Applicant | Address | Phone | Applicant Type | |
---|---|---|---|---|
KIRO-TV, INC. Doing Business As: KIRO-TV, INC. |
Chief Engineer 2807 THIRD AVENUE SEATTLE, WA 98121 United States |
+1 (206) 728-7777 | knealey@kiro7.com | Corporation |
Applicant | Address | Phone | |
---|---|---|---|
[Confidential] |
|
|
|
Applicant | Address | Phone | |
---|---|---|---|
Keith Nealey Engineering Manager KIRO-TV, INC. |
2807 Third Ave Seattle, WA 98121 United States |
+1 (206) 728-7808 | knealey@kiro7.com |
Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | New 220v power circuits will be installed with existing 110v circuits. We will install new transmitter and antenna alongside existing equipment. Once testing is completed we will move existing feed line onto new transmitter and antenna. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Ownership | Owned | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | MX100 | |
Year | 2010 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | .08 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAXTE-3P-C | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 600 W | |
Justification for New Transmitter | Location within the predicted noise-limited contour of and predicted interference greater than 0.5 percent to Post-Incentive-Auction Spectrum Repack facilities of Full-Service station KFFV on Channel 16, which itself is being repacked from Channel 44. |
Section | Question | Response |
---|---|---|
Other Transmitter Costs | ||
Does the transmitter installation require a Transmitter Building Site Survey/Installation? | No | |
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Rigid Conduit and Wiring | No | |
Other Electrical Service | Yes | |
Description | Add 220V breakers and outlets to existing service panel | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Ownership | Owned | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | Yes | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | ||
Mounting | Side Mount | |
Antenna position in stack | Top | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels | 2 | |
Design power capacity in use | 100.0 % | |
Lower Limit | 488.00 MHz | |
Upper Limit | 494.00 MHz | |
ERP: | 0.5 kW | |
Manufacturer | ||
Model | 1X2KBBU | |
Year | 2010 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Change Type | Purchase New | |
Ownership | Owned | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | ||
Mounting | Side Mount | |
Antenna position in stack | Top | |
Polarization | Horizontal | |
Type | Broadband Panel | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 2 | |
Lower Limit | 470.00 MHz | |
Upper Limit | 862.00 MHz | |
Design power capacity in use | 100.0 % | |
ERP: | 4.0 kW | |
Manufacturer | ||
Model | K723147 | |
Year | 2018 | |
Justification for New Antenna | Post-Incentive-auction repack required full-service station KFFV which is being repacked from channel 44 to Channel 16. This has a predicted interference greater than .5 percent. Current antenna cannot be retuned. |
Section | Question | Response |
---|---|---|
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | No |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | No |
Power Dividers | Does the panel antenna require power dividers? | Yes |
Number of Power Dividers | 1 | |
Cable Harness | Does the panel antenna require cable harness? | No |
Name | Description |
---|---|
Scala Mounting Kits and Connectors |
Antenna Mounting Kit, Power Divider Mounting Kit, 6l Jumper, Scala Adapter |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | No |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Move Equipment |
Tower Use | Primary (Main) | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | No | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | Unknown | |
Existing Tower Structure Registration | Do you have a tower registration number? | No |
Coordinates (NAD83) | Latitude (NAD83) | 48° 02' 00.4" N- |
Longitude (NAD83) | 122° 08' 06.5" W- | |
Overall Structure Height | 157.00 feet | |
Support Structure Height | 157.00 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 292.00 feet | |
Structure Type | POLE - Any type of Pole | |
Tower Owner | KIRO-TV, INC | |
Date Constructed | 03/01/1985 |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | No |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 194 | |
Explanation | K26OZ-D does not have sufficient resource capacity and expertise in house to handle all activities necessary for completion of the station's build by the construction deadline. K26OZ-D will hire an outside firm to facilitate a timely transition. | |
Outside RF consulting Engineering Services | Perform engineering study for displacement application | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | No | |
Prepare Form 601 | No | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | No | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 1 | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Form 399 assistance or other program management costs | No | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | No |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Permit and Filing Costs | FCC Construction Permit Major Change | No |
FCC Construction Permit Minor Change | Yes | |
FCC License to Cover Application | Yes | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | No |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | No | |
Does this relocation require Equipment Storage? | No | |
Point to Point Microwave (STL/ICR) | Frequency Coordination for Unidirection System | No |
Frequency Coordination for Bi-Direction System | No | |
New Point to Point Microwave System | No |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $28,666.93 | $27,708.13 | N/A | $27,708.13 | N/A |
Total for all systems | $190,393.43 | $64,056.59 | N/A | $51,057.33 | N/A |
Primary Transmitter UAXTE-3P-C | $28,666.93 | $27,708.13 | $27,708.13 | ||
Other Electrical Service: Add 220V breakers and outlets to existing service panel | $566.93 | $566.93 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $566.93 | N/A |
UHF - Air Cooled Solid State Transmitter 320 - 700 Watts | $28,100.00 | $27,141.20 | N/A | $27,141.20 | Washington State Sales Tax Added See "Q-81229 KIRO K17IZ-D Everett UAXTE-3P-C 600w.pdf" for initial quote information. |
Actual Information Description | File Name |
---|---|
Other Electrical Service: Add 220V breakers and outlets to existing service panel | |
UHF - Air Cooled Solid State Transmitter 320 - 700 Watts |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $5,422.00 | $2,678.65 | N/A | $2,678.65 | N/A |
Total for all systems | $190,393.43 | $64,056.59 | N/A | $51,057.33 | N/A |
Primary Antenna K723147 | $5,422.00 | $2,678.65 | $2,678.65 | ||
Scala Mounting Kits and Connectors | $622.00 | $622.00 | N/A | $622.00 | N/A |
Power Dividers (each, for panel antenna system, if not included in antenna cost) | $1,300.00 | $752.00 | N/A | $752.00 | N/A |
UHF Broadband panel antenna (per panel), horizontally-polarized | $3,500.00 | $1,304.65 | N/A | $1,304.65 | Shipping costs added. Please reference "Kathrein Scala UHF 470-862 Panel Antenna Specs - Everett K17IZ-D.pdf" for specifications and mounting. |
Actual Information Description | File Name |
---|---|
Scala Mounting Kits and Connectors | |
Power Dividers (each, for panel antenna system, if not included in antenna cost) | |
UHF Broadband panel antenna (per panel), horizontally-polarized |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $56,190.00 | $3,606.90 | N/A | $3,606.90 | N/A |
Total for all systems | $190,393.43 | $64,056.59 | N/A | $51,057.33 | N/A |
Primary Tower POLE | $56,190.00 | $3,606.90 | $3,606.90 | ||
Tower Rigging Short Tower (less than 500') | $56,190.00 | $3,606.90 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time | $3,606.90 | N/A |
Actual Information Description | File Name |
---|---|
Tower Rigging Short Tower (less than 500') |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $98,669.50 | $29,087.91 | N/A | $17,063.65 | N/A |
Total for all systems | $190,393.43 | $64,056.59 | N/A | $51,057.33 | N/A |
Outside Professional Services | $98,669.50 | $29,087.91 | $17,063.65 | ||
Project management of the transition | $20,467.00 | $8,115.25 | The estimated cost has been adjusted to include all invoices submitted for reimbursement at this time. | $8,115.25 | N/A |
RF Exposure Measurements | $12,100.00 | $500.00 | N/A | $225.00 | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $3,025.00 | $3,000.00 | N/A | $1,319.14 | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,052.50 | $500.00 | N/A | $0.00 | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $2,102.50 | $1,200.00 | N/A | $0.00 | N/A |
Perform engineering study for displacement application | $1,800.00 | $6,635.16 | Please see Estimated Cost Justification K26OZ-D-530-RF Eng - Engineering Study for Displacement Application V0 | $6,635.16 | N/A |
Prepare/ Review 399 reimbursement form | $1,710.00 | $1,500.00 | N/A | $331.60 | N/A |
Comprehensive coverage verification via field study, if needed | $52,600.00 | $6,000.00 | N/A | $0.00 | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $2,235.00 | $437.50 | Please see K26OZ-D Attorney - Special Temporary Authority Budget Revision Justification Letter | $437.50 | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $1,577.50 | $1,200.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
Project management of the transition | |
RF Exposure Measurements | |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | |
Perform engineering study for displacement application | |
Prepare/ Review 399 reimbursement form | |
Comprehensive coverage verification via field study, if needed | |
Attorney Fees - Prepare and File request for Special Temporary Authorization | |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,445.00 | $975.00 | N/A | $0.00 | N/A |
Total for all systems | $190,393.43 | $64,056.59 | N/A | $51,057.33 | N/A |
Other Expenses | $1,445.00 | $975.00 | $0.00 | ||
FCC Filing Fees - Form 2100 license to cover application | $335.00 | $170.00 | N/A | N/A | N/A |
FCC Filing Fees - Form 2100 minor change CP application | $1,110.00 | $805.00 | N/A | N/A | N/A |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $190,393.43 | $64,056.59 | $51,057.33 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | Yes |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Keith Nealey Director of Engineering 06/01/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Keith Nealey Director of Engineering 06/01/2021 |
Section | Question | Response |
---|---|---|
Submission of Final Allocation or Accounting Information Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Keith Nealey Director of Engineering 06/01/2021 |