Go to the Federal Communications Commission homepage at www.fcc.gov

FCC Form 399: Reimbursement Request

Approved by OMB 3060-1178
Go to the Federal Communications Commission homepage at www.fcc.gov

(REFERENCE COPY - Not for submission) FCC Form 399: Reimbursement Request

Facility ID:
35434
Service:
DTV
Call Sign:
KOTV-DT
Channel:
26 (UHF)
File Number:
0000028007
FRN:
0015452238
Date Submitted:
04/26/2021

Applicant Information

Back to Top

Applicant Name, Type, and Contact Information

Applicant Address Phone Email Applicant Type

Griffin Licensing, L.L.C.

Trevor Wiseman

7401 N. Kelley Ave

Oklahoma City, OK 73111

United States

+1 (405) 841-9106 trevor.wiseman@griffin.news Limited Liability Company

Reimbursement Contact Information

Reimbursement Contact Name and Information

Applicant Address Phone Email

[Confidential]

 

 

 


Preparer Contact Information

Back to Top

Preparer Contact Name and Information

Applicant Address Phone Email

The Preparer is same as the reimbursement contact.

 

 

 

Broadcaster Information and Transition Plan

Back to Top
Question Response
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. Yes
Briefly describe transition plan Please see attached Transition Plan Narrative.

Transmitters

Back to Top
Section Question Response
Transmitter Related Expenses Do you have transmitter related expenses? Yes

Primary Transmitter

Back to Top

Existing Transmitter Information

Section Question Response
Existing Transmitter Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is this transmitter currently shared with another station? No
Is this transmitter currently in operating condition? Yes
Existing Transmitter Manufacturer and Type Manufacturer
Model CDP3260P2
Year 2001
Type Inductive Output Tube
IOT Power Type Two
Power Capacity 64.2 kW

Primary Transmitter

Back to Top

New Transmitter Costs

Section Question Response
New Transmitter Use Primary (Main)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Manufacturer
Model ULXTE-80
Transmitter Type Solid State
Solid State Cooling Liquid Cooled
Solid State Power capacity 50.1 kW
Justification for New Transmitter See attached Transition Plan Narrative

Primary Transmitter

Back to Top

Other Transmitter Costs

Section Question Response
Electrical Service Service Entrance (3 phases 800A 208V) No
Switchgear (industrial 800 amp) Yes
Transformer (480V) No
Power N/A
Rigid Conduit and Wiring Yes
Size 3 inches
Length 200.0 feet
Other Electrical Service No
Description N/A
HVAC Service Does the replacement transmitter require HVAC Service? No
Type N/A
Size N/A
Other Size N/A
Transmitter Building Addition/Modification or Leasehold Improvement Does the Transmitter Building require an addition, modification, other leashold improvement? No
Size N/A
Channel 14 Costs Is an RF Consulting Engineer needed? N/A
Is a channel 14 Mask Filer needed? N/A
Is additional field engineering time needed? N/A
Number of Days N/A

Primary Transmitter

Back to Top

Other Transmitter Cost Not Listed

Information not provided.

Antennas

Back to Top
Section Question Response
Antenna Related Expenses Do you have antenna related expenses? Yes

Auxiliary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Auxiliary (Backup)
Description of Use Auxiliary (Backup)
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Horizontal
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 869.6 kW
Manufacturer
Model TFU-28DSC-R O4
Year 2008

Auxiliary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Auxiliary (Backup)
Description of Use Auxiliary (Backup)
Change Type Purchase New
Is this a request for upgraded equipment? Yes
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Side Mount
Antenna position in stack Not in Stack
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 730.0 kW
Manufacturer
Model TFU-30DSC O4A
Year 2018
Justification for New Antenna See attached Transition Plan Narrative.

Auxiliary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna? No
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Broadband
Feed Line Size 7 3/16 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna? Yes
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? Yes
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Auxiliary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Primary Antenna

Back to Top

Existing Antenna Information

Section Question Response
Existing Antenna Description Type of change Purchase New
Antenna Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing antenna shared with another station or stations? No
Is the existing antenna directional? No
Is antenna in operating condition? Yes
Is antenna located on or in close proximity to an antenna farm? No
Existing Antenna Manufacturer and Type Class Full Power
Mounting Top Mount
Antenna position in stack Bottom
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels N/A
Design power capacity in use N/A
Lower Limit N/A
Upper Limit N/A
Other Antenna Type N/A
ERP: 840.0 kW
Manufacturer
Model TFU-30GBH-R O8
Year 2008

Primary Antenna

Back to Top

New Antenna Costs

Section Question Response
New Antenna Description Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Ownership Owned
Owner N/A
Is antenna shared? No
Is antenna directional? No
Will antenna be located on or in close proximity to an antenna farm? No
New Antenna Manufacturer and Types Class Full Power
Mounting Top Mount
Antenna position in stack Bottom
Polarization Elliptical
Type Slotted Coaxial
Number of Stations Supported N/A
Number of Panels/Bays N/A
Lower Limit N/A
Upper Limit N/A
Design power capacity in use N/A
Other Antenna Type N/A
ERP: 574.0 kW
Manufacturer
Model TFU-25JBH/VP-R O8
Year 2018
Justification for New Antenna See attached Transition Plan Narrative.

Primary Antenna

Back to Top

Other Antenna Costs

Section Question Response
Combiner for Shared Antenna Do you need a Combiner for a Shared Antenna?
Type
Number of channels supported N/A
Frequencies of channels supported N/A
Frequency N/A
Do you need a combiner output splitter/switcher for dual feed lines? N/A
Elbow Complex Do you require the separate purchase of the Elbow Complex? Yes
Broadband or Single Channel? Single Channel
Feed Line Size 6 1/8 inches inches
Side Mount Brackets Do you require the separate purchase of side mount brackets for a high power antenna?
Pattern Scatter Analysis Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? No
Sweep Test Do you require the sweep testing of transmission line and antenna? Yes

Primary Antenna

Back to Top

Other Antenna Cost Not Listed

Information not provided.

Transmission Line

Back to Top
Section Question Response
Transmission Line Related Expenses Do you have transmission line related expenses? Yes

Auxiliary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Utilize Existing
Use Auxiliary (Backup)
Description of Use Auxiliary (Backup)
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer Dielectric
Type Rigid
Diameter 7 3/16 inches
Other Diameter N/A
Segment Length Broadband
Other Segment Length N/A
Number of parallel runs 1
Length 1680 feet per run

Auxiliary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Name Description

Sweep Test

Sweep test of existing transmission line to verify ability to support post-auction channel 26

Primary Transmission Line

Back to Top

Existing Transmission Line

Section Question Response
Existing Transmission Line Description Type of change Purchase New
Use Primary (Main)
Description of Use N/A
Ownership Owned
Owner N/A
Site N/A
Is the existing transmission line shared with another station or stations? No
Is Transmission Line in operating condition? Yes
Existing Transmission Line Manufacturer and Type Manufacturer
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 3/4 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1950 feet per run

Primary Transmission Line

Back to Top

New Transmission Line

Section Question Response
New Transmission Line Costs Use Primary (Main)
Description of Use N/A
Change Type Purchase New
Is this a request for upgraded equipment? No
Type Rigid
Diameter 6 1/8 inches
Other Diameter N/A
Segment Length 19 1/2 inches
Other Segment Length N/A
Number of parallel runs 1
Length 1950 feet per run
Justification for New Transmission Line See attached Transition Plan Narrative.

Primary Transmission Line

Back to Top

Other Transmission Line Expenses Not Listed

Information not provided.

Tower Equipment And Rigging Costs

Back to Top
Section Question Response
Tower Equipment or Rigging Costs Changes Do you have tower equipment or rigging costs changes? Yes

Primary Tower

Back to Top

Add Tower

Section Question Response
Existing Tower Description Type of change Modify Existing
Tower Use Primary (Main)
Description of Use N/A
Ownership Owned
Is this tower consider Complex?
Is this tower currently shared with any other stations? Yes
One or more FM, AM or TV radio broadcaster(s) Yes
Others Types of Users No
Is tower documented for structural analysis? Yes
Is tower compliant with Rev G? Yes
Existing Tower Structure Registration Do you have a tower registration number? Yes
ASR Number 1011355
Coordinates (NAD83) Latitude (NAD83) 36° 01' 15.0" N-
Longitude (NAD83) 095° 40' 33.0" W-
Overall Structure Height 1838.89 feet
Support Structure Height 1838.89 feet
Ground Elevation Above Mean Sea Level (AMSL) 709.97 feet
Structure Type TOWER - Free Standing or Guyed Structure
Tower Owner TULSA TOWER JOINT VENTURE
Date Constructed 09/01/1984

FM, AM or TV radio broadcasters. Facility ID's, Call Signs and Services of other broadcast stations with whom the tower is shared

Facility ID Call Sign Service
81517 KWTU FM
66586 KWGS FM
66195 KOED-TV DTV
37099 KWHB DTV
59439 KJRH-TV DTV

Primary Tower

Back to Top

Tower Modification Costs

Section Question Response
Engineering Study Please what type of engineering study is required, if any: Study needed for documented tower
Tower Reinforcements Please select whether tower reinforcements are needed: Minor Reinforcements needed

Primary Tower

Back to Top

Tower Rigging Costs

Section Question Response
Tower Rigging Costs Complex Tower Other
Helicopter Services Required Are helicopter services required? No

Primary Tower

Back to Top

Other Tower Expenses Not Listed

Name Description

Auxiliary antenna replacement

Replace auxiliary antenna

Outside Professional Services Costs

Back to Top
Section Question Response
Outside Project Management Services Do you require outside project management services? Yes
Number of Hours 711
Explanation Please see Transition Plan Narrative.
Outside RF consulting Engineering Services Perform engineering study for new channel assignment and antenna development Yes
Prepare engineering section of Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare engineering section of Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
Do you have Distributed Transmission System engineering services? N/A
Critical Facility N/A
Terrain-Shielded Facility N/A
Attorney and Other Outside Consulting Services Prepare and file Form FCC Construction Permit Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare and file Form FCC License to Cover Application Yes
For Auxiliary Facility Yes
For Main Facility Yes
Prepare request for Special Temporary Authority Yes
Quantity 1
NEPA Section 106 environmental review No
Environmental Assessment No
ASR Modification No
FAA Consultation (including preparation of FAA Form 7460) No
Negotiation of Lease and other Matter for Shared Locations No
Prepare or Review FCC Form 399 for Reimbursement Yes
Address transition timing and coordination issues w/ other stations and wireless providers Yes
RF Field Engineering Services Comprehensive coverage verification via field study Yes
RF exposure measurements Yes
Additional Field Engineering Service No
Number of Days N/A
Justification N/A

Outside Professional Services Costs

Back to Top

Other Professional Services Expenses Not Listed

Name Description

Transmitter Installation

MARSAND is retained to install and commission transmitter.

Other Expenses

Back to Top
Section Question Response
AM Pattern Disturbance Is an Impact Study needed? No
Is Remediation needed? No
Facility Expenses Name N/A
Other Distributed Transmission System Expenses Not listed N/A
Name N/A
Is Notification of a Medical Facility required as a result of DTV broadcasting? Yes
Permit and Filing Costs Local Zoning No
Non-zoning permits No
BLM or NFS Coordination No
FCC Construction Permit Minor Change Yes
FCC License to Cover Application Yes
FCC Special Temporary Authority Application Yes
Other Miscellaneous Expenses Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? Yes
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? No
Does this relocation require Equipment Storage? No
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? Yes
Does this relocation require MVPD Notification of a Channel Change? Yes

Other Expenses

Back to Top

Other Expenses Not Listed

Name Description

Attorney Fee - FCC Filing Fee

FCC Filing fees associated with Repack.

Attorney Fee - Repack Planning

FCC Repack planning

Attorney Fee - Review Work Form 387

Review and Work on Form 387 for KO

Aux Antenna - RFreight

Aux Antenna - RFreight, shipping, and handling as per Dielectric invoice attached SO 87002 KOTV Invoice MAN00153.pdf line item 30.

Aux Antenna Storage

Interim storage in between Dielectric build completion and shipping it to KOTV TX Site.

BEACON LIGHT'G Freight

Freight for BEACON / LIGHT'G ARR

Attorney Fees - Licensing

Test Authority Filing, License App for Post Auction CH26, Final transition progress reports

Gas for TX Line

Compressed Nitrogen for transmission line construction.

Main Antenna - RFreight

Main Antenna - RFreight, shipping, and handling as per Dielectric invoice attached SO 87002 KOTV Invoice MAN00153.pdf line item 32.

Main Antenna Storage

Interim storage in between Dielectric build completion and shipping it to KOTV TX Site.

Main Tran Test

Test Transistion - RTT775 - Order 827002

Site Prep Electrical

S and J electrical work performed prior to Shawvers arrival. There was an existing electrical conduit that required relocation. This relocation made room to install the hose tray for the new transmitter.

Site Prep - Signage

Signs to direct delivery of supplies related to repack to TX site from highway.

Site Prep - TX Space

Site prep for space new transmitter will be installed in / wall furring - inclosure.

Site Prep Equipment

To receive in equipment and move around parts for install a pallet jack was required to be purchased.

Site Prep Ingress - Egress

This project was required to guarantee heavy equipment ingress and egress routes around the structure and to the winch anchor and pad on the SW side of the structure.

Storage Trailer Rental

Used Milestone Trailer to lease trailers to store TX Line and Equipment securely onsite until it is installed on tower.

Tower Site Physical Security

Site is in a remote area and with main antenna and TX lines we hired a physical security officer to be onsite overnight during a period of time until we installed the new equipment on the tower.

Tower Site Security

Tower site does not have security cameras. KOTV adding security cameras for security purposes of storing millions of dollars worth of repack at KOTV's building at tower site.

Transmitter Shipping-Handling

Shipping - Handling for GatesAir Transmitter as per attached quote - KOTVULXTE80.pdf

Cost Information

Back to Top

Transmitters

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $1,481,391.38 $1,512,441.38 N/A $1,502,641.38 N/A
Total for all systems $3,912,035.35 $4,491,019.35 N/A $3,526,532.12 N/A
Primary Transmitter ULXTE-80 $1,481,391.38 $1,512,441.38 $1,502,641.38
3" Rigid Conduit and Wiring (Cost per foot) $10,400.00 $9,800.00 N/A N/A N/A
Switchgear - industrial 800 amp $38,200.00 $69,850.00 Furnish and Install 800amp panel/breakers/equipment. $69,850.00 N/A
UHF - Liquid Cooled Solid State Transmitter 50.1 kW $503,188.15 $503,188.15 Upated UHF Transmitter Description as per FCC email received on 8/9/2019. As per instructions of 399 the adjustment to description created a new cost component. This is for Final invoice to GatesAir. Updated for Change Order Q85380 $503,188.15 Received requested by FCC on 8/9/2019 requesting the description of the transmitter to be changed to 50.1kw to match final GatesAir Invoice. This caused a new cost estimate line item for the 50.1kw item.
UHF - Liquid Cooled Solid State Transmitter 63 kW $929,603.23 $929,603.23 ***System Notice: Estimate adjusted and locked because line has been superseded.***Refer to quote GA-00023857 - KOTVULXTE80.PDF. The estimated cost on this quote was verified as part of 399 and according to our verfication letter was approved for this amount. The first third of this same quote was paid 11/2017. $929,603.23 Received requested by FCC on 8/9/2019 requesting the description of the transmitter to be changed to 50.1kw to match final GatesAir Invoice. This caused a new cost estimate line item for the 50.1kw item.

Components

Actual Information Description File Name
3" Rigid Conduit and Wiring (Cost per foot) Information not provided.
Switchgear - industrial 800 amp

Component Description:
Invoice 2 for work completed for transmitter electrical panel work.
Amount:
$54,650.00

Component Description:
Progress Invoice for work completed towards installing 800amp.
Amount:
$15,200.00
UHF - Liquid Cooled Solid State Transmitter 50.1 kW

Component Description:
Final Payment - Transmitter Received.
Amount:
$497,448.36

Component Description:
Additional Parts to install GatesAir Transmitter at site.
Amount:
$5,739.79
UHF - Liquid Cooled Solid State Transmitter 63 kW

Component Description:
GatesAir 1/3 ARO - down payment for transmitter - As per Quote GA-00023857
Amount:
$453,919.37

Component Description:
Transmitter Payment Invoice 3 of 3 - Final - Equipment Received. Updated Equipment Description as per request and it created a new line. Moving component under Transmitter for 50.1kw cost estimate.
Amount:
N/A

Component Description:
Invoice 2 of 3 for Transmitter - 33% Prior to Ship Invoice - GatesAir - KOTV JW30004177-2
Amount:
$475,683.86

Cost Information

Back to Top

Antennas

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $624,920.00 $854,820.00 N/A $593,613.53 N/A
Total for all systems $3,912,035.35 $4,491,019.35 N/A $3,526,532.12 N/A
Primary Antenna TFU-25JBH/VP-R O8 $308,530.00 $541,020.00 $391,746.50
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed) $12,300.00 $31,920.00 Please see transition plan narrative and attached Dielectric Main Antenna Quote for base and upgrade. $11,970.00 N/A
Sweep test of existing antenna $6,730.00 $8,900.00 Please see transition plan narrative and attached Dielectric Main Antenna Quote for base and upgrade. $8,757.50 N/A
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized $289,500.00 $500,200.00 Antenna is the bottom antenna in a stacked set and pre-determined costs will likely double. For details, see attached Transition Plan Narrative and attached Dielectric Main Antenna Quote for base and upgrade. $371,019.00 N/A
Auxiliary Antenna TFU-30DSC O4A $316,390.00 $313,800.00 $201,867.03
Sweep test of existing antenna $6,730.00 $6,400.00 Please see transition plan narrative and attached Dielectric Aux Antenna Quote for base and upgrade. $6,400.00 N/A
UHF - High Power, Side Mount, basic slot antenna, 730 kW input, elliptically or circularly polarized $264,400.00 $264,400.00 See Transition Plan Narrative and attached Dielectric Aux Antenna Quote for base and upgrade. $160,875.00 N/A
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) $5,260.00 $5,000.00 N/A $4,224.00 N/A
Side mount brackets for high power antennas (if not included in antenna base cost) $23,150.00 $22,000.00 N/A $15,450.53 N/A
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed) $16,850.00 $16,000.00 Please see transition plan narrative and attached Dielectric Aux Antenna Quote for base and upgrade. $14,917.50 N/A

Components

Actual Information Description File Name
Elbow complex, single channel, at antenna input, per 6 1/8. feedline (if needed)

Component Description:
See attached PDF for $ allocation of Dielectric Net Balance Due on Order.
Amount:
$4,069.80

Component Description:
Elbow Complex 6-75 Digit KOTV Main. Item 4 on invoice - Prior to Ship 33%
Amount:
$3,950.10

Component Description:
Elbow Complex 6-75 Digit KOTV Main. Item 4 on invoice - first 33%
Amount:
$3,950.10
Sweep test of existing antenna

Component Description:
Sweep - on-site for KOTV Main. Item 33 on invoice, Prior to Ship 33%.
Amount:
$2,112.00

Component Description:
Sweep of line as it relates to unstacking KJRH and KOTV to install KOTV new main system.
Amount:
$2,357.50

Component Description:
See note on invoice
Amount:
$2,176.00

Component Description:
Sweep - on-site for KOTV Main. Item 33 on invoice, first 33%.
Amount:
$2,112.00
UHF - High Power Top Mount (200-1000 kW), One station antenna , elliptically or circularly polarized

Component Description:
See memo - remaining balance net 30 for items on order 827002
Amount:
$21,756.21

Component Description:
UHF Main Top Antenna - see attached cover letter.
Amount:
$102,954.09

Component Description:
UHF Main Antenna, VPOL, Top Plate. Items 1,2,3 on invoice. Prior to Ship 33%.
Amount:
$121,042.35

Component Description:
See note on invoice
Amount:
$4,224.00

Component Description:
UHF Main Antenna, VPOL, Top Plate. Items 1,2,3 on invoice. First 33%.
Amount:
$121,042.35
Sweep test of existing antenna

Component Description:
Balance Net 30 amount.
Amount:
$2,176.00

Component Description:
Sweep on-site KOTV Aux. Item 31 on invoice. Prior to Ship 33%
Amount:
$2,112.00

Component Description:
Sweep on-site KOTV Aux. Item 31 on invoice. First 33%.
Amount:
$2,112.00
UHF - High Power, Side Mount, basic slot antenna, 730 kW input, elliptically or circularly polarized

Component Description:
See attached PDF for $ allocation of Dielectric Net Balance Due on Order.
Amount:
$48,310.02

Component Description:
UHF - Side Mount Aux Antenna KOTV. Item 24 invoice. Prior to Ship 33%
Amount:
$53,088.75

Component Description:
UHF - Side Mount Aux Antenna KOTV. Item 24 invoice. First 33%
Amount:
$53,088.75

Component Description:
See Memo in attached - balance net 30 for remaning balance on order 827002
Amount:
$6,387.48
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost)

Component Description:
See Invoice for Explanation.
Amount:
$4,224.00
Side mount brackets for high power antennas (if not included in antenna base cost)

Component Description:
See attached PDF for $ allocation of Dielectric Net Balance Due on Order.
Amount:
$4,610.03

Component Description:
KOTV Aux Side Mounts, also includes scatter study. Item 26 on invoice. Prior to Ship 33%
Amount:
$5,420.25

Component Description:
KOTV Aux Side Mounts, also includes scatter study. Item 26 on invoice. First 33%
Amount:
$5,420.25
Elbow complex, broadband, at antenna input, per 7 3/16. feedline (if needed)

Component Description:
Elbow 7-75 - first cut piece of transmission line and accessories for interior construction
Amount:
$2,947.50

Component Description:
See attached PDF for $ allocation of Dielectric Net Balance Due on Order.
Amount:
$4,069.80

Component Description:
Elbow complex 6-75 KOTV Aux, item 27 on invoice. First 33%.
Amount:
$3,950.10

Component Description:
Elbow complex 6-75 KOTV Aux, item 27 on invoice. Prior to Ship 33%.
Amount:
$3,950.10

Cost Information

Back to Top

Transmission Line

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $400,651.00 $411,351.00 N/A $320,567.09 N/A
Total for all systems $3,912,035.35 $4,491,019.35 N/A $3,526,532.12 N/A
Primary Transmission Line $393,900.00 $404,600.00 $314,351.50
Rigid Transmission Line - copper, 6 1/8" $393,900.00 $404,600.00 Please see transition plan narrative and attached Dielectric Main Antenna Quote for base and upgrade. $314,351.50 N/A
Auxiliary Transmission Line $6,751.00 $6,751.00 $6,215.59
Sweep Test $6,751.00 $6,751.00 Transmission line manufacturer recommends testing the line for ability to support post-auction channel 26. See attached Auxiliary line sweep recommendation. $6,215.59 N/A

Components

Actual Information Description File Name
Rigid Transmission Line - copper, 6 1/8"

Component Description:
Length - Order 827002 with Change Orders from 1/15/2020 and 04/09/2020.
Amount:
$4,571.25

Component Description:
Interior construction hangers and TLSCR 7-75 tx line.
Amount:
$2,437.50

Component Description:
Final cut piece of tx line for interior construction.
Amount:
$1,575.00

Component Description:
See attached PDF for $ allocation of Dielectric Net Balance Due on Order.
Amount:
$88,538.64

Component Description:
Change Order 01/15/2020 - Line Reducer
Amount:
$1,960.00

Component Description:
Rigid Transmission Line, TLSCR's, Reducer, and Test port. Items 5, 9, 28, and 29 on invoice. Prior to Ship 33%.
Amount:
$105,218.93

Component Description:
Rigid Transmission Line - Change Order 3-23-20 827002.
Amount:
$1,040.00

Component Description:
Rigid Transmission Line, TLSCR's, Reducer, and Test port. Items 5, 9, 28, and 29 on invoice. First 33%.
Amount:
$105,218.93

Component Description:
Final cut pieces of tx line for exterior construction.
Amount:
$1,950.00

Component Description:
Rigid TX Line - Order 827002
Amount:
$1,841.25
Sweep Test

Component Description:
Updated with lodging receipt and mileage at $0.545. Updated for per diem at $55 p/day.
Amount:
$6,215.59

Cost Information

Back to Top

Tower Equipment and Rigging Costs

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $791,600.00 $1,120,000.00 N/A $891,430.00 N/A
Total for all systems $3,912,035.35 $4,491,019.35 N/A $3,526,532.12 N/A
Primary Tower TOWER $791,600.00 $1,120,000.00 $891,430.00
Auxiliary antenna replacement $200,000.00 $200,000.00 N/A $126,500.00 N/A
Structural engineering tower load study for well documented tower $12,600.00 $12,000.00 N/A $6,500.00 N/A
Minor tower reinforcement/modifications $158,000.00 $150,000.00 N/A $618.00 N/A
Complex Tower (includes, for example, those with candelabras and/or stacked antennas) $421,000.00 $758,000.00 Tower has a stacked antennas. Please see transition plan narrative. Bury Mount, Pole Socket/Flange for counter balance to the two stacked antennas on the top main of tower. Wedding cake adapters for top / bottom of KOTV main antenna for stacked env. $757,812.00 N/A

Components

Actual Information Description File Name
Auxiliary antenna replacement

Component Description:
Final Bill Post Aux Antenna Install
Amount:
$126,500.00
Structural engineering tower load study for well documented tower

Component Description:
Tower / Structural Analysis
Amount:
$6,500.00
Minor tower reinforcement/modifications

Component Description:
The receipt from Davenport Welding is for the rental of a portable arc welder to fix the Burry pole in the socket after placement on the tower.
Amount:
$618.00
Complex Tower (includes, for example, those with candelabras and/or stacked antennas)

Component Description:
Added per Change Order 08/06/19 - see attached PDF for explanation. Bury Mount, Pole Socket, Wedding Cakes
Amount:
$159,000.00

Component Description:
Beacon Lightning Arrestor on top of stacked environment.
Amount:
$812.00

Component Description:
50% down - Mobilization and work to install new line and antenna on stacked environment.
Amount:
$349,000.00

Component Description:
Per quote - progress payment.
Amount:
$249,000.00

Cost Information

Back to Top

Outside Professional Services

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $416,793.00 $404,192.00 N/A $97,080.25 N/A
Total for all systems $3,912,035.35 $4,491,019.35 N/A $3,526,532.12 N/A
Outside Professional Services $416,793.00 $404,192.00 $97,080.25
Transmitter Installation $160,600.00 $160,600.00 MARSAND to install and commission transmitter. Please see attached MARSAND quote 1756. $3,399.75 N/A
RF Exposure Measurements $21,050.00 $20,000.00 N/A N/A N/A
Comprehensive coverage verification via field study, if needed $84,200.00 $80,000.00 N/A $76,421.00 N/A
Attorney Fees - Prepare and File request for Special Temporary Authorization $3,680.00 $3,500.00 N/A N/A N/A
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application $2,365.00 $2,250.00 N/A $440.50 N/A
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application $4,210.00 $4,000.00 N/A $1,766.00 N/A
Project management of the transition $112,338.00 $106,650.00 N/A N/A N/A
Prepare engineering section of FCC Form 2100 (main), License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
Address transition timing and coordination issues w/ other stations and wireless $2,630.00 $2,500.00 N/A N/A N/A
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application $5,260.00 $5,000.00 N/A $1,261.00 N/A
Prepare request for Special Temporary Authorization $2,050.00 $1,500.00 N/A N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application $1,580.00 $1,500.00 N/A N/A N/A
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application $2,105.00 $2,000.00 N/A $1,850.00 N/A
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application $3,155.00 $3,000.00 N/A $2,250.00 N/A
Perform engineering study for new channel assignment and antenna development $7,360.00 $7,000.00 N/A $6,500.00 N/A
Prepare and or review reimbursement form $2,630.00 $3,192.00 Sub-Total over Predetermined and Estimated Cost due to only taken in account Engineering review. Additional cost(s) are related to attorney fees. $3,192.00 Sub-Total over Predetermined and Estimated Cost due to only taken in account Engineering review. Additional cost(s) are related to attorney fees.

Components

Actual Information Description File Name
Transmitter Installation

Component Description:
Distilled water for transmitter coolant pump installation.
Amount:
$77.68

Component Description:
Distilled water for transmitter coolant pump installation
Amount:
$44.39

Component Description:
Distilled water for transmitter coolant pump installation
Amount:
$77.68

Component Description:
Concrete work necessary for the coolant hoses from transmitter to heat exchangers outside.
Amount:
$3,200.00
RF Exposure Measurements Information not provided.
Comprehensive coverage verification via field study, if needed

Component Description:
Main Antenna Field Study and Verification.
Amount:
$45,757.00

Component Description:
Aux Antenna Field Study and Verification.
Amount:
$30,664.00
Attorney Fees - Prepare and File request for Special Temporary Authorization Information not provided.
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application

Component Description:
Form 2100 - Schedule A Modificatoin App / Draft App to reassign to new channel pursuant to post-auction repack.
Amount:
$440.50
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application

Component Description:
Prepare license to cover app for KOTV-DT post auction aux facilities.
Amount:
$277.50

Component Description:
KOTV Repack Aux CP and License services.
Amount:
$721.50

Component Description:
Prepare draft app for new aux system, FCC Form 2100 aux antenna, finalize and file form 2100 aux antenna for KOTV.
Amount:
$767.00
Project management of the transition Information not provided.
Prepare engineering section of FCC Form 2100 (main), License to Cover Application Information not provided.
Address transition timing and coordination issues w/ other stations and wireless Information not provided.
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application

Component Description:
Combined work on FCC form 2100 and 399. Finalize and file FCC form 2100 and 399 for KOTV.
Amount:
$436.50

Component Description:
Attorney call and prep work regarding KOTV FCC Form 2100 and 399.
Amount:
$194.00

Component Description:
FCC Form 2100 construction permit app for KOTV
Amount:
$630.50
Prepare request for Special Temporary Authorization Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application Information not provided.
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application

Component Description:
Prepare engineering section of FCC Form 2100, CP (AUX).
Amount:
$1,850.00
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application

Component Description:
Prepare engineering section of FCC Form 2100, CP Main
Amount:
$2,250.00
Perform engineering study for new channel assignment and antenna development

Component Description:
Perform engineering study for new channel assignment and antenna development - complex system: multi-channel, shared combiner, multi-tenant site
Amount:
$6,500.00
Prepare and or review reimbursement form

Component Description:
Prepare and/or review reimbursement form.
Amount:
$2,500.00

Component Description:
Work on FCC form 399 for KOTV, submit FCC form 399 and minor mod app and download full file copies.
Amount:
$401.00

Component Description:
KOTV Form 399 Preparation
Amount:
$291.00

Cost Information

Back to Top

Other Expenses

Where no predetermined cost estimate is available, any estimate provided will also become the predetermined cost (displayed in italics).
Description Predetermined
Cost Estimate
Estimated Cost Estimated Cost Justification Actual Cost Actual Cost Justification
Sub-total $196,679.97 $188,214.97 N/A $121,199.87 N/A
Total for all systems $3,912,035.35 $4,491,019.35 N/A $3,526,532.12 N/A
Other Expenses $196,679.97 $188,214.97 $121,199.87
Site Prep Ingress - Egress $5,800.00 $5,800.00 This project was required to guarantee heavy equipment ingress and egress routes around the structure and to the winch anchor and pad on the SW side of the structure. $5,730.00 N/A
Main Tran Test $4,792.50 $4,792.50 Transfer Test - Dielectric $4,792.50 N/A
Main Antenna Storage $1,595.00 $1,595.00 Required due to Dielectric build completion and the timing on when KOTV was ready to receive equipment. $1,595.00 N/A
Main Antenna - RFreight $22,318.00 $22,318.00 Main Antenna - RFreight, shipping, and handling as per Dielectric invoice attached SO 87002 KOTV Invoice MAN00153.pdf line item 32. $22,318.00 N/A
Attorney Fees - Licensing $3,000.00 $3,000.00 Attorney Fees $2,331.00 N/A
Attorney Fee - Repack Planning $600.00 $600.00 Attorney fees for planning of repack efforts $545.00 N/A
Develop and air announcement of upcoming channel change $43,000.00 $43,000.00 Cost estimates associated with outsourcing the production of the viewer announcements for the upcoming channel change. Refer to KOTV GMSRepackRescanEstimate.pdf in the attachments. $277.50 N/A
FCC Filing Fees - Form 2100 minor change CP application $1,110.00 $1,445.00 Fees $1,445.00 N/A
DTV Medical Facility Notification $11,550.00 $2,755.00 N/A $2,755.00 N/A
Disposal Costs (for equipment and other waste, net of any salvage value) $27,000.00 $27,000.00 Existing transmitter removal and fluid recovery. Remove and dispose of existing main and auxiliary antennas and transmission line. See attached MARSAND quote 1755. $7,706.21 N/A
FCC Filing Fees - Special Temporary Authorization request $195.00 $190.00 N/A N/A N/A
FCC Filing Fees - Form 2100 license to cover application $335.00 $335.00 Fees $335.00 N/A
MVPD Notification of Channel Change $1,500.00 $1,500.00 Please see attached MVPD Notification Quote. $1,500.00 N/A
Attorney Fee - Review Work Form 387 $1,800.00 $1,800.00 Attorney Fees associated with reviewing FCC Form 387 for KOTV. $1,717.50 N/A
Aux Antenna - RFreight $18,000.00 $18,000.00 Aux Antenna - RFreight, shipping, and handling as per Dielectric invoices $16,689.08 N/A
Aux Antenna Storage $2,795.00 $2,795.00 Required due to Dielectric build completion and the timing on when KOTV was ready to receive equipment. $2,795.00 N/A
Gas for TX Line $190.00 $190.00 Compressed nitrogen used during transmission line construction. $182.41 N/A
Attorney Fee - FCC Filing Fee $1,070.00 $1,070.00 FCC Filing Fees - KOTV Repack - Attorney fees $0.00 N/A
BEACON LIGHT'G Freight $2,000.00 $2,000.00 Freight to ship in Beacon Light atop stacked environment. $1,018.64 N/A
Transmitter Shipping-Handling $20,856.42 $20,856.42 Shipping - Handling for GatesAir Transmitter Update for Change Order Q85380 Frieght $20,856.42 Change Order
Tower Site Security $1,751.89 $1,751.89 Tower site does not have security cameras. KOTV adding security cameras for security purposes of storing millions of dollars worth of repack at KOTV's building at tower site. $1,751.89 N/A
Tower Site Physical Security $13,315.00 $13,315.00 Tower site physical security guard for overnight rover watch while new tx line and main antenna was on the ground. $12,876.00 N/A
Storage Trailer Rental $3,000.00 $3,000.00 Trailer rental to securely store TX line and equipment related to repack at KOTV transmitter site. $2,991.53 N/A
Site Prep - Signage $150.00 $150.00 SignsNow for signs to direct traffic to site for deliveries $143.24 N/A
Site Prep Electrical $1,400.00 $1,400.00 S and J electric performed prior to Shawver’s arrival. There was an existing electrical conduit that required relocation. This relocation made room to install the hose tray for the new transmitter. $1,400.00 N/A
Site Prep - TX Space $3,966.16 $3,966.16 Site where the new transmitter is being installed required some re-work of the wall inclosure. $3,966.16 N/A
Site Prep Equipment $3,590.00 $3,590.00 To receive in equipment and move around heavy equipment for install a pallet jack was required to be purchased. Equipment necessar for construction of the channel grid to support the coolant hoses for new transmitter. $3,481.79 N/A

Components

Actual Information Description File Name
Site Prep Ingress - Egress

Component Description:
Needed to gravel over soft earth for hoist placement.
Amount:
$1,400.00

Component Description:
Needed to gravel over soft earth for hoist placement. Added Quote.
Amount:
$1,380.00

Component Description:
This project was required to guarantee heavy equipment ingress and egress routes around the structure and to the winch anchor and pad on the SW side of the structure.
Amount:
$2,950.00
Main Tran Test

Component Description:
see attached PDF - Trans Test
Amount:
$4,792.50
Main Antenna Storage

Component Description:
Required due to Dielectric build completion and the timing on when KOTV was ready to receive equipment.
Amount:
$1,595.00
Main Antenna - RFreight

Component Description:
Line 48 - RFreight - Order 827002
Amount:
$149.12

Component Description:
Line 51 RFreight - Order 827002
Amount:
$1,163.71

Component Description:
Main Antenna Freight, Shipping, and Handling - 2/3 Prior to Ship invoice amount as per invoice line item 32
Amount:
$7,364.94

Component Description:
RF Freight - L9 Order 827002 - L53 Order 827002 - Cut Pieces
Amount:
$5,713.50

Component Description:
Main Antenna Freight, Shipping, and Handling - 1/3 ARO invoice amount as per invoice line item 32 - SO 827002 KOTV Invoice MAN00153.pdf
Amount:
$7,364.94

Component Description:
See Memo in attached - balance net 30 for remaning balance on order 827002
Amount:
$561.79
Attorney Fees - Licensing

Component Description:
fee
Amount:
$277.50

Component Description:
Attorney Fees KOTV - Test Authority, Post Chan 26 App, forms
Amount:
$2,053.50
Attorney Fee - Repack Planning

Component Description:
KOTV Repack Planning and Required Reg Filings
Amount:
$222.00

Component Description:
Phase 9 Repack Planning
Amount:
$111.00

Component Description:
Telephone conference with Trevor and Don regarding KOTV Phase 9 Repac planning.
Amount:
$212.00
Develop and air announcement of upcoming channel change

Component Description:
Prepare Viewer Notification Cert for KO Public File and Guidance Regarding KO Viewer Notification.
Amount:
$277.50
FCC Filing Fees - Form 2100 minor change CP application

Component Description:
KOTV License to cover modified Aux CP
Amount:
$335.00

Component Description:
Fee for - Aux Modification Application
Amount:
$1,110.00
DTV Medical Facility Notification

Component Description:
Required DTV Medical Channel Change Notifications
Amount:
$2,755.00
Disposal Costs (for equipment and other waste, net of any salvage value)

Component Description:
dumpster for unpacking and placing the new transmitter
Amount:
$450.00

Component Description:
Pick up and disposal of old UHF45 transmitter fluids.
Amount:
$1,826.38

Component Description:
Forklift Rental to remove CH45 tx and equipment from TX bldg for disposal.
Amount:
$1,511.83

Component Description:
Debris roll off
Amount:
$18.00

Component Description:
The Harley Hollan expenses are for debris removal
Amount:
$390.00

Component Description:
Onsite construction / scrap dumpster.
Amount:
$390.00

Component Description:
This was to transport containers to Oneta. They will be filled with appropriate fluids from the UHF45 transmitter and sent beck for proper disposal.
Amount:
$1,420.00

Component Description:
The Harley Hollan expenses are for debris removal
Amount:
$390.00

Component Description:
30yd disposal container
Amount:
$450.00

Component Description:
dumpster for unpacking and placing the new transmitter
Amount:
$32.00

Component Description:
dumpster for unpacking and placing the new transmitter
Amount:
$24.00

Component Description:
Debris roll off
Amount:
$24.00

Component Description:
The Harley Hollan expenses are for debris removal
Amount:
$390.00

Component Description:
12 YARD DELIVERY - receipt for the dumpster for unpacking and placing the new transmitter for KOTV-DT FIN: 35434
Amount:
$390.00
FCC Filing Fees - Special Temporary Authorization request Information not provided.
FCC Filing Fees - Form 2100 license to cover application

Component Description:
Fee for License
Amount:
$335.00
MVPD Notification of Channel Change

Component Description:
2nd Notifications to MVPD due to use changing our date of transition.
Amount:
$750.00

Component Description:
Required MVPD Channel Change Notice.
Amount:
$750.00
Attorney Fee - Review Work Form 387

Component Description:
Review KOTV Form 387
Amount:
$333.00

Component Description:
Review KOTV Form 387
Amount:
$166.50

Component Description:
Review Draft KO 2nd Q 2020 Form 387 Transition Progress Report.
Amount:
$111.00

Component Description:
Review KOTV Form 387
Amount:
$100.00

Component Description:
Review draft FCC Form 387 Quarterly transistion progress report.
Amount:
$265.00

Component Description:
fee
Amount:
$333.00

Component Description:
Work on KOTV FCC Form 387 quarterly filing.
Amount:
$106.00

Component Description:
Review draft form 387 transition progress report.
Amount:
$106.00

Component Description:
Review draft KOTV schedule 387 3Q 2017 report.
Amount:
$97.00

Component Description:
Work on KOTV FCC Form 387 quarterly filing.
Amount:
$100.00
Aux Antenna - RFreight

Component Description:
See Memo in attached - balance net 30 for remaning balance on order 827002
Amount:
$3,290.52

Component Description:
Freight for Invoice 883004
Amount:
$915.71

Component Description:
Aux Antenna Freight, Shipping, and Handling - 2/3 Prior to Ship invoice amount as per invoice line item 30
Amount:
$3,193.74

Component Description:
Aux Antenna Freight, Shipping, and Handling - 1/3 ARO invoice amount as per invoice line item 30 - SO 827002 KOTV Invoice MAN00153.pdf
Amount:
$3,193.74

Component Description:
Freight for invoice 880015
Amount:
$3,632.92

Component Description:
Freight for Invoice 884004
Amount:
$2,462.45
Aux Antenna Storage

Component Description:
Required due to Dielectric build completion and the timing on when KOTV was ready to receive equipment.
Amount:
$2,795.00
Gas for TX Line

Component Description:
Compressed nitrogen used during transmission line construction.
Amount:
$182.41
Attorney Fee - FCC Filing Fee

Component Description:
KOTV Repack FCC Filing Fees - Attorney Fees
Amount:
$1,070.00
BEACON LIGHT'G Freight

Component Description:
Freight
Amount:
$1,018.64
Transmitter Shipping-Handling

Component Description:
FREIGHT
Amount:
$19,962.24

Component Description:
Freight for components from Change Order Q85380
Amount:
$894.18
Tower Site Security

Component Description:
Tower site does not have security cameras. KOTV adding security cameras for security purposes of storing millions of dollars worth of repack at KOTV's building at tower site.
Amount:
$1,751.89
Tower Site Physical Security

Component Description:
Security services for 4/1/20 - 4/15/20
Amount:
$5,046.00

Component Description:
3/16/20 - 3/31/20 Onsite Transmitter Site Security.
Amount:
$5,568.00

Component Description:
3/1/20 - 3/15/20
Amount:
$2,262.00

Component Description:
This invoices was filed in error, please disregard. See attached memo.
Amount:
N/A
Storage Trailer Rental

Component Description:
4/1/20 - 4/14/20 Trailer Rental
Amount:
$281.99

Component Description:
2/26 - Delivery of trailers
Amount:
$1,050.00

Component Description:
3/1/20 - 3/31/20 trailer rental
Amount:
$757.06

Component Description:
2/26/20 - 2/29/20 Trailer lease
Amount:
$102.48

Component Description:
Final invoice - return of trailers to Milestone yard.
Amount:
$800.00
Site Prep - Signage

Component Description:
SignsNow for signs to direct traffic to site for deliveries
Amount:
$143.24
Site Prep Electrical

Component Description:
Relocation of Conduit Feeding Power to Equiment Rack.
Amount:
$1,400.00
Site Prep - TX Space

Component Description:
Wall prep and paint.
Amount:
$80.16

Component Description:
Site prep
Amount:
$5.54

Component Description:
Wall prep and paint.
Amount:
$140.86

Component Description:
Drywall and wall construction around new KOTV-DT CH26 Transmitter.
Amount:
$3,739.60
Site Prep Equipment

Component Description:
Web sling for lifting heavy equipment. Initial charge was 73.74, refund of 15.18 for items not used. Reimbursement request for 58.56
Amount:
$58.56

Component Description:
Dolly equipment. Initial charge 180.09, returned items not used at a refund of 115.01. Charges requested for reimbursement equal 65.08.
Amount:
$65.08

Component Description:
The Lowes expense is for a portable table saw to create the fixtures necessary to accurately mark and penetrate the wall for the concrete cutting contractors.
Amount:
$295.12

Component Description:
Heavy Load Lifting Straps to move around new tx cabinets into place for install.
Amount:
$77.16

Component Description:
Equipment necessar for construction of the channel grid to support the coolant hoses for new transmitter.
Amount:
$27.38

Component Description:
Equipment necessar for construction of the channel grid to support the coolant hoses for new transmitter.
Amount:
$16.24

Component Description:
Equipment necessar for construction of the channel grid to support the coolant hoses for new transmitter.
Amount:
$162.28

Component Description:
Equipment necessar for construction of the channel grid to support the coolant hoses for new transmitter.
Amount:
$287.67

Component Description:
Equipment necessar for construction of the channel grid to support the coolant hoses for new transmitter.
Amount:
$201.61

Component Description:
The Tractor Supply expense is for a tank to prepare the 50% water and glycol solution. The glycol arrived in concentrated form.
Amount:
$99.99

Component Description:
Gantry Crane and components required to lift trasnmitter equipment into place at site. Less Gift Card
Amount:
$1,026.21

Component Description:
Forklift Rental
Amount:
$863.37

Component Description:
To receive in equipment and move around parts for install a pallet jack was required to be purchased.
Amount:
$301.12

Cost Information

Back to Top

Grand Total

Predetermined
Cost Estimate
Estimated Cost Actual Cost
Total for all systems $3,912,035.35 $4,491,019.35 $3,526,532.12

Reimbursement Status

Back to Top
Question Response
The facility has ceased operating on its pre-auction channel. Yes
Construction of final facilities or all necessary modifications are complete. Yes
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. No

Certification

Back to Top
Section Question Response
Submission of Estimated Expenses Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  3. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  4. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (broadcasters) or to continue to carry the signal of a broadcaster that changes channels (MVPD).

  5. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  6. The above-named entity certifies that it will maintain and provide to the Commission detailed records, including receipts, of all costs eligible for reimbursement actually incurred.

  7. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  8. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Trevor Wiseman

VP of Technology


04/26/2021

Certification

Back to Top
Section Question Response
Submission of Actual Cost Documentation Statements

WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733).

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity.

  2. The above-named entity certifies that the statements in this form and attached documentation are true, complete, and correct.

  3. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  4. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  5. The above-named entity certifies that the equipment and services paid for with money from the TV Broadcaster Relocation Fund are necessary to change channels (full power and Class A stations) and/or otherwise modify a television station’s facility as a result of the spectrum repack (LPTV/TV Translator stations); or to minimize service disruption resulting from a repacked television station (FM stations); or to continue to carry the signal of a broadcaster that changes channels (MVPD) .

  6. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  7. The above-named entity certifies that the cost information/documents submitted reflect costs actually incurred.

  8. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  9. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a prerequisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Trevor Wiseman

VP of Technology


04/26/2021

Certification

Back to Top
Section Question Response
Submission of Final Allocation or Accounting Information Statements

WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT.

  1. The Authorized Person signing below certifies and represents that he/she is authorized to submit this TV Broadcaster Relocation Fund Reimbursement Form on behalf of the above-named entity. The above-named entity acknowledges that all certifications and attached documentation are considered material representations.

  2. The above-named entity acknowledges the submission of the information herein creates no obligation on the part of the government to pay any amount.

  3. The above-named entity certifies that all costs identified as "actual costs" herein accurately represent the costs actually paid by the above-named entity, including any discounts, refunds, or rebates.

  4. The above-named entity certifies that all payments from the TV Broadcaster Relocation Fund (Fund) received by the entity listed on this form will be used only for expenses that are eligible for reimbursement from the Fund.

  5. The above-named entity acknowledges that overpayments or payments in error must be promptly refunded to the Commission.

  6. The above-named entity certifies that it is in full compliance with all statutes, rules, regulations and governmental requirements for which compliance is a pre-requisite for obtaining the payments herein requested.

I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above.

Trevor Wiseman

VP of Technology


04/26/2021

Attachments

Back to Top