Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
20287
Service:
DTV
Call Sign:
WATM-TV
Channel:
31 (UHF)
File Number:
0000028693
FRN:
0003776226
Date Submitted:
05/06/2021

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

PALM TELEVISION, L.P.

Doing Business As: WATM ABC 23

Jill Ream, General Manager

PO Box 15904

Johnstown, PA 15904

United States

+1 (814) 266-8088 jream@foxtv.com Limited Partnership

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

Paul A. Cicelski

Attorney

Lerman Senter PLLC.

Paul A. Cicelski

2001 L Street NW

Suite 400

Washington, DC 20036

United States

+1 (202) 416-6756 sinclair399s@summitridgegroup.com

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. No
Briefly describe transition plan Licensee will replace station's antenna, transmitter, and transmission line for the repack transition. A new antenna will be placed at the top of the tower, so for the interim period the station will remain on the air with the current side mount antenna.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model HP255DW
Year 2002
Type Inductive Output Tube
IOT Power Type Single
Power Capacity 30 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model THU9EVO-20
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 31 kW
Justification for New Transmitter The current transmitter cannot be retuned, the manufacturer is no longer in business.

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring Yes
Size 4 inches
Length 250.0 feet
Other Electrical Service Yes
Description Electrical Installation
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Name Description

Additional Equipment

Additional Equipment

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? Yes
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model SWEDMP24NC/24CF
Year 2002

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? Yes
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 1000.0 kW
Manufacturer
Model TFU-16ETT/VP-R S300
Year 2017
Justification for New Antenna Current antenna is a single channel antenna that cannot be used for the new post-auction channel. This antenna will be moved to the top of the tower, so no interim antenna will be needed.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna?
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Flexible Air
Diameter 3 inches
Other Diameter N/A
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 300 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Flexible Air
Diameter 5 inches
Other Diameter N/A
Segment Length N/A
Other Segment Length N/A
Number of parallel runs 1
Length 315 feet per run
Justification for New Transmission Line The size of the current transmission line cannot handle the power needed for the post-repack system. The new transmission line is not an upgrade. See attached proposal from Dielectric.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Existing Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Leased
Is this tower consider Complex? No
Is this tower currently shared with any other stations? No
One or more FM, AM or TV radio broadcaster(s) N/A
Others Types of Users N/A
Is tower documented for structural analysis? Unknown
Is tower compliant with Rev G? Unknown
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1027125
Coordinates (NAD83) Latitude (NAD83) 40° 34' 06.0" N-
Longitude (NAD83) 078° 26' 37.0" W-
Overall Structure Height 276.90 feet
Support Structure Height 240.15 feet
Ground Elevation Above Mean Sea Level (AMSL) 2529.82 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner Peak Media of Pennsylvania, LLC
Date Constructed 10/01/1986


Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for undocumented/poorly documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Major Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower N/A
Helicopter Services Required Are helicopter services required? Yes

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Structural engineering tower load study for well documented tower

Structural engineering tower load study for well documented tower

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 400
Explanation Outside consulting engineering, legal work, and accounting services, as well as project management for regional and comprehensive repack execution.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility No
For Main Facility Yes
Prepare request for Special Temporary Authority No
Quantity N/A
NEPA Section 106 environmental review Yes
Environmental Assessment Yes
ASR Modification Yes
FAA Consultation (including preparation of FAA Form 7460) Yes
Negotiation of Lease and other Matter for Shared Locations Yes
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Sinclair Internal Costs

Internal Employee Time Costs

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning Yes
Non-zoning permits Yes
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application No
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? Yes
Does this relocation require Equipment Storage? Yes
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Information not provided.

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,035,751.00 $1,007,601.00 N/A $544,194.00 N/A
Total for all systems $2,280,446.51 $2,332,585.35 N/A $1,036,097.44 N/A
Primary Transmitter THU9EVO-20 $1,035,751.00 $1,007,601.00 $544,194.00
Switchgear - industrial 800 amp $38,200.00 $36,300.00 N/A $23,400.00 N/A
Additional Equipment $7,294.00 $7,294.00 N/A $7,294.00 N/A
Other Electrical Service: Electrical Installation $18,007.00 $18,007.00 N/A $0.00 This invoice can be deleted.
4" Rigid Conduit and Wiring (Cost per foot) $25,250.00 $24,000.00 N/A $18,200.00 N/A
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW $947,000.00 $922,000.00 N/A $495,300.00 Item "Submitted - Rohde and Schwarz $118,248.26" should be removed.

Components

Actual Information Description File Name
Switchgear - industrial 800 amp

Component Description:
Transmitter related cost. #114742
Amount:
$23,400.00
Additional Equipment

Component Description:
Additional transmitter materials. #9500122389
Amount:
$4,066.00

Component Description:
Additional transmitter parts. #9500105936
Amount:
$3,228.00
Other Electrical Service: Electrical Installation

Component Description:
Non-reimbursable.
Amount:
N/A
4" Rigid Conduit and Wiring (Cost per foot)

Component Description:
Transmitter related cost. #113560
Amount:
$18,200.00
UHF - Liquid Cooled Solid State Transmitter 21 - 31 kW

Component Description:
Transmitter cost, 25% down. #9500089566
Amount:
$193,945.00

Component Description:
25% downpayment. #9500089566
Amount:
$118,248.26

Component Description:
Transmitter related cost. #9500105913
Amount:
$301,355.00

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $308,530.00 $291,474.40 N/A $135,630.99 N/A
Total for all systems $2,280,446.51 $2,332,585.35 N/A $1,036,097.44 N/A
Primary Antenna TFU-16ETT/VP-R S300 $308,530.00 $291,474.40 $135,630.99
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $11,700.00 N/A $7,682.30 N/A
Sweep test of existing antenna $6,730.00 $4,774.40 N/A $4,774.40 N/A
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized $289,500.00 $275,000.00 N/A $123,174.29 N/A

Components

Actual Information Description File Name
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
Antenna related cost reduced by 25.40%. #562026
Amount:
$7,682.30
Sweep test of existing antenna

Component Description:
Antenna related cost reduced by 25.40%. #567026
Amount:
$4,774.40
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized

Component Description:
Total invoice amount reduced by 25.40%. #525017
Amount:
$123,174.29

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $33,075.00 $24,578.94 N/A $24,578.94 N/A
Total for all systems $2,280,446.51 $2,332,585.35 N/A $1,036,097.44 N/A
Primary Transmission Line $33,075.00 $24,578.94 $24,578.94
Flexible Air Transmission Line - dielectric, 5" $33,075.00 $24,578.94 N/A $24,578.94 Item "$24,578.94 - Dielectric Inv 530024" needs to be removed, see updated cover letter in updated file.

Components

Actual Information Description File Name
Flexible Air Transmission Line - dielectric, 5"

Component Description:
Total invoice amount reduced by 25.40%. #530024
Amount:
$24,578.94

Component Description:
Transmission line cost. #530024
Amount:
$24,578.94

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $582,150.00 $711,253.00 N/A $249,110.00 N/A
Total for all systems $2,280,446.51 $2,332,585.35 N/A $1,036,097.44 N/A
Primary Tower TOWER $582,150.00 $711,253.00 $249,110.00
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study $26,300.00 $25,000.00 N/A N/A N/A
Major tower reinforcement/modifications $421,000.00 $400,000.00 N/A $7,857.00 N/A
Short Tower (less than 500') $84,200.00 $235,603.00 Look at FDH Quote $235,603.00 N/A
Tower Helicopter Lift $650.00 $650.00 N/A $650.00 N/A
Structural engineering tower load study for well documented tower $50,000.00 $50,000.00 N/A $5,000.00 N/A

Components

Actual Information Description File Name
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study Information not provided.
Major tower reinforcement/modifications

Component Description:
50% invoiced upon order. #E-186787
Amount:
$3,928.50

Component Description:
Final balance invoiced upon completion. #E-186790
Amount:
$3,928.50
Short Tower (less than 500')

Component Description:
50% of Tower related cost. #E-190542
Amount:
$117,801.50

Component Description:
Tower related cost. #E-190664
Amount:
$117,801.50
Tower Helicopter Lift

Component Description:
Helicopter landing zone cost. #01918
Amount:
$650.00
Structural engineering tower load study for well documented tower

Component Description:
Tower related cost. #E-166638
Amount:
$2,500.00

Component Description:
50% balance. #E-173402
Amount:
$2,500.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $224,145.51 $201,483.01 N/A $36,796.97 N/A
Total for all systems $2,280,446.51 $2,332,585.35 N/A $1,036,097.44 N/A
Outside Professional Services $224,145.51 $201,483.01 $36,796.97
Sinclair Internal Costs $3,415.51 $3,415.51 N/A $3,415.51 N/A
RF Exposure Measurements $21,050.00 $20,000.00 N/A N/A N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $80,000.00 N/A N/A N/A
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase $2,105.00 $2,000.00 N/A N/A N/A
ASR modification (prepare FCC Form 854) $2,105.00 $2,000.00 N/A N/A N/A
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet $10,520.00 $10,000.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $1,620.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $1,770.00 N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Prepare and or review reimbursement form $2,630.00 $2,500.00 N/A N/A N/A
Project management of the transition $63,200.00 $60,000.00 N/A $28,423.96 N/A
NEPA Section 106 environmental review, if needed $6,310.00 $6,000.00 N/A N/A N/A
Attorney Fees - Negotiation of lease and other matters for shared locations $4,210.00 $0.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $0.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $0.00 N/A N/A N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,567.50 N/A $1,567.50 N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A

Components

Actual Information Description File Name
Sinclair Internal Costs

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$33.53

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$9.47

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$23.96

Component Description:
Internal expense - WATM - 6-2019
Amount:
$403.26

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$8.66

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 31 stations.
Amount:
$4.10

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 31 stations.
Amount:
$52.76

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$26.93

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$7.86

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 52 stations.
Amount:
$41.33

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$16.53

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$11.39

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$1.69

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$15.08

Component Description:
Portion of general repack matter internal time card attributable to this station - divided by 100.
Amount:
$66.55

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 52 stations.
Amount:
$9.79

Component Description:
Internal expense - WATM - 7-2019
Amount:
$2,144.61

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$5.37

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$25.53

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$11.03

Component Description:
Internal expense - WATM - 8-2019
Amount:
$439.92

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 46 stations.
Amount:
$23.56

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$7.96

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$17.02

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 46 stations.
Amount:
$1.53

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations.
Amount:
$6.09
RF Exposure Measurements Information not provided.
Comprehensive coverage verification via field study, if needed Information not provided.
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase Information not provided.
ASR modification (prepare FCC Form 854) Information not provided.
Environmental Assessment, if triggered by NEPA Section 106 review or for certain structures over 450 feet Information not provided.
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Outside professional service cost. #868-00-0006
Amount:
$1,620.00
Perform engineering study for new channel assignment and antenna development

Component Description:
Outside professional service. #868-00-0006
Amount:
$1,770.00
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Prepare and or review reimbursement form Information not provided.
Project management of the transition

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1090
Amount:
$176.70

Component Description:
$146.80 credit to be split across 8 Sinclair stations reimbursed $341.18 for Invoice 471524 (correct reimbursement amount is $322.83). #CM-9-23-2019-471524
Amount:
($18.35)

Component Description:
Legal services cost. #482747
Amount:
$436.25

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1167
Amount:
$313.41

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1156
Amount:
$399.52

Component Description:
Legal services cost. #479895
Amount:
$392.50

Component Description:
Legal services cost. #477399
Amount:
$196.25

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 31 stations. #189
Amount:
$1,968.06

Component Description:
Legal services cost. #481391
Amount:
$172.50

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #477305
Amount:
$393.53

Component Description:
Legal services cost. #473968
Amount:
$157.50

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #473885
Amount:
$318.62

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1161
Amount:
$267.48

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #475283
Amount:
$384.08

Component Description:
Legal services cost. #480237
Amount:
$570.00

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #471524
Amount:
$341.18

Component Description:
Legal Service Cost. #472675
Amount:
$163.75

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 52 stations. #153
Amount:
$1,287.27

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #480175
Amount:
$377.96

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #478780
Amount:
$271.41

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1123
Amount:
$342.14

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #472173
Amount:
$311.78

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #477820
Amount:
$320.19

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 46 stations. #247
Amount:
$1,105.31

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1151
Amount:
$388.07

Component Description:
Legal services cost. #475389
Amount:
$532.50

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1130
Amount:
$281.49

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #476885
Amount:
$403.34

Component Description:
Legal services cost. #477911
Amount:
$126.25

Component Description:
$207.48 credit to be split across 52 Sinclair stations reimbursed $269.71 for invoice #1093 (correct reimbursement amount is $265.72). #CM-7-29-2019-1093
Amount:
($3.99)

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #476367
Amount:
$364.80

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1141
Amount:
$406.17

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1093
Amount:
$269.71

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1143
Amount:
$436.90

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #472985
Amount:
$282.68

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #470923
Amount:
$406.65

Component Description:
Legal services cost. #474914
Amount:
$452.50

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 52 stations. #481318
Amount:
$814.01

Component Description:
Legal services cost. #476974
Amount:
$1,062.50

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #479829
Amount:
$458.99

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #474405
Amount:
$490.56

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #472583
Amount:
$279.89

Component Description:
Legal services cost. #479373
Amount:
$45.00

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1099
Amount:
$266.93

Component Description:
Legal services cost. #485230
Amount:
$58.75

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #475744
Amount:
$305.99

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #118
Amount:
$468.97

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #473506
Amount:
$421.40

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1117
Amount:
$282.68

Component Description:
Legal Service Cost. #470220
Amount:
$120.00

Component Description:
Legal services cost. #479896
Amount:
$155.25

Component Description:
Consulting engineering cost, #709-WATM-0002
Amount:
$285.00

Component Description:
Legal services cost. #478860
Amount:
$155.00

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #107
Amount:
$602.28

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1098
Amount:
$238.07

Component Description:
Legal Service Cost. #475850
Amount:
$572.50

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1133
Amount:
$307.72

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #479285
Amount:
$372.60

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1105
Amount:
$216.88

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #478288
Amount:
$194.86

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1111
Amount:
$159.58

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #132
Amount:
$589.44

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1145
Amount:
$369.98

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #474809
Amount:
$395.77

Component Description:
Portion of general repack matter invoice attributable to this station - divided by 100 stations. #1114
Amount:
$242.25

Component Description:
Legal services cost.#476468
Amount:
$3,495.00
NEPA Section 106 environmental review, if needed Information not provided.
Attorney Fees - Negotiation of lease and other matters for shared locations Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application Information not provided.
Prepare request for Special Temporary Authorization

Component Description:
Consulting engineering services cost. #709-WATM-0001
Amount:
$1,567.50
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $96,795.00 $96,195.00 N/A $45,786.54 N/A
Total for all systems $2,280,446.51 $2,332,585.35 N/A $1,036,097.44 N/A
Other Expenses $96,795.00 $96,195.00 $45,786.54
Disposal Costs (for equipment and other waste, net of any salvage value) $32,300.00 $32,300.00 Check quote for Tercek $32,300.00 N/A
Non-zoning permits $1,500.00 $1,500.00 N/A N/A N/A
Local Zoning $5,000.00 $5,000.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $325.00 N/A N/A N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,070.00 N/A N/A N/A
DTV Medical Facility Notification $11,550.00 $11,000.00 N/A $2,950.00 N/A
MVPD Notification of Channel Change $5,000.00 $5,000.00 N/A N/A N/A
Develop and air announcement of upcoming channel change $20,000.00 $20,000.00 N/A N/A N/A
Equipment Storage $10,000.00 $10,000.00 N/A $2,659.20 N/A
Equipment Delivery and Handling Charges $10,000.00 $10,000.00 N/A $7,877.34 N/A

Components

Actual Information Description File Name
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
Disposal related cost. #112119
Amount:
$18,150.00

Component Description:
Disposal cost. #112874
Amount:
$14,150.00
Non-zoning permits Information not provided.
Local Zoning Information not provided.
FCC Filing Fees - Form 2100 license to cover application Information not provided.
FCC Filing Fees - Form 2100 minor change CP application Information not provided.
DTV Medical Facility Notification

Component Description:
Medical notification cost. #1158
Amount:
$2,950.00
MVPD Notification of Channel Change Information not provided.
Develop and air announcement of upcoming channel change Information not provided.
Equipment Storage

Component Description:
Total invoice amount reduced by 8.40%. #838028
Amount:
$1,099.20

Component Description:
Equipment storage cost. #62266131
Amount:
$310.00

Component Description:
Equipment storage cost. #62263412
Amount:
$300.00

Component Description:
Storage cost. #62261929
Amount:
$750.00

Component Description:
Equipment storage cost. #62265638
Amount:
$200.00
Equipment Delivery and Handling Charges

Component Description:
Total invoice amount reduced by 8.40%. #838028
Amount:
$6,514.18

Component Description:
Delivery related costs. #567026
Amount:
$363.16

Component Description:
Equipment delivery cost. #62266958
Amount:
$1,000.00

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $2,280,446.51 $2,332,585.35 $1,036,097.44

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. No
Construction of final facilities or all necessary modifications are complete. No
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Gregory P. Filandrinos

President GF Inc. General Partner of Licensee


05/06/2021

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Gregory P. Filandrinos

President GF Inc. General Partner of Licensee


05/06/2021

Attachments