,696,347.68 $2,120,138.61 $1,858,189.34

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. Yes

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Robert Folliard , III .

Assistant Secretary


07/08/2021