Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
58912
Service:
DTV
Call Sign:
KPJK
Channel:
27 (UHF)
File Number:
0000028092
FRN:
0004367397
Date Submitted:
06/11/2021

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

RURAL CALIFORNIA BROADCASTING CORPORATION

Doing Business As: RURAL CALIFORNIA BROADCASTING CORPORATION

Darren LaShelle

5850 LABATH AVENUE

ROHNERT PARK, CA 94928

United States

+1 (707) 584-2000 Darren_LaShelle@norcalpublicmedia.org Not-for-Profit

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

The Preparer is same as the reimbursement contact.

 

 

 

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan As is done currently we will share the Sutro Facility several stations. At the conclusion of repacking, three TV stations, KCSM, KTUV, and KPIX, will share the combiner, tower, antenna and transmission lines associated with Antenna Stack A.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model Diamond
Year 2003
Type Solid State
Solid State Cooling Air Cooled
Solid State Power Capacity 19.2 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? No
Manufacturer
Model Maxiva ULXTE 30
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 19.2 kW
Justification for New Transmitter Letter from Gates says:"GatesAir will no longer offer analog to digital conversions, channel change services, or support in field channel changes on the following transmitters: ... Diamond CD."

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) No
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring Yes
Size 2 inches
Length 150.0 feet
Other Electrical Service Yes
Description Add switch gear, circuits to main panel, add breakers, to transformer. Add lines to new transmitter and cooling system as required by Gates Air.
HVAC Service Does the replacement transmitter require HVAC Service? Yes
Type Cooling Only
Size 15 tons
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? Yes
Size 500.0 square feet
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Containment Pan for Glycol Pump

Containment Pan for Glycol Pump

seismic kit

Required by California State law all rack must have seismic mounting

Sutro Tower removal and disposal

Removal and disposal of shared equipment and infrastructure

removal and disposal

KCSM transmitter removal and disposal

RF switching

Allows switching between load aux antenna and main antenna- must have for Sutro's control system

seismic installation

using seismic kit provided by Gates contractor installation as required by law for KCSM Transmitter

redundant exciter switchover

KCSM has two exciters with a switch over device

fork lift rental

rental of forklift for construction for use at the facility

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Retune Existing
Antenna Use Primary (Main)
Description of Use N/A
Ownership Leased
Owner Sutro Tower
Site N/A
Is the existing antenna shared with another station or stations? Yes
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Middle
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 4
Number of Panels 40
Design power capacity in use 80.0 %
Lower Limit 470.00 MHz
Upper Limit 689.00 MHz
Other Antenna Type N/A
ERP: 80.0 kW
Manufacturer dielectric
Model tum-c5sp-14/60h-2-t-r
Year 2003

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
43095 kmtp-tv
35500 kqed
71586 kcns

Primary Antenna

Back to Top

Adjustment to Existing Antenna

Section Question Response
Sweep Test of Existing Antenna Do you need a sweep test of existing antenna? Yes

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 3
Frequencies of channels supported RF channel
Frequency N/A

Enter a list of RF channel numbers.

RF Channel Number
31
27
29

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

reconnect lines

connect lines to shared combiner

remove and replace switches

Remove and replace 6 inch switches for shared combiner

xray core drill patch

xray and drill for transmission lines and fill old holes for shared combiner location

complex RF testing

Complex RF testing to verify operation of shared combiner

removal and disposal

remove and dispose of shared old combiner and transmission line

Tranmission line and switch

transmission line and switch for shared combiner

Auxiliary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Retune Existing
Antenna Use Auxiliary (Backup)
Description of Use Back up antenna
Ownership Leased
Owner Sutro
Site N/A
Is the existing antenna shared with another station or stations? Yes
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? Yes
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Middle
Polarization Horizontal
Type Broadband Panel
Number of Stations Supported 5
Number of Panels 40
Design power capacity in use 80.0 %
Lower Limit 470.00 MHz
Upper Limit 698.00 MHz
Other Antenna Type N/A
ERP: 80.0 kW
Manufacturer Dielectric
Model tua-c4sp-12/40u-1-s
Year 2007

Facility ID's and Call Signs of all stations with whom the antenna is shared.

Facility ID Call Sign
25452 kpix-tv
35703 ktvu

Auxiliary Antenna

Back to Top

Adjustment to Existing Antenna

Section Question Response
Sweep Test of Existing Antenna Do you need a sweep test of existing antenna? Yes

Auxiliary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? Yes
Type New
Number of channels supported 3
Frequencies of channels supported RF channel
Frequency N/A

Enter a list of RF channel numbers.

RF Channel Number
27
29
31

Auxiliary Antenna

Back to Top

Other Antenna Cost Not Listed

Name Description

Remove and Replace switches

Remove and replace 6 inch switches for shared combiner

Reconnect lines

reconnect lines to shared combiner

Remove old combiner

Remove old shared combiner

Remove old combiner line

Remove old shared combiner lines

Complex testing

Complex testing to verify operation

xray core drill patch

xray and drill holes for transmission line for shared combiner. Fill old holes.

transmission line kit

transmission line kit for shared combiner

Combiner Room HVAC and Electrical

Combiner room HVAC and associated electrical work

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Primary (Main)
Description of Use N/A
Ownership Leased
Owner Sutro Tower
Site N/A
Is the existing transmission line shared with another station or stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Dielectric
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 400 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
69619 kbcw
25452 kpix-tv
35500 kqed
35703 ktvu
71586 kcns

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

retuning transmission line

Transmission line will require retuning for new channel. this cost is for existing transmission line to shared antennas

Auxiliary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Auxiliary (Backup)
Description of Use Line to Backup antenna
Ownership Leased
Owner Sutro Tower
Site N/A
Is the existing transmission line shared with another station or stations? Yes
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Dielectric
Type Rigid
Diameter 8 3/16 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 400 feet per run

Facility ID's and Call Signs of all stations with whom the transmission line is shared.

Facility ID Call Sign
25452 kpix-tv
35500 kqed
35703 ktvu
69619 kbcw
71586 kcns

Auxiliary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

retuning transmission line

transmission line will require retuning for new channel

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? Candelabra
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1001289
Coordinates (NAD83) Latitude (NAD83) 37° 45' 19.0" N-
Longitude (NAD83) 122° 27' 10.0" W-
Overall Structure Height 976.69 feet
Support Structure Height 779.85 feet
Ground Elevation Above Mean Sea Level (AMSL) 833.98 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner SUTRO TOWER INC
Date Constructed 03/27/1998

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
71586 KCNS DTV
69619 KBCW DTV
65526 KRON-TV DTV
51429 KFSF-DT DTV
35703 KTVU DTV
35500 KQED DTV
34470 KGO-TV DTV
25452 KPIX-TV DTV

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Serious Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Candelabra
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Information not provided.

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 595
Explanation Project management is needed to coordinate between Sutro vendors, the transmitter vendor and the College District. The College District will be involved to make sure construction meets or exceeds state and local standards.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Sutro Project management

Project management for all work on the tower and related facilities

Tower mapping

Tower mapping

Accounting Services

Accounting services Spectrum Repack

Pemit public relations

Cost to share the permitting information with the SF public

Legal fees - Sutro repack project

Legal fees by Sutro for repacking project

Alternative site study

A study done by Sutro to investigate other locations should SF not approve permit

Architectural plans

Architectural plans of Sutro Tower building used to submit building plans for permit

Building permit

Sutro building permit costs for SF permitting process

Licensee board legal support

Station Licensee is governed by a publicly elected board without expertise in broadcast matters and must adhere to procurement laws; needs external legal support

Neighborhood survey

Sutro to conduct a Neighborhood Survey for permit

Post-assignment study

Sutro study to see how each channel would fit best on the existing tower and how to distribute them to the existing antennas

Preliminary repacking study

Sutro study done to prep for repacking stations

Station consultant

Limited station staff is working to keep the station on the air and needs substantial outside assistance working specifically on KCSM issues in repacking

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Hoist Rental

Hoist Rental

Contractor project costs

Costs for construction company to manage the trades work at Sutro

KCSM Space drawing

Costs for Osborn Eng to modify the existing plans to reflect the new construction for repacking

RF exposure

RF exposure measurements internal to the facility

Sales tax

Sales tax for all Sutro items and KCSM equipment tax

VSWR monitor

VSWR monitor and Tower worker lockout system

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,179,670.65 $1,675,857.05 N/A $1,501,646.95 N/A
Total for all systems $5,164,438.13 $6,855,893.76 N/A $4,064,065.22 N/A
Primary Transmitter Maxiva ULXTE 30 $1,179,670.65 $1,675,857.05 $1,501,646.95
fork lift rental $48,428.00 $48,428.00 Please See Sutro Tower, Inc June Repack Cost Estimates dated June 25, 2020 $26,541.10 N/A
redundant exciter switchover $2,300.00 $2,300.00 Budget reduced to $2,300.00, as expense for the exciter has been accounted for in the Primary Transmitter budget amount. Expenses reconciled per GatesAir quote Q-75341, inv #JW30004343-1 $0.00 N/A
seismic installation $9,300.00 $9,300.00 Seismic installation as quoted by Wadleigh contruction $0.00 N/A
RF switching $0.00 $0.00 Budget reduced to $0.00, as expense for this item has been accounted for in the Primary Transmitter budget amount. Expenses reconciled per GatesAir quote Q-75341, inv #JW30004343-1 N/A N/A
removal and disposal $0.00 $0.00 Gates air included this in their quote. Sutro Tower is a complicated site, little space to store item for disposal, requiring an almost daily removal of items. This is KCSM cost for disposal; budget reduced to $0.00 - cost included in Transmitter budget $0.00 N/A
Sutro Tower removal and disposal $47,485.71 $47,485.71 see Estimated Cost Justification KPJK-110-1st Primary Transmitter - Sutro Tower Removal and Disposal Cost v0 $23,947.50 N/A
Containment Pan for Glycol Pump $575.00 $575.00 Please see KPJK Wadleigh Group proposal dated 2-18-20 $575.00 N/A
seismic kit $3,268.25 $3,268.25 required in the state of California Cost of kit from Gates N/A N/A
Other -- Building Addition Size: 500.0 $39,211.97 $39,211.97 Per Sutro Tower Invoice 8715, Wadleigh Group Transmission Space Alteration Proposal- wall core and flooring quoted amounts $39,211.95 N/A
Other Electrical Service: Add switch gear, circuits to main panel, add breakers, to transformer. Add lines to new transmitter and cooling system as required by Gates Air. $285,401.72 $285,401.72 Per KPJK Wadleigh Group Transmission Space Alteration Proposal April 3 2019 Electrical $285,401.71 N/A
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW $684,000.00 $836,632.60 Estimated Cost Justification KPJK-110-1st Primary Transmitter - UHF Liquid Cooled Solid State, 14.2-20 kW v0 $726,465.89 After the site Survey, the cost of the transmitter will be $767,780.36
15 Ton system $55,800.00 $399,503.80 Please see Wadleigh Group Inc Transmission Space Alteration proposal dated 4/3/19 $399,503.80 N/A
2" Rigid Conduit and Wiring (Cost per foot) $3,900.00 $3,750.00 N/A N/A N/A

Components

Actual Information Description File Name
fork lift rental

Component Description:
KPJK-110-1st Primary Transmitter - Fork Lift Rental
Amount:
$757.78

Component Description:
KPJK-110-1st Primary Transmitter - Fork Lift Rental
Amount:
$780.52

Component Description:
KPJK-110-1st Primary Transmitter - Fork Lift Rental
Amount:
$780.52

Component Description:
KPJK-110-1st Primary Transmitter - Fork Lift Rental
Amount:
$780.52

Component Description:
KPJK-110-1st Primary Transmitter - Fork Lift Rental
Amount:
$780.52

Component Description:
KPJK-110-1st Primary Transmitter - Fork Lift Rental
Amount:
$803.93

Component Description:
KPJK-110-1st Primary Transmitter - Fork Lift Rental
Amount:
$757.78

Component Description:
KPJK-110-1st Primary Transmitter-Fork Lift Rental
Amount:
$757.78

Component Description:
KPJK-110-1st Primary Transmitter-Fork Lift Rental
Amount:
$858.33

Component Description:
KPJK 1st Primary Transmitter-Fork Lift Rental
Amount:
$858.33

Component Description:
KPJK-110-1st Primary Transmitter - Fork Lift Rental
Amount:
$858.33

Component Description:
KPJK 1st Primary Transmitter-Fork Lift Rental
Amount:
$757.78

Component Description:
KPJK-110-1st Primary Transmitter - Fork Lift Rental
Amount:
$757.78

Component Description:
KPJK-110-1st Primary Transmitter - Fork Lift Rental
Amount:
$780.52

Component Description:
KPJK-110-1st Primary Transmitter - Forklift Rental
Amount:
$757.78

Component Description:
KPJK 1st Primary Transmitter- Fork Lift Rental
Amount:
$757.78

Component Description:
KPJK-110-1st Primary Transmitter - Fork Lift Rental
Amount:
$780.52

Component Description:
KPJK-110-1st Primary Transmitter - Fork Lift Rental
Amount:
$780.52

Component Description:
KPJK 1st Primary Transmitter- Fork Lift Rental
Amount:
$757.78

Component Description:
KPJK-110-1st Primary Transmitter-Fork Lift Rental
Amount:
$757.78

Component Description:
12. KPJK-110-1st Primary Transmitter - Fork Lift Rental
Amount:
$780.52

Component Description:
KPJK-110-1st Primary Transmitter - Fork Lift Rental
Amount:
$780.52

Component Description:
KPJK 1st Primary Transmitter-Fork Lift Rental
Amount:
$858.33

Component Description:
Forklift rental
Amount:
$858.33

Component Description:
KPJK-110-1st Primary Transmitter - Fork Lift Rental
Amount:
$757.78

Component Description:
KPJK-110-1st Primary Transmitter - Fork Lift Rental
Amount:
$757.78

Component Description:
KPJK-110-1st Primary Transmitter - Fork Lift Rental
Amount:
$780.52

Component Description:
KPJK-110-1st Primary Transmitter-Fork Lift Rental
Amount:
$858.33

Component Description:
Fork Lift Rental
Amount:
$255.31

Component Description:
KPJK-110-1st Primary Transmitter - Fork Lift Rental
Amount:
$757.78

Component Description:
KPJK-110-1st Primary Transmitter-Fork Lift Rental
Amount:
$757.78

Component Description:
KPJK 1st Primary Transmitter- Fork Lift Rental
Amount:
$858.33

Component Description:
KPJK-110-1st Primary Transmitter - Forklift Rental
Amount:
$757.78

Component Description:
Fork lift rental
Amount:
$858.33

Component Description:
Forklift rental
Amount:
$858.33

Component Description:
Fork lift rental
Amount:
$858.33
redundant exciter switchover Information not provided.
seismic installation Information not provided.
RF switching Information not provided.
removal and disposal Information not provided.
Sutro Tower removal and disposal

Component Description:
KPJK-110-1st Primary Transmitter - Sutro Tower Removal and Disposal Cost
Amount:
$2,162.53

Component Description:
KPJK-110-1st Primary Transmitter - Sutro Tower Removal and Disposal Cost
Amount:
$852.14

Component Description:
KPJK-110-1st Primary Transmitter - Sutro Tower Removal and Disposal Cost
Amount:
$200.78

Component Description:
KPJK-110-1st Primary Transmitter- Sutro Tower Removal and Disposal Cost
Amount:
$571.42

Component Description:
KPJK 1st Primary Transmitter-Sutro Tower Removal and Disposal Cost
Amount:
$208.33

Component Description:
KPJK-110-1st Primary Transmitter - Sutro Tower Removal and Disposal Cost
Amount:
$453.65

Component Description:
KPJK-110-1st Primary Transmitter - Sutro Tower Removal and Disposal Cost
Amount:
$3,716.18

Component Description:
KPJK-110-1st Primary Transmitter - Sutro Tower Removal and Disposal Cost
Amount:
$888.94

Component Description:
11. KPJK-110-1st Primary Transmitter - Sutro Tower Removal and Disposal Cost
Amount:
$2,171.28

Component Description:
KPJK-110-1st Primary Transmitter - Sutro Tower Removal and Disposal Cost
Amount:
$1,676.22

Component Description:
90% HVAC Recover all refrigerant from existing units as required. Properly dispose of refrigerant per EPA guidelines.
Amount:
$7,371.03

Component Description:
KPJK-110-1st Primary Transmitter- Sutro Tower Removal and Disposal Cost
Amount:
$3,675.00
Containment Pan for Glycol Pump

Component Description:
Shared Spectrum Repacking Costs
Amount:
$575.00
seismic kit Information not provided.
Other -- Building Addition Size: 500.0

Component Description:
Final Draw, Floor prep and moisture test.
Amount:
$2,688.19

Component Description:
KPJK-110-1st Primary Transmitter-Building Addition, 500 Sq. Ft.
Amount:
$4,506.66

Component Description:
50% Core West wall for (2) new line sets
Amount:
$3,911.68

Component Description:
KPJK-110-1st Primary Transmitter - Building Addition, 500 Sq. Ft.
Amount:
$14,664.45

Component Description:
KPJK-110-1st Primary Transmitter- Building Addition, 500 Sq. Ft.
Amount:
$13,440.97
Other Electrical Service: Add switch gear, circuits to main panel, add breakers, to transformer. Add lines to new transmitter and cooling system as required by Gates Air.

Component Description:
KPJK-110-1st Primary Transmitter - Other Electrical Service
Amount:
$28,540.17

Component Description:
KPJK-110-1st Primary Transmitter - Other Electrical Service
Amount:
$71,350.43

Component Description:
KPJK-110-1st Primary Transmitter - Other Electrical Service
Amount:
$142,700.86

Component Description:
KPJK-110-1st Primary Transmitter- Other Electrical Service
Amount:
$42,810.25
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW

Component Description:
combined quote, invoice and credit card receipt of payment
Amount:
$3,162.00

Component Description:
A. Transmitter
Amount:
$197,832.39

Component Description:
ULXTE-30 Transmitter
Amount:
$240,060.59

Component Description:
1/3 down payment- merged documents quote, invoice, proof of payment
Amount:
$255,926.79

Component Description:
cost for site survey paid via credit card
Amount:
$3,162.00

Component Description:
80% Complete Demolition
Amount:
$29,484.12

Component Description:
updated the date from the orignal request
Amount:
$3,162.00
15 Ton system

Component Description:
KPJK-110-1st Primary Transmitter - 15 Ton HVAC System
Amount:
$360,477.98

Component Description:
KPJK-110-1st Primary Transmitter - 15 Ton HVAC System
Amount:
$39,025.82
2" Rigid Conduit and Wiring (Cost per foot) Information not provided.

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $607,130.41 $506,041.18 N/A $313,495.48 N/A
Total for all systems $5,164,438.13 $6,855,893.76 N/A $4,064,065.22 N/A
Primary Antenna tum-c5sp-14/60h-2-t-r $108,810.91 $30,037.13 $12,467.13
reconnect lines $0.00 $0.00 N/A N/A N/A
Tranmission line and switch $6,710.91 $6,710.91 ***System Notice: Estimate adjusted and locked because line has been superseded.*** $6,710.91 N/A
removal and disposal $0.00 $0.00 N/A N/A N/A
remove and replace switches $0.00 $0.00 N/A N/A N/A
complex RF testing $0.00 $0.00 N/A N/A N/A
xray core drill patch $11,170.00 $11,170.00 Core drill Holes. Fill holes in floor and walls. N/A N/A
New combiner, cost per channel (without antenna) $84,200.00 $5,756.22 see Estimated Cost Justification KPJK-290-Primary Combiner -New- Cost Per Channel v0 $5,756.22 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 N/A N/A N/A
Auxiliary Antenna tua-c4sp-12/40u-1-s $498,319.50 $476,004.05 $301,028.35
Combiner Room HVAC and Electrical $170,846.00 $170,846.00 KPJK Wadleigh Group Quote $85,423.00 N/A
Remove old combiner $13,770.00 $13,770.00 Per KPJK's share of cost listed on Best Endeavours, Inc. Proposal 19.162 and PO #R-032519-74 $8,448.07 N/A
New combiner, cost per channel (without antenna) $84,200.00 $77,819.80 ***System Notice: Estimate adjusted and locked because line has been superseded.***per Estimated Cost Justification KPJK-290-Auxiliary Combiner - New - Cost Per Channel v2 $77,819.80 N/A
Sweep test of existing antenna $6,730.00 $6,400.00 Re-adding costs lost to LMS bug N/A N/A
Remove and Replace switches $6,120.00 $6,120.00 Re-adding costs lost to LMS bug $1,183.31 N/A
Reconnect lines $42,994.50 $42,994.50 see Estimated Cost Justification KPJK-250-Auxiliary Antenna - Reconnect Lines v1 $26,101.88 N/A
Complex testing $18,360.00 $18,360.00 see Estimated Cost Justification KPJK-250-Auxiliary Antenna - Complex Testing v0 $11,161.34 N/A
xray core drill patch $12,406.00 $12,406.00 Re-adding costs lost to LMS bug N/A N/A
transmission line kit $46,453.00 $46,453.00 Re-adding costs lost to LMS bug $11,473.08 N/A
Remove old combiner line $12,240.00 $12,240.00 see Estimated Cost Justification KPJK-250-Auxiliary Antenna - Remove Old Combiner Line v0 $10,823.12 N/A
New combiner, cost per channel (without antenna) $84,200.00 $68,594.75 ***System Notice: Estimate adjusted and locked because line has been superseded.***per Estimated Cost Justification KPJK-290-Auxiliary Combiner - New - Cost Per Channel v1 $68,594.75 N/A

Components

Actual Information Description File Name
reconnect lines Information not provided.
Tranmission line and switch

Component Description:
revised and original invoices are attached. transmission line components
Amount:
$4,241.91

Component Description:
Cost of reconfiguring the combiners
Amount:
$2,469.00

Component Description:
Sutro Towere Transmission line parts for the combiner
Amount:
$4,249.73
removal and disposal Information not provided.
remove and replace switches Information not provided.
complex RF testing Information not provided.
xray core drill patch Information not provided.
New combiner, cost per channel (without antenna)

Component Description:
KPJK-290-Primary Combiner -New- Cost Per Channel
Amount:
$5,756.22
Sweep test of existing antenna Information not provided.
Combiner Room HVAC and Electrical

Component Description:
KPJK-290-Auxiliary Antenna-Combiner Room HVAC and Electrical
Amount:
$51,253.80

Component Description:
KPJK-290-Auxiliary Antenna - Combiner Room HVAC and Electrical
Amount:
$8,542.30

Component Description:
KPJK-290-Auxiliary Antenna-Combiner Room HVAC and Electrical
Amount:
$25,626.90
Remove old combiner

Component Description:
6. KPJK-250-Auxiliary Antenna - Remove Old Combiner
Amount:
$2,601.00

Component Description:
KPJK-250-Auxiliary Antenna - Remove Old Combiner Line
Amount:
$1,185.12

Component Description:
KPJK-250-Auxiliary Antenna - Remove Old Combiner
Amount:
$820.00

Component Description:
KPJK-250-Auxiliary Antenna - Remove Old Combiner
Amount:
$500.65

Component Description:
KPJK-250-Auxiliary Antenna-Remove Old Combiner
Amount:
$1,791.68

Component Description:
KPJK-250-Auxiliary Antenna - Remove Old Combiner Line
Amount:
$1,549.62
New combiner, cost per channel (without antenna)

Component Description:
KPJK-290-Auxiliary Combiner - New - Cost Per Channel
Amount:
$7,044.62

Component Description:
KPJK Auxiliary Combiner- New- Cost Per Channel
Amount:
$4,174.50

Component Description:
KPJK-290-Auxiliary Combiner - New - Cost Per Channel
Amount:
$10,412.10

Component Description:
KPJK Aux Combiner-New-Cost Per Channel
Amount:
$8,038.59

Component Description:
KPJK-290-Auxiliary Combiner - New - Cost Per Channel
Amount:
$4,115.94

Component Description:
KPJK-290-Auxiliary Combiner - New - Cost Per Channel
Amount:
$11,701.23

Component Description:
KPJK-290-Auxiliary Combiner - New - Cost Per Channel
Amount:
$2,573.60

Component Description:
KPJK Auxiliary Combiner- New- Cost Per Channel
Amount:
$16,940.22

Component Description:
KPJK-290-Auxiliary Combiner-New-Cost Per Channel
Amount:
$29,759.22
Sweep test of existing antenna Information not provided.
Remove and Replace switches

Component Description:
9. KPJK-250-Auxiliary Antenna - New - Remove and Replace Switches
Amount:
$492.00

Component Description:
KPJK-250-Auxiliary Antenna - New - Remove and Replace Switches
Amount:
$691.31
Reconnect lines

Component Description:
8. KPJK-250-Auxiliary Antenna - Reconnect Lines
Amount:
$4,120.37

Component Description:
KPJK-250-Auxiliary Antenna - Reconnect Lines
Amount:
$2,932.12

Component Description:
KPJK-250-Auxiliary Antenna - Reconnect Lines
Amount:
$12,569.37

Component Description:
KPJK-250-Auxiliary Antenna - Reconnect Lines
Amount:
$1,595.75

Component Description:
KPJK-250-Auxiliary Antenna - Reconnect Lines
Amount:
$4,884.27
Complex testing

Component Description:
10. KPJK-250-Auxiliary Antenna - Complex Testing
Amount:
$1,012.76

Component Description:
KPJK-250-Auxiliary Antenna - Complex Testing
Amount:
$1,001.31

Component Description:
KPJK-250-Auxiliary Antenna- Reconnect Lines
Amount:
$8,468.17

Component Description:
KPJK-250-Auxiliary Antenna - Reconnect Lines
Amount:
$679.10
xray core drill patch Information not provided.
transmission line kit

Component Description:
KPJK-250-Auxiliary Antenna - Transmission Line Kit
Amount:
$11,234.70

Component Description:
KPJK-250-Auxiliary Antenna - Transmission Line Kit
Amount:
$238.38
Remove old combiner line

Component Description:
7. KPJK-250-Auxiliary Antenna - Remove Old Combiner Line
Amount:
$8,422.25

Component Description:
KPJK-250-Auxiliary Antenna - Remove Old Combiner Line
Amount:
$710.87

Component Description:
KPJK-250-Auxiliary Antenna - New - Remove and Replace Switches
Amount:
$1,690.00
New combiner, cost per channel (without antenna)

Component Description:
KPJK-290-Auxiliary Combiner - New - Cost Per Channel
Amount:
$12,008.77

Component Description:
KPJK-290-Auxiliary Combiner - New - Cost Per Channel
Amount:
$4,826.11

Component Description:
5. KPJK-290-Auxiliary Combiner - New - Cost Per Channel
Amount:
$1,601.75

Component Description:
KPJK-290-Auxiliary Combiner - New - Cost Per Channel
Amount:
$1,000.00

Component Description:
KPJK Auxiliary Combiner- New- Cost Per Channel
Amount:
$16,940.22

Component Description:
KPJK-290-Auxiliary Combiner - New - Cost Per Channel
Amount:
$32,217.90

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $105,500.00 $105,500.00 N/A $93,756.51 N/A
Total for all systems $5,164,438.13 $6,855,893.76 N/A $4,064,065.22 N/A
Primary Transmission Line $105,500.00 $105,500.00 $93,756.51
retuning transmission line $105,500.00 $105,500.00 see Estimated Cost Justification KPJK-310-Primary Transmission Line - Retune Existing Transmission Line v0 $93,756.51 N/A
Auxiliary Transmission Line $0.00 $0.00 $0.00
retuning transmission line $0.00 $0.00 N/A $0.00 N/A

Components

Actual Information Description File Name
retuning transmission line

Component Description:
KPJK-310-Primary Transmission Line-Retune Existing Transmission Line
Amount:
$619.11

Component Description:
KPJK-310-Primary Transmission Line - Retune Existing Transmission Line
Amount:
$12,396.96

Component Description:
KPJK-310-Primary Transmission Line-Retune Existing Transmission Line
Amount:
$52.62

Component Description:
KPJK-310-Primary Transmission Line-Retune Existing Transmission Line
Amount:
$1,807.50

Component Description:
KPJK-310-Primary Transmission Line - Retune Existing Transmission Line
Amount:
$15,972.94

Component Description:
KPJK-310-Primary Transmission Line - Retune Existing Transmission Line
Amount:
$40,337.37

Component Description:
KPJK-310-Primary Transmission Line - Retune Existing Transmission Line
Amount:
$17,885.27

Component Description:
KPJK-310-Primary Transmission Line - Retune Existing Transmission Line
Amount:
$367.22

Component Description:
KPJK-310-Primary Transmission Line - Retune Existing Transmission Line
Amount:
$859.55

Component Description:
KPJK-310-Primary Transmission Line - Retune Existing Transmission Line
Amount:
$3,457.97
retuning transmission line Information not provided.

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,485,600.00 $2,714,054.29 N/A $1,021,853.70 N/A
Total for all systems $5,164,438.13 $6,855,893.76 N/A $4,064,065.22 N/A
Primary Tower TOWER $1,485,600.00 $2,714,054.29 $1,021,853.70
Serious tower reinforcement/modifications $1,052,000.00 $2,280,454.29 see Estimated Cost Justification KPJK-410-Existing Primary Tower - Complex Tower - Serious Tower Reinforcements_Modifications v0 $884,497.96 N/A
Structural engineering tower load study for well documented tower $12,600.00 $12,600.00 N/A $0.00 N/A
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $421,000.00 N/A $137,355.74 N/A

Components

Actual Information Description File Name
Serious tower reinforcement/modifications

Component Description:
KPJK-410-Existing Primary Tower - Complex Tower -Serious Tower Reinforcements/Modifications
Amount:
$23,812.74

Component Description:
KPJK-410-Existing Primary Tower - Complex Tower - Serious Tower Reinforcements/Modifications
Amount:
$95,302.10

Component Description:
KPJK-410-Existing Primary Tower - Complex Tower - Serious Tower Reinforcements/Modifications
Amount:
$11,837.82

Component Description:
Shared Spectrum Repacking Costs
Amount:
$37,272.17

Component Description:
KPJK-410-Existing Primary Tower - Complex Tower -Serious Tower Reinforcements/Modifications
Amount:
$3,169.10

Component Description:
KPJK-410-Existing Primary Tower - Complex Tower -Serious Tower Reinforcements/Modifications
Amount:
$12,341.34

Component Description:
KPJK-410-Existing Primary Tower - Complex Tower - Serious Tower Reinforcements/Modifications
Amount:
$60.00

Component Description:
KPJK-410-Existing Primary Tower-Complex Tower-Serious Tower Reinforcement/Modifications
Amount:
$20,247.33

Component Description:
Shared Spectrum Repacking Costs
Amount:
$97,054.28

Component Description:
Shared Spectrum Repacking Costs in accordance with paragraph 2b of Spectrum-Repack Project
Amount:
$92,857.14

Component Description:
KPJK-410-Existing Primary Tower - Complex Tower - Serious Tower Reinforcements/Modifications
Amount:
$20,247.33

Component Description:
KPJK-410-Existing Primary Tower-Complex Tower-Serious Tower Reinforcements/Modifications
Amount:
$264.67

Component Description:
KPJK-410-Existing Primary Tower - Complex Tower - Serious Tower Reinforcements/Modifications
Amount:
$12,519.66

Component Description:
Shared Spectrum Repacking Costs in accordance with paragraph 2b of Spectrum-Repack Project
Amount:
$34,240.25

Component Description:
Shared Spectrum Repacking Costs
Amount:
$85,714.28

Component Description:
KPJK-410-Existing Primary Tower - Complex Tower -Serious Tower Reinforcements/Modifications
Amount:
$14,336.97

Component Description:
KPJK-410-Existing Primary Tower - Complex Tower - Serious Tower Reinforcements/Modifications
Amount:
$2,457.30

Component Description:
Shared Spectrum Repacking Costs in accordance with paragraph 2b of Spectrum-Repack Project Agreement related to ERI progress payment upon 60% completion. See supporting documentation attached.
Amount:
$85,714.28

Component Description:
Shared Spectrum Repacking Costs
Amount:
$185,714.28

Component Description:
4. KPJK-410-Existing Primary Tower-Complex Tower-Serious Tower Reinforcements/Modifications
Amount:
$8,519.31

Component Description:
KPJK-410-Existing Primary Tower-Complex Tower-Serious Tower Reinforcements/Modifications
Amount:
$5,237.02

Component Description:
KPJK-410-Existing Primary Tower - Complex Tower - Serious Tower Reinforcements/Modifications
Amount:
$157.53

Component Description:
Shared Spectrum Repacking Costs in accordance with paragraph 2b of Spectrum-Repack Project
Amount:
$35,421.06
Structural engineering tower load study for well documented tower Information not provided.
Complex Tower (includes, for example, those with candelabras and/or stacked antennas)

Component Description:
KPJK-410-Existing Primary Tower - Complex Tower
Amount:
$18,987.79

Component Description:
KPJK-410-Existing Primary Tower - Complex Tower - Serious Tower
Amount:
$15,429.70

Component Description:
KPJK-410-Existing Primary Tower-Complex Tower
Amount:
$468.57

Component Description:
Shared Spectrum Repacking Costs in accordance with paragraph 2b of Spectrum-Repack Project
Amount:
$18,421.87

Component Description:
KPJK-410-Existing Primary Tower - Complex Tower
Amount:
$21,666.49

Component Description:
Shared Spectrum Repacking Costs in accordance with paragraph 2b of Spectrum-Repack Project
Amount:
$53,131.59

Component Description:
KPJK-410-Existing Primary Tower - Complex Tower
Amount:
$3,726.81

Component Description:
KPJK-410-Existing Primary Tower-Complex Tower
Amount:
$5,480.07

Component Description:
KPJK-410-Existing Primary Tower - Complex Tower - Serious Tower Reinforcements/Modifications
Amount:
$42.85

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $987,598.97 $1,057,693.14 N/A $786,701.34 N/A
Total for all systems $5,164,438.13 $6,855,893.76 N/A $4,064,065.22 N/A
Outside Professional Services $987,598.97 $1,057,693.14 $786,701.34
Station consultant $40,000.00 $40,000.00 Additional support is needed to manage the repacking project and work with the staff as they keep the existing facility operational $16,632.32 N/A
Preliminary repacking study $24,570.09 $24,570.09 Study made before the stations were determined to see how to best use what was existing, and its operational standing. Due to the anticipated channels not being the same as the repacked channels there was additional rework that needed to be done. $24,570.09 N/A
Post-assignment study $15,563.00 $15,563.00 This cost is for the study to determine best use of the existing stations after the auction was complete. This is KCSM's portion of that study $5,374.97 N/A
Neighborhood survey $3,333.00 $3,333.00 Perform a survey of the neighbors to submit with the permit application $471.42 N/A
Licensee board legal support $48,707.00 $48,707.00 Per KPJK-550-Attorney-Licensee Board Legal Support Budget Increase Justification. Licensee is owned by a community college district with a publicly elected board that does not have expertise in broadcasting matters. $48,707.00 N/A
Architectural plans $81,821.06 $81,821.06 per Estimated Cost Justification KPJK-590-Architectural Plans v0 $68,099.15 N/A
Alternative site study $77,607.78 $77,607.78 study to see if there would be an alternative site if SF does not approve permit for this project. See PDF attachment KPJK Alternative Site Revised Estimate backup. $77,607.78 N/A
Legal fees - Sutro repack project $92,423.09 $92,423.09 KCSM's portion of Sutro Tower's legal fees; See Justifying Invoices - KPJK CWC 1097441, 1097484, 1097487, 1097910, 1097913, 1098292, 1098295 $33,113.57 N/A
Pemit public relations $19,108.00 $19,108.00 N/A $12,811.02 N/A
Accounting Services $5,075.00 $5,075.00 KPJK Justification for Accounting Services version 1 N/A N/A
Tower mapping $36,062.22 $36,062.22 Estimated Cost Justification KPJK-590-Tower Mapping v0 $20,712.57 N/A
RF Exposure Measurements $21,050.00 $20,000.00 N/A N/A N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $75,000.00 N/A N/A N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A N/A N/A
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application $4,210.00 $4,000.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A N/A N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A $0.00 N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $2,000.00 N/A $0.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $1,000.00 N/A $0.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $8,000.00 Per KPJK-530-RF Eng-Engineering Study New Channel Assignment Budget Increase Justification. Consulting engineer Hammett & Edison, Inc. was extremely busy during this phase and the study was more complex because of San Francisco location at Sutro Tower. $8,000.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A $0.00 N/A
Project management of the transition $94,010.00 $165,209.17 The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. $165,137.72 N/A
Building permit $196,424.87 $196,424.87 The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. $196,424.87 N/A
Sutro Project management $109,038.86 $109,038.86 The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. $109,038.86 Not exceeded
Prepare and or review reimbursement form $2,630.00 $15,000.00 Final costs TBD (all invoices not yet received); form has required many meetings, telecons, and extensive review and coordination by legal counsel and outside project manager because of complexity of Sutro site N/A N/A

Components

Actual Information Description File Name
Station consultant

Component Description:
Station Consultant for repacking
Amount:
$2,943.36

Component Description:
Station Consultant for repacking
Amount:
$3,036.80

Component Description:
Station Consultant for repacking at Sutro Tower
Amount:
$3,504.00

Component Description:
Consulting with college district for work at Sutro tower, status reports and form 399
Amount:
$3,504.00

Component Description:
Station Consultant for repacking
Amount:
$3,644.16

Component Description:
cover letter attached
Amount:
$3,036.80

Component Description:
Station Consultant for repacking- This is a resubmittal for improper name in vendor name field
Amount:
$3,036.80

Component Description:
Consulting work
Amount:
$3,504.00
Preliminary repacking study

Component Description:
Attachment has revised invoice and original. Repack Study
Amount:
$24,570.09

Component Description:
Preliminary study for repacking planning
Amount:
$24,570.11
Post-assignment study

Component Description:
Shared Spectrum Repacking Costs in accordance with paragraph 2b of Spectrum-Repack Project
Amount:
$62.50

Component Description:
KPJK Post Assignment Study
Amount:
$91.66

Component Description:
Shared Spectrum Repacking Costs
Amount:
$20.83

Component Description:
Preliminary study for channels left on Sutro Tower. Channels changed form the expected channels, so the cost is slightly higher than estimated.
Amount:
$3,890.83

Component Description:
Post assignment study
Amount:
$233.33

Component Description:
Shared Spectrum Repacking Costs in accordance with paragraph 2b of Spectrum-Repack Project
Amount:
$229.16

Component Description:
Post assignment antenna study
Amount:
$275.83

Component Description:
Post assignment study
Amount:
$570.83

Component Description:
revised and original invoices are attached. Post Assignment Study
Amount:
$3,890.83
Neighborhood survey

Component Description:
KPJK-590-Neighborhood Survey
Amount:
$471.42
Licensee board legal support

Component Description:
Legal fees for consulting the College board on how to navigate the repacking
Amount:
$20,082.00

Component Description:
Legal fees for consulting the College board on how to navigate the repacking
Amount:
$17,359.00

Component Description:
Legal fees for consulting the College board on how to navigate the repacking
Amount:
$11,266.00
Architectural plans

Component Description:
Architechtual plans
Amount:
$6,107.75

Component Description:
"Shared Spectrum Repacking Costs in accordance with paragraph 2b of Spectrum-Repack Project Agreement for the month of May 2020."
Amount:
$4,959.43

Component Description:
Shared Spectrum Repacking Costs
Amount:
$1,521.37

Component Description:
Shared Spectrum Repacking Costs in accordance
Amount:
$77.82

Component Description:
KPJK-590-Architectural Plans
Amount:
$561.64

Component Description:
KPJK-590-Architectural Plans
Amount:
$340.56

Component Description:
KPJK Architectural Plans
Amount:
$7,103.48

Component Description:
Arch. Plans
Amount:
$2,285.23

Component Description:
Arch. Plans
Amount:
$612.05

Component Description:
Architechtural plans
Amount:
$10,067.50

Component Description:
Expenses incurred for the month of July 2019 related to spectrum repack detailed on share of all costs sheet.
Amount:
$249.21

Component Description:
Architechtual plans
Amount:
$854.73

Component Description:
arch plans
Amount:
$501.17

Component Description:
Architechtural plans
Amount:
$8,439.89

Component Description:
Arch. Plans
Amount:
$10,067.49

Component Description:
1. KPJK-590-Architectural Plans
Amount:
$1,441.54

Component Description:
KPJK Architectural Plans
Amount:
$1,053.41

Component Description:
KPJK Architectural Plans
Amount:
$1,744.63

Component Description:
Architectural plans
Amount:
$1,038.80

Component Description:
Shared Spectrum Repacking Costs in accordance with paragraph 2b of Spectrum-Repack Project
Amount:
$1,566.04

Component Description:
Begin making architectual plans of the Sutro facility
Amount:
$10,460.44

Component Description:
KPJK-590-Architectural Plans
Amount:
$1,332.28

Component Description:
Tower mapping work
Amount:
$2,288.17

Component Description:
KPJK-590-Architectural Plans
Amount:
$5,780.19
Alternative site study

Component Description:
revised and original invoices are attached. Alternative site planning
Amount:
$64,691.12

Component Description:
Sutro Tower initiated a study for an alternative site location if Sutro Tower could not be used.
Amount:
$64,691.26

Component Description:
Alternative Site Engineering
Amount:
$12,916.66
Legal fees - Sutro repack project

Component Description:
KPJK-550-Attorney - Sutro Repack Project
Amount:
$210.96

Component Description:
KPJK-550-Attorney - Sutro Repack Project
Amount:
$1,963.57

Component Description:
KPJK-550-Attorney-Sutro Repack Project
Amount:
$435.33

Component Description:
KPJK-550-Attorney - Sutro Repack Project
Amount:
$1,073.22

Component Description:
KPJK-550-Attorney-Sutro Repack Project
Amount:
$217.68

Component Description:
KPJK-550-Attorney-Sutro Repack Project
Amount:
$1,587.60

Component Description:
KPJK Attorney-Sutro Repack Project
Amount:
$634.20

Component Description:
KPJK-550-Attorney - Sutro Repack Project
Amount:
$551.47

Component Description:
KPJK-550-Attorney - Sutro Repack Project
Amount:
$44.78

Component Description:
KPJK Attorney- Sutro Repack Project
Amount:
$143.31

Component Description:
KPJK Attorney-Sutro Repack Project
Amount:
$655.57

Component Description:
Multi station legal services
Amount:
$367.17

Component Description:
multi station legal costs
Amount:
$283.50

Component Description:
KPJK-550-Attorney - Sutro Repack Project
Amount:
$367.24

Component Description:
Work on KPJK-TV repack and 10-week report prior to Phase deadline.
Amount:
$241.00

Component Description:
legal fees
Amount:
$238.05

Component Description:
Legal Fees
Amount:
$100.54

Component Description:
Sutro Tower multi station legal costs
Amount:
$12,651.94

Component Description:
KPJK-550-Attorney - Sutro Repack Project
Amount:
$44.35

Component Description:
KPJK Attorney- Sutro Repack Project
Amount:
$280.04

Component Description:
multi station legal
Amount:
$934.48

Component Description:
KPJK Attorney- Sutro Repack Project
Amount:
$1,519.20

Component Description:
Multi station legal
Amount:
$509.43

Component Description:
legal fees, multi-station
Amount:
$1,276.56

Component Description:
Legal fees for multi station repacking project
Amount:
$537.94

Component Description:
KPJK-550-Attorney - Sutro Repack Project
Amount:
$63.31

Component Description:
Legal fees
Amount:
$283.49

Component Description:
KPJK-550-Attorney - Sutro Repack Project
Amount:
$148.20

Component Description:
KPJK-550-Attorney - Sutro Repack Project
Amount:
$1,260.24

Component Description:
KPJK-550-Attorney-Sutro Repack Project
Amount:
$214.97

Component Description:
legal services for multi-station proj
Amount:
$100.54

Component Description:
Sutro legal fee for repacking project
Amount:
$2,281.74

Component Description:
Legal fees for multi channel repacking
Amount:
$2,001.97

Component Description:
revised and original invoices are attached. legal fees
Amount:
$12,651.89

Component Description:
multi station legal fees
Amount:
$274.07
Pemit public relations

Component Description:
KPJK-590-Permit Public Relations
Amount:
$1,392.85

Component Description:
KPJK-590-Permit Public Relations
Amount:
$192.85

Component Description:
KPJK-590-Permit Public Relations
Amount:
$225.00

Component Description:
KPJK-590-Permit Public Relations
Amount:
$150.00

Component Description:
KPJK-590-Permit Public Relations
Amount:
$557.14

Component Description:
KPJK-590-Permit Public Relations
Amount:
$139.28

Component Description:
KPJK-590-Permit Public Relations
Amount:
$62.50

Component Description:
KPJK Permit Public Relations
Amount:
$387.50

Component Description:
KPJK-590-Permit Public Relations
Amount:
$375.00

Component Description:
KPJK Permit Public Relations
Amount:
$439.28

Component Description:
KPJK-590-Permit Public Relations
Amount:
$267.85

Component Description:
KPJK-590-Permit Public Relations
Amount:
$21.42

Component Description:
KPJK-590-Permit Public Relations
Amount:
$364.28

Component Description:
KPJK-590-Permit Public Relations
Amount:
$696.42

Component Description:
Permit public relations
Amount:
$312.50

Component Description:
Building permit public relations
Amount:
$225.00

Component Description:
public relations for building permit
Amount:
$516.50

Component Description:
permit public relations
Amount:
$337.50

Component Description:
Permit public relations
Amount:
$62.50

Component Description:
KPJK Permit Public Relations
Amount:
$942.85

Component Description:
revised and original invoices are attached. Public Relations
Amount:
$237.50

Component Description:
KPJK-590-Permit Public Relations
Amount:
$310.71

Component Description:
public relations
Amount:
$516.49

Component Description:
KPJK-590-Permit Public Relations
Amount:
$137.50

Component Description:
KPJK Permit Public Relations
Amount:
$512.50

Component Description:
KPJK-590-Permit Public Relations
Amount:
$192.85

Component Description:
Building Permit public relations
Amount:
$150.00

Component Description:
KPJK-590-Permit Public Relations
Amount:
$107.14

Component Description:
revised price
Amount:
$516.49

Component Description:
Public relations for SF permit process
Amount:
$237.50

Component Description:
public relations for Sutro tower permit process
Amount:
$212.50

Component Description:
KPJK Permit Public Relations
Amount:
$396.42

Component Description:
KPJK-590-Permit Public Relations
Amount:
$632.14

Component Description:
3. KPJK-590-Permit Public Relations
Amount:
$64.28

Component Description:
KPJK-590-Permit Public Relations
Amount:
$771.42

Component Description:
KPJK-590-Permit Public Relations
Amount:
$42.85

Component Description:
Permit Public Relations
Amount:
$525.00

Component Description:
KPJK Permit Public Relations
Amount:
$137.50

Component Description:
Public Relations for permit
Amount:
$712.50
Accounting Services Information not provided.
Tower mapping

Component Description:
Shared Spectrum Repacking Costs in accordance with paragraph 2b of Spectrum-Repack Project
Amount:
$2,670.83

Component Description:
"Shared Spectrum Repacking Costs in accordance with paragraph 2b of Spectrum-Repack Project Agreement."
Amount:
$4,329.35

Component Description:
KPJK Existing Primary Tower-Tower Mapping
Amount:
$4,184.71

Component Description:
Tower mapping
Amount:
$3,087.48

Component Description:
Tower mapping
Amount:
$118.83

Component Description:
Tower Mapping, Peter Eckmann Consultants, Inc..
Amount:
$2,888.88

Component Description:
tower mapping services
Amount:
$1,481.09

Component Description:
Tower mapping for Sutro Tower
Amount:
$113.67

Component Description:
revised and original invoices are attached. tower mapping
Amount:
$113.66

Component Description:
Shared Spectrum Repacking Costs in accordance with paragraph 2b of Spectrum-Repack Project
Amount:
$1,416.66

Component Description:
Tower mapping
Amount:
$268.67

Component Description:
tower mapping
Amount:
$152.42

Component Description:
tower mapping
Amount:
$152.41
RF Exposure Measurements Information not provided.
Comprehensive coverage verification via field study, if needed Information not provided.
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare request for Special Temporary Authorization Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application

Component Description:
Hammett and Edison invoice and proof of payment for channel study. CP submitted and received
Amount:
$1,000.00

Component Description:
H & E preparing eng portion of 2100
Amount:
$1,000.00
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
H&E bill for Maximization
Amount:
$1,650.00

Component Description:
This invoice is for the eng study and filling out the form 2100
Amount:
$1,000.00
Perform engineering study for new channel assignment and antenna development

Component Description:
Hammett & Edison, Inc. invoice with cover letter, quote, proof of payment for channel study
Amount:
$8,000.00

Component Description:
channel study for channel 27
Amount:
$7,000.00

Component Description:
This invoice is for the channel study and filling out the form 2100
Amount:
$7,000.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Project management of the transition

Component Description:
Project Management
Amount:
$5,702.90

Component Description:
Project Management
Amount:
$581.25

Component Description:
KPJK-510-Project Management
Amount:
$5,868.42

Component Description:
Project Management
Amount:
$660.00

Component Description:
Project Management
Amount:
$7,053.10

Component Description:
KPJK-510-Project Management
Amount:
$2,929.01

Component Description:
Project Management
Amount:
$4,821.60

Component Description:
Project Management
Amount:
$5,492.65

Component Description:
Project Management
Amount:
$4,370.55

Component Description:
Project Management
Amount:
$7,456.05

Component Description:
Project Management
Amount:
$12,431.70

Component Description:
KPJK-510-Project Management
Amount:
$6,321.74

Component Description:
Project Management
Amount:
$4,336.65

Component Description:
Project Management
Amount:
$20,321.10

Component Description:
Project Management
Amount:
$6,669.80

Component Description:
Project Management
Amount:
$8,276.45

Component Description:
Project Management
Amount:
$7,935.40

Component Description:
Project Management
Amount:
$8,272.10

Component Description:
Project Management
Amount:
$11,348.70

Component Description:
Project Management
Amount:
$7,272.65

Component Description:
Project Management
Amount:
$3,642.50

Component Description:
Project Management
Amount:
$7,957.90

Component Description:
Project Management
Amount:
$8,238.80

Component Description:
Project Management
Amount:
$7,176.70
Building permit

Component Description:
KPJK-590-Building Permit Sutro Tower, Inc. 9632
Amount:
$2,622.33

Component Description:
Shared Spectrum Repacking Costs in accordance with paragraph 2b of Spectrum-Repack
Amount:
$382.37

Component Description:
KPJK-590-Building Permit
Amount:
$5,614.77

Component Description:
Shared Spectrum Repacking Costs in accordance with paragraph 2b of Spectrum-Repack
Amount:
$421.39

Component Description:
KPJK-590-Building Permit
Amount:
$3,654.06

Component Description:
Shared Spectrum Repacking Costs
Amount:
$1,660.73

Component Description:
Shared Spectrum Repacking Costs
Amount:
$9,527.24

Component Description:
KPJK-590-Building Permit
Amount:
$2,091.22

Component Description:
KPJK-590-Building Permit
Amount:
$8,688.85

Component Description:
KPJK-590-Building Permit
Amount:
$357.43

Component Description:
KPJK Building Permit
Amount:
$7,529.19

Component Description:
KPJK-590-Building Permit
Amount:
$2,174.70

Component Description:
KPJK Building Permit
Amount:
$12,260.62

Component Description:
Shared Spectrum Repacking Costs
Amount:
$3,829.31

Component Description:
Shared Spectrum Repacking Costs
Amount:
$1,642.55

Component Description:
KPJK-590-Building Permit
Amount:
$19,207.92

Component Description:
KPJK Building Permit
Amount:
$9,761.92

Component Description:
KPJK-590-Building Permit
Amount:
$11,378.44

Component Description:
Building permit costs
Amount:
$705.37

Component Description:
Building Permit
Amount:
$8,170.00

Component Description:
Shared Spectrum Repacking Costs in accordance with paragraph 2b of Spectrum-Repack Project
Amount:
$571.83

Component Description:
Building Permit work
Amount:
$812.09

Component Description:
Shared spectrum repacking costs
Amount:
$1,980.71

Component Description:
KPJK-590-Building Permit
Amount:
$26,769.63

Component Description:
Expenses incurred for the month of August 2019 related to spectrum repack detailed on share of all costs sheet.
Amount:
$3,420.67

Component Description:
KPJK-590-Building Permit
Amount:
$1,685.06

Component Description:
Building permit process continuing
Amount:
$2,054.30

Component Description:
starting the building permit process with San Francisco
Amount:
$10,478.17

Component Description:
Shared Spectrum Repacking Costs
Amount:
$3,973.57

Component Description:
Shared Spectrum Repacking Costs in accordance with paragraph 2b of Spectrum-Repack Project
Amount:
$5,171.32

Component Description:
Shared Spectrum Repacking Costs
Amount:
$5,844.12

Component Description:
KPJK Building Permit
Amount:
$523.29

Component Description:
revised and original invoices are attached. Building permit
Amount:
$10,478.13

Component Description:
KPJK-590-Building Permit
Amount:
$3,971.00

Component Description:
Building permit
Amount:
$197.83

Component Description:
KPJK Building Permit
Amount:
$966.15

Component Description:
Building permits SF
Amount:
$4,666.94

Component Description:
Building permits
Amount:
$407.31

Component Description:
Building Permits - serious modifications
Amount:
$704.66

Component Description:
Building permit
Amount:
$67.68

Component Description:
Building permit
Amount:
$705.37

Component Description:
building permit work
Amount:
$197.84
Sutro Project management

Component Description:
KPJK-510-Sutro Project Management
Amount:
$317.13

Component Description:
KPJK-590-Sutro Project Managemen
Amount:
$4,984.55

Component Description:
KPJK-510-Sutro Project Management
Amount:
$4,189.44

Component Description:
Sutro Tower Project management
Amount:
$889.58

Component Description:
KPJK-510-Sutro Project Management
Amount:
$666.07

Component Description:
KPJK-590-Sutro Project Management
Amount:
$4,248.72

Component Description:
KPJK-590-Sutro Project Management
Amount:
$1,709.37

Component Description:
KPJK Sutro Project Management
Amount:
$956.25

Component Description:
KPJK-590-Sutro Project Management
Amount:
$583.33

Component Description:
KPJK Sutro Project Management
Amount:
$1,183.92

Component Description:
KPJK-590-Sutro Project Management
Amount:
$4,799.88

Component Description:
KPJK-590-Sutro Project Management
Amount:
$4,280.68

Component Description:
KPJK Sutro Project Management
Amount:
$1,033.56

Component Description:
Sutro Project mgmt
Amount:
$812.07

Component Description:
KPJK-510-Sutro Project Management
Amount:
$8,851.93

Component Description:
Sutro Tower Project Management
Amount:
$5,315.63

Component Description:
KPJK-590-Sutro Project Management
Amount:
$2,613.56

Component Description:
KPJK-590-Sutro Project Management
Amount:
$6,851.97

Component Description:
KPJK-590-Sutro Project Management
Amount:
$5,043.53

Component Description:
Sutro tower project management
Amount:
$738.24

Component Description:
KPJK-590-Sutro Project Management
Amount:
$7,881.91

Component Description:
KPJK Sutro Project Management
Amount:
$944.58

Component Description:
Sutro Proj Management
Amount:
$1,188.75

Component Description:
KPJK Sutro Project Management
Amount:
$759.37

Component Description:
Sutro project management
Amount:
$146.87

Component Description:
15. KPJK-590-Sutro Project Management
Amount:
$4,376.44

Component Description:
Sutro Tower Project management
Amount:
$293.75

Component Description:
KPJK Sutro Project Management
Amount:
$1,180.35

Component Description:
Sutro Project mgmt
Amount:
$2,051.38

Component Description:
Sutro Proj. management
Amount:
$125.00

Component Description:
KPJK-590-Sutro Project Management
Amount:
$8,053.96

Component Description:
KPJK-590-Sutro Project Management
Amount:
$6,651.00

Component Description:
revised and original invoices are attached. Project Management
Amount:
$5,240.62

Component Description:
Sutro Tower Project management
Amount:
$1,396.42

Component Description:
Sutro Proj management
Amount:
$1,203.74

Component Description:
KPJK-590-Sutro Project Management
Amount:
$1,162.50

Component Description:
KPJK-590-Sutro Project Management
Amount:
$7,344.78

Component Description:
KPJK-590-Sutro Project Management
Amount:
$3,344.92

Component Description:
Project Management
Amount:
$125.00

Component Description:
Project Management
Amount:
$146.87

Component Description:
Sutro Tower, Inc. Project Management
Amount:
$938.74
Prepare and or review reimbursement form Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $798,938.10 $796,748.10 N/A $346,611.24 N/A
Total for all systems $5,164,438.13 $6,855,893.76 N/A $4,064,065.22 N/A
Other Expenses $798,938.10 $796,748.10 $346,611.24
VSWR monitor $271,224.67 $271,224.67 Per Estimated Cost Justification KPJK-610-VSWR Monitor v1 $235,944.39 N/A
Sales tax $118,500.00 $118,500.00 California sales tax $10,722.93 N/A
KCSM Space drawing $62,190.00 $62,190.00 Per Estimated Cost Justification KPJK-610-KCSM Space Drawing v0. This cost is for a planning document for KCSM, Wadleigh and Gates as to where to put the new equipment as well as maintain the operational status of the existing equipment $54,677.92 N/A
Contractor project costs $214,371.00 $214,371.00 Contractor project management, profit and overhead, and general conditions for the KCSM leased space as quoted by Wadleigh Group (attached) N/A N/A
Hoist Rental $28,761.00 $28,761.00 Please see Sutro Tower, Inc June Repack Cost Estimates dated June 25, 2020 $2,571.42 N/A
MVPD Notification of Channel Change $10,000.00 $10,000.00 A cost to notify MVPD's of channel changes $1,250.00 N/A
Develop and air announcement of upcoming channel change $7,000.00 $7,000.00 This cost is to make on air announcements and messages for Web and print N/A N/A
Equipment Storage $2,500.00 $2,500.00 Storage for KCSM equipment for the repacking project $1,817.10 N/A
Equipment Delivery and Handling Charges $52,833.00 $52,833.00 This includes KCSM's share of a rental space to store and deliver equipment until ready to install $20,917.05 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $15,035.43 $15,035.43 Estimated Cost Justification KPJK-610-Disposal Cost v1 $15,035.43 N/A
RF exposure $3,333.00 $3,333.00 N/A N/A N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $0.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $0.00 N/A N/A N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $0.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A $3,675.00 N/A

Components

Actual Information Description File Name
VSWR monitor

Component Description:
Vendor Credit - Shared Spectrum Repacking Costs in accordance with paragraph 2b of Spectrum. Also see COMB KPJK Sutro Tower 9775 Supporting Docs
Amount:
($39,949.08)

Component Description:
KPJK-610-VSWR Monitor
Amount:
$2,053.85

Component Description:
KPJK-610-VSWR Monitor
Amount:
$9,563.50

Component Description:
KPJK-610-VSWR Monitor
Amount:
$2,204.55

Component Description:
KPJK-610-VSWR Monitor
Amount:
$8,763.09

Component Description:
KPJK-610-VSWR Monitor
Amount:
$34,714.49

Component Description:
KPJK-610-VSWR Monitor
Amount:
$9,726.80

Component Description:
KPJK-610-VSWR Monitor
Amount:
$2,699.98

Component Description:
KPJK-610-VSWR Monitor
Amount:
$8,184.93

Component Description:
KPJK-610-VSWR Monitor
Amount:
$2,264.68

Component Description:
KPJK VSWR Monitor
Amount:
$1,822.11

Component Description:
KPJK-610-VSWR Monitor
Amount:
$16,361.63

Component Description:
KPJK VSWR Monitor
Amount:
$4,241.86

Component Description:
KPJK-610-VSWR Monitor
Amount:
$55,395.09

Component Description:
KPJK-610-VSWR Monitor
Amount:
$1,762.03

Component Description:
KPJK VSWR Monitor
Amount:
$10,092.46

Component Description:
KPJK-610-VSWR Monitor
Amount:
$9,057.92

Component Description:
KPJK VSWR Monitor
Amount:
$2,937.55

Component Description:
VSWR monitoring
Amount:
$2,091.66

Component Description:
KPJK-610-VSWR Monitor
Amount:
$4,852.14

Component Description:
KPJK VSWR Monitor
Amount:
$1,464.16

Component Description:
VSWR replacement
Amount:
$1,569.09

Component Description:
KPJK-610-VSWR Monitor
Amount:
$11,575.45

Component Description:
KPJK-610-VSWR Monitor
Amount:
$20,420.87

Component Description:
VSWR monitoring
Amount:
$4,183.54

Component Description:
16. KPJK-610-VSWR Monitor
Amount:
$15,562.30

Component Description:
KPJK-610-VSWR Monitor
Amount:
$2,077.69

Component Description:
KPJK-610-VSWR Monitor
Amount:
$833.13

Component Description:
KPJK VSWR Monitor
Amount:
$1,960.00

Component Description:
KPJK-610-VSWR Monitor
Amount:
$4,005.14

Component Description:
KPJK-610-VSWR Monitor
Amount:
$19,035.80

Component Description:
KPJK-610-VSWR Monitor
Amount:
$3,248.56

Component Description:
KPJK-610-VSWR Monitor
Amount:
$1,167.42
Sales tax

Component Description:
KPJK-610-Sales Tax
Amount:
$1,817.96

Component Description:
KPJK-610-Sales Tax
Amount:
$4,231.19

Component Description:
KPJK-610-Sales Tax
Amount:
$2,708.58

Component Description:
KPJK Sales Tax
Amount:
$829.78

Component Description:
17. KPJK-610-Sales Tax
Amount:
$1.09

Component Description:
KPJK Sales Tax
Amount:
$1,134.33
KCSM Space drawing

Component Description:
KPJK-610-KCSM Space Drawing
Amount:
$524.46

Component Description:
Shared Spectrum Repacking Costs in accordance with paragraph 2b of Spectrum-Repack Project
Amount:
$16,026.00

Component Description:
Shared Spectrum Repacking Costs
Amount:
$4,216.00

Component Description:
KPJK-610-KCSM Space Drawing
Amount:
$67.44

Component Description:
Shared Spectrum Repacking Costs in accordance with paragraph 2b of Spectrum-Repack Project
Amount:
$18,356.39

Component Description:
Shared Spectrum Repacking Costs
Amount:
$3,019.38

Component Description:
KPJK KCSM Space Drawing
Amount:
$5,600.32

Component Description:
KPJK KCSM Space Drawing
Amount:
$3,200.09

Component Description:
KPJK-610-KCSM Space Drawing
Amount:
$3,667.84
Contractor project costs Information not provided.
Hoist Rental

Component Description:
KPJK-610-Hoist Rental
Amount:
$1,285.71

Component Description:
KPJK-610-Hoist Rental
Amount:
$1,285.71
MVPD Notification of Channel Change

Component Description:
MVPD Notification Mailing
Amount:
$1,250.00
Develop and air announcement of upcoming channel change Information not provided.
Equipment Storage

Component Description:
13. KPJK-610-Equipment Storage
Amount:
$76.80

Component Description:
KPJK-610-Equipment Storage
Amount:
$17.72

Component Description:
KPJK-610-Equipment Storage
Amount:
$76.80

Component Description:
KPJK-610-Equipment Storage
Amount:
$79.25

Component Description:
KPJK-610-Equipment Storage
Amount:
$1,197.81

Component Description:
KPJK-610-Equipment Storage
Amount:
$76.80

Component Description:
KPJK-610-Equipment Storage
Amount:
$79.25

Component Description:
KPJK-610-Equipment Storage
Amount:
$135.87

Component Description:
KPJK-610-Equipment Storage
Amount:
$76.80
Equipment Delivery and Handling Charges

Component Description:
KPJK-610-Equipment Delivery and Handling
Amount:
$4,348.42

Component Description:
KPJK-610-Equipment Delivery and Handling
Amount:
$189.21

Component Description:
KPJK-610-Equipment Delivery and Handling
Amount:
$11.71

Component Description:
KPJK-610-Equipment Delivery and Handling
Amount:
$1,046.66

Component Description:
KPJK-610-Equipment Delivery and Handling
Amount:
$1,801.45

Component Description:
KPJK Equipment Delivery and Handling
Amount:
$149.15

Component Description:
KPJK-610-Equipment Delivery and Handling
Amount:
$2,215.69

Component Description:
KPJK-610-Equipment Delivery and Handling
Amount:
$523.85

Component Description:
KPJK-610-Equipment Delivery and Handling
Amount:
$1,022.48

Component Description:
KPJK-610-Equipment Delivery and Handling
Amount:
$1,876.31

Component Description:
14. KPJK-610-Equipment Delivery and Handling
Amount:
$187.42

Component Description:
KPJK-610-Equipment Delivery and Handling
Amount:
$213.98

Component Description:
KPJK-610-Equipment Delivery and Handling
Amount:
$385.71

Component Description:
KPJK-610-Equipment Delivery and Handling
Amount:
$1,146.81

Component Description:
shipping/storage/delivery
Amount:
$288.45

Component Description:
KPJK Equipment Delivery and Handling
Amount:
$89.58

Component Description:
KPJK-610-Equipment Delivery and Handling
Amount:
$1,075.20

Component Description:
KPJK-610-Equipment Delivery and Handling
Amount:
$193.39

Component Description:
KPJK-610-Equipment Delivery and Handling
Amount:
$102.85

Component Description:
Shipping, storage, delivery, handling
Amount:
$255.31

Component Description:
KPJK-610-Equipment Delivery and Handling
Amount:
$378.04

Component Description:
KPJK-610-Equipment Delivery and Handling
Amount:
$2,739.03

Component Description:
Equipment storage and delivery
Amount:
$676.35
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
KPJK-610-Disposal Cost
Amount:
$1,335.51

Component Description:
KPJK-610-Disposal Cost
Amount:
$445.16

Component Description:
KPJK-610-Disposal Cost
Amount:
$389.14

Component Description:
Disposal of transformer
Amount:
$2,218.66

Component Description:
KPJK-610-Disposal Cost
Amount:
$453.97

Component Description:
KPJK-610-Disposal Cost
Amount:
$1,028.57

Component Description:
KPJK-610-Disposal Cost
Amount:
$9,164.42
RF exposure Information not provided.
FCC Filing Fees - Special Temporary Authorization request Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
FCC Filing Fees - Form 2100 minor change CP application Information not provided.
DTV Medical Facility Notification

Component Description:
Medical Notification
Amount:
$3,675.00

Component Description:
Invoice moved to correct category per NMI message
Amount:
N/A

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $5,164,438.13 $6,855,893.76 $4,064,065.22

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Amy Boyd

COO


06/11/2021

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Amy Boyd

COO


06/11/2021

Attachments

Back to Top