Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
LONG COMMUNICATIONS, LLC. Doing Business As: LONG COMMUNICATIONS, LLC. |
Thomas Long Jr 526 MAIN AVENUE SE HICKORY, NC 28602 United States |
+1 (828) 324-5265 | TLONGJR@WHKY.COM | Limited Liability Company |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Thomas Edmund Long , Jr . Director of Engineering Long Communications, LLC |
WHKY 526 Main Ave SE Hickory, NC 28602 United States |
+1 (828) 324-5265 | tlongjr@whky.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | WHKY-TV is a 2-site DTS system. The DTS1 facility will operate with an interim channel 40 antenna during its transition at it's studio tower. The DTS2 facility operate with the current antenna using a new transmission line during its transition. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | 2 | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | NE710 | |
Year | 1999 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 2 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | TMU9-5 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 3 kW | |
Justification for New Transmitter | Current 2 KW transmitter will not tune from ch 40 to ch 14 |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | Yes | |
Power | 150 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 75.0 feet | |
Other Electrical Service | Yes | |
Description | Support for cooling system and outside equipment | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | 5 |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | 1 | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Sigma Plus | |
Year | 2006 | |
Type | Inductive Output Tube | |
IOT Power Type | Other | |
Other IOT Power Type | 4 | |
Power Capacity | 120 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | THU9-60 EV0 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 88.5 kW | |
Justification for New Transmitter | Current transmitter is a Harris IOT running 4 IOT's that can make up to 120 kW DTV. Transmitter can make full power running only 2 of the 4 tubes. Transmitter is set up to run 2 or 4 tubes only. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 300 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 4 inches | |
Length | 100.0 feet | |
Other Electrical Service | Yes | |
Description | Cooling system and control wiring. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 20 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase | |
Manufacturer | ||
Model | THU9-12 EV0 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 19 kW | |
Justification for New Transmitter | Need transmitter to operate during the transfer time from channel 40 to 14 at the main studio into a current channel 40 antenna that is on the studio tower. See problems with transfer to channel 14. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | Yes |
Switchgear (industrial 800 amp) | Yes | |
Transformer (480V) | Yes | |
Power | 300 kVA | |
Rigid Conduit and Wiring | Yes | |
Size | 4 inches | |
Length | 175.0 feet | |
Other Electrical Service | Yes | |
Description | Replacement of the current 208 volt feed to the studio. The 480 feed was removed at the end of analog transmission. We will have to feed the 208 volt feed from the 480 feed. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | Yes |
Type | Cooling Only | |
Size | 20 tons | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | 30 | |
Inside RF System | Is an additional interior RF system required to support this interim transmitter? | Yes |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | 1 | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 950.0 kW | |
Manufacturer | ||
Model | ATW25HS3-HSWC-40H | |
Year | 2009 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | ATW19H3-ESCX-14H | |
Year | 2019 | |
Justification for New Antenna | Existing antenna will not function on new channel and cannot be retuned. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 6 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | 2 | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Circular | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 18.0 kW | |
Manufacturer | ||
Model | ALP12L4-CSBR-40 | |
Year | 2011 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Elliptical | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 10.2 kW | |
Manufacturer | ||
Model | ALP16M4-ESBR-14 | |
Year | 2019 | |
Justification for New Antenna | Existing antenna will not function on new channel and cannot be retuned. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 6 1/8 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Interim |
Description of Use | N/A | |
Change Type | Rent Temporary | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 600.0 kW | |
Manufacturer | ||
Model | ATW16H3-HSP5-14 | |
Year | 2004 | |
Justification for New Antenna | This is the former channel 14 main antenna located at the WHKY-TV studio location that will be employed as an interim antenna for the transition to channel 14. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Broadband or Single Channel? | N/A | |
Feed Line Size | N/A | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for an antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | 1 | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 210 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 250 feet per run | |
Justification for New Transmission Line | Length of line for channel 40 was wrong for channel 14 per ERI table. Need 20 foot sections for channel 14. |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | 2 | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Waveguide | |
Diameter | N/A | |
Other Diameter | N/A | |
Segment Length | N/A | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 750 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 800 feet per run | |
Justification for New Transmission Line | The the frequency cutoff for the existing WR1500 waveguide is channel 18 and the waveguide is not usable at channel 14. |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Lease New | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Segment Length | 20' | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 560 feet per run | |
Justification for New Transmission Line | This is the existing transmission line at the WHKY-TV studio that will be utilized for the interim transmitting antenna mounted on the studio tower. |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Interim |
Description of Use | N/A | |
Change Type | Purchase New | |
Type | Flexible Air | |
Diameter | 5 inches | |
Segment Length | N/A | |
Other Segment Length | ||
Number of parallel runs | 1 | |
Length | 750 feet per run | |
Justification for New Transmission Line | Interim antenna system is necessary to ensure uninterrupted service during transition to Channel 14. Implementation delays are anticipated due to land mobile protection issues. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Leased | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1005065 | |
Coordinates (NAD83) | Latitude (NAD83) | 35° 17' 15.0" N- |
Longitude (NAD83) | 080° 41' 44.0" W- | |
Overall Structure Height | 1246.70 feet | |
Support Structure Height | 1197.49 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 715.21 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Central Piedmont Community College | |
Date Constructed | 08/01/1992 |
Facility ID | Call Sign | Service |
---|---|---|
10645 | WTVI | DTV |
69436 | WFAE | FM |
53970 | WRFX | FM |
Users |
---|
ENG Microwave |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Minor Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | No | |
Others Types of Users | Yes | |
Is tower documented for structural analysis? | Yes | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
ASR Number | ||
Coordinates (NAD83) | Latitude (NAD83) | 35° 39' 28.5" N- |
Longitude (NAD83) | 081° 24' 23.3" W- | |
Overall Structure Height | 190.00 feet | |
Support Structure Height | 190.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 1742.00 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Long Communications, LLC | |
Date Constructed | 01/01/2005 |
Users |
---|
Duke Energy |
FM Trans W272DU |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | No reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Construct New Tower | Use | Interim |
Description of Use | N/A | |
Height | 487.00 feet | |
Justification for New Tower | This is the current studio tower. No new tower construction or modifications are expected. |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 250 | |
Explanation | Station does not have internal resources to make changes needed for the channel moves at three sites. Will rely on outside services for this project. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
Do you have Distributed Transmission System engineering services? | Yes | |
Critical Facility | 1 | |
Terrain-Shielded Facility | 0 | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | No | |
FAA Consultation (including preparation of FAA Form 7460) | No | |
Negotiation of Lease and other Matter for Shared Locations | Yes | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | No | |
Additional Field Engineering Service | Yes | |
Number of Days | 60 | |
Justification | Channel 14 DTS with land mobile |
Name | Description |
---|---|
399 Outside work services |
Work on Form 399 for reimbursement expenses |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | Yes | |
Name | DTS Field measurements | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | No |
Non-zoning permits | No | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | Yes | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Channel 14 Land Mobile Coordination notification letters |
Channel 14 land mobile Coordination notification letters |
DTS 1 and 2 Inside Patch Panels |
This is for inside Transmission line for DTS 1 and DtS 2 Sites. This supports connecting the transmitters, filters, and antenna systems together. |
DTS 1 and 2 Inside Transmission Line |
This is for inside Transmission line for DTS 1 and DtS 2 Sites. This supports connecting the transmitters, filters, and antenna systems together. |
DTS1 Ch 14 tempory Filter |
Delivery of filter for CH 14 is not going to deliver by Sept 6th of 2019. We are moving a used filter from another station that can be used until arrival of the new filter. |
DTS2 Ch 14 tempory Filter |
Delivery of filter for CH 14 is not going to deliver by Sept 6th of 2019. We are moving a used filter from another station that can be used until arrival of the new filter. |
File Change to CP to make antennas match CP |
File Change to CP to make antennas match CP for DTS1 and DTS2. Patterns did not match original file data as built. |
Master Clock System for DTS Timing |
Master Clock System for DTS Timing. System for DTS 0 DTS 1 DTS2 and Studio. Original system would not work with later Rohde & Schwarz Exciters and DTS Studio adapters. |
Move UPS for DTS1 |
Station need to relocate Large UPS to make room for new transmitter |
Paint of inside DTS1 building |
Paint of inside DTS1 building after removal of old AC systems and Harris IOT Transmitter |
Remove 2 Cab of 4 cab IOT TX |
Remove 2 Cab of 4 cab IOT TX. Config to run without driver that will not run on ch 14 |
Road Work DTS 1 Baker Mt |
Perform Road work on Baker Mt DTS 1 site. Work is to allow large trucks to get up Mt to deliver transmitters and antennas to Mt top. |
Roof work for DTS1 |
Make changes to roof to remove old AC system and transmitter |
SFN Adapter |
SFN Adapter for ATSC1 |
Water system tray support DTS1 |
Water system tray support DTS1 to support waters lines from transmitter to pumps to outside heat ex-changers. |
Copper Ground Strap |
Copper Ground Strap used to ground transmitter at WHKY DTS0 DTS1 and DTS2 |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $4,518,913.31 | $3,617,137.95 | N/A | $2,807,984.79 | N/A |
Total for all systems | $6,791,211.64 | $5,456,807.38 | N/A | $3,776,845.30 | N/A |
Interim Transmitter THU9-12 EV0 | $1,301,435.00 | $1,038,213.64 | $499,274.77 | ||
Additional field engineering time, 10-30 days | $63,100.00 | $60,000.00 | N/A | N/A | N/A |
Channel 14 Mask Filter | $189,500.00 | $180,000.00 | N/A | $0.00 | N/A |
RF Consulting Engineer | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Other -- HVAC Service Type: C Size:20 (Other) | $65,000.00 | $65,000.00 | Add additional 20 ton system to building for cooling of solid state transmitter | $63,989.13 | N/A |
Other Electrical Service: Replacement of the current 208 volt feed to the studio. The 480 feed was removed at the end of analog transmission. We will have to feed the 208 volt feed from the 480 feed. | $40,000.00 | $40,000.00 | Replace current 208 volt feed to studio with 480 feed. Replacement of power transformer and switch gear, wire. | N/A | N/A |
4" Rigid Conduit and Wiring (Cost per foot) | $17,675.00 | $16,800.00 | N/A | $0.00 | N/A |
Transformer 3 phase/480v - 300 KVA | $36,800.00 | $35,000.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | N/A | N/A | N/A |
Service entrance 3 phase/800 amp/208 volt | $14,400.00 | $13,700.00 | N/A | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | $684,000.00 | $446,413.64 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $435,285.64 | N/A |
UHF inside RF system including switching | $147,500.00 | $140,000.00 | N/A | N/A | N/A |
Primary Transmitter TMU9-5 | $412,378.31 | $401,293.31 | $163,990.31 | ||
Channel 14 -- Additional field engineering time, 5 days | $10,000.00 | $10,000.00 | Provide engineering for channel 14, land mobile problems. | N/A | N/A |
Channel 14 Mask Filter | $189,500.00 | $180,000.00 | N/A | N/A | N/A |
RF Consulting Engineer | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Other Electrical Service: Support for cooling system and outside equipment | $5,000.00 | $5,000.00 | Cooling system wiring for control and pumps systems | N/A | N/A |
2" Rigid Conduit and Wiring (Cost per foot) | $1,950.00 | $1,875.00 | N/A | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 3 kW | $175,118.31 | $175,118.31 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $163,990.31 | N/A |
Transformer 3 phase/480v - 150 KVA | $25,550.00 | $24,300.00 | N/A | N/A | N/A |
Primary Transmitter THU9-60 EV0 | $2,805,100.00 | $2,177,631.00 | $2,144,719.71 | ||
UHF - Liquid Cooled Solid State Transmitter 86.8 . 106 kW | $2,630,000.00 | $2,006,731.00 | N/A | $2,082,229.92 | This was the quoted and billed amount for the DTS1 transmiiter |
Other -- HVAC Service Type: C Size:20 (Other) | $55,000.00 | $55,000.00 | provide 20 ton air conditioning system fro cooling of solid state transmitter | $36,789.00 | N/A |
Other Electrical Service: Cooling system and control wiring. | $35,000.00 | $35,000.00 | Provide control and cooling system wiring for new transmitter. | $25,700.79 | N/A |
4" Rigid Conduit and Wiring (Cost per foot) | $10,100.00 | $9,600.00 | N/A | N/A | N/A |
Transformer 3 phase/480v - 300 KVA | $36,800.00 | $35,000.00 | N/A | N/A | N/A |
Switchgear - industrial 800 amp | $38,200.00 | $36,300.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Additional field engineering time, 10-30 days | Information not provided. |
Channel 14 Mask Filter | Information not provided. |
RF Consulting Engineer | Information not provided. |
Other -- HVAC Service Type: C Size:20 (Other) | |
Other Electrical Service: Replacement of the current 208 volt feed to the studio. The 480 feed was removed at the end of analog transmission. We will have to feed the 208 volt feed from the 480 feed. | Information not provided. |
4" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Transformer 3 phase/480v - 300 KVA | Information not provided. |
Switchgear - industrial 800 amp | Information not provided. |
Service entrance 3 phase/800 amp/208 volt | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 14.2 - 20 kW | |
UHF inside RF system including switching | Information not provided. |
Channel 14 -- Additional field engineering time, 5 days | Information not provided. |
Channel 14 Mask Filter | Information not provided. |
RF Consulting Engineer | Information not provided. |
Other Electrical Service: Support for cooling system and outside equipment | Information not provided. |
2" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 3 kW | |
Transformer 3 phase/480v - 150 KVA | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 86.8 . 106 kW | |
Other -- HVAC Service Type: C Size:20 (Other) | |
Other Electrical Service: Cooling system and control wiring. | |
4" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
Transformer 3 phase/480v - 300 KVA | Information not provided. |
Switchgear - industrial 800 amp | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $656,823.33 | $402,809.43 | N/A | $214,149.43 | N/A |
Total for all systems | $6,791,211.64 | $5,456,807.38 | N/A | $3,776,845.30 | N/A |
Interim Antenna ATW16H3-HSP5-14 | $369,230.00 | $119,896.10 | $3,496.10 | ||
Interim antenna rental and installation - Cost will depend on antenna size and height and/or complexity of tower. | $115,500.00 | $110,000.00 | N/A | $0.00 | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized | $247,000.00 | $3,496.10 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $3,496.10 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
Primary Antenna ATW19H3-ESCX-14H | $170,947.00 | $168,607.00 | $136,647.00 | ||
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,000.00 | N/A | $4,320.00 | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $22,000.00 | N/A | $8,820.00 | N/A |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | $12,300.00 | $11,700.00 | N/A | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
UHF - High Power, Side Mount, basic slot antenna, 1000 kW input, directional,, elliptically or circularly polarized | $123,507.00 | $123,507.00 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $123,507.00 | N/A |
Primary Antenna ALP16M4-ESBR-14 | $116,646.33 | $114,306.33 | $74,006.33 | ||
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,000.00 | N/A | $4,800.00 | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $22,000.00 | N/A | N/A | N/A |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | $12,300.00 | $11,700.00 | N/A | N/A | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
UHF - High Power, Side Mount, basic slot antenna, 10 kW input, directional,, elliptically or circularly polarized | $69,206.33 | $69,206.33 | ***System Notice: Estimate adjusted and locked because line has been superseded.*** | $69,206.33 | N/A |
Actual Information Description | File Name |
---|---|
Interim antenna rental and installation - Cost will depend on antenna size and height and/or complexity of tower. | |
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized | |
Sweep test of existing antenna | Information not provided. |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | |
Side mount brackets for high power antennas (if not included in antenna base cost) | |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | Information not provided. |
Sweep test of existing antenna | Information not provided. |
UHF - High Power, Side Mount, basic slot antenna, 1000 kW input, directional,, elliptically or circularly polarized | |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | |
Side mount brackets for high power antennas (if not included in antenna base cost) | Information not provided. |
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) | Information not provided. |
Sweep test of existing antenna | Information not provided. |
UHF - High Power, Side Mount, basic slot antenna, 10 kW input, directional,, elliptically or circularly polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $453,250.00 | $284,600.00 | N/A | $166,582.48 | N/A |
Total for all systems | $6,791,211.64 | $5,456,807.38 | N/A | $3,776,845.30 | N/A |
Interim Transmission Line | $162,400.00 | $0.00 | $0.00 | ||
Rigid Transmission Line - copper, 7 3/16" | $162,400.00 | $0.00 | Using Old line on tower that was used for channel 14 analog. | N/A | N/A |
Interim Transmission Line | $78,750.00 | $75,000.00 | $14,321.91 | ||
Flexible Air Transmission Line - dielectric, 5" | $78,750.00 | $75,000.00 | N/A | $14,321.91 | N/A |
Primary Transmission Line | $50,500.00 | $48,000.00 | $39,958.80 | ||
Rigid Transmission Line - copper, 6 1/8" | $50,500.00 | $48,000.00 | N/A | $39,958.80 | N/A |
Primary Transmission Line | $161,600.00 | $161,600.00 | $112,301.77 | ||
Rigid Transmission Line - copper, 6 1/8" | $161,600.00 | $161,600.00 | N/A | $112,301.77 | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 7 3/16" | Information not provided. |
Flexible Air Transmission Line - dielectric, 5" | |
Rigid Transmission Line - copper, 6 1/8" | |
Rigid Transmission Line - copper, 6 1/8" |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $562,100.00 | $562,655.00 | N/A | $280,165.00 | N/A |
Total for all systems | $6,791,211.64 | $5,456,807.38 | N/A | $3,776,845.30 | N/A |
Interim Tower | $84,200.00 | $0.00 | $0.00 | ||
New tower | $0.00 | $0.00 | Existing tower will be employed with no modifications expected to be required. | N/A | N/A |
Short Tower (less than 500') | $84,200.00 | $0.00 | No new rigging work is expected for existing studio tower and antenna to be used for interim facility. | N/A | N/A |
Primary Tower TOWER | $96,800.00 | $200,655.00 | $109,013.00 | ||
Short Tower (less than 500') | $84,200.00 | $188,655.00 | Per Attached ERI Quote "WHKY Proposal DTS1 Tower Work" | $109,013.00 | N/A |
Structural engineering tower load study for well documented tower | $12,600.00 | $12,000.00 | N/A | N/A | N/A |
Primary Tower TOWER | $381,100.00 | $362,000.00 | $171,152.00 | ||
Tall Tower (greater than 500') | $210,500.00 | $200,000.00 | N/A | $171,152.00 | N/A |
Structural engineering tower load study for well documented tower | $12,600.00 | $12,000.00 | N/A | N/A | N/A |
Minor tower reinforcement/modifications | $158,000.00 | $150,000.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
New tower | Information not provided. |
Short Tower (less than 500') | Information not provided. |
Short Tower (less than 500') | |
Structural engineering tower load study for well documented tower | Information not provided. |
Tall Tower (greater than 500') | |
Structural engineering tower load study for well documented tower | Information not provided. |
Minor tower reinforcement/modifications | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $268,790.00 | $258,875.00 | N/A | $23,519.00 | N/A |
Total for all systems | $6,791,211.64 | $5,456,807.38 | N/A | $3,776,845.30 | N/A |
Outside Professional Services | $268,790.00 | $258,875.00 | $23,519.00 | ||
DTS Site RF Consulting Engineer - Critical Facility | $8,420.00 | $8,000.00 | N/A | $750.00 | N/A |
399 Outside work services | $28,125.00 | $28,125.00 | Outside Engineering Services not included in original 399. | $19,269.00 | Outside Engineering Services not included in original 399. |
Additional Field Engineering Service, 60 Days | $60,000.00 | $60,000.00 | Additional field engineering required due to land mobile interference issues and DTS requirements. | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | In order for the DTS system to operate with minimal mutual interference, it is necessary to verify coverage via field study work. | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $7,360.00 | $7,000.00 | N/A | N/A | N/A |
Attorney Fees - Negotiation of lease and other matters for shared locations | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | $0.00 | N/A |
DTS Site RF Consulting Engineer - Terrain-shielded Facility | $0.00 | $0.00 | This a critical non-terrain shielded DTS facility. | N/A | N/A |
Prepare request for Special Temporary Authorization | $4,100.00 | $3,000.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | $3,500.00 | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Project management of the transition | $39,500.00 | $37,500.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
DTS Site RF Consulting Engineer - Critical Facility | |
399 Outside work services | |
Additional Field Engineering Service, 60 Days | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees - Negotiation of lease and other matters for shared locations | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
DTS Site RF Consulting Engineer - Terrain-shielded Facility | Information not provided. |
Prepare request for Special Temporary Authorization | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | Information not provided. |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form | Information not provided. |
Project management of the transition | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $331,335.00 | $330,730.00 | N/A | $284,444.60 | N/A |
Total for all systems | $6,791,211.64 | $5,456,807.38 | N/A | $3,776,845.30 | N/A |
Other Expenses | $331,335.00 | $330,730.00 | $284,444.60 | ||
Water system tray support DTS1 | $28,000.00 | $28,000.00 | N/A | $27,022.00 | N/A |
SFN Adapter | $26,000.00 | $26,000.00 | N/A | $24,890.00 | N/A |
Roof work for DTS1 | $5,500.00 | $5,500.00 | N/A | $3,250.00 | N/A |
Road Work DTS 1 Baker Mt | $60,000.00 | $60,000.00 | N/A | $59,365.48 | N/A |
Remove 2 Cab of 4 cab IOT TX | $40,000.00 | $40,000.00 | N/A | $33,262.50 | N/A |
Paint of inside DTS1 building | $4,000.00 | $4,000.00 | N/A | $1,505.00 | N/A |
Move UPS for DTS1 | $10,500.00 | $10,500.00 | N/A | $9,255.00 | N/A |
Master Clock System for DTS Timing | $16,000.00 | $16,000.00 | N/A | $15,309.30 | N/A |
File Change to CP to make antennas match CP | $4,000.00 | $4,000.00 | N/A | $3,500.00 | N/A |
DTS2 Ch 14 tempory Filter | $20,000.00 | $20,000.00 | N/A | $19,943.32 | N/A |
DTS1 Ch 14 tempory Filter | $20,000.00 | $20,000.00 | N/A | $19,894.00 | N/A |
DTS 1 and 2 Inside Transmission Line | $36,145.00 | $36,145.00 | N/A | $36,145.00 | N/A |
DTS 1 and 2 Inside Patch Panels | $10,000.00 | $10,000.00 | N/A | $9,729.30 | N/A |
Channel 14 Land Mobile Coordination notification letters | $10,000.00 | $10,000.00 | Need for DTV channel 14 to Land Mobile inference | $10,000.00 | N/A |
MVPD Notification of Channel Change | $2,500.00 | $2,500.00 | N/A | $1,250.00 | N/A |
Develop and air announcement of upcoming channel change | $2,500.00 | $2,500.00 | Development and airing of channel change announcements to ensure uninterrupted service to the public. | N/A | N/A |
Equipment Storage | $2,500.00 | $2,500.00 | N/A | N/A | N/A |
Equipment Delivery and Handling Charges | $5,000.00 | $5,000.00 | N/A | $2,143.60 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $2,500.00 | $2,500.00 | N/A | $239.41 | N/A |
FCC Filing Fees - Special Temporary Authorization request | $195.00 | $190.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $1,070.00 | N/A | $0.00 | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | $4,750.00 | N/A |
Other Distributed Transmission System Expenses Not listed, Name: DTS Field measurements | $10,000.00 | $10,000.00 | DTS Field measurements are included as part of comprehensive coverage verification costs. But will be required as part of this project. We will need to develop null points to protect reception of the station. | N/A | N/A |
Copper Ground Strap | $3,000.00 | $3,000.00 | N/A | $2,990.69 | N/A |
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $325.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Water system tray support DTS1 | |
SFN Adapter | |
Roof work for DTS1 | |
Road Work DTS 1 Baker Mt | |
Remove 2 Cab of 4 cab IOT TX | |
Paint of inside DTS1 building | |
Move UPS for DTS1 | |
Master Clock System for DTS Timing | |
File Change to CP to make antennas match CP | |
DTS2 Ch 14 tempory Filter | |
DTS1 Ch 14 tempory Filter | |
DTS 1 and 2 Inside Transmission Line | |
DTS 1 and 2 Inside Patch Panels | |
Channel 14 Land Mobile Coordination notification letters | |
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | Information not provided. |
Equipment Storage | Information not provided. |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
FCC Filing Fees - Special Temporary Authorization request | Information not provided. |
FCC Filing Fees - Form 2100 minor change CP application | |
DTV Medical Facility Notification | |
Other Distributed Transmission System Expenses Not listed, Name: DTS Field measurements | Information not provided. |
Copper Ground Strap | |
FCC Filing Fees - Form 2100 license to cover application | Information not provided. |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $6,791,211.64 | $5,456,807.38 | $3,776,845.30 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Thomas Edmund Long , Jr . Director of Engineering 05/12/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Thomas Edmund Long , Jr . Director of Engineering 05/12/2021 |