Question | Response |
---|---|
Will the station be sharing equipment with another broadcast television station or stations (e.g., a shared antenna, co-location on a tower, use of the same transmitter room, multiple transmitters feeding a combiner, etc.)? If yes, enter the facility ID's of the other stations and click 'prefill' to download those stations' licensing information. | No |
Briefly describe transition plan | KENS will be transitioning from channel 39 to channel 29. The KENS tower is shared with Sinclair. KENS is the bottom half of a 2 antenna stack. KENS has a licensed auxiliary & main transmitter that will need to be replaced as part of this repack. |
Section | Question | Response |
---|---|---|
Transmitter Related Expenses | Do you have transmitter related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Reduced power Backup Transmitter | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | Diamond DHD8D1 | |
Year | 2000 | |
Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power Capacity | 2 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Auxiliary (Backup) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Manufacturer | ||
Model | UAXTE-4R37 | |
Transmitter Type | Solid State | |
Solid State Cooling | Air Cooled | |
Solid State Power capacity | 2.4 kW | |
Justification for New Transmitter | The older Diamond series of Harris transmitters cannot be re-tuned and and are no longer supported. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | Yes | |
Size | 2 inches | |
Length | 100.0 feet | |
Other Electrical Service | Yes | |
Description | Additional electrical services required for transmitter installation. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | No |
Size | N/A | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Existing Transmitter Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmitter currently shared with another station? | No | |
Is this transmitter currently in operating condition? | Yes | |
Existing Transmitter Manufacturer and Type | Manufacturer | |
Model | CD3260P2-CF | |
Year | 2004 | |
Type | Inductive Output Tube | |
IOT Power Type | Two | |
Power Capacity | 60 kW |
Section | Question | Response |
---|---|---|
New Transmitter | Use | Primary (Main) |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | Yes | |
Manufacturer | ||
Model | ULXTE 90 | |
Transmitter Type | Solid State | |
Solid State Cooling | Liquid Cooled | |
Solid State Power capacity | 56.4 kW | |
Justification for New Transmitter | Per the original manufacturer the transmitter cannot be re-tuned. The parts are not available. The reimbursable TPO is 51.7 kW based on initial 90-day filing CP. This requires a ULXTE-90 and is therefore reimbursable. |
Section | Question | Response |
---|---|---|
Electrical Service | Service Entrance (3 phases 800A 208V) | No |
Switchgear (industrial 800 amp) | No | |
Transformer (480V) | No | |
Power | N/A | |
Rigid Conduit and Wiring | Yes | |
Size | 3 inches | |
Length | 100.0 feet | |
Other Electrical Service | Yes | |
Description | Additional electrical services required for transmitter installation, including heat exchangers, transformers, cooling pumps, etc. | |
HVAC Service | Does the replacement transmitter require HVAC Service? | No |
Type | N/A | |
Size | N/A | |
Other Size | N/A | |
Transmitter Building Addition/Modification or Leasehold Improvement | Does the Transmitter Building require an addition, modification, other leashold improvement? | Yes |
Size | 100.0 square feet | |
Channel 14 Costs | Is an RF Consulting Engineer needed? | N/A |
Is a channel 14 Mask Filer needed? | N/A | |
Is additional field engineering time needed? | N/A | |
Number of Days | N/A |
Section | Question | Response |
---|---|---|
Antenna Related Expenses | Do you have antenna related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Auxiliary (Backup) | |
Description of Use | Backup Antenna | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this antenna currently shared with any other stations? | No | |
Is this antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 54.3 kW | |
Manufacturer | ||
Model | TFU-32DSB-H | |
Year | 2008 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Auxiliary (Backup) |
Description of Use | Backup Antenna for maintenance and repairs | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | Yes | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Side Mount | |
Antenna position in stack | Not in Stack | |
Polarization | Horizontal | |
Type | Broadband Slot | |
Number of Stations Supported | 1 | |
Number of Panels/Bays | 8 | |
Lower Limit | 620.00 MHz | |
Upper Limit | 626.00 MHz | |
Design power capacity in use | 100.0 % | |
Other Antenna Type | N/A | |
ERP: | 54.3 kW | |
Manufacturer | ||
Model | TFU-16WB | |
Year | 2019 | |
Justification for New Antenna | Existing AUX can't be re-tuned. A new AUX antenna is necessary to keep station on air during primary antenna replacement & for duration of assigned phase. TFU-8WB cost is equivalent to a single-channel slot AUX antenna and is required for replication. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Broadband | |
Feed Line Size | 4 1/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | Yes |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | Yes |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Section | Question | Response |
---|---|---|
Existing Antenna Description | Type of change | Purchase New |
Antenna Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing antenna shared with another station or stations? | No | |
Is the existing antenna directional? | No | |
Is antenna in operating condition? | Yes | |
Is antenna located on or in close proximity to an antenna farm? | No | |
Existing Antenna Manufacturer and Type | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Bottom | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels | N/A | |
Design power capacity in use | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Other Antenna Type | N/A | |
ERP: | 1000.0 kW | |
Manufacturer | ||
Model | TFU-30BH-R06 | |
Year | 2008 |
Section | Question | Response |
---|---|---|
New Antenna Description | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Ownership | Owned | |
Owner | N/A | |
Is antenna shared? | No | |
Is antenna directional? | No | |
Will antenna be located on or in close proximity to an antenna farm? | No | |
New Antenna Manufacturer and Types | Class | Full Power |
Mounting | Top Mount | |
Antenna position in stack | Bottom | |
Polarization | Horizontal | |
Type | Slotted Coaxial | |
Number of Stations Supported | N/A | |
Number of Panels/Bays | N/A | |
Lower Limit | N/A | |
Upper Limit | N/A | |
Design power capacity in use | N/A | |
Other Antenna Type | N/A | |
ERP: | 816.0 kW | |
Manufacturer | ||
Model | TFU-26GBH-R 06 | |
Year | 2019 | |
Justification for New Antenna | Licensed top-mount antenna cannot be re-tuned for new post-transition frequency and must be replaced. |
Section | Question | Response |
---|---|---|
Combiner for Shared Antenna | Do you need a Combiner for a Shared Antenna? | No |
Type | ||
Number of channels supported | N/A | |
Frequencies of channels supported | N/A | |
Frequency | N/A | |
Do you need a combiner output splitter/switcher for dual feed lines? | N/A | |
Elbow Complex | Do you require the separate purchase of the Elbow Complex? | Yes |
Broadband or Single Channel? | Single Channel | |
Feed Line Size | 7 3/16 inches inches | |
Side Mount Brackets | Do you require the separate purchase of side mount brackets for a high power antenna? | No |
Pattern Scatter Analysis | Do you require separate purchase of pattern scatter analysis for a side mount high or medium power antenna? | No |
Sweep Test | Do you require the sweep testing of transmission line and antenna? | Yes |
Name | Description |
---|---|
Shipping |
$6,800 |
New Top Plate |
Existing top-plate and/or bolt pattern may not work for new top-mount antenna. |
Section | Question | Response |
---|---|---|
Transmission Line Related Expenses | Do you have transmission line related expenses? | Yes |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Auxiliary (Backup) | |
Description of Use | Backup transmission line | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is this transmission currently shared with any other stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 4 1/16 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1515 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Auxiliary (Backup) |
Description of Use | Backup transmission line | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 6 1/8 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1515 feet per run | |
Justification for New Transmission Line | Current 20 ft line sections will not work on the new channel assignment. |
Name | Description |
---|---|
TX Line Sweep |
Sweep required to verify post-transition channel measures well on existing line. |
Section | Question | Response |
---|---|---|
Existing Transmission Line Description | Type of change | Purchase New |
Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Owner | N/A | |
Site | N/A | |
Is the existing transmission line shared with another station or stations? | No | |
Is Transmission Line in operating condition? | Yes | |
Existing Transmission Line Manufacturer and Type | Manufacturer | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Other Diameter | N/A | |
Segment Length | 20 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1675 feet per run |
Section | Question | Response |
---|---|---|
New Transmission Line Costs | Use | Primary (Main) |
Description of Use | N/A | |
Change Type | Purchase New | |
Is this a request for upgraded equipment? | No | |
Type | Rigid | |
Diameter | 7 3/16 inches | |
Other Diameter | N/A | |
Segment Length | 19 1/2 inches | |
Other Segment Length | N/A | |
Number of parallel runs | 1 | |
Length | 1675 feet per run | |
Justification for New Transmission Line | Old 20 foot line sections will not work on the new channel assignment. |
Name | Description |
---|---|
TX Line Sweep |
Sweep required to verify post-transition channel measures well on existing line. |
Section | Question | Response |
---|---|---|
Tower Equipment or Rigging Costs Changes | Do you have tower equipment or rigging costs changes? | Yes |
Section | Question | Response |
---|---|---|
Existing Tower Description | Type of change | Modify Existing |
Tower Use | Primary (Main) | |
Description of Use | N/A | |
Ownership | Owned | |
Is this tower consider Complex? | No | |
Is this tower currently shared with any other stations? | Yes | |
One or more FM, AM or TV radio broadcaster(s) | Yes | |
Others Types of Users | No | |
Is tower documented for structural analysis? | No | |
Is tower compliant with Rev G? | Yes | |
Existing Tower Structure Registration | Do you have a tower registration number? | Yes |
ASR Number | 1226610 | |
Coordinates (NAD83) | Latitude (NAD83) | 29° 16' 11.5" N- |
Longitude (NAD83) | 098° 15' 55.9" W- | |
Overall Structure Height | 1529.84 feet | |
Support Structure Height | 1526.56 feet | |
Ground Elevation Above Mean Sea Level (AMSL) | 519.02 feet | |
Structure Type | TOWER - Free Standing or Guyed Structure | |
Tower Owner | Texas Tall Tower Corporation | |
Date Constructed | 12/13/2001 |
Facility ID | Call Sign | Service |
---|---|---|
69618 | WOAI-TV | DTV |
Section | Question | Response |
---|---|---|
Engineering Study | Please what type of engineering study is required, if any: | Study needed for undocumented/poorly documented tower |
Tower Reinforcements | Please select whether tower reinforcements are needed: | Major Reinforcements needed |
Section | Question | Response |
---|---|---|
Tower Rigging Costs | Complex Tower | N/A |
Helicopter Services Required | Are helicopter services required? | Yes |
Name | Description |
---|---|
Helicopter Security |
Helicopter Security |
Section | Question | Response |
---|---|---|
Outside Project Management Services | Do you require outside project management services? | Yes |
Number of Hours | 750 | |
Explanation | It will be necessary to schedule and coordinate multiple vendors, complete progress reports, and update Schedule 399s. Station does not have available personnel or personnel trained in project management for such complex projects. | |
Outside RF consulting Engineering Services | Perform engineering study for new channel assignment and antenna development | Yes |
Prepare engineering section of Form FCC Construction Permit Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare engineering section of Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
Do you have Distributed Transmission System engineering services? | N/A | |
Critical Facility | N/A | |
Terrain-Shielded Facility | N/A | |
Attorney and Other Outside Consulting Services | Prepare and file Form FCC Construction Permit Application | Yes |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare and file Form FCC License to Cover Application | Yes | |
For Auxiliary Facility | Yes | |
For Main Facility | Yes | |
Prepare request for Special Temporary Authority | Yes | |
Quantity | 2 | |
NEPA Section 106 environmental review | No | |
Environmental Assessment | No | |
ASR Modification | Yes | |
FAA Consultation (including preparation of FAA Form 7460) | Yes | |
Negotiation of Lease and other Matter for Shared Locations | No | |
Prepare or Review FCC Form 399 for Reimbursement | Yes | |
Address transition timing and coordination issues w/ other stations and wireless providers | Yes | |
RF Field Engineering Services | Comprehensive coverage verification via field study | Yes |
RF exposure measurements | Yes | |
Additional Field Engineering Service | Yes | |
Number of Days | 20 | |
Justification | It will be necessary to survey the site, plan the equipment, develop specifications for purchasing, and oversee multiple vendor RF projects. Station does not have available personnel or personnel trained in such services. |
Name | Description |
---|---|
Other Engineering Services |
Fewer PM tasks are required & Other Engineering Services are required, therefore the PM total has been reduced to 750 hrs ($112,500.00 at $150/hr), & a new OES category has been created & funded with the $ removed from PM. See KGA quote to KENS for OE.pdf |
Other Legal Services |
Other Legal Services related to the DTV Repack |
Pre-Submission Site Review |
We hired Osborne Engineering to review or sites to insure that we were not missing items. |
Section | Question | Response |
---|---|---|
AM Pattern Disturbance | Is an Impact Study needed? | No |
Is Remediation needed? | No | |
Facility Expenses | Name | N/A |
Other Distributed Transmission System Expenses Not listed | N/A | |
Name | N/A | |
Is Notification of a Medical Facility required as a result of DTV broadcasting? | Yes | |
Permit and Filing Costs | Local Zoning | Yes |
Non-zoning permits | Yes | |
BLM or NFS Coordination | No | |
FCC Construction Permit Minor Change | No | |
FCC License to Cover Application | No | |
FCC Special Temporary Authority Application | No | |
Other Miscellaneous Expenses | Does this relocation require paying Disposal Costs (for equipment and other waste, net of any salvage value)? | Yes |
Does this relocation require Equipment Delivery or Handling Charges not otherwise included in individual item costs? | Yes | |
Does this relocation require Equipment Storage? | Yes | |
Does this relocation require the Development and Airing of an Announcement regarding an upcoming channel change? | Yes | |
Does this relocation require MVPD Notification of a Channel Change? | Yes |
Name | Description |
---|---|
Viewer call assistance service |
Viewer call assistance service |
Coaxial switch installation |
Coaxial switch installation |
Demolition |
Demolition |
Internal Labor |
Internal and Corporate labor |
Sales Tax |
Sales Tax |
Transmitter Installation |
Transmitter Installation |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $2,065,725.07 | $1,904,472.35 | N/A | $1,782,267.92 | N/A |
Total for all systems | $4,992,201.32 | $4,745,510.58 | N/A | $3,442,251.30 | N/A |
Primary Transmitter ULXTE 90 | $1,912,125.07 | $1,761,803.43 | $1,667,099.00 | ||
Coax elbows | $4,630.20 | $4,630.20 | See attached / uploaded PDF file titled "Myat 00090198 v201119jgv1.pdf" | $4,440.00 | N/A |
Other -- Building Addition Size: 100.0 | $25,000.00 | $25,000.00 | New pad required for heat exchangers, transformers, pumps, etc. Equipment must also be shielded. | $7,644.43 | N/A |
Other Electrical Service: Additional electrical services required for transmitter installation, including heat exchangers, transformers, cooling pumps, etc. | $89,294.87 | $89,294.87 | Additional electrical services required for transmitter installation, including heat exchangers, transformers, cooling pumps, etc. | $89,294.87 | N/A |
3" Rigid Conduit and Wiring (Cost per foot) | $5,200.00 | $4,900.00 | N/A | N/A | N/A |
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW | $1,788,000.00 | $1,637,978.36 | N/A | $1,565,719.70 | N/A |
Auxiliary Transmitter UAXTE-4R37 | $153,600.00 | $142,668.92 | $115,168.92 | ||
Other Electrical Service: Additional electrical services required for transmitter installation. | $25,000.00 | $25,000.00 | Additional electrical services required for transmitter installation. | N/A | N/A |
2" Rigid Conduit and Wiring (Cost per foot) | $2,600.00 | $2,500.00 | N/A | N/A | N/A |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW | $126,000.00 | $115,168.92 | For explanation and costs, see attached "Gates 464956212 JW30004287-2 181207 181207 Transmitter UAXTE-4R37 aux pmt 2 41932-35 v1.pdf" | $115,168.92 | N/A |
Actual Information Description | File Name |
---|---|
Coax elbows | |
Other -- Building Addition Size: 100.0 | |
Other Electrical Service: Additional electrical services required for transmitter installation, including heat exchangers, transformers, cooling pumps, etc. | |
3" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
UHF - Liquid Cooled Solid State Transmitter 52 - 61 kW | |
Other Electrical Service: Additional electrical services required for transmitter installation. | Information not provided. |
2" Rigid Conduit and Wiring (Cost per foot) | Information not provided. |
UHF - Air Cooled Solid State Transmitter 1 - 2.5 kW |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $482,468.25 | $600,966.37 | N/A | $497,004.64 | N/A |
Total for all systems | $4,992,201.32 | $4,745,510.58 | N/A | $3,442,251.30 | N/A |
Primary Antenna TFU-26GBH-R 06 | $330,947.00 | $435,743.12 | $388,621.44 | ||
New Top Plate | $25,000.00 | $25,000.00 | Existing top-plate and/or bolt pattern may not work for new top-mount antenna | $309.57 | N/A |
Shipping | $38,317.00 | $38,317.00 | Please see attached invoices | $22,285.75 | N/A |
Elbow complex, single channel, at antenna input, per 7 3/16. feedline (if needed) | $13,900.00 | $12,383.00 | N/A | $12,383.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized | $247,000.00 | $353,643.12 | Bottom antenna in a two Antenna stack. it must be able to hold the load of the top antenna. | $353,643.12 | N/A |
Auxiliary Antenna TFU-16WB | $151,521.25 | $165,223.25 | $108,383.20 | ||
Shipping | $16,031.25 | $16,031.25 | Please see attached invoices and quotes. | $0.00 | N/A |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Side mount brackets for high power antennas (if not included in antenna base cost) | $23,150.00 | $22,000.00 | N/A | N/A | N/A |
Elbow complex, broadband, at antenna input, per 4 1/16. feedline (if needed) | $10,950.00 | $8,232.00 | N/A | $823.20 | N/A |
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized | $89,400.00 | $107,560.00 | Cost estimate now includes a power divider to combine two TFU-8WB antennas into a single TFU-16WB. | $107,560.00 | N/A |
Sweep test of existing antenna | $6,730.00 | $6,400.00 | N/A | N/A | N/A |
Actual Information Description | File Name |
---|---|
New Top Plate | |
Shipping | |
Elbow complex, single channel, at antenna input, per 7 3/16. feedline (if needed) | |
Sweep test of existing antenna | Information not provided. |
UHF - High Power Top Mount (200-1000 kW), One station antenna, horizontally polarized | |
Shipping | |
Pattern scatter analysis for side mount high/med power antennas (if not included in antenna base cost) | Information not provided. |
Side mount brackets for high power antennas (if not included in antenna base cost) | Information not provided. |
Elbow complex, broadband, at antenna input, per 4 1/16. feedline (if needed) | |
UHF - Lower Power Side Mount, One station antenna - medium power (50-200 kW), horizontally polarized | |
Sweep test of existing antenna | Information not provided. |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $804,580.00 | $606,049.86 | N/A | $536,737.21 | N/A |
Total for all systems | $4,992,201.32 | $4,745,510.58 | N/A | $3,442,251.30 | N/A |
Primary Transmission Line | $492,150.00 | $348,115.67 | $316,750.22 | ||
Rigid Transmission Line - copper, 7 3/16" | $485,750.00 | $341,715.67 | See attached invoices and quotes | $310,350.22 | N/A |
TX Line Sweep | $6,400.00 | $6,400.00 | N/A | $6,400.00 | N/A |
Auxiliary Transmission Line | $312,430.00 | $257,934.19 | $219,986.99 | ||
Rigid Transmission Line - copper, 6 1/8" | $306,030.00 | $251,534.19 | See attached invoices and quotes. | $213,586.99 | N/A |
TX Line Sweep | $6,400.00 | $6,400.00 | N/A | $6,400.00 | N/A |
Actual Information Description | File Name |
---|---|
Rigid Transmission Line - copper, 7 3/16" | |
TX Line Sweep | |
Rigid Transmission Line - copper, 6 1/8" | |
TX Line Sweep |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $1,051,655.00 | $1,018,855.00 | N/A | $395,855.00 | N/A |
Total for all systems | $4,992,201.32 | $4,745,510.58 | N/A | $3,442,251.30 | N/A |
Primary Tower TOWER | $1,051,655.00 | $1,018,855.00 | $395,855.00 | ||
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | $26,300.00 | $25,000.00 | N/A | $2,000.00 | N/A |
Major tower reinforcement/modifications | $421,000.00 | $400,000.00 | N/A | $375,377.00 | N/A |
Tall Tower (greater than 500') | $210,500.00 | $200,000.00 | N/A | N/A | N/A |
Helicopter Security | $600.00 | $600.00 | N/A | $600.00 | N/A |
Tower Helicopter Lift | $393,255.00 | $393,255.00 | See attached invoices and quotes | $17,878.00 | N/A |
Actual Information Description | File Name |
---|---|
Tower mapping for an undocumented/poorly documented tower and preparation of documentation necessary for tower load study | |
Major tower reinforcement/modifications | |
Tall Tower (greater than 500') | Information not provided. |
Helicopter Security | |
Tower Helicopter Lift |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $393,795.00 | $421,739.00 | N/A | $133,455.36 | N/A |
Total for all systems | $4,992,201.32 | $4,745,510.58 | N/A | $3,442,251.30 | N/A |
Outside Professional Services | $393,795.00 | $421,739.00 | $133,455.36 | ||
Other Engineering Services | $37,500.00 | $37,500.00 | Fewer Project Management "PM" tasks are required & Other Engineering Services "OES" are required, therefore the PM total has been reduced to 750 hrs ($112,500.00 at $150/hr), & a new OES component has been created & funded with the money removed from PM. | $33,243.75 | N/A |
Pre-Submission Site Review | $24,000.00 | $24,000.00 | N/A | N/A | N/A |
Additional Field Engineering Service, 20 Days | $50,000.00 | $50,000.00 | $2,500 per site visit including expenses x 20 days. It is necessary to survey the site, plan the equipment, develop specifications for purchasing, & oversee multiple vendor RF projects. Station does not have available personnel trained in such services. | N/A | N/A |
Comprehensive coverage verification via field study, if needed | $84,200.00 | $80,000.00 | N/A | N/A | N/A |
ASR modification (prepare FCC Form 854) | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File request for Special Temporary Authorization | $7,360.00 | $7,000.00 | N/A | N/A | N/A |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | $2,365.00 | $2,250.00 | N/A | N/A | N/A |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | $4,210.00 | $4,000.00 | N/A | N/A | N/A |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | $5,260.00 | $5,000.00 | N/A | N/A | N/A |
Prepare request for Special Temporary Authorization | $4,100.00 | $3,000.00 | N/A | $1,500.00 | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | $1,580.00 | $1,500.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | $1,580.00 | $1,500.00 | N/A | $625.00 | N/A |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | $2,105.00 | $2,000.00 | N/A | N/A | N/A |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | $3,155.00 | $3,000.00 | N/A | N/A | N/A |
Perform engineering study for new channel assignment and antenna development | $7,360.00 | $7,000.00 | N/A | N/A | N/A |
Address transition timing and coordination issues w/ other stations and wireless | $2,630.00 | $2,500.00 | N/A | N/A | N/A |
Prepare and or review reimbursement form | $2,630.00 | $44,989.00 | The cost estimate includes the initial 399 amendment, anticipated subsequent 399 amendments, and Actual Cost invoice prep and submission by KGA. | $44,989.00 | N/A |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | $2,105.00 | $2,000.00 | N/A | $550.00 | N/A |
Other Legal Services | $10,000.00 | $10,000.00 | Other Legal Services related to the DTV Repack | $424.09 | N/A |
RF Exposure Measurements | $21,050.00 | $20,000.00 | N/A | N/A | N/A |
Project management of the transition | $118,500.00 | $112,500.00 | It will be necessary to schedule and coordinate multiple vendors, complete progress reports, and update Schedule 399s. Station does not have available personnel or personnel trained in project management for such complex projects. | $52,123.52 | N/A |
Actual Information Description | File Name |
---|---|
Other Engineering Services | |
Pre-Submission Site Review | Information not provided. |
Additional Field Engineering Service, 20 Days | Information not provided. |
Comprehensive coverage verification via field study, if needed | Information not provided. |
ASR modification (prepare FCC Form 854) | Information not provided. |
Attorney Fees - Prepare and File request for Special Temporary Authorization | Information not provided. |
Attorney Fees -Prepare and File FCC Form 2100 (main), License to Cover Application | Information not provided. |
Attorney Fees - Aux Antenna, prepare and File Form 2100 Construction Permit or License Application | Information not provided. |
Attorney Fees - Prepare and File FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Prepare request for Special Temporary Authorization | |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, License to Cover Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), License to Cover Application | |
RF Consulting Engineer Fees- Aux Antenna: Prepare engineering section of FCC Form 2100, Construction Permit Application | Information not provided. |
Prepare engineering section of FCC Form 2100 (main), Construction Permit Application | Information not provided. |
Perform engineering study for new channel assignment and antenna development | Information not provided. |
Address transition timing and coordination issues w/ other stations and wireless | Information not provided. |
Prepare and or review reimbursement form | |
FAA consultant, including cost of preparing FAA Form 7460 (Notice of Proposed Construction), if needed for height increase | |
Other Legal Services | |
RF Exposure Measurements | Information not provided. |
Project management of the transition |
Description | Predetermined Cost Estimate |
Estimated Cost | Estimated Cost Justification | Actual Cost | Actual Cost Justification |
---|---|---|---|---|---|
Sub-total | $193,978.00 | $193,428.00 | N/A | $96,931.17 | N/A |
Total for all systems | $4,992,201.32 | $4,745,510.58 | N/A | $3,442,251.30 | N/A |
Other Expenses | $193,978.00 | $193,428.00 | $96,931.17 | ||
Transmitter Installation | $10,217.02 | $10,217.02 | Transmitter Installation: This Estimated Cost is directly from the actual cost invoices / receipts | $8,510.18 | N/A |
Sales Tax | $4,165.09 | $4,165.09 | Sales Tax | $4,165.09 | N/A |
Internal Labor | $22,029.00 | $22,029.00 | N/A | N/A | N/A |
Demolition | $1,896.54 | $1,896.54 | Demolition | $1,896.54 | N/A |
Coaxial switch installation | $8,324.50 | $8,324.50 | N/A | $8,324.50 | N/A |
Viewer call assistance service | $32,745.85 | $32,745.85 | N/A | $32,745.85 | N/A |
MVPD Notification of Channel Change | $6,000.00 | $6,000.00 | Notification campaign to inform MVPD's of upcoming channel changes and testing periods. | $3,730.00 | N/A |
Develop and air announcement of upcoming channel change | $6,000.00 | $6,000.00 | To produce informational spot for air | $3,270.00 | N/A |
Equipment Storage | $15,000.00 | $15,000.00 | 2 flatbed trailers of equipment for 6 Months. | $11,263.59 | N/A |
Equipment Delivery and Handling Charges | $25,000.00 | $25,000.00 | N/A | $17,080.58 | N/A |
Disposal Costs (for equipment and other waste, net of any salvage value) | $25,000.00 | $25,000.00 | N/A | $2,194.84 | N/A |
Non-zoning permits | $25,000.00 | $25,000.00 | N/A | N/A | N/A |
Local Zoning | $1,050.00 | $1,050.00 | Construction permit fee | N/A | N/A |
DTV Medical Facility Notification | $11,550.00 | $11,000.00 | N/A | $3,750.00 | N/A |
Actual Information Description | File Name |
---|---|
Transmitter Installation | |
Sales Tax | |
Internal Labor | Information not provided. |
Demolition | |
Coaxial switch installation | |
Viewer call assistance service | |
MVPD Notification of Channel Change | |
Develop and air announcement of upcoming channel change | |
Equipment Storage | |
Equipment Delivery and Handling Charges | |
Disposal Costs (for equipment and other waste, net of any salvage value) | |
Non-zoning permits | Information not provided. |
Local Zoning | Information not provided. |
DTV Medical Facility Notification |
Predetermined Cost Estimate |
Estimated Cost | Actual Cost | |
---|---|---|---|
Total for all systems | $4,992,201.32 | $4,745,510.58 | $3,442,251.30 |
Question | Response |
---|---|
The facility has ceased operating on its pre-auction channel. | Yes |
Construction of final facilities or all necessary modifications are complete. | No |
All receipts for reimbursement have been submitted no further costs are expected to be incurred. Note this will lock the Form 399 from further editing and begin close-out procedures with the Fund Administrator. | No |
Section | Question | Response |
---|---|---|
Submission of Estimated Expenses Statements | WILLFUL FALSE STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT. |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jeffrey C Gehman Engineering Associate 03/30/2021 |
Section | Question | Response |
---|---|---|
Submission of Actual Cost Documentation Statements | WILLFUL FALSE, FRAUDULENT, OR FICTITIOUS STATEMENTS ON THIS FORM ARE PUNISHABLE BY FINE AND/OR IMPRISIONMENT (U.S. CODE, TITLE 18, SECTION 1001), AND/OR REVOCATION OF ANY STATION LICENSE OR CONSTRUCTION PERMIT (U.S. CODE, TITLE 47, SECTION 312(a)(1), AND/OR FORFEITURE (U.S. CODE, TITLE 47, SECTION 503), AND ANY FALSE AND/OR FRAUDULENT STATEMENTS COULD SUBJECT THIS ENTITY TO LIABILITY UNDER THE FALSE CLAIMS ACT (U.S. CODE, TITLE 31, SECTIONS 3729-3733). |
|
I declare, under penalty of perjury, that I am an authorized representative of the above-named applicant for the Authorization(s) specified above. | Jeffrey C Gehman Engineering Associate 03/30/2021 |